Home / Allianz Australia / Determination 874511
Determination 874511
Claim declined for earthquake-related cracking damage; AFCA found cause was excluded seasonal/soil movement; $500 non-financial loss awarded for handling
Summary
The complainant claimed earthquake cracking damage to her home, which the insurer declined as caused by excluded seasonal soil and building movement. AFCA upheld the decline but ordered $500 non-financial loss for handling confusion and delays.
The policy covers only listed insured events and excludes earth movement, settling and expansion; the engineer's evidence showed on balance the cracking was not caused by the earthquake.
Issues
- Claim denial primary · not upheld
“It would be unfair to compel the insurer to accept the claim because the material provided does not establish the cause of the cracking damage was the earthquake event.”
- Inadequate claim investigation secondary · not upheld
“IM's report is comprehensive and explains in detail why it came to this conclusion; photographs provide a thorough overview of the house collectively.”
- Complaint handling failure secondary · unclear
“the insurer did not respond to her complaint in the required timeframe”
- Delay secondary · upheld
“once it received the engineer's report there was a delay in confirming its final decision.”
- Poor communication secondary · upheld
“the insurer failed to keep the complainant and her representative adequately updated about the claims progress while it was waiting for the engineer's report.”
Subjects and remedies
home or building damagenatural disasterthird party authoritypay non financial loss
Text of the determination
Determination
Case number 874511
Financial firm Allianz Australia General Insurance Limited
Determination | Case number: 874511 Page 1 of 7
Case number: 874511 31 August 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
On 27 September 2021 the complainant lodged a claim for cracking damage following the
earthquake that occurred in Victoria on 22 September 2021.
The insurer does not dispute an earthquake occurred and there is cracking damage to the
home. However, it declined the claim because it says the cracking was not caused by the
earthquake but by seasonal earth or soil movement, settlement and expansion. These causes
are excluded from cover under its policy.
The complainant disputes the insurer’s decision. She says:
the home is less than 15 years old
the assessor provided provisional approval of approximately $5,000 worth of work
the insurer’s engineer failed to inspect the side of the house
the insurer did not comply with its complaint timeframes and it did not provide information
requested (full scope of works).
The complainant is represented by a family member. Reference in this determination to the
complainant includes reference to the representative.
1.2 Issues and key findings
Can the insurer decline the claim for earthquake damage?
Yes. It would be unfair to compel the insurer to accept the claim because the material
provided does not establish the cause of the cracking damage was the earthquake event. The
available material shows, on balance, the damage was caused by general earth and building
movement from seasonal changes over time. This is excluded from cover under the policy.
Is the insurer required to compensate the complainant?
Yes. The correspondence shows the insurer caused the complainant confusion, stress and
inconvenience greater than that reasonably expected in the circumstances. It is fair for the
insurer to compensate the complainant $500 for this.
1.3 Determination
This determination is substantially in favour of the insurer.
Within 14 days of the complainant’s acceptanc e of this determination, the insurer is required
to compensate the complainant $500. The insurer is not required to take any further action in
relation to the claim or complaint.
Determination | Case number: 874511 Page 2 of 7
2 Reasons for determination
2.1 Can the insurer decline the claim for earthquake damage?
Yes. It would be unfair to compel the insurer to accept the claim because the material
provided does not establish the cause of the cracking damage was the earthquake event. The
available material shows, on balance, the damage was caused by general earth and building
movement from seasonal changes over time. This is excluded from cover under the policy.
Policy provides cover if an earthquake caused the damage claimed
The policy is an insured events policy. It provides cover for loss or damage caused by one of
the specifically listed insured events. It does not cover all damage and it does not cover
accidental damage unless this is added as an optional cover. The complainant did not add
accidental damage cover to the policy.
When lodging an insurance claim, the complainant has the initial onus of proof to establish
loss or damage caused by an event covered by the policy. This is known as establishing a
prima facie claim, or a claimable loss.
If the complainant can establish a claimable loss, and if the insurer seeks to decline the claim,
the insurer has the onus to show a policy exclusion applies or the claim is otherwise not
covered.
Relevant to this complaint, the policy provides cover for loss or damage caused by an
earthquake. The available cover is however subject to the general exclusion for wear, tear
and environmental conditions, including:
earth or soil movement (other than earthquake) including landslide,
subsidence, erosion or heave,
settling, expansion, shrinkage or vibration […]
Engineer’s report shows the cracking was caused by seasonal movement
The insurer’s asse ssor (AJ) initially reviewed the damage and advised that many of the
cracks are pre-existing. AJ did, however, consider that there was some internal plaster
damage that may be consistent with the claimed earthquake event.
AJ provided a scope of works and estimated repair cost of $803.46 for the damage it thought
might be a result of the earthquake. AJ clarified that it was unsure of the policy coverage and
recommended that the claim not be progressed until an engineer confirmed the cause of
damage.
The insurer subsequently engaged an engineer (IM) to report on the cause of the cracking.
IM’s report of 30 November 2021 includes data and mapping from Geoscience Australia and
the Seismology Research Centre about the intensity and magnitude of the earthquake, in
addition to an analysis of the individual cracking at the complainant’s home .
IM concludes that there is no resultant damage at the complainant’s home from the
earthquake event on 22 September 2021. IM considers the movement and cracking identified
at the property is more consistent with:
differential thermal shrinkage and expansion between different construction materials
Determination | Case number: 874511 Page 3 of 7
differential footing movement caused by volumetric fluctuations in the reactive clay soil
foundation, due to seasonal and environmental factors.
I consider that these causes of damage would fall within the above policy exclusions.
IM’s report is comprehensive and explains in detail why it came to this conclusion. Some of
the reasons include:
the Modified Mercalli (MM) intensity level at the site was between MM III and MM IV
earthquake intensity at this level is insufficient to initiate new cracking in the building
superstructure
where movement from earthquake accelerations cause cracking to a building, it typically
produces bi-directional diagonal cracking above and below window corners and door
openings
the pattern of cracking in the complain ant’s home is of vary ing severity and frequency, and
not consistent with earthquake accelerations
the cracking in and around the home is more consistent with differential thermal shrinkage
and footings movement
the nature and type of cracking in the garage floor is consistent with shrinkage effects
which occurred soon after the slab was laid, because the edges of the crack openings are
rounded and weathered
the presence of dark staining in and around the external wall cracking is indicative of the
cracking being present for an extended period
the external horizontal cracking is common when cement render has been applied across
the damp proof course with no provision for movement
there is evidence of previous patch repairs to the cracks in the boundary wall
the presence of stepped cracking is consistent with differential footing movement
historical images of the property show in 2019 the western dwelling wall and bound ary
fence had existing cracking.
Engineer’s report shows, on balance, cracks were not cau sed by earthquake
I acknowledge the complainant says IM did not assess the cracking on every side of the
house. However, the photographs supplied wi th IM’s and AJ’s report provide a thorough
overview of the house collectively. IM’s report also confirms the photographs extracted in its
report are not a complete inventory of the building damage.
I am satisfied IM’s and AJ’s report s show the external and concrete slab cracking has been
present for some time. As outlined by IM, this is evident by the dark staining in the cracking
and some previous patch repairs to the front wall. I also accept the online image provided
shows, on balance, there was pre-existing external cracking in 2019.
IM has also explained why the characteristics and nature of the cracking patterns on the slab
and external sections of the building are inconsistent with earthquake damage.
While AJ thought some of the internal plaster cracking may be consistent with an earthquake
event, it appears this was based on the internal cracking looking more recent. This is not
sufficient to confirm earthquake cracking and AJ was clear that its conclusion was subject to
an engineer’ s confirmation. IM confirmed the cracking in the home is consistent with
differential movement caused by environmental factors and footing movement.
The available photographs and detail in IM’s report supports this conclusion. There is
extensive external cracking throughout the property, including the base of the front fence and
around its pillars, the base of the property’s render and around the top at the roof line, in
addition to the concrete slab.
Determination | Case number: 874511 Page 4 of 7
Given the evidence of extensive existing cracking and movement throughout the home, I
accept the property and site has been exposed to footing and ground movement over time.
Even if there is some new cracking that was not noticeable before the earthquake event, I
consider this to be, on balance, consistent with the differential movement throughout the
home rather than a one-off earthquake event.
Complainant’s builder’s report does not assist the complainant’s position
I acknowledge the complainant provided her own builder’s (AL) report after the insurer
declined the claim. I am not satisfied AL’s report is sufficient to establish a claim for
earthquake damage.
AL says the cracking in various locations ‘appears to be relatively fresh’. However, AL does
not explain what characteristics indicate the cracks are fresh. Many of AL’s photographs show
cracking with dark staining which IM says is an indication they have been present for an
extended time.
AL’s report and conclusions rely heavily on what the complainant advised him. AL says:
the unit next door also has cracking which the complainant says was not there prior
the complainant stated that none of the cracks shown in the photographs were present
prior to the earthquake event and they were caused by the event
the complainant presented a media article showing damages caused by the earthquake to
a nearby shop which is approximately 3.6km from the insured dwelling.
AL also says he had reports of plaster falling off a garage ceiling at an address in Epping, so
AL therefore believes the earthquake had the power to cause damage at a wide variety of
locations. AL concludes:
In light of the above details, and based on the owner’s statement that the cracks
were not present before the earthquake event, in my opinion, I believe it is
probable that the above damages were caused by the earthquake event in
question.
I am not satisfied ‘fresh’ cracks automatically establish a causal connection with the
earthquake event, especially given the evidence of the existing movement and cracking
damage. AL has not provided any explanation of how the cracking in the complainant’s home
is consistent with earthquake damage.
I am also not satisfied reports of building damage to different properties means the
earthquake caused the claimed cracking. I accept it was widely reported that a shop in
Victoria was affected by the earthquake. However, a media article is not comparable to an
engineer’s report , nor is it proof the loss was actually caused by the earthquake.
There are various reasons why a property may, or may not, have been affected by the
earthquake event. Any such reasons are not necessarily transferable to the complainant’s
home and site. The material provided does not show the other buildings referred to by AL:
are of the same building or construction type
have been exposed to the same environmental factors
exhibit damage that is consistent between the properties, or
that the earthquake was the operative cause of the damage and affected the properties in
the same way.
Determination | Case number: 874511 Page 5 of 7
Fair for the insurer to decline the claim
Insurance policies do not cover all circumstances that give rise to loss or damage. The
insurer is entitled to rely on the policy terms and the available information when assessing the
claim.
For the claim to be covered, the material provided must be sufficient to show the earthquake
event was the dominant and operative cause of the cracking damage. That is, the damage
would not have occurred but for the earthquake.
I am not satisfied the material provided sufficiently establishes the earthquake event caused
the claimed cracking damage. Given the detail and comprehensive analysis of IM’s report that
is specific to the cracking and home, I am satisfied the cause of the damage claimed is, on
balance:
differential thermal shrinkage and expansion
differential footing movement caused by volumetric fluctuations in the soil foundation due
to seasonal and environmental factors.
These causes of damage are excluded from cover under the policy. It would therefore be
unfair to compel the insurer to accept the claim.
2.2 Is the insurer required to compensate the complainant?
Yes. The correspondence shows the insurer caused the complainant confusion, stress and
inconvenience greater than that reasonably expected in the circumstances. It is fair for the
insurer to compensate the complainant $500 for this.
Complainant raises several concerns with the insurer’s handling of the claim
The complainant raises concerns with the way the insurer handled the claim. She says:
the engineer did not assess all the cracking on the property and did not return to complete
the assessment
she was unable to get access to the full scope of works referred to by AJ
AJ provided provisional approval of approximately $5,000 worth of work
the insurer did not respond to her complaint in the required timeframe
the complainant was under extreme pressure due to personal circumstances at the time of
the claim and the insurer kept contacting the complainant rather than the authorised family
member after they requested the insurer to liaise with the representative
the insurer’s handling of the matter has been neglectful and caused unnecessary stress.
AFCA can award compensation in certain circumstances
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. We also recognise
making a claim can be stressful and time-consuming, even if the insurer handles the claim
correctly. We do not award compensation for inconvenience and delays that can normally be
expected in a claim or in ordinary dealings with an insurer.
Determination | Case number: 874511 Page 6 of 7
Fair for the insurer to compensate the complainant $500
I acknowledge there was confusion between the parties regarding a scope of works referred
to by AJ. AJ did not complete a full scope of works but offered to complete a full scope of
works if the insurer required it. The complainant was under the impression AJ had offered to
complete a scope of works for her purposes and requested this from the insurer. The insurer
was then unable to investigate the complainant’s request within the timeframe it indicated it
would comply with.
While there is no information to show AJ offered a provisional settlement of $5,000 I note AJ
referenced a potential settlement of $1,148 which is different to the $803.46 in its scope of
works. This appears to have caused additional confusion for the complainant.
It is clear the complainant and her representative spent a great deal of time following up AJ’s
full scope of works, and it caused a large amount of avoidable stress and confusion.
The correspondence also shows:
the complainant and her representative were frustrated the insurer continued to contact the
complainant despite the representative requesting all correspondence be sent to her
the insurer failed to keep the complainant and her representative adequately updated
about the claims progress while it was waiting for the engineer’s report, and
once it received the engineer’s report there was a delay in confirming its final decision.
While there were some delays and administrative errors that may seem minor for the insurer,
I am satisfied this caused the complainant stress and inconvenience greater than that
reasonably expected in the circumstances. For these reasons, I consider it fair for the insurer
to compensate the complainant $500.
Determination | Case number: 874511 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.