The complainant claimed home damage from a leaking sewer under home insurance, and the insurer denied the claim in 2019 and again in 2022. AFCA found the proximate cause was reactive soil shrinkage and not the insured escape of water, but ordered $750 for non-financial loss due to delay.

Under the policy, cover for escaping water requires it to be the proximate (dominant) cause of damage, and the engineers' evidence showed soil shrinkage during drought was the dominant cause.

Issues

Subjects and remedies

home or building damagepay non financial loss

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 877538 Financial firm Youi Pty Ltd Determination | Case number: 877538 Page 2 of 11 Case number: 877538 20 December 2022 1 Determination overview 1.1 Complaint The complaint is about a denial of the claim lodged under the complainant’s home insurance policy with the financial firm (the insurer), which commenced on 17 January 2019. The property had previously been insured by the complainant’s father and previous p olicy would also be relevant, should damage have occurred during that period. The complainant says the damage to the home was caused due to leaking sewer, which is covered under the policy. The insurer says the claim is not payable because the damage was not caused by a single event, as required by the policy terms. The engineer’s report confirms that damage to the building was not caused by any single event but by ground movement due to various long- term processes. The complainant disputes the insurer’s decision to deny the claim. The complainant was also dissatisfied with the level of service received from the insurer in 2019 and 2022. The complainant says the insurer declined the initial claim lodged in 2019 based on an inconclusive report causing financial loss and inconvenience. 1.2 Issues and key findings Was the insurer entitled to deny the claim? Yes, the insurer was entitled to deny the claim because the proximate cause of damage was not the escape of water. Is the complainant entitled to compensation for non-financial loss? Yes, the complainant is entitled to compensation of $750 for non-financial loss due to delay in the claim assessment. Why is the outcome fair? While I understand the discovery of the leaking pipe in 2022 would have caused frustration to the complainant as he wanted the insurer to investigate the damage in 2019. However, the claim is only payable if the dominant or proximate cause of the damage is an insurable event under the policy. The insurer's engineer and the complainant ’s engineer largely agree the proximate cause of damage is the shrinking of the reactive soil during the historic dry period. 1.3 Determination This determination is substantially in favour of the insurer. Within 14 days of both parties accepting the assessment, the insurer must pay $750 due to the service delivery issues caused by the insurer when deciding the claim. Determination | Case number: 877538 Page 3 of 11 2 Reasons for determination 2.1 Was the insurer entitled to deny the claim? Yes, the insurer was entitled to deny the claim because the proximate cause of damage was not the escape of water. Policy covers insured events, subject to conditions and exclusions The policy covering the insured property is an insured event policy. This means the policy will cover the cost of repairing the property up to the policy limits where the cause of damage is one of the listed events in the policy. The full details of the coverage provided by the policy is contained within the product disclosure statement (PDS) and the certificate of insurance (COI). The exchanged material confirms the insurer provided the complainants with a copy of the policy documentation. I am satisfied the insurer is entitled to rely upon the policy documentation to assess its obligations to the complainant in respect of the claim under the terms of the policy. PDS issued on 7 November 2018 states: 8. Escaping Water What is covered? Loss or damage to the insured property caused by escaping water that occurred:  suddenly and without warning; or  slowly over a period of time and you could not have been reasonably aware of it. -If you have buildings cover the most we will pay after excess is $7,500 in total for all buildings damage that occurs in a contract period. Insurer denied the initial claim lodged in September 2019 The complainant lodged the initial claim on or around 2 September 2019. During this call, the complainant could not explain the cause of damage. The complainant said:  one end of the house has dropped by 35mm  he noticed the damage on or around 16 July 2019  he was told the property was damaged due to the reactive soil condition. The complainant requested the insurer to investigate the claim under the storm event as he could not identify the cause of damage. The complainant also said the structural engineer recommended assessing all pipes, especially the main water pipes and stormwater pipes. The insurer engaged AB builder to conduct a leak test and declined the claim based on a report provided by the builder. Determination | Case number: 877538 Page 4 of 11 The insurer said the cause of the damage was an excluded event. That is: By hydrostatic pressure, subsidence or landslip, expansion or contraction of the earth, ground or soil, unless it was a direct result of and immediately following the insured events of earthquake or explosion However, AB Builder did not complete a leak detection in sewer pipes. Complainant requested to reopen the claim on 1 February 2022 In February 2022, the complainant contacted the insurer and informed that he was dissatisfied with the denial of the claim in 2019 and requested to reopen the claim. He claimed that the insurer declined the claim without completing a proper investigation. He engaged AD plumbing services, who found a leakage in the sewer pipes. After receiving the request, the insurer engaged an engineer (JHA) to undertake a site inspection and provide a report about the condition of the dwelling concerning movement and cracking. Complainant claims significant structural damage to the house The complainant claims the leaking sewerage pipe at the dwelling caused the internal and external damage. The damage includes:  internal and external damages to the sunroom  cracking to external brickwork and internal brickwork in the main dwelling  separation at patio roof (rear of dwelling) and separation in brick sill (front of dwelling)  front patio slab dropping  tearing of articulation joint above front entrance  separation between sunroom and main dwelling  termite damage (right side of dwelling)  cracking to slab covered by vinyl flooring  cracking to outside of shower  buckling of plasterboard outside shower cracking  cracking to internal ceiling  cracking above window frames In 2022, the insurer denied the damage was because of ‘ escape of liquid ’ event There is no dispute there was an ‘ escape of liquid ’ event. The leaks were found:  a 90-degree bend directly under the house footings at the toilet pope  between the sunroom and the septic tank on the northwest corner. However, the insurer disputes the escape of liquid was not the proximate cause of the damage. The insurer says the damage results from the settlement due to drier soil conditions, not heaving or expansion due to wetter soil conditions. It further says there is no cover for damage caused by the effects of the climate or weather; or by expansion or contraction of the Determination | Case number: 877538 Page 5 of 11 earth, ground or so il unless caused by earthquake or explosion. The insurer’s decision was based on the report provided by JHA. JHA says leaking pipe did not cause the damage JHA says the leaking pipe did not cause damage to the property because:  floor level shows no evidence of any peak in the flooring around the leak locations  there is a 42mm drop across the front RH bedrooms which is well away from the leak area and on the uphill side so is not susceptible to any excess moisture from the leak  the property was unoccupied several months between 2018 to 2021, therefore the flow of water would be intermittent, and ground would therefore be less likely to be saturated for long periods  the crack through the centre of the slab that runs through the hallway and into the adjoining rooms appears to be movement related as this area is acting as a pivot point in the slab  the slab slopes off significantly to the RH end which has created stress along the central part of the slab and led to the cracking that was observed. JHA also says the cause of movement/cracking may be attributed to several factors including:  soil moisture variation and climate conditions, including abnormal moisture condition such as drought declared since 10 March 2017  plasterwork ageing and construction method  extensions founded on different footing systems. Complainant’s engineer (OCE) says leaking pipe likely caused damage to the main dwelling OCE report states that it is difficult to determine the cause of damage. It states:  the complainant took possession of the house in 2018  the complainant said the house had little to no significant cracking at the time  the house largely unoccupied for three years until later 2021  the sewer was used occasionally  termite infestation found in early 2019  the cracks in the slab and walls were found in 2019  the combination of weak ground and reactive soil caused the most significant damage to the home  initial termite infestation through the cracked slab happened before late 2018  swelling in the area due to damaged sewer pipe is a significant factor in cracking the slab  the property was unoccupied during the dry season; therefore, the lower moister content from both the weather and lack of sewer leakage resulted from a much drier soil profile  most of the damage occurred during the start of the dry period. The report further says: Determination | Case number: 877538 Page 6 of 11 It is very difficult to determine the extent to which each contributing factor caused the settlement and cracking. It is likely that some foundation settlement occurred due to the soft soil profile early in the life of the building. This settlement was small enough not to cause significant wall cracking . As the soil dried out due to climate and lack of the sewerage leak, further settlement occurred. This settlement increased the total deflection in the slab to the point where walls started cracking. Proximate cause of the damage to main dwelling was not the leaking pipe Damage can have more than one cause. When deciding whether the policy covers the damage, the proximate cause of the damage needs to be identified. Proximate cause is the dominant, efficient or operative cause of the loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common-sense evaluation of the evidence. Having reviewed reports provided by JHA and OCE, I find the report provided by JHA is more persuasive. This is because the report contains satisfactory information to support the reasoning and findings of the engineer. JHA report includes a floor level survey. The floor level shows no evidence of any peak in the flooring around the two leak locations. OCE report does not include floor level survey and based its findings on the floor level survey completed by JHA. Further, OCE report has not identified any peak or heave at the time of the inspection. However, it has concluded that ‘the leaking of the sewer in the centre of the house has likely caused heave which contributed to the slab cracking in the ar ea’ . It believed the slab cracking would have occurred prior to 2018 when the property was occupied. This is an assumption based on the current status of the home. The OCE report contains a statement of the complainant who admitted that the house had little to no significant cracking when he took the possession of the property in 2018. If there was a heave or peak in the slab cracking area, this should have been evident to the complainant in 2018 when he took over the possession. He claims he did not notice any damage to the property. Further, OCE report supports the finding of JHA report stating even if there was a leak it was small enough to cause the damage and it admits the dominant cause of the damage was shrinking of the reactive soil during the historic dry period. Further, the home was largely unoccupied for three years until 2021. The complainant only noticed the cracks on the slab and walls in 2019 when the property was unoccupied, and sewer pipes were not used. The local area has been experiencing drought since 2017, and the OCE report also states the lack of sewer leakage could have resulted from the drier soil profile, which led to further damage to the dwelling. Therefore, even if there had been a leak in 2018, it would not have caused the damage due to the drier soil profile. On balance, the proximate cause of the damage to the house was caused due to shrinking of the reactive soil during the historic dry period combined with the piers at one end of the house. Determination | Case number: 877538 Page 7 of 11 Proximate cause of the damage to the sunroom and patio was not the leaking JHA report and OCE report both agree that the sunroom was added as an extension to the main dwelling. OCE report states the veranda on the northern side of the sunroom is settling primarily due to an inadequate footing design. JHA report also states the rear of the sunroom indicates the maximum settlement and if the leak contributed to the damage, the area would show a rise not settlement due to the reactive soil in the area. I am satisfied that the proximate cause of the damage to the sunroom and patio was not caused by the leaking sewer pipe. Complainant’s arguments are not persuasive The complainant says the insurer has not provided a soil report to support the local area containing reactive soil. JHA report also comments: The determination of reactive clay sub-soils on the site is further enforced by soil test results provided by the Insured that were taken during the initial construction of the dwelling, which show various clay-based layers. OCE report recommends the complainant obtain a new soil report to determine the extent of potential weakness. However, both engineers have confirmed that the area contains reactive soil and that the local area experienced draught around the period. The statement made in the OCE report does not suggest soil was not reactive rather it is a recommendation as the complainant requires to lift and strengthen the house foundation to eliminate future damage to the property. Further, the JHA has provided the information they found on the Australian Soil Resources Information System, which validates the point that the local area has reactive clay soil that changes in volume due to moisture variation. The complainant further says that JHA confirmed during their visit that a heave existed at the time. However, JHA denies providing information about the finding during the inspection. AFCA is not a court of law and cannot take evidence on oath. AFCA makes a finding based on the written correspondence created at the time of the incident. JHA provided a report that was drawn at the time. They confirmed that there was no heave at the time of the inspection. Further, the floor-level survey confirms there was a settlement, not a heave. I am not persuaded by the complainant’s argument as there is insufficient basis for this. Further, OCE has not evidenced a heave in the report. It only assumes that the heave caused the slab cracking. The complainant has referred to the PDS in relation to escape of water. Whilst I am sympathetic to the complainant, the escape of water has not been shown to have caused the damage, so the escape of water is not triggered. Insurer was entitled to deny the claim The insurer was entitled to deny the claim because: Determination | Case number: 877538 Page 8 of 11  the proximate cause of the damage was not the insured event, which is the leaking sewer pipe  the damage was caused by various factors not covered by the policy which includes inadequate footing design and shrinking of the reactive soil during the dry period. 2.2 Is the complainant entitled to compensation for non- financial loss? Yes, the complainant is entitled to compensation of $750 for non-financial loss due to delay in the claim assessment. Complainant raised various service delivery issues The complainant raised various service delivery issues.  The insurer denied the claim in 2019 without conducting a proper investigation.  The insurer’s conduct in 2019 caused further damages to the house.  The insurer did not inform him about his right to lodge a complaint with AFCA until 28 April 2022.  When the complainant contacted the insurer in 2022 to reopen the claim, he had to be on hold for a long period because the representative was unsure about the claim process.  During a call with the insurer’s representative on 7 February 2022, the complainant was informed of the acceptance of the claim, and the representative informed him that the complainant would only be eligible for $7,500 under the policy.  The time taken to decide the claim was lengthy.  The insurer provided incorrect information about obtaining an extension through AFCA when he needed to get an expert report and required more time. AFCA can award compensation for non-financial loss Under its rules, AFCA can award the complainant compensation for non-financial loss (capped at $5,400) where the insurer:  takes an unusual amount of tim e to resolve the complainant’s situation  causes him to experience unusual physical inconvenience  unusually interferes with his expectation of enjoyment or peace of mind. AFCA takes a conservative approach when assessing compensation for non-financial loss. AFCA generally expects complainants to be moderately robust and bear the usual degree of stress and inconvenience experienced during an insurance claim or in ordinary dealings with an insurer. AFCA cannot award punitive, exemplary or aggravated damages . AFCA’s ability to award financial or non-financial compensation is not intended to penalise an insurer just because:  it made an error  its service was not perfect. Determination | Case number: 877538 Page 9 of 11 Complainant is entitled to non-financial loss of $750 I have reviewed the phone call recordings between parties, and I am not satisfied that the complainant was misinformed about the policy information and coverage on 7 February 2022. I am also not satisfied that the complainant was misinformed about how to proceed with reopening the claim in 2022. The insurer took appropriate steps to provide a response that was suitable for his requirements. Further, the claim notes show the insurer actioned his request within seven days. The complainant says the insurer did not inform him about AFCA and his right to lodge a complaint until 28 April 2022. I disagree with the complainant’s statement because:  the claim denial letter dated 11 September 2019 contains a link that provides information about AFCA.  the letter dated 16 February 2022 contains information about AFCA.  the PDS contains information about AFCA and how to lodge a complaint. I agree that the insurer should have conducted a leak detection in sewer pipes in 2019 before deciding on the claim. This is because they were investigating whether a leak caused the damage. There was no reason to exclude the investigation of the sewer pipes only. However, I note that the complainant requested to lodge the claim under storm event during the initial call and the complainant only mentioned of inspecting storm and water pipes during the call. I am not satisfied that the insurer not investigating sewer leak caused the complainant to suffer a financial loss because the complainant has not established the proximate cause of the damage was the leaking sewer pipe. Even if the test was carried out in 2019 and it found a leak, the insurer was not required to accept the liability based on the finding on this determination. However, had the sewer pipe been tested in 2019 it could have been excluded as ultimately occurred. The insurer says it received the report from the engineer on 4 March 2022 and acknowledged there was a delay in providing the claim decision. The insurer took 40 days to review the report and provide a response. The insurer apologised for the delay in delivering the claim decision. Based on the information available, I am satisfied that the complainant is entitled to a compensation of $750 for non-financial loss because of the delay in providing the claim decision. 2.3 Why is the outcome fair? While I understand the discovery of the leaking pipe in 2022 would have caused frustration to the complainant as he wanted the insurer to investigate the damage in 2019. However, the claim is only payable if the dominant or proximate cause of the damage is an insurable event under the policy. The insurer's engineer and the complainant ’s engineer largely agree the proximate cause of damage is the shrinking of the reactive soil during the historic dry period. Determination | Case number: 877538 Page 10 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 877538 Page 11 of 11 3.2 Policy terms General Exclusions We will not pay for any loss, damage or legal liability caused directly or indirectly: by hydrostatic pressure, subsidence or landslip, expansion or contraction of the earth, ground or soil, unless it was a direct result of and immediately following the insured events of earthquake or explosion;

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.