Claim declined for earthquake damage as damage attributed to seasonal foundation movement
Summary
The complainants claimed $20,000 for pipe and structural damage they attributed to the September 2021 Victorian earthquake. AFCA found the damage was more consistent with seasonal foundation movement, which is excluded, and determined in favour of the insurer.
The complainants bore the onus of showing an insured event was the proximate cause of the damage, and they did not do so given the engineer's evidence of pre-existing foundation movement.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case number 872995
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 872995 Page 1 of 5
Case number: 872995 20 October 2022
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm (insurer).
They lodged a claim for damage they say was due to the Victorian earthquake on 22
September 2021.
The insurer declined the claim because it says the damage is not consistent with the
earthquake. It says the damage is due to seasonal foundation movement, which is excluded
under the policy.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Yes. The evidence supports the insurer’s decision to decli ne the damage.
Why is the outcome fair?
The initial onus is on the complainants to show an insured event caused the damage. The
complainants have not provided persuasive information to show the earthquake was the
dominant or effective cause of the damage. Given the damage is not covered under the
policy, it would be unfair for the insurer to accept cover for it.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to decline the claim.
Determination | Case number: 872995 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Yes. The evidence supports the insurer’s decision to decline the damage.
Policy covers earthquake damage that is not otherwise excluded
The initial onus is with the complainants to establish on the balance of probabilities (that is
more likely than not) that the loss or damage claimed falls within the terms of the policy. This
is known as a valid (or prima facie ) claim.
Once the complainants have established a valid claim, the onus shifts to the insurer to
establish, on balance, the application of a policy exclusion or that it is otherwise entitled to
decline the claim under the policy.
The policy is an ‘insured events’ policy. This means not all loss and damage is automatically
covered. Rather, only loss or damage caused by one or more of the insured events and not
subject to exclusions, is covered.
The insured events are set out in the product disclosure statement (PDS) and include
earthquake.
Complainants says an earthquake caused damage to their property
The complainants say:
the earthquake caused cracks in the sewer and storm water pipes
the damage had to be fixed urgently, but the insurer failed to send a representative or
engineer to inspect on time, so they had to pay for the damage to be fixed prior to them
attending
the insurer’s engineer did not confirm or deny whether the earthquake caused the damage
they could not use facilities in the house and had to stay with family as the insurer was too
slow to act and did not show any goodwill or understanding.
The complainants seek the cost of repairs of $20,000.
Insurer provided reports commenting on the cause of damage
The insurer appointed an engineer (EC) to attend the property on 16 December 2021. EC
stated:
the Modified Mercalli Intensity scale for the area of the complainant’s property was weak to
light and is not predicted to cause damage to a structure
the inspection noted a slight vertical crack to the wall in the sitting room and no further
damage was identified within the dwelling
it is expected that if an earthquake event caused damage, that cracking would be
widespread through the dwelling and not limited to one isolated location
the insured advised that plumbing repairs had been required to the pipes at the front right
corner of the dwelling and there were concerns the pipes may have been damaged during
the earthquake event and that a subsequent plumbing leak may have caused further
damage
the insured raised concern in relation to several brickwork cracks through the walls near
the front right corner of the dwelling, however each of the cracks had been painted over
prior to the recent event
Determination | Case number: 872995 Page 3 of 5
the evidence indicates that the cracking damage had occurred prior to the earthquake
the damage is consistent with previous foundation movement
the inspection of the subfloor noted the stumps had been packed up for relevelling in some
locations at a time prior to recent events, indicating the dwelling had previously sustained
foundation movement and had since been rectified
the floor level survey indicates differential foundation movement has occurred over the
length of the dwelling
comparisons between the measured floor level differentials and the Australian Standard
tolerances revealed the floor levels were inside acceptable tolerances and the building is
displaying minor seasonal foundation movement
the site inspection suggests that the foundation movement has generated stresses in the
structure which has been relieved through cracks
there is insufficient evidence to correlate the effects of the earthquake with the identified
cracks being claimed.
EC provided a supplementary report dated 25 February 2022, which stated:
it reviewed photos of damage to pipes at the property
its inspection of the property did not find evidence to indicate the earthquake had caused
any damage to the property
the inspection did not detect any foundation movement that may be attributed to a leak
given the lack of damage observed or detected to the area, it is unlikely that the
earthquake damaged the plumbing lines
while the cause of the damage to the pipes cannot be completely determined by the
presentation of photos after the completion of repairs, it is important to note there are
many issues that can cause cracking to a pipe that occur over an extended duration that
are unrelated to earthquake events
some of these issues include the growth of trees within the vicinity of the pipe, the long-
term settlement and seasonal movement of the dwelling placing stresses on the pipe as
well as the workmanship of the pipe installation.
Information does not show damage due to earthquake
When deciding whether the policy responds, I need to be satisfied the proximate cause of the
damage is earthquake. Proximate cause is a question of fact depending on the
circumstances. The proximate cause is not necessarily the first or last or the sole cause of the
loss. It is the effective, dominant or operative cause of the loss.
I appreciate the complainants’ concerns that the pipe repairs were urgent. I also appreciate
there is limited information regarding the cause of damage to the pipes. However, the initial
onus is on the complainants to show an insured event caused the damage. There is
insufficient information to show the earthquake caused this damage.
Rather, the information from EC shows, on balance, the damage is more consistent with
foundation movement. This is evidenced in previous cracking repairs to the property and
relevelling to the property. In the absence of more persuasive information from the
complainants, I am persuaded by EC’s report.
For the damage claimed to be covered under the policy, the complainants must show the
earthquake was the proximate cause of this damage. I am not satisfied they have done so.
Determination | Case number: 872995 Page 4 of 5
Fair for the insurer to decline the claim
The insurer’s policy consists of the policy schedule and PDS. It is not in dispute the insurer
provided the policy documents to the complainant. The insurer is therefore entitled to rely on
those terms when assessing any claim made against the policy.
The policy covers several insured events, including earthquake. The insurer says the damage
is not consistent with an earthquake event.
The onus is on the complainants to show an insured event covered by the policy caused the
damage claimed. I do not consider the complainants have satisfied this onus. I am therefore
satisfied it is fair for the insurer to decline cover for the damage.
The complainants also raise concerns with the insurer’s handling of the claim and delays. I
appreciate the complainants’ concerns given they have suffered a loss. However, the
information provided does not show the insurer caused undue delays on the claim. The
complainants lodged the claim on 29 November 2021 and the insurer appointed an engineer
to attend on 16 December 2021. The engineer’s report was provided on 28 January 2022.
The claim notes show the insurer contacted the complainants shortly after this date to provide
the claims decision.
I understand the complainants needed to repair the pipes urgently while awaiting a claims
decision. However, I do not consider the insurer unfairly delayed assessing the claim or
unfairly declined the claim. I do not consider the insurer is liable for the costs paid to fix the
pipes on this basis.
Determination | Case number: 872995 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and e ach
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.