Home / Allianz Australia / Determination 872896
Determination 872896
Flood damage claim cash settlement offer considered unfair; mould remediation not completed
Summary
The complainant made a flood damage claim under his home and contents policy and rejected the insurer's cash settlement offer. AFCA found the offer unfair and ordered increased settlement for building, mould remediation and contents, plus $4,000 non-financial loss compensation.
The insurer failed to complete recommended make-safe and mould remediation despite its experts' advice and knowledge of the complainant's vulnerability, so the settlement offer had to be increased to fairly restore the complainant's position.
Issues
- Claim amount dispute primary · upheld
“The insurer must increase the offer to $167,345.51 for the building damage repairs.”
- Poor claim handling secondary · upheld
“Insurer sought to cash settle the claim when it knew from its own experts there was a likelihood of further damage.”
- Delay secondary · upheld
“The insurer did not arrange a further engineering report until a conciliation was conducted by AFCA on 7 July 2022.”
- Poor communication secondary · unclear
“The insurer has not responded to the further list of items.”
- Repairs or contractors secondary · upheld
“The insurer failed to complete recommended mould remediation and clean and decontamination.”
Subjects and remedies
elderly or capacityfinancial hardshiphealth or medicalhome or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Determination
Case number
872896
Financial firm Allianz Australia General Insurance Limited
Determination | Case number: 872896 Page 1 of 7
Case number: 872896 12 December 2022
1 Determination overview
1.1 Complaint
The complainant lodged a claim on 23 June 2021 on his Home and Contents Policy with the
financial firm (insurer) after recent storms caused flood damage to his home and contents.
The insurer accepted liability but wants to cash settle the claim due to the pre-existing
condition of the property.
The complainant rejected the cash settlement offer and says the settlement does not cover
the full extent of the building or contents damage suffered from the event. The complainant is
seeking the insurer cover all the disputed damage and pay non-financial loss compensation
for the stress and inconvenience suffered because of the insurer’s claims handling .
1.2 Issues and key findings
Is the cash settlement offer to settle the building claim fair?
No. The offer does not consider the contingencies that may arise during the repair process.
The insurer must increase the offer to $167,345.51 for the building damage repairs.
Is the cash settlement offer for the mould remediation fair?
No. The offer for mould remediation does not cover the possible contingencies, certification or
possible structural timber damage. The offer should be increased to $22,229.92.
Is the cash settlement offered for the contents fair?
No. On balance the continued mould exposure has caused further mould related damage.
Based on the complainants inventory the panel considers it fair the insurer increases its offer
to $69,457.50 being the sum insured plus the 5% policy safety net.
Is the insurer required to pay compensation?
Yes. It is fair in the circumstances the insurer pays $4,000 non-financial loss compensation.
Why is the outcome fair?
The outcome is fair as the insurer had failed to follow its own expert advice and failed to
complete the mould remediation. The outcome allows the complainant to be placed in the
position he was in prior to the claimed event.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of this determination being
accepted, the insurer must pay the complainant in finalisation of the claim:
$259,032.93 in settlement of the claim for building and contents damage including mould
remediation
$4,000 compensation for non-financial loss
Interest is not payable as the determination takes into account current rates.
Determination | Case number: 872896 Page 2 of 7
2 Reasons for determination
The complainant is represented. Any reference to the complainant in this determination
includes submissions made on behalf of the complainant by his representative.
2.1 Is the cash settlement offer to settle the building claim
fair?
No. The offer does not consider the contingencies that may arise during the repair process.
The insurer must increase the offer to $167,345.51 for the building damage repairs.
No dispute building damaged following storms.
The complainant’s Home and Contents policy is a listed events policy provi ding cover for a
series of listed events including flood and storm subject to several conditions and exclusions.
On 23 June 2021 the complainant lodged a claim on the policy after recent storms had
caused flood damage throughout the property. The insurer does not dispute that the building
was damaged by water flooding through the property because of the storm but seeks to limit
its liability due to the pre-existing condition of the building.
Reports identify remediation works required
AJG inspected the property for the insurer on 6 July 2021 and reported flood waters had
flowed through insured's property and entered the shed, garage and possibly the lower
sections of the house. Damage was identified in the garage, master bedroom, bedroom 2,
linen cupboard, ensuite and sun room.
Mould damage was found in the master bedroom around the ceiling and cornice and affected
plaster. Bedroom 2 showed similar damage. The return air ducting in the linen cupboard was
full of water. Water had also entered the rear sun room garage and shed.
The roof above bedroom 2 had a broken tile where AJG thought water maybe entering.
Guttering at the rear of the house had rusted. AJG reported the house is in a dilapidated
condition and poorly maintained with numerous contents inside house and garage and strewn
around back yard.
The panel notes the report recommended an inventory and disposal of non-salvageable
contents affected by flood waters. It recommended a clean and decontamination of the
garage and shed and any areas in the house confirmed to be affected by flood water. Strip
out and mould remediation to internal areas of house damaged by the storm water ingress
was also recommended. Despite these recommendations the insurer did not proceed with the
clean and decontamination or mould remediation.
Engineers CCS were appointed and provided a report to AJG on 19 August 2021. The panel
accepts the report from CCS is a fair and detailed report. CCS confirmed the event caused
flooding of the subfloor area but considered it very difficult to exactly ascertain the extent of
flood related damage given the pre-existing structural (cracking) damage from long-term
movement. CCS confirmed more recent cracking damage was likely caused by the flood but
considered the full extent of cracking/structural damage would only be evident after a 6-9
month drying period.
Determination | Case number: 872896 Page 3 of 7
Reasonable for complainant to have rejected cash settlement offered
Following receipt of the report from CCS, on 1 September 2021 AJG recommended a cash
settlement of the claim despite the drying out period recommended.
The recommendation was made despite no mould remediation or clean and decontamination
occurring.
The SOW and cash settlement covered damage that had developed by August 2021. On 8
October 2021 the insurer offered to cash settle the building damage for $133,878.41 and
mould remediation for $17,099.94 making a total of $152,975.94 less $2,000 excess. The
insurer also offered $19,100 for contents based on an inventory of items from the garage.
The panel notes this offer was made despite the insurer being aware the complainant might
need assistance. The insurer was also aware of the outstanding mould remediation and the
ongoing risk of foundation movement.
While the panel accepts pre-existing issues with the home most likely prevented the insurer
from completing the repairs, the insurer has provided no reasonable explanation as to why it
did not conduct a clean and decontamination or mould remediation as recommended. It is
unclear why the insurer did not undertake a full review to the contents given it was aware of
the ongoing issue with mould.
The complainant’s representative rejected this offer, concerned there was further movement
of the foundations and mould damage to the entire sub-floor. The local council identified there
was a chance of the footings becoming dislodged because of the sub-floor inundation.
CCS had acknowledged the entire sub-floor was inundated by the flood. It identified the sub-
floor soils were still wet and muddy, and the timber floor joists and bearers were moist and
damp. It also noted significant surface mould developing inside the premises.
Given the findings in the CCS report and risks identified in the council report, the panel is
satisfied there was a real risk of further structural damage, footing movement, and sub-floor
mould damage. The panel accepts it was reasonable for the complainant to reject the offer
and insist on the further engineering report being obtained as recommended by CCS.
Insurer to increase cash settlement offer for building.
The insurer did not arrange a further engineering report until a conciliation was conducted by
AFCA on 7 July 2022. This is despite the recommendation from CCS that a report be
obtained six to nine months after the event.
IE assessed the damage in August 2022. The report is not detailed. The panel notes IE did
not distinguish between any pre-existing or new damage. IE did not inspect the sub-floor, take
soil samples or conduct any type of testing to assess whether there was mould damage.
Although the report from IE is limited, the panel accepts the findings that there was no further
foundation movement. On this basis and with the report from CCS the panel accepts it is fair
to rely on the SOW and quotation from AJG on which to base the settlement for the building
damage.
It was fair for the complainant to wait until the recommended drying out period had elapsed
before any settlement of the building damage. In the panel ’ s view the settlement for the
building damage should be increased to reflect the significant increase in cost of building
repairs and to cover the various contingencies that arise in any significant repair process.
Determination | Case number: 872896 Page 4 of 7
The panel determines the insurer should pay the complainant $167,345.51 in settlement of
the building damage based on the assessed SOW at $133,878.41 plus an uplift of 25%
($33,469.60) to cover contingencies.
2.2 Is the cash settlement offer for the mould remediation
fair?
No. The offer for mould remediation does not cover the possible contingencies, certification
or possible structural timber damage. The offer should be increased to $22,229.92.
Insurer failed to complete recommended mould remediation
Although the insurer had both the AJG and CCS reports prior to October 2021 the insurer
chose to offer a cash settlement. It failed to complete any mould remediation despite being
aware the complainant was vulnerable.
There is no evidence the insurer or its experts specifically advised the complainant to
complete the remediation works to prevent further mould damage to the sub-floor.
As indicated under section 2.1 AJG found mould damage in the master bedroom, bedroom 2
and the return air ducting full of water. Water had also entered the sun room garage and
shed. AJG recommended a clean and decontamination of the garage, shed and any areas in
house confirmed to be affected by flood water plus a strip out and mould remediation to
internal areas of house damaged by the storm water.
CCS reported the entire sub-floor was inundated, the sub-floor soils were still wet and muddy,
and the timber floor joists and bearers were moist and damp. CCS noted significant surface
mould developing inside the premises and recommended mould remediation.
Insurer to cash settle mould remediation
The panel is satisfied the failure to complete the mould remediation and drying out of the
house is likely to have contributed to further mould growth.
AJG provided a quote for the restoration/mould remediation dated 29 September 2021 for
$17,099.94. The quote does not include restoration or cleaning of contents or a clearance
certificate from a Hygienist. It comes with a note that should there be any structural timber
that cannot be remediated, it would request removal by a builder.
The panel accepts that maintenance issues identified by AJG and the pre-existing condition
of the building may have contributed to the mould development. This does not, in the panel’s
view, justify the insurer’s decision not to complete the mould remediation as recommended.
The insurer was aware the complainant continued to reside in the home.
The panel accepts, given the ongoing maintenance issues (and likely contribution to mould
development) that it is now appropriate that the cost of the remediation be cash settled. The
SOW for the remediation and drying of the affected areas is detailed and would still be
sufficient to cover most of the necessary remediation. The quote however is now over 12
months old.
The panel considers it fair in the circumstances that the settlement be increased to cover the
increased costs of remediation and contingencies. The panel determines the insurer should
increase the offer to settle the mould remediation and drying out of the affected areas to
$22,229.92 being the quoted SOW of $17,099.94 plus a 30% uplift to cover the increased
costs and contingencies.
Determination | Case number: 872896 Page 5 of 7
2.3 Is the cash settlement offered for the contents fair?
No. On balance, the continued mould exposure has caused further mould related damage.
Based on the complainants inventory the panel considers it fair that the insurer increases its
offer to $69,457.50 being the sum insured plus the 5% policy safety net.
Insurer failed to provide complete inventory of all damaged contents
The insurer offered to settle the complainant for contents for $19,100 based on an inventory
of items in the garage deemed non-restorable because of mould or water damage. The
complainant rejected this offer, on the basis this offer did not account for further mould
damage to contents.
The insurer acknowledges the additional contents may have been mould affected but says
this was not identified by its expert AJG when assessing mould damage. Accordingly, it says
it is likely this developed after settlement was offered in October 2021. It says the damage is
a direct result of the complainant’s refusal to settle and not caused by any error or delay it is
responsible for.
The panel disagrees. As already indicated the panel accepts it was reasonable for the
complainant to reject the offer and insist on the further engineering report being obtained as
recommended by CCS. CCS identified there was dampness inside the house and mould
growing on numerous surfaces beyond the containment measures in place. It confirmed the
sub-floor was still wet and there was a lot of surface water and saturated sub-soil around and
beneath the home. The panel is satisfied the initial settlement offer was neither fair nor
appropriate. There is no basis to deem the complainant rejecting it unreasonable.
Considering the available evidence, the panel is satisfied it is likely there was further mould
damage inside the house. Given the lapse of time since the event it is likely the internal mould
damage would have spread from the affected surfaces to the affected contents.
The panel accepts the complainant had a duty to mitigate against further loss. However, the
insurer was aware of the complainant’s vulnerabilities. The insurer should have authorised
AJG to handle the mould remediation works.
Insurer to increase settlement for contents
AJG’s inventory is limited to contents in the garage. Despite the opportunity to complete a
further inventory of items it has not done so.
During the conciliation on 7 July 2022 the insurer requested a list of affected items be
provided by the complainant. Following the conciliation, the complainant provided on 12 July
2022 a list of additional contents damaged totalling $74,715.16 making a total contents loss of
$93,815.16.
The insurer has not responded to the further list of items. On 25 July 2022 AJG offered to
reassess if required. No reassessment was arranged. The panel accepts in the absence of
any further assessment by the insurer that the loss claimed by the complainant is fair in the
circumstances.
The policy provides contents cover of $66,150 plus a 5% safety net. As the total loss claimed
significantly exceeds the sum insured, the panel determines the insurer should pay the
complainant $69,457.50 (sum insured plus 5% safety net) for the loss of contents
Determination | Case number: 872896 Page 6 of 7
2.4 Is the insurer required to pay compensation?
Yes. It is fair in the circumstances the insurer pays $4,000 non-financial loss compensation.
AFCA can award compensation for non-financial loss
Under AFCA rule D3.3 AFCA can award compensation of up to $5,400 for non-financial loss
where a complainant suffers an unusual degree of physical inconvenience, time taken to
resolve a situation and/or interference with an insured’s reasonable expectations or peace of
mind.
AFCA takes a conservative approach to assessing non-financial loss compensation and
expects a complainant to be moderately robust in dealing with the normal inconvenience
associated with any claim.
It is fair in the circumstances the insurer pays non-financial loss compensation
The panel accepts there were pre-existing issues with the property however the insurer failed
to complete the make safe or mould remediation when it should have known the complainant
was vulnerable. It sought to cash settle the claim when it knew from its own experts there was
a likelihood of further damage.
The insured event happened in June 2021, the first assessment on 8 July 2021 recommends
a make safe which was not completed while the next report on 21 July 2021 recommends a
cash settlement for building and contents due to the pre-existing condition of the home.
condition.
The restoration report identifies works to complete which include a full inventory of non-
salvageable contents, a decontamination of garage and shed and any areas of house
affected by flood. It identified damage to master bedroom, bedroom 2, linen cupboard,
ensuite and sunroom. Mould is identified in each of these areas. This work was not done.
The insurer has then offered to settle the claim without offering an uplift or inspecting the
premises for additional damage after the drying out period as recommended by CCS. Its
position regarding the additional mould damage is illogical when considering its own
engineer’s findings and delay in unde rtaking appropriate make-safe works.
The panel is satisfied all this has caused the complainant an unusual amount of distress and
difficulty. It is noted the complainant is a vulnerable person and had a heart attack during the
claim/complaint process. Given this, the panel is satisfied it is fair the insurer pays $4,000
non-financial loss compensation.
2.5 Why is the outcome fair?
The outcome is fair as the insurer had failed to follow its own expert advice and failed to
complete the mould remediation. The outcome allows the complainant to be placed in the
position he was in prior to the claimed event.
Determination | Case number: 872896 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes an ombudsman, a member with significant experience in consumer and small
business advocacy and a member with extensive industry experience.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.