Determination 874718

Claim settlement and mould damage repairs

FirmYoui
Decided2022-12-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home was flooded by a burst hose fitting and the insurer later denied cover for mould in the toilet and bathroom, then offered a cash settlement and stopped repairs. AFCA found the mould was caused by the flood, that cash settlement was unfair, and ordered the insurer to complete repairs and pay $3,000 for non-financial loss.

Under the PDS the insurer must repair damaged buildings where possible, and cash settlement is unfair where the insurer abandoned partly completed repairs and the uninsured damage is minor.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial lossrepair or rectify

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 874718 Financial firm Youi Pty Ltd Determination | Case number: 874718 Page 1 of 7 Case number: 874718 21 December 2022 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (the insurer). In January 2022, he lodged a claim for damage caused by a hose fitting bursting and flooding the lower level of his home. The insurer accepted the claim and started repairs. In March 2022, the insurer discovered mould in the wall between the toilet and bathroom. The insurer says the mould was not caused by the flooding, but was caused by a separate event. The insurer stopped repairs, and offered to settle the claim by paying the cost of the outstanding repairs. The complainant says the mould was caused by the flooding. He wants the insurer to complete the repairs. 1.2 Issues and key findings Is the insurer liable for the mould damage? Yes. The available information indicates the mould was caused by the flooding on 7 January 2022, not by a separate event. Is the insurer entitled to cash-settle the claim? No. It would be unfair for the insurer to cash-settle the claim, because:  it would be difficult for the complainant to finish work the insurer started  there is a strong possibility of further claim-related damage that has not been identified  the home has no uninsured damage, other than minor pre-existing damage to a skirting board (with an estimated repair cost of $50)  the policy terms do not entitle the insurer to cash-settle the claim. The insurer must settle the claim by completing the repairs. Repairs will include the replacement of the skirting board with pre-existing damage. To account for this, the insurer may require the complainant to contribute $50 to the cost of repairs. Is the complainant entitled to further compensation? Yes. AFCA can award compensation for non-financial loss if an insurer causes an unusual degree of stress, inconvenience, or delay. The insurer unfairly refused to complete repairs. This caused an unusual degree of stress, inconvenience, and delay. The complainant is entitled to $3,000 compensation for non-financial loss. 1.3 Determination This determination is in favour of the complainant. Within 14 days of being notified the complainant accepts this determination, the insurer must:  appoint a suitably qualified expert or experts to repair the damage  pay $3,000 compensation for non-financial loss. Determination | Case number: 874718 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer liable for the mould damage? Home damaged by escaping water The complainant says the lower level of his house flooded on 6 January 2022. He lodged a claim with the insurer on 7 January 2022. According to the insurer’s records, he said the flooding occurred because ‘ the lead hose fitting from the washing machine & water outlet had burst off ’. There is no dispute that the policy covers damage caused by water escaping from the hose fitting. The complainant says he called family and friends to remove water and carpet. The insurer appointed a builder, who inspected the house on 11 January 2022. The builder said:  there was extensive damage throughout the lower level of the house  the damage was consistent with having been caused by a single event: the breaking of the hose fitting  the house needed ‘invasive structural drying to the internal wall framing’ to prevent further damage. The insurer’s claim notes from 11 January 2022 said : ‘ our estimator attended today and has advised that restoration (drying) is urgently required ’. The insurer appointed a restorer, who inspected the house on 12 January 2022. The restorer said the home needed about 10 days of ‘mould remediation works’ , which would include installing drying equipment for seven days. On 31 January 2022, the i nsurer’s contractors started the mould remediation works. The insurer says it apologised for the delay in starting the work. On 2 February 2022, the complainant says the workers had left the site. On 7 February 2022, the insurer noted the workers had stopped work because they found asbestos. On 3 March 2022, the insurer says it obtained an asbestos clearance certificate and restarted work. The insurer’s claim notes indicate work did not actually restart until 21 March 2022. On 24 March 2022, the builder said they discovered mould in the wall between the toilet and bathroom. This was in the area affected by the flooding. The insurer says this mould was not caused by the flooding, but was caused by a separate event. On 12 April 2022, the insurer decided to deny cover for the damage to the toilet and bathroom. As the rest of the home could not be repaired without repairing the toilet and bathroom, the insurer said it would stop repairs. The insurer offered to settle the claim by paying the cost of the outstanding repairs, not including repairs to the toilet and bathroom. The insurer has now offered to pay the cost of repairing the toilet and bathroom. However, it maintains its decision to stop repairs and settle the claim by paying the cost of the outstanding repairs. Complainant provided evidence mould is claim-related There is a piece of rotted skirting next to the toilet, on the wall shared with the bathroom. There is no dispute that this was present before the flooding on 7 January 2022. Determination | Case number: 874718 Page 3 of 7 The complainant provided a pre-purchase inspection report by a building inspector who inspected the home on 10 November 2021. The report said:  there was ‘rotted skirting in [the] down stairs toilet’ which would cost $50 to repair  the property had no rising damp, no dampness, and no mould  the inspection did not include any wall cavities or under-floor areas. The building inspector reinspected the home on 14 July 2022. The building inspector provided a written statement saying:  the damage to the skirting noted in the pre-purchase inspection report was due to sub- standard timber or ‘possible urination events’  there were no water leaks and no mould present during the pre-purchase inspection  any mould now present was due to the flooding on 7 January 2022. Insurer provided no evidence mould is not claim-related The insurer says the mould between the toilet and bathroom was not caused by the flooding on 7 January 2022 but was caused by a separate event. However, the insurer has not said what the separate event was. The insurer says it advised the complainant to investigate the cause of the mould. The complainant provided a statement from his building inspector saying the cause of the mould was the flooding on 7 January 2022. The insurer has not responded to this. There is a shower on the opposite side of the wall with the rotted skirting. The insurer says there could be a leak from the shower. However, none of the expert reports say this. The insurer did not ask its experts to test whether there was a leak from the shower. Insurer’s builder says mould could be claim -related The insurer’s builder’s report of 24 March 2022 said the mould was caused by a ‘new event’. The report did not say why the builder thought the mould was caused by a new event, or what the new event was. The insurer’s builder’s report of 24 March 2022 said the mould was ‘ believed to be new and occurred separately from the pre-existing issue ’. This means whatever caused the rotten skirting (pre-existing issue) did not cause the mould. The insurer ca lled its builder on 6 April 2022. According to the insurer’s claim notes, the builder said there was a ‘real possibility’ the flooding on 7 January 2022 contributed to the mould. The insurer appears to have ignored this. Mould caused by insured event The toilet and bathroom were flooded with water on 7 January 2022 . The insurer’s experts said the home needed mould remediation works urgently, and the work would take about 10 days. The insurer did not begin the works for another three weeks, and it stopped after about two days. The insurer’s claim notes say moisture levels were ‘still high’ when the mould was discovered on 24 March 2022. This means the environment was conducive to mould growth for about 11 weeks. The skirting next to the toilet had pre-existing damage. However, the damage was minor, and there is no evidence it was associated with any mould or water leaks. There is no other evidence the mould was caused by anything other than the flooding on 7 January 2022. Determination | Case number: 874718 Page 4 of 7 The available information indicates the damage to the toilet and bathroom was caused by the flooding on 7 January 2022. Therefore, the insurer was not entitled to deny cover for this damage. The insurer must cover this damage as part of the complainant’s claim. 2.2 Is the insurer entitled to cash-settle the claim? Policy requires insurer to repair damage The product disclosure statement (PDS) for the complainant’s policy sets out how the insurer will settle a claim for building damage:  if the insurer can repair the damage, it will repair the damage (and guarantee the repairs)  if the insurer cannot repair the damage, it will pay the reasonable cost of repairs. The PDS says the insurer may be unable to repair damage if ‘the pre -incident condition of the buildings prevents us from repairing or rebuilding them’. The complainant’s home had pre -existing damage to a skirting board. However, this damage was minor, and would not prevent the insurer from repairing the damage. The insurer has not provided any other information indicating it is unable to repair the damage. Therefore, according to the policy terms, the insurer must repair the damage. Cash settlement not fair in the circumstances The General Insurance Code of Practice (to which the insurer subscribes) requires insurers to act fairly to their customers. When an insurer offers to cash-settle a claim rather than appointing a repairer, AFCA will consider whether the proposed settlement is fair. The insurer took responsibility for repairs from 11 January 2022 to 12 April 2022. If the insurer cash-settles the claim, it will leave the complainant responsible for finishing repairs the insurer started. This may include repairing damage that developed during those three months because the insurer did not properly dry out the property. It may be difficult for the complainant to find a builder willing to do this work. The complainant’s home had extensive water damage, and was in urgent need of mould remediation, in January 2022. Almost a year later, it appears mould remediation was never properly completed. Mould was identified in March 2022, and could have spread since then. For these reasons, the home may have claim-delated damage that has not yet been identified. The insurer has offered to pay the cost of repairing the identified damage, plus an extra 15% for possible unidentified damage. However, for the above reasons, the unidentified damage may be extensive, and an extra 15% may not be sufficient. A cash settlement will usually be fair if an insured property has a mix of insured and uninsured damage, and it would be impractical to repair the insured damage without repairing the uninsured damage. In this case, the only identified uninsured damage is the minor pre- existing damage to the skirting board. It is unfair for the insurer to refuse to complete repairs for this reason. For the above reasons, it would be unfair for the insurer to cash-settle the claim. Therefore, the insurer must settle the claim by repairing the damage and guaranteeing the repairs. Insurer must complete repairs Within 14 days of receiving notice the complainant accepts this determination, the insurer must appoint a suitably qualified expert or experts to repair the damage identified by its Determination | Case number: 874718 Page 5 of 7 builder and restorer. The insurer must also repair any additional claim-related damage that is discovered. Repairs will include the replacement of the skirting with pre-existing damage. To account for this, the insurer may require the complainant to contribute $50 to the cost of repairs. Insurer may only cash-settle if it is impossible to complete repairs The parties will need to work together to allow the insurer to complete repairs. Depending on both parties’ conduct, their relationship may deteriorate to the extent that it becomes impossible for them to work together, and the insurer will not be able to complete repairs. If it becomes impossible for the insurer to complete repairs, it may settle the claim by paying the cost of the outstanding repairs. The insurer may not do this unless it has made every reasonable attempt to complete repairs. If the insurer claims it is impossible for it to complete repairs, and the complainant claims otherwise, the complainant may lodge another AFCA complaint. If it becomes impossible for the insurer to complete repairs, and the insurer cash-settles the claim, it must pay the complainant an amount that will allow him to complete all outstanding repairs. It must also pay the complainant an amount that fairly compensates him for the disadvantages that come with a cash settlement, including the loss of the in surer’s guarantee and the difficulty of appointing builders to complete the insurer’s repairs. If the parties cannot agree on a fair settlement sum, the complainant may lodge another AFCA complaint. 2.3 Is the complainant entitled to further compensation? Insurer must pay $3,000 compensation for non-financial loss Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim. We do not award compensation for the usual amount of inconvenience involved in making a claim. The insurer admits there was a delay between lodging the claim on 7 January 2022 and starting remediation work on 31 January 2022. The insurer has waived the excess of $1,000 for the inconvenience caused by this delay. There was another delay between 2 February 2022, when asbestos was discovered at the home, and 3 March 2022, when the insurer obtained an asbestos clearance certificate. This was not the insur er’s fault. However, the insurer did not resume work until 21 March 2022. The insurer has not explained this delay. From 24 March 2022, the insurer stopped repairing the home. For the reasons set out above, this was unfair. This has caused a long delay in the repair of the home. The affected rooms are severely damaged, and will be unusable until they are repaired. The insurer has mishandled the claim, and this has led to a long delay in the resolution of the claim. The delay has caused the complainant an unusual degree of stress and inconvenience. Having considered the information provided by both parties, I think it is fair for the insurer to pay the complainant compensation for non-financial loss in the sum of $3,000 (in addition to the excess waiver of $1,000). Determination | Case number: 874718 Page 6 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant policy terms Product Disclosure Statement Insured events (pages 13 – 16) Your buildings and contents are covered up to the sum insured shown on your policy schedule for the following events where they occur at the insured premises. 8. Escaping Water What is covered? Loss or damage to the insured propert y caused by escaping water that occurred:  suddenly and without warning; or  slowly over a period of time and you could not reasonably have been aware of it. … What is not covered? Loss or damage which was:  caused by water escaping slowly over a period of time and you could reasonably have been aware of it;  caused by water escaping: ‒ from a leak in a shower bas e, recess or cubicle; …  caused by rising damp or seepage of water from the ground. Determination | Case number: 874718 Page 7 of 7 How we settle your claim (pages 31 – 32) 1. If you are claiming for buildings If we can, we will settle your buildings claim by:  repairing the damaged parts of your buildings if it is both possible for the parts to be repaired and economic al for us to repair thos e parts because t he cost of repair is less than the cost of rebuilding; or  rebuilding the damaged part of your buildings if it is either not possible for those parts to be repaired or not economical for us to repair those parts because the cost of repair is more than the c ost of rebuilding. The circumstances in which we may be unable to repair or rebuild the buildings include:  if materials needed for the repair or rebuild are not readily available;  if the repair or rebuilding cannot commenc e for a significant amount of time ; for example, due to availability of service providers;  if the pre - incident condition of the buildings prevents us from repairing or rebuilding them; or  if the insured event makes the land uns afe to build on; for example, after an earthquake. If we cannot repair or rebuild the damaged part of your buildings, we will pay you an amount equal to the reasonable cost that you would incur to repair or rebuild the buildings up to the limits noted in your policy. We will undertake a search of the market to determi ne what this cost would be in your area, based on factors including scope of works and comparison quotes from repairers or builders. We can use a combination of the above settlement methods if we are able to partially repair or rebuild the damaged part of your buildings. Quality guarantee (page 34) Where we arrange, authorise and pay a service provider for repairs, we will guarantee the quality of the repairs for as long as you are the owner of the ins ured property. The guarantee includes the rectification of any defects caused by poor workmanship, or faulty materials, related to thes e repairs. The guarantee does not apply to:  general wear and tear or deterioration;  electrical or mec hanical failure of appliances or machines, unless it is a dire ct result of authorised works related to the claim;  any item exceeding its expected or specified lifespan;  any part of the claim where we pay you to repair, rebuild or replace; or  any repairs you have arranged and/or paid for.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.