Insurer declined part of a storm damage claim for bathroom damage, relying on gradual deterioration and defect exclusions, and the cash settlement amount for accepted damage was disputed.
Text of the determination
Determination
Case number 877703
Financial firm Insurance Australia Limited
Case number: 877703 4 April 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
In March 2020, he lodged a claim for damage from a storm which occurred on 1 August 2019.
The complainant says gutters/downpipes were blocked, causing water to enter the ceiling
space. He believes water then tracked down the wall frame, damaging waterproofing and
causing flooring timber to swell. He maintains the storm caused that damage. He also says a
later storm event in 2022 caused further damage. The insurer accepted some of the damage
identified and offered to cash settle for that. The insurer submits the remainder of the
bathroom damage was instead caused by leaks from the shower, which is a separate matter.
It declined cover for that based on policy exclusions, including for defects and gradual
causes. The complainant does not accept that decision.
1.2 Issues and key findings
Is the insurer liable for the disputed damage under the current claim?
No. The available evidence does not establish, on balance, the proximate cause of the
disputed damage to the bathroom was the 2019 storm or any other ‘accidental’ event.
Instead, the evidence indicates, on balance, pre-existing maintenance and ongoing
deterioration issues.
The complainant has identified a further water ingress event into the ceiling in 2022, which
the insurer said could be included under the original claim, but he rejected the insurer’s initial
offer on 5 October 2022, which included an allowance for likely further damage. The
complainant also rejected the offer of further investigations by an engineer to confirm the
nature, cause and extent of any such additional damage. It is fair and reasonable in the
circumstances that the insurer settles the claim by paying $11,932.86. That represents an
uplift of 20% on its builder’s most recent amended quotes for the accepted damage, together
with a further $2,000 as an allowance for possible additional damage. If not already paid, the
insurer is entitled to retain the applicable policy excess(es) from the settlement.
Why is the outcome fair?
It would not be fair to require the insurer to cover all the claimed damage, which has not been
shown, on the available evidence, to fall within the scope of cover under the policy. The
insurer is, however, required to cash settle the accepted damage, including an allowance for
possible additional damage, by making a payment that reasonably reflects the likely cost to
the complainant for the necessary claim-related repairs.
1.3 Determination
This determination is substantially in favour of the insurer. The insurer is required to cash
settle the claim for $11,932.86, as set out below. It is not required to take any other action.
2 Reasons for determination
2.1 Is insurer liable for disputed damage under current claim?
Policy covers accidental loss or damage, subject to exclusions
The policy covers accidental loss or damage to the insured property. ‘ Accident ’/accidental’ is
not defined in the policy, but the commonly understood meaning is something that is sudden,
unexpected and unforeseen.
The complainant has the initial responsibility to establish, on balance, that the damage being
claimed falls within the scope of cover under the policy. In other words, he must show the
damage was accidental.
If he can do that, then the onus shifts to the insurer to show, on balance, exclusions apply or
that it is otherwise entitled to decline the claim.
The insurer has raised the following three exclusions, saying it does not cover damage from:
Water entering your Buildings: …
o because of a structural defect, faulty design or faulty workmanship when
your Buildings were constructed and that you knew about (or should
reasonably have known about) and did not fix before the loss or damage
occurred (e.g. if there are signs that previous damage was caused by a
defect, we will not pay a later claim for further damage from that defect).
Rust, corrosion, gradual deterioration, depreciation, wear or tear.
A defect in an item, faulty workmanship, structural defects or faulty design that
you knew about (or should reasonably have known about) and did not fix before
the loss or damage occurred. We will however cover resultant damage. But we
will not pay for the defective item or for the costs to rectify the faulty workmanship
or design.
Experts disagree as to cause of disputed bathroom damage
After the 2019 storm, the complainant first reported damage to the bathroom ceiling. The
report from the complainant’s builder, JSM, says the complainant was not aware rainwater
was tracking down the ceiling. However, it is clear that in September 2019 the complainant
was aware the gutters had overflowed; the complainant had then taken steps to try to avoid
further build-up of debris/blockages in the gutter. I consider he was therefore reasonably
aware of the risk of further overflow occurrences, and of the possibility of consequential
internal water damage.
The insurer’s roofer JG investigated but found no obvious issues with the roof (and no signs
of storm or impact damage) but did observe that there were likely leaks/blockages/overflows
from the gutters in the past. JG concluded the water ingress occurred due to blockages in the
valley gutter preventing it from draining freely in heavy rain. JG believed that may have
happened on multiple occasions (sometimes because of maintenance issues and presence of
debris), and noted the complainant had been concerned enough ‘ about the gutter guard not
keeping the valley gutter clear of debris that he had this removed ’.
On inspection, the insurer’s experts also found water damage to the bathroom door frames
and lower linings adjacent to the main bathroom shower alcove. The complainant submits
that damage was also from the storm. He believes water had pooled in the ceiling before
tracking down the doorframes and into floor timbers, collecting at the base of the shower,
causing swelling, mould and the waterproofing to degrade and leak. He wants the cost of
refurbishing the whole bathroom ($27,280.00), based on a quote from JSM, his builder and
advocate in this complaint.
However, a September 2019 report of the insurer’s assessor, CC, did not refer to any new
concerns raised by the complainant about bathroom leaks or waterproofing at that time
(although he is reported as having mentioned an event two years before, from a shower leak
which affected the door frame). The only damage identified in CC’s report as relating to water
ingress from blocked roof gutters was to the bathroom ceiling. On that basis, CC did not
identify any maintenance issues. The complainant’s waterproofing concerns were only raised
and investigated later.
The insurer engaged plumber LH to investigate the claim. On 23 April 2020, LH reported a
need for maintenance of the bathroom generally, as well as several specific issues: leaking
shower strip, poor shower seals, poor silicone and grout and waterproof seals. LH also noted
the following:
- Main bathroom: water damage to the door frame at low level; cracking of low
level wall tiling
- Hallway area adjacent the main bathroom shower area: water damage to the
wall lining at low level; water damage to the door frame at low level.
In the main bathroom (shower area), LH tested and observed the following:
- Shower head, hose and rail – Fair (external leakage noticed)
- Floor gradient – Fair/Poor
- Waterproofing – Puddle flange – Shower floor waste drain – Unable to locate
- Waterproofing – Membrane – Unable to locate
- Plug the shower strip drain - Flood test the shower strip drain - Leakage
recorded
- Plug the shower drain – Flood test the shower alcove area – Leakage recorded
LH concluded:
The suspected resultant water damage in and adjacent the main bathroom is
believed to be caused by a leaking shower strip drain and poor shower alcove
water seals including poor silicone, grout and waterproof seals.
In order to address those issues, LH recommended repairing the leaking shower hose
connection and fully renovating the shower alcove area.
In response to that report, the insurer appointed builder HPG to quote for repairs. The
$5,245.63 quote was for resultant water damage only (not a full shower repair), and included
the removal and replacement of the damaged door frame and wall linings, microbial treatment
to the wall framing, cleaning and reinstatement of tiles and painting of these areas; and the
costs to remove and reinstate affected areas in the hallway.
JSM responded to those reports by describing how water which entered the ceiling may affect
(the plasterboard wall) waterproofing, but JSM did not provide any evidence that established
this had actually occurred in this case. (JSM clarified in later correspondence that it was not
the waterproof membrane of the floor which he had been referring to.)
JSM submits, on behalf of the complainant, that hail and ice blocked the roof valley gutters,
causing water to enter the ceiling space above the bathroom. He noted four water damage
stains on the bathroom ceiling in different locations, with the ceiling showing signs of sagging.
His report states water has entered the roof space, pooled on the ceiling with the excess
water travelling down the wall frames and collecting around the bottom plate and concrete,
bypassing the waterproofing; the water on the timber has caused mould and the expansion of
timber has broken down the waterproofing. JSM pointed out the complainant would not have
been aware of this damage.
The insurer engaged a second roofing specialist, IB, who confirmed there was water staining
and sagging to a small section of the plasterboard ceiling lining in the bathroom, and
observed a white substance on the valley timbers that could be efflorescence or mould. Two
holes cut in the bathroom and hallway linings to allow inspection of the bottom plate timbers
for timber rot and mould found the bottom plate was black in colour, but no timber rot had
occurred (at least to the top half of the bottom plate). IB did also find moisture under the floor
tiling located in the bathroom and shower alcove.
IB concluded the damage to the ceiling cavity appeared to be from a one-off hail and rain
event, but said there was no evidence of any water tracking further than the affected areas
observed in the bathroom ceiling, or water staining or signs of water ingress observed near
the top plate timbers or plasterboard ceiling lining located above the shower alcove or
surrounding walls. In other words, the remaining (lower level) damage in and around the
shower was not from the storm event.
On the basis of its experts’ reports, the insurer accepted (and says it settled) the bathroom
ceiling damage, bathroom door frame and other water damage to the bathroom and adjacent
areas (hallway).
The complainant, however, believes the insurer should cover a full strip-out and reinstatement
of the bathroom (including waterproofing). He says some of the shower damage occurred
after CC attended. He also says he then undertook some re-grouting of the shower walls in
order to limit any further loss. He believes IB’s dry reading on the exterior of the shower and
moisture recorded under the tiles shows the waterproofing membrane had not deteriorated,
but was working.
The insurer maintains the disputed damage in the shower area relates to a leaking strip drain
and poor shower alcove seals (in other words, maintenance issues), and not the storm event.
Proximate cause of disputed bathroom damage was not, on balance, the storm
The complainant has the onus of establishing, on balance, the proximate cause of the
damage was from the 2019 storm as he claims. In other words, he needs to show that the
water ingress from the storm was the effective, dominant or operative cause of the disputed
bathroom damage.
The JSM reports say the (plasterboard wall) waterproofing had failed, but do not provide
compelling evidence in support of the complainant’s claim that the storm event is what
caused that and the associated disputed damage to the bathroom.
JSM’s repair quote states: ‘ Inspection of the water damaged bathroom shows that the timbers
have swollen at the shower alcove base and therefore the water proofing has failed. The
quote is for work required to ‘ meet the building codes and to rectify the water proofing ’. I note,
however, there is no confirmation there was any waterproofing in the shower in the first place.
JSM supplied photographs of stains on ceilings (taken from below) – each is small, limited to
central parts of the ceiling and not close to walls or doorways where JSM says storm water
tracked down. Images from within the roof space are similar in that they show only limited
staining.
The bathroom damage (apart from the ceiling) is limited to the floor level (timbers and a
cracked tile). If storm water had soaked into the ceiling and then down walls and doorframes,
I would expect those vertical timbers would be damp and require replacement, or at least
exhibit some significant deterioration, but the available evidence does not show that is the
case.
The insurer identified issues with the shower, which it found was leaking. The damage – to
lower walls, skirtings and related areas – is typical of a floor level leak from the shower, not a
leak from above, which (in respect of the 2019 event) the evidence does not support was
significant in any case.
As well, in September 2019, CC reported that the complainant had said water damage had
occurred two years before to the door frame of the bathroom entrance door, as a result of
water seeping through the back of the tap on the wall in the adjoining shower recess
(although I acknowledge the complainant has since said he does not recall that and did not
carry out any repairs in that regard.) At the same time, however, in their submissions, JSM
appears to acknowledge some damage had occurred two years before. That does suggest,
on balance, there had been previous (and possibly ongoing) water ingress in the bathroom
from the shower recess which is likely to have caused damage gradually over time.
Having considered all the available evidence, I am not satisfied the complainant has
established the 2019 storm event caused water ingress into the ceiling to the extent that it
then tracked down walls and doorframes to cause the disputed damage in the
bathroom/shower area.
Complainant says further damage has occurred
Video footage and photos of a leak from a light fitting in the bathroom provided by the
complainant are said to be from a 2022 hail event. The complainant suggests the cause of
that water entry may be damaged sarking. However, the current evidence only shows
relatively minor disruption to the sarking (which is not, in any case, intended, on its own, to
prevent water ingress). I do not consider the volume of water shown in the video would be
entering the ceiling space in the first place, simply because of ripped sarking. Even if there is
further damage to the sarking since the 2019 event, that does not automatically mean the
insurer is liable for that, or any further internal damage.
I am not satisfied the complainant’s 2022 images assist in establishing a valid claim for
accidental damage caused to the bathroom in 2019. However, they appear to identify issues
which do require further investigation and prompt attention. Even though the currently
available evidence indicates the roof is generally in good condition, I consider the evidence
does reasonably suggest a further instance of gutter overflow, which is what occurred in 2019
and possibly also prior to that. I consider that, in turn, indicates the likelihood of either faulty
design (in relation to the gutters) and/or maintenance issues, which is something of which the
complainant was, or should reasonably have been aware.
In terms of any additional damage that may since have occurred in 2022, the insurer offered
to send an engineer to inspect and report (including in relation to the valley timbers in the
ceiling cavity, bathroom ceiling, bottom plate timbers, waterproofing membrane) and said it
would include additional damage within this current matter. The complainant rejected the offer
of a further inspection. A decision about the 2019 claim and the disputed/further possible
damage can therefore only be made on the evidence which is currently available.
I note the insurer did also offer to consider the 2022 event under a new claim. If the
complainant chooses to lodge a new claim for the 2022 event (given the video evidence of
substantial water entry through the bathroom ceiling), then the insurer is required to
investigate it and the complainant will need to cooperate in relation to allowing the necessary
inspections and assessments.
Insurer is not liable for disputed bathroom damage
On the currently available evidence, I am not satisfied the complainant has established the
disputed bathroom damage was caused unexpectedly by the 2019 storm event. Instead, the
evidence shows, on balance, it was gradual, more likely than not caused by shower
waterproofing issues, leaking and general wear and tear/gradual deterioration over time.
These represent maintenance issues for which the complainant is responsible. Whether or
not the complainant was aware of those issues does not alter the outcome. The policy
exclusion for gradual deterioration and wear and tear applies.
It is fair, therefore, that the insurer cash settles for repairs as follows.
The insurer reiterated an earlier (lapsed) offer to settle the complaint by paying a total of
$11,518.89 (although that too has now lapsed). The offer comprised $8,277.30 (based on IB’s
November 2021 quotes of $2,123.10 and $6,154.20 for the bathroom ceiling damage and
resultant bathroom damage, respectively), plus a 15% uplift of $1,241.59, and $2,000 as a
goodwill gesture.
The insurer suggested the 15% uplift and the goodwill gesture would effectively cover any
additional damage from the 2022 event. I do not accept those additional payments
necessarily reflect t he insurer’s possible liability for any such additional damage (in the
absence of specific further investigations), nor does the total offer clearly cover the currently
identified damage.
In the first place, it is not clear that IB’s quotes are actionable by the complainant as a retail
customer. They do not specifically include all additional damage – and given the photographic
evidence, I am satisfied there is the possibility of some further damage (although I appreciate
it is not possible to be definitiv e as to the nature, extent or cause of it, given the complainant’s
refusal to allow a further inspection). The quotes also do not allow for the transfer of risk to
the complainant.
Given the above, as well as the age of the quotes and the insurer’s genera l
acknowledgement of some likely additional damage, I consider it fair that the cash settlement
for repairs be $9,932.86 ($8,277.30 increased by 20%), plus the further $2,000 previously
offered to represent an extra allowance for possible further damage. That takes the cash
settlement required for building repairs to $11,932.86, less the applicable policy excess(es) if
not already paid.
Insurer not liable for compensation or complainant’s professional costs
Under the AFCA Rules, we may decide that the insurer should pay compensation for non-
financial loss where its actions have caused an unusual/significant degree of upset or
inconvenience to the complainant in the course of the claim.
We may also decide the insurer is to contribute to the professional costs incurred by the
complainant in the course of the complaint (up to a maximum of $5,000, unless special
circumstances apply).
I appreciate the complainant has pointed to several issues where he believes the insurer has
not acted reasonably (such as errors in its experts’ reports, and not providing all available
quotes/information). I also acknowledge the very close involvement of JSM, the complainant’s
builder and advocate in this complaint, both in terms of progressing the claim/complaint and
in providing expert reports in support of the complainant’s position .
This matter has been ongoing for some time. I accept it has been a long and challenging
process for the complainant. However, I am not persuaded he has suffered excessive
avoidable upset (caused by the insurer’s actions) over and above what might reasonably be
expected in the course of a claim and complaint such as this. Compensation for non-financial
loss is not warranted in the circumstances.
In addition, while the complainant has had the active assistance of JSM, I do not consider the
complaint was in itself particularly complex, and AFCA does provide a free service to
complainants who should not require the assistance of paid representatives.
In order to substantiate their respective positions, the parties were invited to submit
supporting evidence, which could include expert reports. The complainant believes the
professional costs he incurred (through JSM) should be covered , beyond AFCA’s limit.
However, I am not satisfied the insurer should be liable for the complainant’s professional
costs, since they were no more than might reasonably be required in his attempts to finalise
the claim and complaint in his favour. Nor have JSM’s investigations, submissions and
reports altered the outcome in any case.
2.2 Why is the outcome fair?
It would not be fair to require the insurer to cover damage which has not been shown to fall
within the scope of cover under the policy.
The insurer is, however, required to cash settle the accepted and possible further damage
fairly by making a cash settlement that reasonably reflects the likely cost to the complainant
for necessary repairs, based on the available evidence.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.