Home / Auto & General / Determination 872311
Determination 872311
Flood exclusion applied to storm water inundation of home
Summary
The complainants' home was inundated during heavy rain in February 2022 and the insurer declined the home claim as flood damage. AFCA found the initial inundation to 100mm above floor level was stormwater covered by the policy, and ordered the insurer to cash settle the building and contents damage and pay $2,000 non-financial loss.
Policy covers storm and rainwater but excludes flood as defined by escape from watercourses; the initial above-floor inundation before creek overtopping was stormwater runoff, not flood.
Issues
- Claim denial primary · upheld
“The panel accepts the initial above floor inundation of the home to a level of 100mm was caused by stormwater. The panel is satisfied the insurer is liable for the damage.”
- Claim amount dispute secondary · upheld
“Insurer to cash settle contents claim... the insurer pays the complainants $23,200 representing approximately one third of the contents claimed.”
- Inadequate claim investigation secondary · upheld
“the insurer should have obtained further information given the house was relatively low lying and there was no accurate measurement of the flooring height.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Determination
Case number 872311
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 872311 Page 1 of 6
Case number: 872311 6 December 2022
1 Determination overview
1.1 Complaint
The complainants hold a Home and Contents Insurance policy with the financial firm (insurer).
and lodged a claim after the property was inundated with water on 27 February 2022
following a period of heavy rain.
The insurer accepts the inundation of the garage (which sits lower than the home) was
caused by storm water but says the inundation of the home was flood. The insurer declined
cover for the home as the policy excludes damage caused by flood.
The complainants dispute this decision. They say inundation was from storm water which was
unable to flow into storm water drains, therefore the insurer is liable for the entire claim.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
No. While the peak level inundation was most likely flood, the panel accepts the initial above
floor inundation of the home to a level of 100mm was caused by stormwater. The panel is
satisfied the insurer is liable for the damage to the home and contents caused by such
inundation as set out in section 2.1 of this determination
Are the complainants entitled to compensation for non-financial loss?
Yes. The complainants have endured a very difficult and challenging experience, made worse
by the insurer’s handling of the claim. Compensation of $2,000 for non-financial loss is fair.
Why is the outcome fair?
The outcome is fair as the available information while confirming the peak level of inundation
was flood, supports a finding that the initial above floor inundation was stormwater which is
covered under the terms of the policy. It is fair the insurer meets its liability under the terms of
the policy.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of the complainant’s
acceptance of this determination the insurer is to:
appoint an independent engineer and builder to prepare an actionable quote to cover the
cost to repair damage arising from inundation of the home to a level of 100mm above floor
level. Once received the insurer is to cash settle the claim as set out in section 2.1 of this
determination.
pay the complainants $23,200 for contents damage
pay the complainant $2,000 compensation for non-financial loss
Determination | Case number: 872311 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
No. While the peak level inundation was most likely flood, the panel accepts the initial above
floor inundation to a level of 100mm was caused by stormwater. The panel is satisfied the
insurer is liable for the damage caused by such inundation as set out in this determination
Policy provides cover for storm and rainwater but not flood
The complainants’ policy covers loss or damage to the insured property caused an insured
event during the period of insurance. The policy lists ten insured events which are covered,
including ‘Storms and rainwater’.
Under ‘Storms and rainwater’, loss or damage caused by storms and rainwater is covered, as
well as surface run-off rainwater within 24 hours of a storm, and the escape of rainwater from
any water pipe, drain or gutter.
Damage caused by flood is excluded unless the optional flood cover offer has been
purchased. The complainants did not select flood cover. The certificate of insurance clearly
identifies flood is not included.
The policy defines flood as:
The covering of normally dry land by water that has escaped or been released
from the normal confines of any of the following:
a lake, river, creek, or other natural watercourse (whether or not any of
them have been altered or modified)
a reservoir, canal or dam.
Circumstances of the loss
The complainants’ property consists of a residential home with a shed situated at the rear of
the property. The property is approximately 150 meters West of CT creek, on IR Place (a
residential street) which falls in an easterly direction toward the creek.
There is no dispute the property was inundated by water on 27 February 2022. The area had
experienced heavy rainfall from in the days prior to inundation. The weather event was
severe, resulting in major flooding in Queensland and New South Wales.
The complainants report that water began pooling outside the property prior to inundation,
and that clear water began entering the home at 1440hrs. They have supplied timestamped
photographs supporting this assertion. They report leaving the property at 1515hrs, at which
time water was shin deep in the home.
Complainant s’ say rainwater was prevented from draining
The complainants describe a period of sustained, significant rainfall prior to inundation. They
note that 33 mm of rainfall fell over a 15-minute period in the hours prior to inundation, and
that existing drainage was unable to cope with this high volume of water. They say the storm
water was prevented from draining away and pooled in streets and surrounding areas.
Determination | Case number: 872311 Page 3 of 6
The complainant’s supplied photos and short video showing that storm water was not draining
away due to the volume of rain. The stormwater system was surcharging with the manholes
at several locations near the property lifting. One photo of the surcharging stormwater
indicates that time was 1445hrs. The water bubbling up looks clear in one photo which also
shows clear water surrounding the manhole.
The complainants ’ position, broadly put, is that high intensity rainfall in an already saturated
area resulted a large amount of runoff. They say water was unable to escape via council
drains which were overcome. This resulted in localized pooling of rainwater which then
inundated the home.
Hydrologist considers home was inundated by floodwater
The insurer engaged hydrologist WR. WR concluded initial inundation to a depth of 0.1m,
affecting the rear yard and shed, was from stormwater runoff, whereas initial and peak
inundation to the home was caused by floodwater from CT creek.
WR basis this conclusion off the following:
short duration rainfall intensities were not exceptional, however longer duration intensities
were, with an AEP of 1 in 1700 (meaning a 1 in 1700 chance of occurring each year)
peak flows into CT creek corresponded with rainfall volumes with an AEP of 1 in 200, yet
longer durations were more significant. CT creek likely experienced a 1 in 200 AEP flood
event
peak water level at the property was 12.0 mAHD; this is close to a 1 in 2000 AEP flood
level (based on a flood study from BCC)
the property is within the mapped CT flood extent for an event of the magnitude
experienced on 27 February 2022
the complainant’s property is free draining; nearby properties may drain stormwater to the
rear of the property and pool in the rear yard to a depth of 0.1m, affecting the shed, hot
water system and multiple ground level air-conditioning units
stormwater could not have reached sufficient depth to inundate the floor level of the house
(above 0.25 m above ground level)
the timing of inundation (at 1440hrs) corresponds with the peak of recorded flood levels at
CT creek.
The WR report includes rainfall data, recorded water levels at CT creek, and other data in
reaching these conclusions. The report does not indicate at what time water first escaped
from CT creek.
Initial inundation caused by stormwater
The panel has relied on the submissions from both parties in reaching a decision. The panel
notes the information relating to rainfall data and recorded peak water levels at WT creek is
uncontested.
The panel accepts the peak level of inundation in the home was flood, consistent with the
hydrology, however the panel is not satisfied the insurer has established the initial inundation
above floor height in the home is flood.
The data used in the hydrology report is vague. It talks about approximate heights. WR
suggests the data shows the inundation would have occurred between 1500hrs and 1530hrs
on 27 February 2022. The photos show clear water entering the home at 1444hrs. While the
panel accepts this is not necessarily an indication the inundation was not flood, it does
Determination | Case number: 872311 Page 4 of 6
indicate the inundation occurred before the hydrologist considers inundation would have
occurred from CT creek.
WR says the flooding in CT creek would have filled the stormwater pipe system with flood
water. It is not clear how this conclusion was reached. WR does not comment on whether the
stormwater drains into CT creek have non-return valves which would prevent water escaping
the creek through the stormwater drains.
The panel accepts that the height of water in the river would have prevented the stormwater
draining into the creek and therefore the stormwater would backflow causing stormwater
runoff. This is not flood under the flood definition but is stormwater runoff. This would occur
before the water escaped from the normal confines of the creek.
The additional submission by the complainants on 20 September provide a detailed review of
the river height data. The complainants note the CT creek peak at 13.9 mAHD was recorded
between 1500hrs and 1530hrs. This corresponds to a height of 11.91 mAHD adjacent to the
property. As stated in the hydrology report; the property has an average ground height of
11.6mADH with the internal floor height approximately 25cm above ground level at
11.85mADH.
The complainants say at the time of first inundation, 1444hrs, CT creek had a recorded height
of 13.78mAHD at P street. This height of 13.78mAHD equates to a height of 11.79mAHD
adjacent to the property. WR does not say whether the creek at this height would have
overtopped its banks. As the height of the creek at this time is lower than the 11.85mAHD
floor height of the property and there is no evidence the creek had overtopped its banks at
this time then it is fair to accept the initial above floor inundation was stormwater.
The insurer has not responded to the complainant’s further submission. The panel is not
satisfied the insurer has established the initial above floor inundation was caused by flood.
The panel accepts that most likely the inundation at 14.44hrs was stormwater.
Insurer liable for initial inundation above floor level
The available information confirms the peak inundation of the complainant’s home was 0.22 m
above floor height by flood occurred between 1500hrs and 1530hrs. There is no accurate
estimate of the height of the initial inundation by stormwater.
The panel considers it fair in the circumstances, given the initial inundation was at 1444hrs
and occurred during a period of sustained rainfall, that the insurer covers the damage to a
level of 100mm above floor height. This would cover floorings, carpets, soft furnishings,
electrical testing and other contents as well as building damage.
Insurer to cash settle building damage claim
The only quotes for the damage have been provided by the complainants. The complainants
provided a builder’s quote from SB dated 22 March 2022 for $296,102. In the panel ’ s view
this is excessive, even for damage to a height of .22m above floor level. The quote includes
items such as replacement of split air-conditioning units and all wall linings.
In the panels view, to assess the potential damage that would result from inundation to a level
of 100mm above floor height, the insurer should appoint an engineer to prepare a scope of
works. Once obtained the insurer should appoint an independent builder to prepare an
actionable quote to cover the repairs. The insurer can then cash settle the building damage
based on the actionable quote plus a 10% uplift to cover contingencies.
Determination | Case number: 872311 Page 5 of 6
Insurer to cash settle contents claim
The complainants have also provided a spreadsheet of damaged contents totalling
$69,692.62. This may be consistent with damage to a height of .22mm above floor level but
not to a height of 100mm above floor level.
The itemised list includes items such as beds, bedding including pillows and mattresses,
tablet computers, air pods, dining room furniture and other similar items that are unlikely to be
damaged or have significant damage due to the initial inundation.
The panel accepts there would be damage to items such as electrical fittings, floor coverings
including carpets and rugs, some soft furnishings and other low-lying items. In the absence of
any actual assessment of the contents damage and to bring some finality to the complaint it is
appropriate for the panel to estimate the possible damage.
Taking all matters into account the panel considers it fair that the insurer pays the
complainants $23,200 representing approximately one third of the contents claimed.
2.2 Are the complainants entitled to any compensation?
Compensation may be awarded in certain circumstances
Under our Rules, AFCA may award compensation for non-financial loss (capped at $5,400)
where there has been an unusual amount of physical inconvenience, time taken to resolve
the situation or interference with a complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a
normal degree of inconvenience during a claim.
The complainants are entitled to compensation for non-financial loss
The complainants describe the impact the claim has had, describing physical and
psychological impacts, and ongoing challenges. These primarily stems from the event, with
the property unable to be occupied until the property is decontaminated. The situation is
made more difficult as the complainants’ children are enduring these stresses.
This is not all due to the insurer’s handling of the complaint. The submissions indicate the
insurer has proactively managed the claim. The panel however is not satisfied the insurers
decision to refuse cover for inundation to the home was correct.
While it has based its decision on the hydrology information, in the panels view the insurer
should have obtained further information given the house was relatively low lying and there
was no accurate measurement of the flooring height. This in the panel’s view has led to
inconvenience and interference with the complainant’s peace of mind.
In the panels view it is fair in the circumstances that the insurer pays the complainants
compensation of $2,000 for non-financial loss
2.3 Why is the outcome fair?
The outcome is fair as the available information while confirming the peak level of inundation
was flood, supports a finding that the initial above floor inundation was stormwater which is
covered under the terms of the policy. It is fair the insurer meets its liability under the terms of
the policy.
Determination | Case number: 872311 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as a [field of expertise].
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.