Storm damage claim - roof repairs and internal repairs settlement

FirmAuto & General
Decided2022-08-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$5,479
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed storm damage to his home, including roof repairs and timber flooring. AFCA found the roof damage was caused by defective installation and was not covered, but ordered the insurer to pay a 15% contingency uplift, the timber floor repair cost and non-financial loss compensation for delay in mould remediation.

Under the policy, loss caused by a defect in design, structure, materials or workmanship is not covered, so pre-existing roof defect damage falls outside cover, while storm-related internal damage remains payable.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay non financial loss

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination Case number 875145 Financial firm Auto & General Services Pty Ltd Determination | Case number: 875145 Page 1 of 5 Case number: 875145 30 August 2022 1 Determination overview 1.1 Complaint The complainant held a home and contents policy with the financial firm (insurer) and lodged a claim on 28 February 2022 for storm-related damage after heavy rain had caused water damage to his home. The insurer partially accepted the claim but identified maintenance and defect issues with the roof that required repair before internal repairs could commence. The claim was cash settled for $3,528.42 for the building damage and $10,758 for contents damage. The complainant says he was not aware of any defect in the roof having had the roof previously repaired. The complainant seeks payment for the cost to repair the damaged roof plus repairs to the timber flooring that had been water damaged. 1.2 Issues and key findings Is the insurer liable for the repair of the roof? No. While there is no dispute there was a severe storm, there is no evidence that the storm caused damage to the roof. The available information indicates there are defective repairs that require rectification. Should the insurer increase its offer of settlement? Yes. The insurer must in addition to the accepted mould restoration work, increase the cash settlement paid for building damage of $3,528.42 by 15% ($529.26) to allow for contingencies. The insurer must also meet the cost of repairs to the complainant’s timber floor of $4,950 and pay compensation for non-financial loss of $1,000. Why is the outcome fair? The outcome is fair as the insurer is only liable for damage arising from the storm and is not liable under the terms of the policy for pre-existing defective repairs. It is fair however that the insurer pays for the repairs to the timber floor and compensation for non-financial loss in view of the delays in commencing mould remediation repairs. 1.3 Determination This determination is partially in favour of the complainant. Within 14 days of the complainant’s acceptance of this determination, the insurer is to pay the complainant:  $529.26 being a 15% contingency fee on the cash settlement for the building damage  $4,950 for the damaged timber flooring,  $1,000 compensation for non-financial loss under AFCA rule D3.3. The insurer is otherwise not liable for the complainant’s claim for the roof repairs. Determination | Case number: 875145 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer liable for the roof repairs? No. While there is no dispute there was a severe storm, there is no evidence that the storm caused damage to the roof. The available information indicates there are defective repairs that require rectification. Complainant has the onus to establish claim within the terms of the policy It is established insurance law that an insured has the initial onus to prove, on the balance of probabilities, that is, more likely than not, that the loss or damage claimed falls within the terms of the policy. This is commonly called a prima facie claim. The complainant’s policy is an insured events policy that provides cover for a series of defined events including storm and rainwater subject to a number of conditions and limitations. There is no dispute that in the period from approximately 25 February 2022 to 27 February 2022 the complainant’s property, along with many others, was subject to a sign ificant storm- related event and as a result sustained damage to the building and contents. The insurer partially accepted the claim but identified maintenance and defect issues with the roof that required repair before internal repairs could commence. The claim was cash settled for $3,528.42 for the building damage and $10,758 for contents damage. Expert report identifies defective roof repairs The complainant admits that the roof had previously been repaired by the complainant’s previous insurer. The complainant had had a dispute regarding the quality of the repairs with the Queensland Building and Construction Commission (QBCC). According to a screenshot provided by the complainant that dispute was closed as QBCC considered the repairs were acceptable. The insurer obtained a report from OSB, a building services company. OSB attended the complainant’s property on 3 Marc h 2002. According to the report OSB found water damage to the ceiling and wall of the lounge room as well as cabinetry. OSB considered the roof damage was not storm related but caused by the non-standard installation of the roof cladding above the area, allowing water to leak into the ceiling and wall cavity and damage the lining and painted surfaces. OSB considered the original roofing contractor/builder was responsible to repair the roof leak. The complainant advised that the contractor was not willing to make further rectifications. There is no evidence to dispute OSB’s finding that the damage to the roof was not caused by the storm but was caused by the non-standard installation of the roof cladding which was a defect. Insurer accepts complainant was not aware of the damage While the policy covers loss or damage caused by storms or rainwater, it does not cover loss or damage caused by a defect in design, structure, materials or workmanship that you knew about or should reasonably have known about. Determination | Case number: 875145 Page 3 of 5 Arguably the complainant having raised issues about the quality of the repairs should reasonably have known about the defective installation. The insurer however accepts the complainant was not aware of the defective installation at the time of the loss, given the complainant had been informed by QBCC that the repairs were acceptable. As the insurer could not complete the internal repairs until the maintenance/defects had been repaired, the insurer cash settled the complainant’s claim for building damage for $3 ,528.42 based on a quote provided by OSB and contents claim for $10,758. Insurer not liable to repair defective roof cladding The policy is clear it does not cover loss or damage caused by a defect a structural fault or a design fault. To the extent that there is damage to the roof cladding, that damage has not been caused by the storm but has been caused by the incorrect installation of the roof cladding. In the absence of any information to suggest that the storm caused the damage to the roof cladding, I accept that it is fair and reasonable for the insurer to rely upon the terms and conditions of the policy to deny liability for that damage. 2.2 Is the insurer liable to increase its offer of settlement? Yes. The insurer must in addition to the accepted mould restoration work, increase the cash settlement paid for building damage of $3,528.42 by 15% ($529.26) to allow for contingencies. The insurer must also meet the cos t of repairs to the complainant’s timber floor of $4,950 and pay compensation for non-financial loss of $1,000. Insurer to increase settlement to allow for contingencies While I accept the insurer is not liable for the roof damage, the insurer remains liable for the internal repairs. The insurer had previously advised that it had cash settled the complainant’s claim for the internal repairs for the sum of $3,528.42. The insurer had based that settlement on a scope of works (SOW) provided by OSB dated 4 March 2022. The SOW did not allow for contingencies. The scope of works made no allowance for any unforeseen damage, no allowance for removal or storage of contents, no allowance for alternative accommodation. In my view it is fair that the allowance for the internal repairs be increased by 15% ($529.26) to take into account possible contingencies. Insurer to complete mould remediation and repairs In a report dated 19 May 2022 ‘S’ confirmed there was mould damage to the front entrance of the home and made various recommendations including that a builder remove a ceiling sheet to inspect the inside of the front entrance. The insurer in its notice of response whilst indicating the claim has been cash settled, provided no information to confirm that it had completed the mould remediation as suggested by S. On 4 July 2022, the complainant provided AFCA with a series of emails that had been exchanged with the insurer. The emails confirm that the insurer had provided the complainant with the restoration report on 1 July 2022. According to the email that report confirmed the following:  there is visible mould and mould remediation as required  further damage may become apparent during any demolition  will be necessary to inspect timber frames for further damage Determination | Case number: 875145 Page 4 of 5  any rotted framework will be encapsulated and marked for the builders to remove and replace  mould-affected subfloor between the stud walls and floor joists will need to be removed, the subfloor will be encapsulated and marked for builders to remove and replace  HEPA air filtration devices to be set up  timber has been assessed as restorable and will be returned to pre-loss condition in the front entrance builder to remove ceiling sheet to inspect inside of front entrance. According to the email, the insurer has accepted liability and the restorers asked to proceed with the restoration works. The insurers builders were to prepare a quote. Neither the restoration report nor quote from the builders have been provided by the insurer to AFCA. As it appears that the insurer is currently involved in further mould restoration work of the property and has agreed to cover further damages associated with the mould restoration work, I do not propose to make any findings with respect to this. Should the parties be unable to agree on the extent of the mould remediation and restoration works required then the matter can return to AFCA for determination. Insurer to pay compensation for non-financial loss I do note however, there has been a delay of at least six weeks from receipt of the mould report from S before the insurer has contacted the complainant to discuss the mould issue and provide a copy of the mould restoration report. Such a delay is in my view unacceptable given the risks associated with exposure to mould. It is fair in these circumstances the insurer pay compensation of $1,000 for non-financial loss. Insurer to cash settle claim for timber floors The complainant has sent a quote for the repair and re-sanding of timber flooring damaged by water during the storm. The first quote dated 31 July 2022 is from TPF for $2,950. A more recent quote obtained from SJF is for $4,950. According to the complainant, the first repairer TPF is unable to complete the work for several months. The insurer has provided no information in response to the complainant’s request to have the timber floors re-sanded. In the absence of any information to dispute the claim for damage to the timber flooring I determine the insurer should pay the complainant $4,950 as per the quote from SJF to cover the repair costs. 2.3 Why is the outcome fair? There is no dispute the complainant had been provided the relevant policy documents. The policy is clear it does not cover pre-existing damage. The information exchanged confirms the roof damage was pre-existing and most likely caused by defective workmanship. It is not covered under the terms of the policy. The policy covers the internal damage and it is fair the insurer completes the mould remediation and repairs. Should a dispute arise with respect to the mould remediation this may be brought back to AFCA for determination. The delay in providing the remediation report however is not acceptable and has caused the complainant an unusual degree of physical inconvenience. It is fair that compensation under AFCA rule D3.3 be paid for non- financial loss. It is also fair given the available information that the insurer cash settle the claim for the re- sanding and repair of the damaged timber flooring. Determination | Case number: 875145 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.