Home / Allianz Australia / Determination 876003
Determination 876003
Denial of escape of liquid claim and loss of rent claim, plus delay in handling claims
Summary
The landlord complained about the insurer's denial of an escape of liquid claim, loss of rent cover, and delays. AFCA upheld the declines but ordered $1,000 for non-financial loss due to delay.
The complainant did not establish the escape of liquid caused the damage or that the property was unliveable from accepted malicious damage, but the insurer's delays warranted modest compensation.
Issues
- Claim denial primary · not upheld“The insurer is entitled to decline the claim for damage from escape of liquid and the claim for loss of rent.”
- Delay secondary · upheld“there were delays by the insurer, but the complainant also contributed to the delays. An award of $1,000 is appropriate”
- Product terms interpretation secondary · not upheld“loss of rental is only paid where the property is unliveable due to an insured event”
Subjects and remedies
home or building damagepay non financial loss
Related
All Allianz Australia determinations · Find similar determinations
Text of the determination
Determination
Case number 876003
Financial firm Allianz Australia General Insurance Limited
Determination | Case number: 876003 Page 1 of 10
Case number: 876003 6 March 2023
1 Determination overview
1.1 Complaint
The male complainant is the named insured on a landlord insurance policy with the financial
firm (insurer) over a rental property in regional Victoria. On 9 February 2021 the complainant
lodged an escape of liquid (EOL) claim and on 21 July 2021 lodged a malicious damage (MD)
claim in respect of the property.
The insurer denied indemnity for the EOL claim but granted indemnity for the MD claim. The
complainant claims an additional amount for loss of rent and has complained about the delay
by the insurer.
1.2 Issues and key findings
Has the complainant established damage to the property resulted from an EOL
event?
No, a large volume of water flowed from a broken pi pe under the complainant’s property, but
expert evidence shows it did not cause movement of the stumps or distortion of the flooring.
Is the complainant entitled to loss of rent cover based on the insurer’s
acceptance of a claim for damage from malicious acts?
No, the complainant has not established the property was unliveable as a result of the
accepted malicious damage.
Is the complainant entitled to compensation for non-financial loss?
Yes, there were delays by the insurer, but the complainant also contributed to the delays. An
award of $1,000 is appropriate in the circumstances.
Why is the outcome fair?
The outcome is fair because the only evidence before AFCA shows the EOL did not cause
damage to the property. Further, the insurer is entitled to rely on the terms of the policy which
provide that loss of rental is only paid where the property is unliveable due to an insured
event.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is entitled to decline the claim for damage from escape of liquid and the claim for
loss of rent.
Within 21 days of this Determination being accepted the insurer is to pay $1,000 to the
complainant as compensation for non-financial loss.
Determination | Case number: 876003 Page 2 of 10
2 Reasons for determination
2.1 Has the complainant established that damage to the
property resulted from an EOL event?
No, a large volume of water flowed from a broken pipe under the complainant’s property, but
expert evidence shows it did not cause movement of the stumps or distortion of the flooring.
The onus lies with complainant to establish an insured event caused the
damage
The onus is on the complainant to establish, on the balance of probabilities (that is more likely
than not), an event covered by the policy caused the damage as claimed. Only once this is
established, does the onus shift to the insurer to show on the balance of probabilities, the
claimed loss falls within an exclusion of the policy to deny the claim.
The policy document has been exchanged between the parties and there is no dispute that a
copy was received by the complainant prior to policy inception. The complainants provides
cover for damage caused by a series of insured events specified in the policy including
escape of liquid and malicious damage.
Escape of Liquid reported January 2021.
Escape of liquid covers loss or damage caused by the sudden and accidental escape of liquid
from any fixed pipe. An escape of liquid claim was reported in late January 2021. A
chronology of the claim is set out in 3.2 below as well as relevant extracts from expert reports.
T he insurer’s builder AB attended the property in February 2021 and was informed that the
tenant had recently vacated the property after starting to deliberately cause damage over the
last 12 months.
The tenant had broken a water pipe which caused substantial water to flow under the house.
The complainant had this fixed earlier but now, with the tenant gone, the complainant had
noticed some resultant damage to the house. AB observed the carpet and underlay had been
removed as they were said to have been damp. The complainant pointed out the floor had
slumped in several areas and that the house had previously been re-stumped. The floor
boards were dry. The concrete stumps to the sub floor were sound. No damage to the house
was observed. AB observed there was a maintenance issue with sagging roof guttering.
Expert Engineer reports find no damage from EOL
The complainant followed up the insurer at the end of April 2021 and AB recommended an
engineer provide a report. IL was appointed and in May 2021 reported that due to the volume
of water that escaped from the pipe and the pre-existing earth movement that a six-month
drying out period was required to ascertain the effect of the water leak from the broken pipe.
IL stated the initial movement and distress to the dwelling was attributed to the long
degradation of the dwelling and the ongoing natural seasonal movement of the founding soils
exacerbated by localised areas of surface water runoff from the sagging roof.
In early September 2021 the complainant advised he was unhappy about the 6 months wait
and wanted to rent out the property. The insurer appointed an engineer LE to arrange soil
testing. LE provided a report in October 2021 which found differential footing movement
Determination | Case number: 876003 Page 3 of 10
caused by soil movement from foundation reactivity and abnormal site moisture conditions.
On 19 October 2021 the insurer denied the claim in reliance on the LE report.
On 3 December 2021 the complainant sent an email to the insurer which stated:
“Cracking to the hallway wall - this related to the water that flowed under the house for
an extended period and had moved the stumps and created rising salt through the
veranda. The water bill of in excess of $2500 ha been provided to substantiate this
excess water loss event due to a broken pipe under the house. The floor in the loung e
room now bounces due to the sinking of the stumps. this was not detected or noted by
the engineer, nor was the salt on the concrete veranda that defines the water damage too.”
A further report was obtained from LE but not until mid-June 2022. The report confirmed the
broken water pipe was not responsible for any wall cracking nor distortion in the flooring. It is
not suggested by anyone that leaking water contacted the floor boards. Any damage is
alleged to have been due to sinking of the stumps. The insurer confirmed its claims
declinature.
The complainant has not provided any expert evidence to contradict the expert reports relied
on by the insurer. That evidence shows the cause of damage was because of earth and soil
movement and settling, wear and tear, gradual deterioration. These causes are expressly
excluded, but I do not need to consider the policy exclusions as the complainant has been
unable to establish loss from an escape of liquid event.
2.2 Is the complainant entitled to loss of rent cover based on
the insurer’s acceptance of a claim for malicious damage ?
No, the complainant has not established the property was unliveable as a result of the items
of damage from malicious acts that were accepted.
On 21 July 2021 the Complainant lodged a new claim for malicious damage and
rent default
On 21 July 2021 the complainant lodged a claim for malicious damage and rent default. On
the same day the insurer requested supporting material such as the lease agreement that
had been in place. On 26 July 2021 the property manager at the complainant’s real estate
business prepared a draft email to the insurer as follows:
The policy covers loss or damage occurring during the period of insurance that is caused by
malicious acts by tenants. Malicious acts do not include damage caused by accident or wear
and tear. The policy defines malicious acts as deliberate acts intended to
harm ano ther person’s property through an unlawful or wrongful act without justification or
excuse.
The malicious damage claim met with a partial denial on 10 October 2021. A scope of works
was prepared for the agreed items in the sum of $6,393.35. The AFCA file indicates a
payment in the sum of $2742 was made by the insurer to the complainant and which appears
to be for rent default. I understand from the complainant that at about this time a remark was
made to the complainant which caused offence and which resulted in an apology from the
insurer.
Determination | Case number: 876003 Page 4 of 10
The complainant requested the partial refusal be reviewed. By email dated 16 November
2021 the insurer noted that the refused items were not regarded as resulting from malicious
damage but made an offer of $4,000 to cover the items and for the delay experienced.
The offer was rejected by the complainant’s email of 1 December 2021 in which he added
“ The lack of a foreseeable resolution has forced me to disappoint and let go of numerous
tenants for this property which dir ectly affects the reputability of my company”. From this
email and the earlier email by his property manager it is apparent the complainant was also
seeking to make a claim for ongoing loss of rent, not just for a closed period of rent default.
On 9 December 2021 the insurer revised its position and agreed on a commercial basis to
pay for repairs to items in dispute comprising the rear door floor, hole in lounge wall, broken
blind, five missing blinds and bedroom door. The insurer invited the complainant to provide
quotes for repairs to these additional items of malicious damage. The complainant did not
respond to this suggestion. The communications are difficult to follow but it appears the
insurer ultimately expanded its scope of work to include these additional items of alleged
malicious damage. The complainant seems to have agreed to the insurer undertaking this
repair work which was completed by mid-September 2022.
I note that when the EOL claim was first made in February 2021 the complainant remarked to
the assessor that the tenant had been causing deliberate damage. However so far as I can
observe from the AFCA file it is not argued by the complainant that the breach of the water
pipe was a result of a malicious act. There is no material before me showing how the pipe
burst and it would be unusual for it to be a malicious act.
Policy provides coverage for lost rent
The policy provides If the property is leased at the time of an insured event and loss or
damage makes the property unliveable and rent payments cease, then the insurer will cover
the lost rent. This expense will only be paid during the repair or replacement period and only
while the property remains unliveable. There is a 12-month cap on this benefit.
The complainant provided a tenancy agreement dated 18 November 2016 (an ongoing
agreement) and a payment history between 2016 and 2021 from the former tenant. The
complainant provided documents showing he had issued VCAT proceedings against the
tenant.
By letter of 25 October 2022 the complainant detailed the basis for a loss of rent claim. The
complainant says that on 22 Dec 2020 the house was put up for lease for $330 per week, as
the tenant was due to vacate on 14 January 2021. The complainant operates a real estate
business and has provided a copy of his online advertisement to let the property. The
complainant asserts the property was unable to be rented for the period from 26 January
2021 which at a rental of $330 a week equates to a rental loss of $30,171.42 by the end of
October 2022. The 12-month cap would appear to limit the maximum recovery to $17,160.
No evidence property was unliveable
The insurer has admitted loss from malicious acts even though it sought to avoid admissions
in respect a number of particular items of damage. The loss occurred whilst the property was
leased. Rent payments ceased but in fact the lease was expiring in January 2021 in any
event.
Importantly, there is no persuasive evidence that the property was unliveable. The policy
defines unliveable to mean when a building is so damaged that normal domestic activities like
Determination | Case number: 876003 Page 5 of 10
cooking, sanitation and personal hygiene cannot take place, and local authorities will not
provide permission for the home to be inhabited.
Reviewing the items of alleged malicious damage does not create an impression that the
house was unliveable. The complainant appeared to believe the property was liveable
because he listed the property online for leasing. It is difficult to know what the complainant
means in saying that he let go numerous tenants. Significantly, the malicious damage claim
was not lodged until 7 months after the tenant vacated the property. It is difficult to
understand why these items of damage were not photographed and repaired within this
period. They were not part of the EOL claim. Further, the loss of rental income must take
place during the repair and replacement period. In the circumstances it is difficult to know
when this period commenced.
Based on the available information provided by the parties there is nothing to suggest the
items of malicious damage that were accepted had any impact on domestic activities,
cooking, sanitation and personal hygiene. The claim for loss of rent has not been established.
In the circumstances, it was fair and reasonable for the insurer to rely on the policy terms to
decline the claim for loss of rent.
2.3 Is the complainant entitled to compensation for non-
financial loss?
Yes, there were delays by the insurer, but the complainant also contributed to the delays. An
award of $1,000 is appropriate in the circumstances.
Complainant says the insurer caused unreasonable delays
AFCA can award up to maximum of $5,400 compensation for non-financial loss. AFCA takes
a conservative approach to awarding this type of compensation. AFCA will only award
compensation for non-financial loss where there has been an unusual amount of physical
inconvenience, time taken to resolve a situation, or interference with the complainant’s
expectation of enjoyment or peace of mind.
AFCA expects complainants to bear the normal degree of inconvenience experienced when a
problem occurs and take reasonable steps to minimise the inconvenience suffered. In the
present case the complainant lets the property as part of his real estate business and has the
benefit of an employed property manager in dealing with at least some of the tasks involved.
For the EOL claim there was an apparent delay of 3 to 4 months for the insurer to arrange an
engineer to attend the property. There was a period of 7 months from December 2021 when
the complainant submitted the insurer’s engineer had missed some items until June 2022
when the engineer re attended. However, the second attendance added little and the
evidence was that 6 months drying out was needed.
For the malicious damage claim it was lodged in July 2021 (several months late) and was
largely agreed by November 2021. The insurer had initially issued a partial denial but later
accepted most of the claim. However, I do not regard the initial refusal as unreasonable. The
works were completed by August 2022. This delay in completing the works appears
excessive and is not adequately explained.
Determination | Case number: 876003 Page 6 of 10
Although not raised by the insurer, I note there was a complete transfer of the claims staff
handling this matter due to corporate rearrangements. Covid was also an issue during this
period. The insurer’s notice of response regarding the denial of the escape of liquid claim and
loss of rental income was not provided until 6 October 2022.
I accept the complainant has contributed to delays during the process. The loss of rental
claim was not particularised and supporting material not provided until 25 October 2022. The
malicious damage claim was not submitted until approximately 7 months after the event.
Weighing up the above matters I consider an amount of $1,000 compensation for non-
financial loss is fair in the circumstances.
2.4 Why is the outcome fair?
The outcome is fair because the only evidence before AFCA shows the EOL did not cause
damage to the property. Further, the insurer is entitled to rely on the terms of the policy which
provide that loss of rental is only paid where the property is unliveable due to an insured
event.
Determination | Case number: 876003 Page 7 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Escape of Water Claim
Chronology of EOL Claim
Date Event (relating to escape of liquid claim)
26 Jan 2021 Complainant say s notified insurer of the escape of liquid claim
9 February 2021 I nsurer says the claim for escape of liquid was lodged. AB builders are appointed
to assess the damage and provide reports.
30 April 2021 Complainant contact s insurer advising dissatisfied wit h how claim progressing
and AB are notified
6 May 2021 AB provide a response and rec ommend an engineer is engaged. The insurer
en gages IL engine ers to provide an opinion on proximate cause of damage
Determination | Case number: 876003 Page 8 of 10
14 May 2021 IL assess the property
25 May 2021 IL provides report and recommends re - assessment after furt her six months drying
out period, so a comparison of floor levels and the distress can be completed.
2 June 2021 Complainant is provided wit h a copy of IL ’s report and notified of the
recommendation for 6 mont hs drying.
3 September 2021 Complainant advise s insurer not happy about the 6 - mont h drying period and
would like to rent out the property
7 September 2021 I nsurer considers the request and refers the claim to XY and AB for advice.
10 September 2021 Recommendation made for soil testing to ascertain if leak has caused damage
20 September 2021 LE engineers appoint ed to assess if the leak has caused damage
13 October 2021 Complainant provided with LE ’s report.
19 October 2021 Complainant provided with written confirmation denyi ng EOL claim.
20 December 2021 Insurer requests LE reattend to assess damage that complainant assert s was not
included in initial assessment
31 March 2022 LE respond to the insurer’s request, confirming whether or not they should re -
attend.
10 June 2022 LE reattends property to addres s damage not assessed in initial report.
25 July 2022 After reviewing LE ’s supplemen tary report, the insurer advises it maintain s the
denial for EOL claim
Expert Evidence EOL
Expert Key findings
IL en gineers
25 May 2021
a significant volume of water has flowed beneath the dwelling from the leaking
water supply pipe
due to the pre - existing damage/movement evident throughout the dwelling, an
accurate assessment of the effect of the escape of water cannot be confirmed
a t this stage in the investigation
reassessment after a further six months drying out period is required so a
comparis on of floor levels and the distress can be completed. Further
movement and distress is likely to occur as the founding soils continue to dr y
out over an extended period
initial movement and distress to the dwelling is attributed to the long
degradation of the dwelling and the ongoing nat ural seasonal movement of the
founding soils exacerbated by localised areas of surface water runoff from
sa gging roof guttering flowing beneath areas of the dwelling
the rotation of the chimney is not attributed to the water supply pipe leak
the leaning garage/shed located in the north - east area of the dwelling is also
Determination | Case number: 876003 Page 9 of 10
not relat ed to water pipe leak
LE Engineers
6 October 2021
the observed building damage has been caused by stresses induced by
building movements due to one or more contributing factors
differential footing movement caused by soil movement from foundation
reactivity and abnormal site mois ture conditions due to existing and removed
groups of large and medium sized trees, and inadequate site and subfloor
drainage provisions
LE
Engineers
14 June 2022
the insurer requested further comment regarding damage that (the insured)
reported was ov erlooked in the initial assessment
it was reported the cracking in the hallway, lounge room floor bouncing due to
sinking of the stumps and efflorescence to the porch concrete slab had been
overlooked
the reported damages were not overlooked during the initial investigation. The
initial report provides commentary on whether the reported escape of water is
the cause of building damage, and what the cause of building damage is. The
initial investigation and report provides advice including cracking and damage
throughout the entire house including floor movement.
commentary was not provided on efflorescenc e to the porch slab as this is a
non - structural issue and is not considered damage as efflorescence i s easily
cleaned
the absence of any notable change in the pattern or degree of footing
movement (bet ween the two assessments) confirms that the foundation
moisture content was not adversely affected from the escape of water in - line
with the findings of the initial investigation and report
it is therefore confirmed that footing movement issues detected at the building
have not been caused by an escape of water
this finding extends to the reported deflection in the flooring of the lounge room
and cracking thr oughout the house and specifically noted in the hallway. Given
the escape of water has not adversely affected the foundation soils and is not
the cause of differential footing movement detected, it is advised that the
escape of water is not the cause of bu ilding cracking to any rooms and is not
the cause of deflection in the flooring
it is therefore reaffirmed that the reported crack in the hallway (and throughout
the rest of the house) has not been caused by the escape of water for the
reasons discussed in the initial report and as reaffirmed from the secondary
investigation
3.3 Malicious act claim
Chronology
Date Event (relating to malicious damage claim)
Determination | Case number: 876003 Page 10 of 10
21 July 2021 Complainant lodged a claim for malicious damage
2 August 2021 AB attended and assesses the claim for malicious damage
23 September 2021 M alicious dama ge claim is partially denied.
24 September 2021 Complainant requests claim be escalated
14 October 2021 IDR team acknowledge your complaint regarding malicious damage.
9 December 2021 In surer says accepts the malicious damage claim a s a good will gesture
AB are appointed to complete the work.
2 August 2022 AB complete the work for malicious damage