Home / Hollard / Determination 878711
Determination 878711
storm damage claim denial
Summary
The complainant claimed storm damage to his home, retaining wall, driveway, pool and related areas, and the insurer denied the claim as caused by excluded factors. AFCA found the insurer liable only for the driveway damage caused by the landslip, to be cash settled based on a quote plus a 15% contingency.
Storm damage must be proximately caused by the storm; expert evidence showed the other damage was likely caused by pre-existing or long-term issues, while the landslip damage was caused by the storm.
Issues
- Claim denial primary · upheld“The insurer is liable for the damage to the driveway caused by the landslip... The insurer can deny the balance of the claim.”
- Inadequate claim investigation secondary · not upheld“I am not persuaded the foundation movement the property is experiencing was proximately caused by the storm.”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
Text of the determination
Determination
Case number 878711
Financial firm Hollard Insurance Partners Limited
Determination | Case number: 878711 Page 1 of 5
Case number: 878711 3 November 2022
1 Determination overview
1.1 Complaint
The complainant lodged a claim for various damages he says were caused by a storm with
his home insurer, the financial firm (insurer).
The insurer denied the claim on the basis the damages were not caused by the storm.
Instead, the insurer says the damage was caused by factors excluded under the policy.
The complainant disputes this.
1.2 Issues and key findings
Can the insurer deny the claim?
Mostly. The insurer is liable for the damage to the driveway caused by the landslip. This is
because that part of the damage was caused by the storm.
The insurer can deny the balance of the claim. This is because the available information does
not show those damages were caused by the storm.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is to settle the claim in the manner set out in section 2.1.
Determination | Case number: 878711 Page 2 of 5
2 Reasons for determination
2.1 Can the insurer deny the claim?
Damages claimed must be caused by the storm
The complainant has claimed for various damages he says were caused by the storm. These
include the following:
movement and cracking damage to the main dwelling – this includes the bi-fold doors,
piers and deck
retaining wall
driveway
pool, spa, concrete surrounds and pool room.
General legal principles say that when claiming under an insurance policy, a n insured must
show the damages claimed fall within the insuring provision (i.e. a valid claim).
The complainant’s policy covers his property for loss or damage caused by insured events,
one of which is storm. Further, when an insurance policy refers to ‘caused by’, this means
proximate cause.
Proximate cause is the dominant, efficient or operative cause of the loss. It is not required to
be last in time or the sole cause. It is a question of fact that depends on the circumstances of
each case. It requires a common sense evaluation of the evidence.
Once the complainant establishes a valid claim, the onus shifts to the insurer to show an
exclusion or other provision applies to enable it to deny the claim.
For this complaint, the complainant must be able to at least show the damages claimed were
proximately caused by a storm.
Both parties have provided expert reports
The insurer engaged engineer IN and also provided a report from builder M. The complainant
engaged engineer LH.
I do not propose to summarise them in detail. However, when referring to the claimed
damages, I will refer to their pertinent points.
Retaining wall
The policy excludes damages to a retaining wall caused by the storm. Therefore, even if I
accept the retaining wall damage claimed was caused by the storm, the insurer is not liable
for this.
Main dwelling (including the deck)
IN said the timber doors are binding to their frames as a result of timber swelling due to
absorption of atmospheric moisture. IN said this is a normal occurrence. IN a lso noted a
downpipe is discharging directly into the ground.
For the deck, IN said this movement is due to discontinuity in the framing and loss of support
of the framing.
Determination | Case number: 878711 Page 3 of 5
M said the movement and cracking damage of the main house is due to poor site drainage,
including the downpipe discharging into the ground.
LH said there is differential movement. LH says the soil has experienced an abnormal amount
of moisture which he attributes to the storm. LH therefore says the storm is the cause.
I am not persuaded the foundation movement the property is experiencing was proximately
caused by the storm. The only expert evidence in support of this is LH. However, LH’s report
does not consider the downpipe discharging in the soil as a potential source of the increased
moisture. Neither does LH address whether there is adequate site drainage to ensure the
founding soil is not experiencing abnormal moisture due to normal surface run-off. These
omissions in LH’s report mean I am not persuaded by his conclusions about the main
dwelling.
The insurer’s experts disagree the storm caused the foundation movement. They provide
different reasons for the cause. Whilst their reports may be lacking in detail on certain issues
(e.g. no floor measurements were done nor was there any detailed analysis of the site
drainage), this does not mean the damage is payable. There must be sufficient information to
show the foundation movement was proximately caused by the storm.
On the information available, I am not persuaded it is. LH’s repo rt is limited in this regard.
There are other issues identified that indicate the issue is more long-term. Therefore, the
insurer is not liable for any of the movement and cracking damage claimed to the main
dwelling or the deck.
Pool, spa, concrete surrounds and pool area
IN says the pool and spa shells showed no signs of movement. IN did observe movement
between the concrete paving and the swimming pool. IN noted imagery pre-dating the event
showed a pre-existing gap that has since increased. IN said this gap was due to a lack of
adequate support of the paving slab and lack of tying provisions. IN also noted settlement
would continue to occur with water ingress over a period of time. For the pool room, IN noted
movement there but did not believe this would be due to the storm.
LH said there is significant subsidence under and around the pool. LH said this is due to the
storm event. LH did not specifically address the pool room or gate. Presumably, LH’s
evidence of cracking to these areas was based on similar reasons for the main dwelling.
Having considered these reports, as well as all the other information, I am not persuaded the
movement between the concrete paving and the pool was due to the storm. IN found
evidence this was pre-existing in a photo. No evidence has been provided to refute this. This
pre-existing gap indicates this is a long-term issue rather than damage caused by a one-off
storm event.
Similar reasons apply to the pool, spa and pool room. Whilst the pool and spa may have
issues following the storm, I am not satisfied that would have been the proximate cause. This
is because IN’s evidence is persuasive in showing there was pre -existing movement in the
pool area. This would indicate the likely proximate cause of all these areas are ongoing
issues over a period of time that may have been exacerbated by the storm (but not
proximately caused by it).
Therefore, the insurer is entitled to deny liability for these areas.
Determination | Case number: 878711 Page 4 of 5
Driveway
IN says the driveway was in poor condition prior to the event. IN noted surfaces were
unsealed and exhibited cracking. They also lacked adequate drainage provisions. IN noted
the recent rains had caused some of the surface materials to wash out. However, IN said
these damages would not have been present to a well-sealed driveway with adequate
drainage provisions.
IN noted there was a localised landslip that occurred. IN said this was due to an inadequate
drainage structure. Whilst the heavy rain saturated these materials, IN said the underlying
reason for the failure was due to a lack of an appropriate retaining structure.
LH said the driveway has experienced significant subsidence and is no longer safe to be
used. LH said the damage was due to the storm.
Considering these reports, as well as all the other information, I note the following.
There is no dispute the landslip that damaged part of the driveway was caused by the storm.
This is enough to establish a valid claim. Whilst IN said the damage was caused by the lack
of an appropriate retaining structure, this of itself does not establish an exclusion. For
instance, it is not clear if this constituted faulty workmanship as IN makes no reference to
building standards at the time of construction. The complainant produced compliance
certificates to indicate the driveway was properly constructed.
Therefore, the insurer is liable for the driveway damaged by the landslip.
For the other areas, I am not persuaded this is covered. IN provided evidence to show the
driveway had pre-existing issues. This included cracking. This indicates it had pre-existing
issues that were the likely the proximate cause of that damage . I am also persuaded by IN’s
opinion that a well-sealed driveway would unlikely have sustained the damage it did from
scouring. Whilst LH says otherwise, his report did not address the pre-existing issues and
why that would not have been the proximate cause of the damage.
Therefore, I do not accept the parts of the driveway being claimed that were not damaged by
the landslip were proximately caused by the storm.
Conclusion
After careful consideration of all the available information, I accept the insurer is entitled to
deny the complainant’s claim , except for the damage to the driveway caused by the landslip.
The insurer must accept this part of the damage. In doing so, the insurer should cash settle
this part of the claim. This is because there are other parts of the driveway that were
damaged which the insurer is not liable to cover. This means it would be impractical for the
insurer to attempt to repair this aspect only.
The insurer must cash settle this aspect of the damage based on a quote. The quote must be
comparable to market rates that would be available to the complainant. The quote should
include any works necessary to ensure that part of the driveway was adequately supported.
The insurer should also include a 15% contingency on its cash settlement. This is to address
any potential variances that would have occurred and to address the transfer of risk of the
works passing to the complainant.
If there is any dispute about the quantum payable for the driveway damaged by the landslip,
the complainant can lodge a new complaint at AFCA on that point.
Determination | Case number: 878711 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.