Determination 875145
Storm damage claim - roof repairs and internal repairs settlement
Summary
The complainant claimed storm damage to his home, including roof repairs and timber flooring. AFCA found the roof damage was caused by defective installation and was not covered, but ordered the insurer to pay a 15% contingency uplift, the timber floor repair cost and non-financial loss compensation for delay in mould remediation.
Under the policy, loss caused by a defect in design, structure, materials or workmanship is not covered, so pre-existing roof defect damage falls outside cover, while storm-related internal damage remains payable.
Issues
- Claim denial primary · not upheld
“The insurer is otherwise not liable for the complainant's claim for the roof repairs; damage caused by non-standard roof cladding installation is excluded.”
- Claim amount dispute secondary · upheld
“The insurer must increase the cash settlement for building damage by 15% ($529.26) to allow for contingencies.”
- Delay secondary · upheld
“There has been a delay of at least six weeks from receipt of the mould report before the insurer contacted the complainant; such a delay is unacceptable.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay non financial loss
Text of the determination
Determination
Case number 875145
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 875145 Page 1 of 5
Case number: 875145 30 August 2022
1 Determination overview
1.1 Complaint
The complainant held a home and contents policy with the financial firm (insurer) and lodged
a claim on 28 February 2022 for storm-related damage after heavy rain had caused water
damage to his home.
The insurer partially accepted the claim but identified maintenance and defect issues with the
roof that required repair before internal repairs could commence. The claim was cash settled
for $3,528.42 for the building damage and $10,758 for contents damage.
The complainant says he was not aware of any defect in the roof having had the roof
previously repaired. The complainant seeks payment for the cost to repair the damaged roof
plus repairs to the timber flooring that had been water damaged.
1.2 Issues and key findings
Is the insurer liable for the repair of the roof?
No. While there is no dispute there was a severe storm, there is no evidence that the storm
caused damage to the roof. The available information indicates there are defective repairs
that require rectification.
Should the insurer increase its offer of settlement?
Yes. The insurer must in addition to the accepted mould restoration work, increase the cash
settlement paid for building damage of $3,528.42 by 15% ($529.26) to allow for
contingencies. The insurer must also meet the cost of repairs to the complainant’s timber floor
of $4,950 and pay compensation for non-financial loss of $1,000.
Why is the outcome fair?
The outcome is fair as the insurer is only liable for damage arising from the storm and is not
liable under the terms of the policy for pre-existing defective repairs. It is fair however that the
insurer pays for the repairs to the timber floor and compensation for non-financial loss in view
of the delays in commencing mould remediation repairs.
1.3 Determination
This determination is partially in favour of the complainant.
Within 14 days of the complainant’s acceptance of this determination, the insurer is to pay the
complainant:
$529.26 being a 15% contingency fee on the cash settlement for the building damage
$4,950 for the damaged timber flooring,
$1,000 compensation for non-financial loss under AFCA rule D3.3.
The insurer is otherwise not liable for the complainant’s claim for the roof repairs.
Determination | Case number: 875145 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer liable for the roof repairs?
No. While there is no dispute there was a severe storm, there is no evidence that the storm
caused damage to the roof. The available information indicates there are defective repairs
that require rectification.
Complainant has the onus to establish claim within the terms of the policy
It is established insurance law that an insured has the initial onus to prove, on the balance of
probabilities, that is, more likely than not, that the loss or damage claimed falls within the
terms of the policy. This is commonly called a prima facie claim.
The complainant’s policy is an insured events policy that provides cover for a series of
defined events including storm and rainwater subject to a number of conditions and
limitations.
There is no dispute that in the period from approximately 25 February 2022 to 27 February
2022 the complainant’s property, along with many others, was subject to a sign ificant storm-
related event and as a result sustained damage to the building and contents. The insurer
partially accepted the claim but identified maintenance and defect issues with the roof that
required repair before internal repairs could commence. The claim was cash settled for
$3,528.42 for the building damage and $10,758 for contents damage.
Expert report identifies defective roof repairs
The complainant admits that the roof had previously been repaired by the complainant’s
previous insurer.
The complainant had had a dispute regarding the quality of the repairs with the Queensland
Building and Construction Commission (QBCC). According to a screenshot provided by the
complainant that dispute was closed as QBCC considered the repairs were acceptable.
The insurer obtained a report from OSB, a building services company. OSB attended the
complainant’s property on 3 Marc h 2002.
According to the report OSB found water damage to the ceiling and wall of the lounge room
as well as cabinetry. OSB considered the roof damage was not storm related but caused by
the non-standard installation of the roof cladding above the area, allowing water to leak into
the ceiling and wall cavity and damage the lining and painted surfaces. OSB considered the
original roofing contractor/builder was responsible to repair the roof leak. The complainant
advised that the contractor was not willing to make further rectifications.
There is no evidence to dispute OSB’s finding that the damage to the roof was not caused by
the storm but was caused by the non-standard installation of the roof cladding which was a
defect.
Insurer accepts complainant was not aware of the damage
While the policy covers loss or damage caused by storms or rainwater, it does not cover loss
or damage caused by a defect in design, structure, materials or workmanship that you knew
about or should reasonably have known about.
Determination | Case number: 875145 Page 3 of 5
Arguably the complainant having raised issues about the quality of the repairs should
reasonably have known about the defective installation. The insurer however accepts the
complainant was not aware of the defective installation at the time of the loss, given the
complainant had been informed by QBCC that the repairs were acceptable.
As the insurer could not complete the internal repairs until the maintenance/defects had been
repaired, the insurer cash settled the complainant’s claim for building damage for $3 ,528.42
based on a quote provided by OSB and contents claim for $10,758.
Insurer not liable to repair defective roof cladding
The policy is clear it does not cover loss or damage caused by a defect a structural fault or a
design fault. To the extent that there is damage to the roof cladding, that damage has not
been caused by the storm but has been caused by the incorrect installation of the roof
cladding.
In the absence of any information to suggest that the storm caused the damage to the roof
cladding, I accept that it is fair and reasonable for the insurer to rely upon the terms and
conditions of the policy to deny liability for that damage.
2.2 Is the insurer liable to increase its offer of settlement?
Yes. The insurer must in addition to the accepted mould restoration work, increase the cash
settlement paid for building damage of $3,528.42 by 15% ($529.26) to allow for
contingencies. The insurer must also meet the cos t of repairs to the complainant’s timber floor
of $4,950 and pay compensation for non-financial loss of $1,000.
Insurer to increase settlement to allow for contingencies
While I accept the insurer is not liable for the roof damage, the insurer remains liable for the
internal repairs. The insurer had previously advised that it had cash settled the complainant’s
claim for the internal repairs for the sum of $3,528.42. The insurer had based that settlement
on a scope of works (SOW) provided by OSB dated 4 March 2022.
The SOW did not allow for contingencies. The scope of works made no allowance for any
unforeseen damage, no allowance for removal or storage of contents, no allowance for
alternative accommodation. In my view it is fair that the allowance for the internal repairs be
increased by 15% ($529.26) to take into account possible contingencies.
Insurer to complete mould remediation and repairs
In a report dated 19 May 2022 ‘S’ confirmed there was mould damage to the front entrance of
the home and made various recommendations including that a builder remove a ceiling sheet
to inspect the inside of the front entrance. The insurer in its notice of response whilst
indicating the claim has been cash settled, provided no information to confirm that it had
completed the mould remediation as suggested by S.
On 4 July 2022, the complainant provided AFCA with a series of emails that had been
exchanged with the insurer. The emails confirm that the insurer had provided the complainant
with the restoration report on 1 July 2022. According to the email that report confirmed the
following:
there is visible mould and mould remediation as required
further damage may become apparent during any demolition
will be necessary to inspect timber frames for further damage
Determination | Case number: 875145 Page 4 of 5
any rotted framework will be encapsulated and marked for the builders to remove and
replace
mould-affected subfloor between the stud walls and floor joists will need to be removed,
the subfloor will be encapsulated and marked for builders to remove and replace
HEPA air filtration devices to be set up
timber has been assessed as restorable and will be returned to pre-loss condition in the
front entrance builder to remove ceiling sheet to inspect inside of front entrance.
According to the email, the insurer has accepted liability and the restorers asked to proceed
with the restoration works. The insurers builders were to prepare a quote. Neither the
restoration report nor quote from the builders have been provided by the insurer to AFCA.
As it appears that the insurer is currently involved in further mould restoration work of the
property and has agreed to cover further damages associated with the mould restoration
work, I do not propose to make any findings with respect to this. Should the parties be unable
to agree on the extent of the mould remediation and restoration works required then the
matter can return to AFCA for determination.
Insurer to pay compensation for non-financial loss
I do note however, there has been a delay of at least six weeks from receipt of the mould
report from S before the insurer has contacted the complainant to discuss the mould issue
and provide a copy of the mould restoration report. Such a delay is in my view unacceptable
given the risks associated with exposure to mould. It is fair in these circumstances the insurer
pay compensation of $1,000 for non-financial loss.
Insurer to cash settle claim for timber floors
The complainant has sent a quote for the repair and re-sanding of timber flooring damaged by
water during the storm. The first quote dated 31 July 2022 is from TPF for $2,950. A more
recent quote obtained from SJF is for $4,950. According to the complainant, the first repairer
TPF is unable to complete the work for several months.
The insurer has provided no information in response to the complainant’s request to have the
timber floors re-sanded. In the absence of any information to dispute the claim for damage to
the timber flooring I determine the insurer should pay the complainant $4,950 as per the
quote from SJF to cover the repair costs.
2.3 Why is the outcome fair?
There is no dispute the complainant had been provided the relevant policy documents. The
policy is clear it does not cover pre-existing damage. The information exchanged confirms the
roof damage was pre-existing and most likely caused by defective workmanship. It is not
covered under the terms of the policy.
The policy covers the internal damage and it is fair the insurer completes the mould
remediation and repairs. Should a dispute arise with respect to the mould remediation this
may be brought back to AFCA for determination. The delay in providing the remediation
report however is not acceptable and has caused the complainant an unusual degree of
physical inconvenience. It is fair that compensation under AFCA rule D3.3 be paid for non-
financial loss.
It is also fair given the available information that the insurer cash settle the claim for the re-
sanding and repair of the damaged timber flooring.
Determination | Case number: 875145 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.