Storm and hail claims denied for roof water ingress due to building defects and maintenance
Text of the determination
Determination
Case number 874069
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 874069 Page 2 of 9
Case number: 874069 7 December 2022
1 Determination overview
1.1 Complaint
The complainant holds landlord insurance issued by the financial firm (the insurer). During
2021, the complainant lodged three claims for storm damage to his investment property.
Other than in relation to some hail damage to the patio roof, the insurer has denied each of
the claims. It says:
the claim lodged on 18 January 2021 is not covered because the damage cannot be
attributed to a single insured event and, instead, has been occurring gradually over time
the claims lodged on 5 and 29 October 2021 do not involve damage through a storm
created opening. Instead, the damage is due to defects and lack of maintenance affecting
the roof.
The complainant disagrees with the insurer’s decisions. He says that he has maintained the
property in good condition and that the storm events were the cause of all the damage
claimed. The complainant wants the insurer to cover the claims. He is also dissatisfied with
the insurer’s claim handling.
1.2 Issues and key findings
Is the insurer required to pay more under the policy?
No. The insurer has on balance established the claims are not covered by the policy terms,
except for the hail damage to the patio roof. The insurer has offered to waive the excess and
pay the complainant $1,526.10 for the patio roof damage. There is nothing to suggest the
complainant is dissatisfied with that offer or that the offer is unreasonable.
Is non-financial loss compensation payable?
No. The insurer handled the second and third claims in a reasonable and prompt manner.
The insurer’s coverage decisio n on the first claim was slightly delayed but I am satisfied that
its excess waiver offer is sufficient to address the stress this caused the complainant.
Why is the outcome fair?
The insurer has established the aspects of the claims it denied are not covered. It would not
be fair for the insurer to have to cover those aspects when that is not required by the policy.
The proposal to waive the excess fairly compensates the complainant for delay related stress .
1.3 Determination
This determination is in favour of the insurer.
If the complainant provides written notice he accepts this determination, the insurer must
within 21 days of receiving that notice pay him $1,526.10 for the patio damage. In doing so, it
must not apply the excess.
The insurer is not required to take any other steps.
Determination | Case number: 874069 Page 3 of 9
2 Reasons for determination
2.1 Is the insurer required to pay more under the policy?
No. The insurer has on balance established the claims are not covered by the policy terms,
except for the hail damage to the patio roof. The insurer has offered to waive the excess and
pay the complainant $1,526.10 for the patio roof damage. There is nothing to suggest the
complainant is dissatisfied with that offer or that the offer is unreasonable.
Complainant is required to establish a valid claim under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that he suffered a loss caused by a risk he is insured against under the policy. This is
known as a valid, or prima facie, claim.
The complainant holds a landlord insurance policy issued by the insurer. Subject to the terms
and conditions set out in the product disclosure statement (PDS), the policy provides cover
for loss or damage caused by a listed insured event. One of those insured eve nts is ‘Storm,
rainwater or run- off’.
On 18 January 2021, the complainant lodged a claim on the policy (the first claim). He said
that a severe storm had caused water ingress, which had damaged the front bedroom and
living room ceilings.
On 5 October 2021, the complainant lodged another claim (the second claim). He said that
heavy winds and rain in a storm the day before had lifted roof tiles, resulting in water leaking
into the rear living room and a bedroom.
On 29 October 2021, the complainant lodged a further claim (the third claim). He said that a
severe hailstorm earlier that day caused flooding and ceiling damage throughout the house,
as well as damaging the roofing.
The policy was incepted on 20 January 2020 and runs for periods of 12 months, subject to
annual renewal. This means the first claim falls within the 2020/2021 policy period, while the
second and third claims are within the 2021/2022 policy period.
Once the complainant establishes a valid claim, the insurer is liable for the loss unless it
shows an exclusion or limiting condition applies. The insurer has the onus of proving on the
balance of probabilities the application of the exclusion or condition.
When there are multiple potential causes of a loss, it is necessary to determine the proximate
cause. Proximate cause is the dominant, efficient or operative cause of a loss. It is not
required to be last in time or the sole cause. It is a question of fact that depends on the
circumstances of each case. It requires a common sense evaluation of the evidence.
Insurer has denied each of the claims
Following notification of the first claim, the insurer (through its loss adjuster) appointed IE,
engineers, to comment on causation. After inspecting the insured property on 20 April 2021,
IE provided a report in which it concluded:
The building’s roof has dropped due to roof spread, caused by restraints at the rafter feet
that are insufficient to support normal load conditions. This has been a long-term issue,
with the roof drop evident in a 2013 Google image and from a previous attempt at repair
The house has moved and cracked over time, due to settlement, which will continue
Determination | Case number: 874069 Page 4 of 9
The cause of the settlement is shrinkage of the reactive clay foundation, due to reducing
soil moisture content as a result of seasonal and environmental factors (including trees)
The roof drop and the footing movement has reduced the roof’s effectiveness , allowing
wind driven rain to enter. This has been a long-term issue, probably since before 2013.
On 2 June 2021, the insurer denied the first claim. It says that the ceiling damage claimed
was not the direct result of an insured event. Instead, it was a result of a building defect
affecting the roof that had occurred prior to the policy’s inception and had led to progressively
worsening damage over time.
The insurer says the complainant was advised to seek independent advice on rectifying the
roofing problem (potentially, through re-roofing) to prevent further water ingress in the future.
Through its builder, AJ, the insurer appointed AB, roofers, to assist it in investigating the
second claim. After inspecting the insured property on 20 October 2021, AB reported that:
the water ingress was due to building defects involving insufficient overhang of tiles into
the roof valley, incorrect lapping of tiles and incorrect installation of leaf guard
debris build up restricting water flow was a contributing factor
a complete re-roof was required, and it would not recommend attempting to maintain the
existing roof.
On 29 October 2021, the insurer denied the second claim. It says that the damage claimed
was not the result of a storm created opening but was the direct result of water penetrating
into the building due to inherent defects, faulty design, structural defects, poor workmanship
and inadequate maintenance (all of which are excluded).
The insurer also says that the complainant had failed to take steps to rectify the roof problems
following the first claim. it says this means he had breached his policy obligations to take
reasonable precautions to prevent damage and to maintain the building in good repair.
Following the third claim’s lodgement, AJ inspected the property on 11 November 2021. AJ
ag reed with the content of AB’s report dated 20 October 2020 and also noted that the older
valleys were too flat. AJ said that absent the defects and maintenance issues, the damage
would not have occurred. AJ concluded:
The roof report states there are several issues in relation to previous roof
restoration repairs in which the valleys have been incorrectly installed, valley
gutters are not sealing correctly and are allowing water to enter the roof space.
This appears to be an ongoing issue and the recent hail storm has exacerbated
the amount of water entering the property and therefore causing more damage.
The recent hail storm is not the contributing factor but has allowed further ingress
than normal.
In a roof report dated 18 November 2021, AJ expressed the opinion ‘the damages are due to
poorly installation [sic] of new valleys, old valleys overflowing due to possible hail build up and
folds being flat on sides of valley’.
On 23 November 2021, the insurer offered to pay the complainant $926.10 ($1,526.10 less
the $600 policy excess) for the cost to repair the patio roof. That roof was made of
polycarbonate and hail had punched holes through it. The insurer says it requested EFT
details to facilitate payment, but the complainant did not provide them.
On 3 December 2021, the insurer denied the remainder of the third claim. It did so on the
same grounds as its denial of the second claim.
Determination | Case number: 874069 Page 5 of 9
Extracts from the PDS of the provisions the insurer has relied on in denying the claims appear
in section 3.2 of this determination.
Complainant disagrees with the insurer’s claim decisions
The complainant purchased the property in 2016. He says that in 2017, he arranged for RS,
roofers, to perform a complete roof restoration. The property was leased out in late 2019.
According to the complainant, prior to January 2021, there were only three or four minor leaks
reported by the tenant. On each occasion, RS attended, identified debris clogged gutters as
the cause and removed the debris.
The complainant says that due to the insurer’ s delay in progressing the first claim, he retained
CD, builders. In a quote dated 5 May 2021, CD said that the left valley rafter had cracked. CD
said this was probably due to a fault in the timber beam. The cracked beam had caused the
roof and roof tiles to drop, leading to sagging of bedroom two’s ceiling. It had also caused
three common rafters to crack. CD suggested RS should have repaired the valley rafter.
On 29 July 2021, CD issued three further quotes:
quote one was for a garage roof leak. CD said roof sheets had not been bent under the
ridge cap, allowing rain ingress. CD said the ridge capping and sheets had to be creased
quote two concerned a leak between the house’s back wall and the rear veranda. CD
could not find where the water affecting the bedroom was coming from but said it was
possible that after it had straightened the roof, the roof tiles were not covering the valley
quote three related to a roof leak between the rear of the original house and the extension.
CD said it would be necessary to extend the flashing and install two new valleys.
According to the complainant, after CD did the repairs, there were no further leaks until 4
October 2021.
The complainant has provided an invoice dated 4 October 2021 from WP, plumbers. WP
notes that the tenants had reported dripping in the roof when they used the basin and hot
water tap. WP could not identify any roof leaks or water damage.
On 21 October 2021, CD attended the property following the ‘new leak’ to clean debris from
the gutters, valleys and downpipes.
The complainant says the hailstorm on 29 October 2021 was a major event that damaged his
and neighbouring properties. He refers to media reports on the ferocity of the storm. The
complainant says that the large hailstones that fell cracked roof tiles and damaged three
skylights, leading to water ingress into the insured property.
The complainant has provided a copy of an email dated 23 August 2022 from HR, roofers. In
March 2022, HR had quoted then undertaken roof replacement work. In the email, HR said:
when it quoted, there was no visible hail damage to roof tiles, but there was hail damage to
three skylights, which caused water ingress and extensive ceiling damage
when undertaking the work, no structural defects affecting the roof frame were identified
it considered that the original tiles ‘were a poor design on a low pitch style roof like [the
insured property] causing water ingress issues over time’.
Insurer is entitled to deny the disputed aspects of the claims
Based on the available information, I am satisfied that the insurer is entitled to deny the
disputed aspects of the claims.
Determination | Case number: 874069 Page 6 of 9
In relation to the first claim, there is no evidence that the claimed damage was storm related.
Instead, both IE and CD identify a longstanding building defect as being causative. The
complainant has not established a valid storm damage claim under the policy. The damage
was caused by excluded factors.
I accept that there was rainwater ingress during the storm on 4 October 2021. However, I
agree with the insurer that the second claim is excluded. None of AB, CD and WP identified a
storm related opening. AB’s finding that the ingress was due to continuing building defects
and debris build up is persuasive. It is notable that on 21 October 2021, CD attended the
property to remove debris following the new leak.
It is clear the hailstorm on 29 October 2021 amounts to a valid claim under the policy.
However, I am satisfied that other than in relation to the patio damage, the insurer is entitled
to deny the third claim. I accept AJ’s opinion that while the hailstorm had contributed to the
water ingress, the proximate cause of damage remained the building defects and
maintenance issues.
HR says that three skylights were hail damaged, leading to water ingress and ceiling damage.
However, no photos showing the skylights were hail damaged have been provided (the one
skylight photo HR took does not depict any obvious hail damage). AJ did not identify any
damage to the skylights in either of its two detailed reports. HR did not provide substantive
commentary on the building defects IE, AB, AJ and CD identified.
It is also telling that HR says that the original tiles were unsuitable and would have led to
water ingress over time.
The complainant notes that AJ identified and replaced a broken tile. However, AJ does not
suggest the tile was broken in the hailstorm. In relation to AJ’ s reference to the old valleys
being too flat, the complainant suggests this may have been due to foot traffic following the
storms on 4 and 29 October 2021. There is no evidence to confirm that is the case.
The complainant also refers to an email he received from IE which he says indicates that the
roof movement was only in the area that CD had prepared prior to the 29 October 2021
storm. What the complainant had asked was whether the roof drop was only in one part of the
roof, which IE confirmed. That is not confirmation that the associated damage was limited, as
also shown by the comments of AB, AJ and CD.
Further, AB and AJ identified there were continuing defect issues after CD completed the
repairs.
Accordingly, I am satisfied that the complainant has not established a valid claim in relation to
the first claim and that the insurer has proven that the second and third claims are excluded.
Patio damage offer appears reasonable
On 23 November 2021, the insurer offered to pay the complainant $1,526.10 less the $600
excess for the damage to the patio roof caused by the hailstorm on 29 October 2021. It says
it could not proceed with the payment as the complainant did not provide his EFT details.
On 5 October 2021, the insurer offered to waive the policy excess, meaning the patio roof
damage payment would be $1,526.10.
The basis on which the insurer calculated the repair costs is not clear. No supporting quote
has been provided. However, the complainant has not said he is dissatisfied with the insurer ’s
offer and there is nothing to suggest that the offer is unreasonable.
Determination | Case number: 874069 Page 7 of 9
2.2 Is non-financial loss compensation payable?
No. The insurer handled the second and third claims in a reasonable and prompt manner.
The insurer’s coverage decision on the first claim was slightly delayed but I am satisfied that
its excess waiver offer is sufficient to address the stress this caused the complainant.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer has offered reasonable compensation for stress due to delay
The complainant says the insurer’s refusal to cover the claims in full and its delays have
caused him considerable stress and inconvenience.
However, I am satisfied that the insurer’s claim denials are cor rect.
I also consider that the insurer handled the second and third claims in a reasonable manner.
The insurer made a claim decision on each of them well within the standard four month period
referred to in the General insurance Code of Practice (Code).
I accept that the insurer’s decision on the first claim was issued about two weeks outside the
standard period. I also accept that this delay may have led the complainant to experience
some stress beyond that to be normally expected when making an insurance claim.
However, I am satisfied that the insurer’s offer to waive the excess is sufficient to address that
additional stress.
2.3 Why is the outcome fair?
The insurer has established the aspects of the claims it denied are not covered. It would not
be fair for the insurer to have to cover those aspects when that is not required by the policy.
The proposal to waive the excess fairly compensates the complainant for delay related stress.
Determination | Case number: 874069 Page 8 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 PDS Extracts
Page 24
Storm, rainwater or run-off
What’s covered?
Loss or damage caused by storm, rainwater or run-off.
What’s not covered?
Loss or damage caused by:
Determination | Case number: 874069 Page 9 of 9
X water seeping, perc olating or otherwise penetrating into the building as a result of:
structural defects
faulty design of the buildings
faulty workmanship in the construction of the buildings; or
your failure to adequately maint ain the buildings;
X Wind, rainwater, hail or snow ent ering the buildings through an open window or door or
any opening not made by the storm, unless the loss or damage is caused by run -off;
Pages 43 and 44
This policy doe s not cover loss, liability, injury or damage:
f. Wear and tear
arising out of depreciation, gradual deterioration and wear and tear
g. Inherent defects
caused directly or indirectly through inherent defects, faulty design, structural defects or
poor workmanship;
Unless we state differently in your policy, we will not pay for:
b. any loss or damage which is not caused directly by one of t he insured events
Page 47
Taking precautions
We will not pay for loss, liability, injury or damage… if you do not:
a. take all reasonable precautions to prevent the loss, liability, injury or damage;
b. maintain your buildings in good repair;
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.