Home / Suncorp Group / Determination 874460

Determination 874460

Earthquake damage to home balcony archway claim denied

FirmSuncorp Group
Decided2022-09-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed under their home insurance for earthquake damage to a brick balcony archway, which the insurer denied. AFCA found the dominant cause was age, deterioration and foundation movement rather than the earthquake, and found the insurer handled the claim reasonably with no compensation payable.

The proximate or dominant effective cause of the loss was not a listed insured event, so the loss was not covered by the policy.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 874460 Financial firm AAI Limited Case number: 874460 12 September 2022 Determination | Case number: 874460 Page 2 of 7 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy underwritten by the financial firm (insurer). They lodged a claim seeking cover for earthquake damage after the Victorian earthquake which occurred on 22 September 2021. They reported part of the balcony archway at their home was compromised and became unsafe due to the earthquake. The insurer denied the claim. It says the damage was not caused by the earthquake or any other listed event in the policy. It says the reasons for the archway ’s damage wer e other factors which the policy does not cover. The complainants are unhappy with the insurer’s handling of the claim. They disagree with the insurer’s decision and with the time taken to make the decision. 1.2 Issues and key findings Is the insurer liable for the loss? No. It has not been established that the loss was caused by an insured event. Whilst the earthquake may have exacerbated the damage it was not the dominant or effective cause of it. On balance, the damage was due to a mixture of the age of the home and the long-term deterioration of the balcony archway. Is non-financial loss compensation warranted? No. The available information does not show the insurer unduly or unreasonably delayed the claim or otherwise failed to handle it appropriately. The insurer is not required to pay compensation in this instance. Why is the outcome fair? The exchanged material shows the dominant or effective cause of the loss was not the earthquake or any other listed insured event under the policy. The complainants are not able to show they are entitled to cover under the policy. It would not be fair in these circumstances to require the insurer to cover the claimed loss. As the insurer overall handled the claim reasonably, it would not be fair to require it to pay non-financial loss compensation. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 874460 Page 3 of 7 2 Reasons for determination 2.1 Is the insurer liable for the loss? No. It has not been established that the loss was caused by an insured event. Whilst the earthquake may have exacerbated the damage it was not the dominant or effective cause of it. On balance, the damage was due to a mixture of the age of the home and the long-term deterioration of the balcony archway. Complainants say earthquake damaged his home A 5.9 magnitude earthquake occurred near Rawson, Victoria on 22 September 2021. The epicentre of this earthquake was about 120 km from the complainants ’ property. The complainants ’ home is described as a circa- 1920’s , single storey building. The complainants purchased it about 20 years ago. The damaged brick balcony archway at the front is the subject of this complaint. The complainants acknowledge the home had some pre- existing cracking but say the earthquake caused damage which rendered the balcony unsafe. Policy covers loss or damage caused by an earthquake, subject to exclusions The insurer’s policy is made up of the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainants. The policy covers loss or damage which occurs due to one or more of the listed events. It also offers optional cover for accidental damage at the home, but the complainants did not select this option. Amongst the listed events covered by the policy is loss or damage caused by an earthquake or tsunami. The PDS says the insurer will not cover loss or damage caused by, connected with or arising from:  Wear, tear and gradual deterioration any part of the building that has wear, tear, rust, fading, rising damp, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to: • tiles and their adhesive or grouting breaking down; • weathering of roof tiles or roof ridge capping; • gradual weathering and breakdown of bricks, mortar or concrete . Builder considers there was evidence the damage predated the event The insurer initially arranged for a builder (KB) to visit the site. KB noted there was damage to the archway balcony and there were ‘many visible cracks’. A ‘make safe’ had been completed and the archway ‘propped up’. KB found: many areas pointed out by the [complainants] have damages consistent with pre- existing, cracked mortar, previous repairs and dislodged brickwork. Determination | Case number: 874460 Page 4 of 7 After reviewing online images, KB observed ‘there is evidence consiste nt with previous damages’. The photos exchanged show evidence of cracking and step-cracking in and around the brick archway. KB recommended the appointment of an engineer. Insurer’s engineer says loss not caused by earthquake The insurer arranged for building engineer ‘ MO ’ to inspect and report on the damage to the insured home. MO inspected the property on 11 January 2022. It prepared a substantive report dated 22 March 2022, noting:  the damage to the building was not ‘caused or contributed to by the earthquake event’  there were ‘signs of prior repairs in multiple locations’  the earthquake impact at the property was MMI IV on the Modified Mercalli Intensity (MMS) scale, meaning ‘ Some heavy furniture moved, a few instances of fallen plaster. Damage slight’  the cracking in the archway was due to: > a lack of mass above the arch > arch thrust, which divides the loading from above to the sides – the absence of a ‘keystone’ means this is not as effectively managed > potential brick growth issues  online images from before the earthquake show damage and attempted repairs present  it is ‘plausible’ the earthquake may have exacerbated damage , but it was not the proximate cause of the damage  the damage is due to ‘long term deterioration and fatigue of the archway, thermal b rick growth movements and differential foundation movements’. MMI scale shows earthquake’s intensity was not sufficient to cause damage MO says the earthquake registered MMI IV. The MMI scale measures seismic intensity (shaking) caused by an earthquake. MM I IV is considered ‘light’ and characterised as: Felt indoors by many, outdoors by few during the day: At night, some are awakened. Dishes, windows, and doors are disturbed; walls make cracking sounds. Sensations are like a heavy truck striking a building. Standing motor cars are rocked noticeably. Based on the MMI classifications, damage is generally not observed until MMI VI or MMI VII is reached. Complainants disagree with MO ’s findings The complainants say they were in the home when the earthquake occurred and disagree its impact was ‘light’ . They say: The building visibly shook violently from side to side for a brief moment, windows shook and rattled, and objects fell from the bookshelves. They acknowledge there was some damage to the archway prior to the earthquake but say it was more significantly damaged in the wake of the event. The complainants say that after the earthquake, the archway became ‘structurally unsafe’ and required ‘immediate remediation work’. They say the earthquake caused the archway to ‘crack, lower and pull away from the verandah ceiling’, making it structurally unsafe. Determination | Case number: 874460 Page 5 of 7 They believe the insurer should at least ‘contribute’ to the repair costs to make the archway safe again. The complainants provided no expert report to challenge the views of KB or MO. Insurer is not liable for the claimed loss The complainants have the onus of establishing they suffered a loss from an event covered by the policy. If a claimable loss is established, the insurer then has the onus of establishing the application of any exclusion or condition it relies on to deny or reduce its liability. I accept the earthquake shook the home. I accept it may have exacerbated existing cracking issues, but I am not satisfied the policy responds to the damage. There is clear evidence in exchanged photos of prior damage to the brickwork. MO provided an explanation for the stresses on the construction, which affected its viability over time. Whilst the earthquake may have contributed to this, I am not satisfied it was the proximate cause. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. The complainants say the archway balcony only became unstable after (and because of) the earthquake. I am satisfied that they observed it to be unstable after the event, although I consider the underlying reason for this were the issues cited by MO. I am satisfied the observed damage would not have occurred but for the underlying problems. Conversely, if these problems were not present, the archway would not have become unstable. In this instance, I am satisfied the issues identified by MO (age, construction, deterioration, brick growth and foundation movement) were the proximate causes of the damage. These factors all pre-date the earthquake event. There is clear evidence of damage prior to this event. The earthquake was not the dominant or effective cause of the damage. It is possible the shaking caused by the earthquake was the ‘straw that broke the camel’s back’ for the archway. However, in terms of influence, the other highlighted factors were the dominant or effective reasons for this damage. As the complainants have a listed events policy, they must show the loss was caused by one of the listed events. I am satisfied it was not an earthquake. There is no other listed event in the policy to account for the damage. Therefore, I am satisfied the loss is not covered by the policy. 2.2 Is compensation warranted? No. I am not satisfied that the insurer unduly or unreasonably delayed the claim or otherwise failed to handle it appropriately. The insurer is not required to pay compensation in this instance. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which causes:  an unusual degree of stress, delay, or inconvenience, and/or  interference with a person’s expectation of enjoyment and/or peace of mind. Determination | Case number: 874460 Page 6 of 7 We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer is not required to pay compensation to the complainants The complainants say they ‘endured a lengthy period of uncertainty and inconvenience’ waiting for the insurer to review the claim. They also say this experience was ‘stressful’ and the delays ‘exceeded what most would consider reasonable’. The loss was reported to the insurer on 27 September 2021. The exchanged material shows the insurer arranged for KB to attend on 5 October 2021 and KB attended t o ‘make safe’ repairs by 13 October 2021. This ensured the home was stable against further damage. KB’s report raised concerns over whether the loss would be covered. An internal assessor provided an opinion on 6 November 2021. Based on this and KB’s view, the insurer appointed MO to review the damage. MO attended the home on 11 January 2021. The subsequent report was provided to the insurer on 25 March 2022. After receipt of this report, the insurer reviewed and denied the claim in its letter to the complainants dated 5 April 2022. I acknowledge the event, the damage caused and the uncertainty over their home distressed the complainants. I accept there were some delays in the claims handling process. That the home suffered damage is not in dispute and I acknowledge it will require considerable costs to fix it. The exchanged material does not show the insurer is liable for this. It also does not show the delays incurred were unreasonable in the circumstances, noting the demand for engineers at the time was high and the intervention of the holiday period at the end of the year would likely have contributed to delays. On balance, I am satisfied the insurer overall handled the claim reasonably well. The insurer appropriately investigated the claim, kept the complainants informed of progress and delivered its final decision in a timely fashion. There were delays relating to the engineer’s attendance at the home and the provision of its report. As noted above, I accept there were some mitigating reasons for this. Even so, I am not satisfied these delays were excessive or sufficient to cause an unusual degree of inconvenience or interference with the complainants ’ peace of mind. This insurer is not required to pay compensation to the complainants. Determination | Case number: 874460 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.