Home / Suncorp Group / Determination 878904

Determination 878904

Insurer declined earthquake damage claim, saying damage was due to foundation soil settlement and defective ceiling construction

FirmSuncorp Group
Decided2023-05-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for home damage he attributed to the 22 September 2021 Victorian earthquake, and the insurer declined it. AFCA found for the insurer, as the complainant did not show the earthquake caused the damage, and refused non-financial loss and expert report costs.

The complainant bore the initial onus to show an insured event was the proximate cause of the damage, and the engineer's evidence of soil settlement and defective construction was more persuasive than the complainant's reports.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 878904 Financial firm AAI Limited Determination | Case number: 878904 Page 1 of 7 Case number: 878904 23 May 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). He lodged a claim for damage he says was due to the Victorian earthquake on 22 September 2021. The insurer declined the claim because it says the damage is not consistent with the earthquake. It says the damage is due to differential foundation soil settlement and defective and non-compliant construction of the ceiling. The complainant is unhappy with the insurer’s assessment of the damage. He wants the insurer to cover all earthquake damage. The complainant lodged a second claim for storm damage that occurred on or about 19 December 2021. The insurer partially accepted this claim. This storm claim has since been resolved and will not be considered as part of this determination. 1.2 Issues and key findings Is the insurer entitled to decline the earthquake claim? Yes. The evidence supports the insurer’s decision to decline the claim. Why is the outcome fair? The initial onus is on the complainant to show an insured event caused the damage. The complainant has not provided persuasive information to show the earthquake, or any other insured event, was the dominant or effective cause of the damage. Given the damage is not covered under the policy, it would be unfair for the insurer to accept cover for it. I also do not consider it would be fair for the insurer to pay compensation for non-financial loss or pay the costs of the complainant’s reports. This is because I cannot be satisfied the insurer acted in a manner that caused the complainant to suffer an unusual degree or extent of inconvenience outside of that expected for an insurance claim or for pursuing a complaint. I also cannot be satisfied the reports provided assisted the complainant in establishing his case. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to decline the claim. Determination | Case number: 878904 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer entitled to decline the earthquake claim? Yes. Th e evidence supports the insurer’s decision to decline the claim. Complainant has initial onus to establish loss covered by terms of policy It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy. Only if the complainant can do this, will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise. Information must show the proximate cause of the damage is earthquake The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to exclusions, is covered. Earthquake is an insured event. When an insurance policy uses the term ‘caused by’, this typically means proximate cause. Proximate cause is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. Therefore, to establish cover under the policy, the available information must show the cause of the damage claimed is earthquake. Parties provided reports commenting on the cause of damage The insurer appointed an engineer (MO) to attend the property. MO ’s report dated 10 January 2022, stated the damage was not due to the earthquake. Rather, it stated the damage was due to ongoing foundation soil settlement caused by the drying effect of nearby trees. MO supported its conclusions with a floor level survey, which it stated showed subsidence throughout the perimeter of the slab, more pronounced to the north-east of the building. MO also stated the earthquake epicentre was approximately 145km from the property, and the Modified Mercalli Intensity (MMI) scale for the area of the property would be light, and the vibrations from the earthquake would not have caused the damage. The insurer obtained a supplementary report from MO dated 18 March 2022, which stated:  cracking damage to certain areas of the property presented with significant dusting within the cracks, indicating the damage is long-standing and pre-dates the earthquake  other cracking damage presented with signs of previous repairs, confirming they are long- term and ongoing settlement of the foundation soils  the wall cracking damage is due to differential foundation soil settlement  the ceiling detachment and sagging is due to defective and non-compliant construction, due to being spaced too far apart and not being installed correctly, and secondarily due to differential foundation soil settlement. The complainant provided a report dated 28 October 2022 from an architect (HO), which stated: Determination | Case number: 878904 Page 3 of 7 The significant cracking and sagging in the first floor living room is most likely due to the effect of the earthquake of 22 September 2021 of 5.9 magnitude on the already weakened glue fixings. There are indications the first floor ceiling to the master bedroom had been affected by water ingress during a heavy storm in December 2021 which may have contributed generally to weakening the ceiling fixings at first floor (roof cavity). The rain storm damage re master bedroom area and insurance claim by the owner is a separate item. The house is over 23 years old and if the ceiling had been poorly fixed or otherwise defective at the time of construction, there would have been much earlier signs of failure of the ceiling. The inspection of the ceiling space revealed that the trusses supporting both the ceiling and the roofing tiles are currently dry and appeared to be structurally sound. There was no deflection (movement) noticed in the trusses. In should be noted that the ceiling was not fixed to battens but to the underside of the trusses themselves. Whist inspections and reports by other parties refer to subsidence in the house foundations and other cracks to internal plaster linings (also see items below), they do not seem to adequately address nor explain the sag/deflection in the first floor lounge ceiling. The ceiling has been in position for more than 23 years and perhaps due to the wide span of plaster to the large living area it was the most susceptible area to a triggering event such as the vibrations from an earthquake and several aftershocks. (sic) Regarding the other cracking damage, HO stated:  the cracks are mostly occurring at usual weak points at openings for doors which indicates some movement in the house over time and some of the cracks have been previously patched and painted  no significant cracking to ceilings in the ground floor indicates the glue fixings are adequate  there are some small shrubs/trees to the side of the property that are well clear of the house and would unlikely affect the foundations  one tree has been removed previously, trees and paths are well established and soil moisture levels would have normalised over time  the internal cracking is not near the trees and the removed tree would not have had any effect on the cracking in the internal walls. The insurer provided a supplementary report from MO dated 16 January 2023 in response. MO stated:  the first-floor ceiling has been primarily damaged due to defective construction, with the adhesive-daub configuration being non-compliant and being spaced too far apart, and also due to differential foundation soil movement  the floor level survey indicates a pattern of edge subsidence, which correlates to foundation soil settlement due to the root drying effect of the surrounding trees/vegetation  although a tree has been removed this does not guarantee the subsided slab/foundation would fully recover to its initial condition  HO’s statement regarding internal cracking not being near the trees is incorrect, as it noted a high number of wall cracking located within the meals, kitchen and pantry areas, which Determination | Case number: 878904 Page 4 of 7 are all located at the north-eastern area of the building, where there are medium sized trees, and also the building structure reacts to slab movement as a whole system and it is expected to see cracking at its weakest points. HO provided a further response, which stated:  it agreed that subsidence had occurred and has resulted in cracks to plaster linings, most of which are at ground floor level, but almost all of the cracks were nowhere near the first- floor ceiling  HO is a registered architect with over 50 years’ experience in the building industry  i n HO’s experience, it takes a strong, vibratory force such as an earthquake to dislodge elements, such as floor tiles and ceilings fixed only with glue  the earthquake brought about the collapse of the ceiling, but the following contributing factors may have weakened the ceiling: > poor workmanship as the suspended ceiling was incorrectly fixed at the time of construction > the probable lack of glue and glue at excessive spacings > probable egress of moisture into the roof space, possibly during the storm mentioned in other reports, prior to the re-roofing, may have weakened the glue fixings. The complainant also provided report from a plasterer (BP) dated 26 August 2022. BP stated after looking at the photos from before and after the earthquake, that the ceiling and other areas ‘did not crack as a result of poor workmanship, but as a result of movement caused by the earth quake’. Information does not show damage, on balance, due to earthquake I have considered the complainant’s extensive submissions. I acknowledge his concerns regarding some factual errors in MO’s reports, including those about the trees on the property. He raises several concerns, including that the reports are fraudulent. I do not consider the information shows reports are fraudulent or inaccurate. I consider MO is appropriately qualified to report on the cause of damage. MO has provided an opinion on the cause of damage as a qualified engineer. Whilst the complainant disagrees with the findings, this does not make the findings fraudulent. I accept this damage was first noticed by the complainant after the earthquake event. However, this does not mean the earthquake was the cause. I also acknowledge HO has provided an opinion that the earthquake, along with poor workmanship issues and possible moisture ingress, caused the damage. However, HO has not provided detailed reasons on how the earthquake caused this damage. BP also says the earthquake caused the damage based off photos. BP’s report is brief and does not address in detail how the earthquake could have caused the damage. MO, on the other hand, provided detailed reasons regarding this particular earthquake, the epicentre’s distance from the property, and the MMI scale for the property being insufficient to cause damage. I find these conclusions logical and plausible. I do not consider the information provided shows, on balance, the earthquake caused the ceiling damage. Regarding the other cracking damage to the property, both MO and HO accept there is subsidence damage resulting in cracks. MO supports its findings with a floor level survey, showing ongoing settlement at the property. The photos also support the evidence of dust in Determination | Case number: 878904 Page 5 of 7 some cracks and previously patched repairs. This indicates the damage is ongoing and not due to an insured event such as earthquake. Whilst the complainant provided photos from before the earthquake showing some cracking damage was not present then, this does not show the damage is due to the earthquake. I consider MO’s conclusions regarding the cracking damage to be persuasive, that it is due to ongoing differential foundation soil settlement, not the earthquake. The complainant says the policy will not cover poor workmanship that the insured knew or reasonably knew about, yet he clearly did not know about any poor workmanship. I accept the complainant did not know of any poor workmanship with the ceiling. However, to establish cover under the policy, the complainant must first satisfy his onus to show an insured event covered by the policy caused the damage. The information provided does not show, on balance, the earthquake or any other insured event caused the damage to the ceiling. It is therefore not necessary to consider whether this exclusion can be relied upon by the insurer. Fair for the insurer to decline the claim The onus is on the complainant to show an insured event covered by the policy caused the damage. I do not consider the complainant has satisfied this onus. I am satisfied it is fair for the insurer to decline cover for the damage. As the complainant has not satisfied his onus, there is no need to consider whether any exclusion applies. Insurer not required to pay any compensation Under our Rules, AFCA may award compensation for non-financial loss where there has been an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with a complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation and expects a complainant to bear a normal degree of inconvenience during a claim. The complainant raises concerns with the insurer placing seven steel poles within yellow caution tape in the middle of his living room and leaving it there for more than 100 days. He says this compromises the health and safety of his family, especially his asthmatic daughter. He also raised concerns with the insurer’s assessor’s conduct, including allegations of bullying. I appreciate the time and energy the complainant has applied to his complaint and his dissatisfaction with the conduct of the insurer and the claims process. However, I do not believe the insurer acted in a manner that caused the complainant to suffer an unusual degree or extent of inconvenience outside of that expected for an insurance claim or for pursuing a complaint. The information provided shows there were two concurrent claims that required several experts to attend the property. I acknowledge the claims process and make-safe have inconvenienced the complainant and his family. However, given I do not consider the insurer is liable for the damage to the property from the earthquake, I do not consider it is liable to pay compensation for the fact the make-safe has been in place during this time. I also do not consider there is sufficient information to show the insurer engaged in inappropriate conduct such as bullying. Determination | Case number: 878904 Page 6 of 7 The insurer said it agrees to leave the props in place for a reasonable period so the complainant can engage a relevantly qualified trade to attend to ceiling repairs or replacement. I consider this to be fair. The parties are to work together to determine a fair and reasonable timeframe for the insurer to remove the make-safe. Insurer not required to pay expert report fees The complainant provided a receipt for $770 for HO’s report cost and $467.50 for the supplementary report. Under Rule D.5, AFCA may determine an insurer contribute to legal or other professional costs incurred by a complainant during a complaint. Unless exceptional circumstances apply, AFCA will not require an insurer to contribute more than $5,000 to these costs. When determining whether an insurer should contribute to the payment of professional fees incurred, AFCA will consider the complexity of the complaint, whether the advice was reasonably needed and whether the costs incurred were because the expert advice was genuinely required. Whilst the complainant was entitled to engage an expert, I do not consider the reports provided assisted the complainant in establishing his case. I therefore do not consider it would be fair for the insurer to reimburse these costs. Determination | Case number: 878904 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.