Home / Allianz Australia / Determination 874511

Determination 874511

Claim declined for earthquake-related cracking damage; AFCA found cause was excluded seasonal/soil movement; $500 non-financial loss awarded for handling

FirmAllianz Australia
Decided2022-09-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$500
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed earthquake cracking damage to her home, which the insurer declined as caused by excluded seasonal soil and building movement. AFCA upheld the decline but ordered $500 non-financial loss for handling confusion and delays.

The policy covers only listed insured events and excludes earth movement, settling and expansion; the engineer's evidence showed on balance the cracking was not caused by the earthquake.

Issues

Subjects and remedies

home or building damagenatural disasterthird party authoritypay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 874511 Financial firm Allianz Australia General Insurance Limited Determination | Case number: 874511 Page 1 of 7 Case number: 874511 31 August 2022 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). On 27 September 2021 the complainant lodged a claim for cracking damage following the earthquake that occurred in Victoria on 22 September 2021. The insurer does not dispute an earthquake occurred and there is cracking damage to the home. However, it declined the claim because it says the cracking was not caused by the earthquake but by seasonal earth or soil movement, settlement and expansion. These causes are excluded from cover under its policy. The complainant disputes the insurer’s decision. She says:  the home is less than 15 years old  the assessor provided provisional approval of approximately $5,000 worth of work  the insurer’s engineer failed to inspect the side of the house  the insurer did not comply with its complaint timeframes and it did not provide information requested (full scope of works). The complainant is represented by a family member. Reference in this determination to the complainant includes reference to the representative. 1.2 Issues and key findings Can the insurer decline the claim for earthquake damage? Yes. It would be unfair to compel the insurer to accept the claim because the material provided does not establish the cause of the cracking damage was the earthquake event. The available material shows, on balance, the damage was caused by general earth and building movement from seasonal changes over time. This is excluded from cover under the policy. Is the insurer required to compensate the complainant? Yes. The correspondence shows the insurer caused the complainant confusion, stress and inconvenience greater than that reasonably expected in the circumstances. It is fair for the insurer to compensate the complainant $500 for this. 1.3 Determination This determination is substantially in favour of the insurer. Within 14 days of the complainant’s acceptanc e of this determination, the insurer is required to compensate the complainant $500. The insurer is not required to take any further action in relation to the claim or complaint. Determination | Case number: 874511 Page 2 of 7 2 Reasons for determination 2.1 Can the insurer decline the claim for earthquake damage? Yes. It would be unfair to compel the insurer to accept the claim because the material provided does not establish the cause of the cracking damage was the earthquake event. The available material shows, on balance, the damage was caused by general earth and building movement from seasonal changes over time. This is excluded from cover under the policy. Policy provides cover if an earthquake caused the damage claimed The policy is an insured events policy. It provides cover for loss or damage caused by one of the specifically listed insured events. It does not cover all damage and it does not cover accidental damage unless this is added as an optional cover. The complainant did not add accidental damage cover to the policy. When lodging an insurance claim, the complainant has the initial onus of proof to establish loss or damage caused by an event covered by the policy. This is known as establishing a prima facie claim, or a claimable loss. If the complainant can establish a claimable loss, and if the insurer seeks to decline the claim, the insurer has the onus to show a policy exclusion applies or the claim is otherwise not covered. Relevant to this complaint, the policy provides cover for loss or damage caused by an earthquake. The available cover is however subject to the general exclusion for wear, tear and environmental conditions, including:  earth or soil movement (other than earthquake) including landslide, subsidence, erosion or heave,  settling, expansion, shrinkage or vibration […] Engineer’s report shows the cracking was caused by seasonal movement The insurer’s asse ssor (AJ) initially reviewed the damage and advised that many of the cracks are pre-existing. AJ did, however, consider that there was some internal plaster damage that may be consistent with the claimed earthquake event. AJ provided a scope of works and estimated repair cost of $803.46 for the damage it thought might be a result of the earthquake. AJ clarified that it was unsure of the policy coverage and recommended that the claim not be progressed until an engineer confirmed the cause of damage. The insurer subsequently engaged an engineer (IM) to report on the cause of the cracking. IM’s report of 30 November 2021 includes data and mapping from Geoscience Australia and the Seismology Research Centre about the intensity and magnitude of the earthquake, in addition to an analysis of the individual cracking at the complainant’s home . IM concludes that there is no resultant damage at the complainant’s home from the earthquake event on 22 September 2021. IM considers the movement and cracking identified at the property is more consistent with:  differential thermal shrinkage and expansion between different construction materials Determination | Case number: 874511 Page 3 of 7  differential footing movement caused by volumetric fluctuations in the reactive clay soil foundation, due to seasonal and environmental factors. I consider that these causes of damage would fall within the above policy exclusions. IM’s report is comprehensive and explains in detail why it came to this conclusion. Some of the reasons include:  the Modified Mercalli (MM) intensity level at the site was between MM III and MM IV  earthquake intensity at this level is insufficient to initiate new cracking in the building superstructure  where movement from earthquake accelerations cause cracking to a building, it typically produces bi-directional diagonal cracking above and below window corners and door openings  the pattern of cracking in the complain ant’s home is of vary ing severity and frequency, and not consistent with earthquake accelerations  the cracking in and around the home is more consistent with differential thermal shrinkage and footings movement  the nature and type of cracking in the garage floor is consistent with shrinkage effects which occurred soon after the slab was laid, because the edges of the crack openings are rounded and weathered  the presence of dark staining in and around the external wall cracking is indicative of the cracking being present for an extended period  the external horizontal cracking is common when cement render has been applied across the damp proof course with no provision for movement  there is evidence of previous patch repairs to the cracks in the boundary wall  the presence of stepped cracking is consistent with differential footing movement  historical images of the property show in 2019 the western dwelling wall and bound ary fence had existing cracking. Engineer’s report shows, on balance, cracks were not cau sed by earthquake I acknowledge the complainant says IM did not assess the cracking on every side of the house. However, the photographs supplied wi th IM’s and AJ’s report provide a thorough overview of the house collectively. IM’s report also confirms the photographs extracted in its report are not a complete inventory of the building damage. I am satisfied IM’s and AJ’s report s show the external and concrete slab cracking has been present for some time. As outlined by IM, this is evident by the dark staining in the cracking and some previous patch repairs to the front wall. I also accept the online image provided shows, on balance, there was pre-existing external cracking in 2019. IM has also explained why the characteristics and nature of the cracking patterns on the slab and external sections of the building are inconsistent with earthquake damage. While AJ thought some of the internal plaster cracking may be consistent with an earthquake event, it appears this was based on the internal cracking looking more recent. This is not sufficient to confirm earthquake cracking and AJ was clear that its conclusion was subject to an engineer’ s confirmation. IM confirmed the cracking in the home is consistent with differential movement caused by environmental factors and footing movement. The available photographs and detail in IM’s report supports this conclusion. There is extensive external cracking throughout the property, including the base of the front fence and around its pillars, the base of the property’s render and around the top at the roof line, in addition to the concrete slab. Determination | Case number: 874511 Page 4 of 7 Given the evidence of extensive existing cracking and movement throughout the home, I accept the property and site has been exposed to footing and ground movement over time. Even if there is some new cracking that was not noticeable before the earthquake event, I consider this to be, on balance, consistent with the differential movement throughout the home rather than a one-off earthquake event. Complainant’s builder’s report does not assist the complainant’s position I acknowledge the complainant provided her own builder’s (AL) report after the insurer declined the claim. I am not satisfied AL’s report is sufficient to establish a claim for earthquake damage. AL says the cracking in various locations ‘appears to be relatively fresh’. However, AL does not explain what characteristics indicate the cracks are fresh. Many of AL’s photographs show cracking with dark staining which IM says is an indication they have been present for an extended time. AL’s report and conclusions rely heavily on what the complainant advised him. AL says:  the unit next door also has cracking which the complainant says was not there prior  the complainant stated that none of the cracks shown in the photographs were present prior to the earthquake event and they were caused by the event  the complainant presented a media article showing damages caused by the earthquake to a nearby shop which is approximately 3.6km from the insured dwelling. AL also says he had reports of plaster falling off a garage ceiling at an address in Epping, so AL therefore believes the earthquake had the power to cause damage at a wide variety of locations. AL concludes: In light of the above details, and based on the owner’s statement that the cracks were not present before the earthquake event, in my opinion, I believe it is probable that the above damages were caused by the earthquake event in question. I am not satisfied ‘fresh’ cracks automatically establish a causal connection with the earthquake event, especially given the evidence of the existing movement and cracking damage. AL has not provided any explanation of how the cracking in the complainant’s home is consistent with earthquake damage. I am also not satisfied reports of building damage to different properties means the earthquake caused the claimed cracking. I accept it was widely reported that a shop in Victoria was affected by the earthquake. However, a media article is not comparable to an engineer’s report , nor is it proof the loss was actually caused by the earthquake. There are various reasons why a property may, or may not, have been affected by the earthquake event. Any such reasons are not necessarily transferable to the complainant’s home and site. The material provided does not show the other buildings referred to by AL:  are of the same building or construction type  have been exposed to the same environmental factors  exhibit damage that is consistent between the properties, or  that the earthquake was the operative cause of the damage and affected the properties in the same way. Determination | Case number: 874511 Page 5 of 7 Fair for the insurer to decline the claim Insurance policies do not cover all circumstances that give rise to loss or damage. The insurer is entitled to rely on the policy terms and the available information when assessing the claim. For the claim to be covered, the material provided must be sufficient to show the earthquake event was the dominant and operative cause of the cracking damage. That is, the damage would not have occurred but for the earthquake. I am not satisfied the material provided sufficiently establishes the earthquake event caused the claimed cracking damage. Given the detail and comprehensive analysis of IM’s report that is specific to the cracking and home, I am satisfied the cause of the damage claimed is, on balance:  differential thermal shrinkage and expansion  differential footing movement caused by volumetric fluctuations in the soil foundation due to seasonal and environmental factors. These causes of damage are excluded from cover under the policy. It would therefore be unfair to compel the insurer to accept the claim. 2.2 Is the insurer required to compensate the complainant? Yes. The correspondence shows the insurer caused the complainant confusion, stress and inconvenience greater than that reasonably expected in the circumstances. It is fair for the insurer to compensate the complainant $500 for this. Complainant raises several concerns with the insurer’s handling of the claim The complainant raises concerns with the way the insurer handled the claim. She says:  the engineer did not assess all the cracking on the property and did not return to complete the assessment  she was unable to get access to the full scope of works referred to by AJ  AJ provided provisional approval of approximately $5,000 worth of work  the insurer did not respond to her complaint in the required timeframe  the complainant was under extreme pressure due to personal circumstances at the time of the claim and the insurer kept contacting the complainant rather than the authorised family member after they requested the insurer to liaise with the representative  the insurer’s handling of the matter has been neglectful and caused unnecessary stress. AFCA can award compensation in certain circumstances Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. We also recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We do not award compensation for inconvenience and delays that can normally be expected in a claim or in ordinary dealings with an insurer. Determination | Case number: 874511 Page 6 of 7 Fair for the insurer to compensate the complainant $500 I acknowledge there was confusion between the parties regarding a scope of works referred to by AJ. AJ did not complete a full scope of works but offered to complete a full scope of works if the insurer required it. The complainant was under the impression AJ had offered to complete a scope of works for her purposes and requested this from the insurer. The insurer was then unable to investigate the complainant’s request within the timeframe it indicated it would comply with. While there is no information to show AJ offered a provisional settlement of $5,000 I note AJ referenced a potential settlement of $1,148 which is different to the $803.46 in its scope of works. This appears to have caused additional confusion for the complainant. It is clear the complainant and her representative spent a great deal of time following up AJ’s full scope of works, and it caused a large amount of avoidable stress and confusion. The correspondence also shows:  the complainant and her representative were frustrated the insurer continued to contact the complainant despite the representative requesting all correspondence be sent to her  the insurer failed to keep the complainant and her representative adequately updated about the claims progress while it was waiting for the engineer’s report, and  once it received the engineer’s report there was a delay in confirming its final decision. While there were some delays and administrative errors that may seem minor for the insurer, I am satisfied this caused the complainant stress and inconvenience greater than that reasonably expected in the circumstances. For these reasons, I consider it fair for the insurer to compensate the complainant $500. Determination | Case number: 874511 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.