Home / Hollard / Determination 871662
Determination 871662
Insurer declined storm claim for water inundation of lower ground floor, relying on defective design/workmanship and other exclusions
Summary
The insurer declined a home claim for storm inundation of the lower ground floor. AFCA found the storm caused the internal damage, ordered the insurer to cover it (repair or cash settlement based on a JLG scope plus 15%), pay $746.50 pump hire, $3,000 non-financial loss and $1,320 engineer costs, but not the slab or mitigation works.
The storm was the proximate cause of the internal damage and the insurer did not prove an exclusion applied to it, while slab damage and drainage mitigation were excluded defects or subsurface water.
Issues
- Claim denial primary · upheld
“panel satisfied the internal damage to the lower ground floor including mould was most likely caused by the claimed storm event; insurer liable for internal damage”
- Poor claim handling secondary · upheld
“insurer did not assist in removing water or arrange mould remediation; claims handling caused significant stress and inconvenience”
- Inadequate claim investigation secondary · upheld
“insurer's engineer report fails to consider the severity of the storm, the BOM data or the significant rainfall”
- Poor communication secondary · upheld
“difficulty the complainant had communicating with the insurer and arranging the make safe immediately after the loss”
- Product terms interpretation secondary · not upheld
“slab damage and mitigation works excluded as defects, hydrostatic pressure or water beneath the surface of the land”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay non financial lossreassess claim
Text of the determination
Determination
Case number 871662
Financial firm Hollard Insurance Partners Limited
Determination | Case number: 871662 Page 1 of 8
Case number: 871662 27 March 2023
1 Determination overview
1.1 Complaint
The complainant held a home insurance policy with the financial firm (insurer) and lodged a
claim after the lower ground floor of his home was inundated by water following a severe
storm on 26 February 2022.
The insurer declined the claim and says the damage was not caused by a one-off storm event
or storm created opening. The insurer says the damage was caused by defective design or
workmanship or otherwise excluded under the terms of the policy.
The complainant says the proximate cause of the inundation was the severe storm and that
the damage was exacerbated by the insurers failure to complete the make safe. The
complainant seeks repair costs of $417,225 plus compensation for non-financial loss.
1.2 Issues and key findings
Is the insurer liable for the internal damage?
Yes. The panel is satisfied the internal damage to the lower ground floor including mould
damage was most likely caused by the claimed storm event and subsequent heavy rainfall. It
is fair the insurer covers the repair of the internal damage as set out in section 2.1 of the
determination.
Is the insurer liable for the damage to the concrete slab and mitigation works?
No. The panel is satisfied the damage to the concrete slab and need for mitigation works to
resolve the site drainage was not caused by the storm event and is otherwise excluded from
cover under the terms of the policy.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer ’ s claims handling has caused significant stress and inconvenience to the
complainant. Compensation of $3,000 for non-financial loss is fair in the circumstances.
Why is the outcome fair?
The outcome is fair as the panel is satisfied the proximate case of the internal damage was
the storm. It is fair in these circumstances that while the insurer is not liable for the structural
damage to the slab or mitigation costs it covers the damage caused by the storm.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of the complainant’s
acceptance of this determination the insurer is to:
meet the complainant’s claim as set out in section 2.1.
pay the complainant $3,000 in non-financial loss.
pay $1,320 contribution to the complainant engineers report.
Determination | Case number: 871662 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer liable for the internal damage?
Yes. The panel is satisfied the internal damage to the lower ground floor and subsequent
mould was most likely caused by the claimed storm event and subsequent heavy rainfall. It is
fair the insurer covers the repair of the internal damage and mould damage.
Policy provides cover for insured events subject to exclusions
It is accepted insurance law that an insured has the initial onus to prove on the balance of
probabilities (that is more likely than not) that the loss or damage claimed falls within the
terms of the policy. Once established, the onus then shifts to the insurer should it seek to
refuse payment of the claim to prove on the balance of probabilities that a relevant exclusion
applies to defeat the complainant’s claim.
The complainant’s policy is a Residential Home Package that provides cover for the
complainant’s building. Contents cover is provided under a separate policy and is not subject
of this dispute.
The Residential Home Package provides cover for a series of insured events including storm.
Storm is defined to mean a violent wind (including cyclone, rain, hail or snow of unusual
volume, force or duration). Under the insured event Storm, the policy also outlines what is not
covered which includes damage caused by:
when rain, hail, wind or snow enters your building unless the entry point was created by
the storm;
if the storm enters via an opening made for renovations, repairs or the like, even if there is
a temporary cover in place; or
when water enters through an opening that is found to be an existing entry point or
because of defective design. However, if we can verify by qualified opinion that the water
entered with such significant force that it would have entered even in the absence of the
existing entry point or design defect, we will not apply this limitation.
The policy also provides several general exclusions that relate to loss or damage or liability
caused directly or indirectly by or in any way connected with:
defects, structural or design faults, faulty workmanship or faulty design;
damage to your building or part of your building that at the time it was built, renovated or
installed was not compliant with the relevant local government regulations, or the
requirement of any other statutory authority.
water, including rainwater, after it has disappeared beneath the surfaces of the land at
your insured address;
the vibration, settling, shrinking or expanding of earth of any building, foundation, wall,
pavement or path (except under a 'Lightning', 'Earthquake', 'Explosion' or 'Sudden Impact'
claim).
The onus is therefore on the complainant to establish that the proximate cause that is the
dominant or effective cause of the damage to the property was the storm.
Circumstances of claim
The complainant says his property was first inundated on or about 26 February 2022 during
severe storms that impacted the area from about 23 February 2022. There is no dispute that
a severe storm impacted the area.
Determination | Case number: 871662 Page 3 of 8
The Bureau of Meteorology (BOM) data from the nearest weather stations at Gordon Golf
club shows on 23 February 2022 103mm of rain fell on this day and rain consistently
continued to fall heavily until 8 March 2022 where 187.00mm fell.
The BOM data at the nearest weather station which dates to 1906 shows the mean monthly
rainfall for February to be 138.6mm and March being 147.3mm. The monthly rainfall which
occurred in February 2002 was 371.3mm and March 2022 was 665.5mm showing the
severity of the event.
The complainant says the event was a one in 150-year event which caused water to ingress
into his property, resulting in significant water and mould related damages. The complainant
says that during the storm, the stormwater overwhelmed the stormwater pipes and inundated
the lower ground level of the home which was below the surrounding natural ground level of
the property.
The complainant says this has resulted in significant internal damage with the subsequent
development of mould. The complainant has provided quotations and damage estimates
more than $400,000.
Internal damage most likely due to storm
The insurers builder JLG attended on 3 March 2022 and provided a report on 18 March 2022,
which says:
JL are of the opinion that all damage to the property is due to excessive rains
received on the day of the event that have overwhelmed the street stormwater
pipes and flooded the street causing water to pour down the driveway and lay
against the basement section of the home that is located under natural ground
level causing water to permeate through the walls and ground slab.
Based on the supplied reports and in my opinion, I believe or (sic) water ingress is
due to the overwhelming inundation of rainwater received pouring down the
driveway at the height of the event when the stormwater pipes of the street were
blocked causing a street to flood. Excessive amounts of water ran down the
driveway and laid at the flattest point of the property which is the basement area
located under natural ground level on the eastern side of the property. It would be
of my opinion is no water ingress was caused on the western side of the property
based on the fact that it is not under natural ground level on this side of the home.
It is clearly evident that all damage internally to the basement area is sudden and
unexpected from a one off event and no damage that I could see on the day of my
assessment related to maintenance and all age related damage pre-dating this
event.
The plumbing report provided by (SE) advised:
We carried out a CCTV inspection to multiple storm water pipes through pits and
strip drains. All down pipes run to multiple storm water pits at the rear of the
property. It was raining at the time of our attendance with water observed to be
flowing freely though all storm water lines, we found no blockages or damaged
PVC pipes.
Determination | Case number: 871662 Page 4 of 8
The panel accepts there were no blockages in the stormwater system but most likely the
stormwater system had been overwhelmed by the heavy rains following the storm event.
The panel is satisfied that the information available confirms that the inundation of the
property was directly related to the significant storm event. The panel accepts there is
extensive internal damage.
Insurer has not established relevant exclusion applies to internal damage
The insurer relies upon the general exclusions contained in the policy that excludes cover for
damage directly or indirectly connected with defects, structural or design faults, faulty
workmanship or faulty design, or alternatively water that has disappeared beneath the surface
of the land and caused damage.
The insurer relied upon reports from its engineer SC and says the engineer’s report is more
persuasive than the report from its builder JLG due to the engineer’s qualifications.
SC reported:
the storm water seepage into the lower ground flood is consistent with defective design
and defective workmanship
the defects relate to the site drainage, damp proofing and cracking to the concrete slab.
the lower ground slab is consistently elongating randomly, with three-way webbed
cracking. This pattern is typical of shrinkage cracking.
a pour joint in the slab was also observed consistent with what appeared to be a section of
the lower ground floor where there had been concrete levelling applied.
The panel notes the report from SC fails to consider the severity of the storm, the BOM data
or the significant rainfall. The report appears to focus on the damaged concrete slab rather
than the impact of the storm itself.
The complainant’s engineer ST considered the crack on the concrete slab to be new and
associated with the likely build up of water pressure under the lower ground floor slab. ST
concluded that despite the substantial above ground drainage (as confirmed by
accompanying photographs) due to the high volume of rain in the period, the slab was not
capable of withstanding the water pressure and cracked. This position is supported by the
complainant’s builder TH who reported on 22 May 2022:
...it is evident that there has been substantial water damage to the ground floor
area of the dwelling. The water had penetrated through the concrete slab from a
build up of pressure resulting in pooling of water. Once penetrated, we were
advised the water pooling remained above ground for over a month more water
was entering the dwelling than could exit. This pooling of water internally caused
significant mould issues as evidenced by the removal level of gyprock evident in
the photos below. The cavities have been holding water and as a result, the
structural timber walls are rotted in many areas including damage to majority of
the insulation and plasterboard (gyprock).
It is not in dispute that there was unprecedented rainfall on the day of the storm, nor that this
significant event overwhelmed the local stormwater systems. It is also evident that the ingress
of water on that day was a direct result of the volume of rainfall and the failure of the local
stormwater systems to cope. There is no evidence to show that the inundation and resultant
damage would not have occurred, but for the defects or design.
Determination | Case number: 871662 Page 5 of 8
The panel accepts the storm was the proximate that is the dominant or effective cause of the
damage. While the panel acknowledges the issues with the defects, the panel accepts there
is no evidence of previous inundation of the area. The storm was particularly severe with
close to five times the average rainfall in February and March 2022. As indicated by JLG the
stormwater most likely overwhelmed the storm water drainage system.
Insurer is liable for internal damage
Having considered the available information, the panel is satisfied that the complainant has
established a relevant claim for storm related damage to the internal areas of the lower
ground floor.
The complainant has provided several quotes for that damage, the most recent quote being
more than $360,000. The insurer has not provided a quote with respect to the internal
damage.
In the panel’s view, to properly assess the extent of the internal damage caused by the
inundation, that is, the damage to the floor coverings, walls, framing and cabinetry etc, it is
fair to allow the insurer to appoint JLG to attend the complainant’s property .
The insurer must within 14 days of the complainant’s acceptance of this determination
appoint JLG to attend the complainant’s property and prepare a scope of works and
actionable quote to complete the relevant internal repairs to the lower ground floor level of the
complainant’s property including any mould remediation.
The insurer may then choose to cash settle the claim or complete the repairs in accordance
with the scope of works. The panel accepts that prior to the completion of any repairs, it will
be necessary for the complainant to complete maintenance work as indicated in section 2.2 of
this determination.
In the event however that the insurer choses to cash settle the complainant or the parties
agree to a cash settlement, then the insurer can cash settle the claim based on the quote
provided by JLG with a 15% uplift to allow for contingencies in any repair process. As the
quote will be a current quote, no interest would be applicable on any cash settlement.
2.2 Is the insurer liable for the damage to the concrete slab and
mitigation works?
No. The panel is satisfied the need for mitigation works to resolve the site drainage and
damage to the concrete slab was not caused by the storm event and is otherwise excluded
from cover under the terms of the policy.
Insurer liable for initial make safe works
The insurer completed some initial make safe works to the complainant’s property including
the stripping out of part of the flooring and walls. The insurer did not however assist the
complainant in removing the water from the lower ground floor area despite the complainant’s
advice to the insurer that the water was flowing through the lower ground f loor area.
It is apparent from the information provided that the complainant was required to hire pumps
to assist in removing the water from the area. In doing so, the complainant was seeking to
mitigate any damage sustained to the property.
Determination | Case number: 871662 Page 6 of 8
Whilst the panel accepts the insurer had not determined its position on liability, the panel is of
the view that it was fair and reasonable for the complainant to expect assistance from the
insurer given the circumstances of the loss and damage.
The complainant has provided invoicing indicating the cost of hiring the water pumps for
$746.50. The panel considers it fair in the circumstances that the insurer meets the cost to
hire the water pumps.
Insurer not liable for mitigation works
The complainant has also claimed the cost of hiring a tract dirt remover, digging external
trenches, hire of skips to remove the dirt and associated labour as part of the make safe.
The panel does not accept that the insurer is liable for these costs. The work required is
associated with the drainage issues identified by the complainant ’s engineer ST and the
insurer’s engineer SC. The panel is satisfied that the drainage issues relate to the defective
site drainage and damp proofing identified by SC and in the circumstances, the insurer is not
liable for this mitigation work.
Insurer not liable for cost to repair concrete slab
The panel is also satisfied that the insurer is not liable for the costs to repair the concrete
slab.
The available information confirms there were original defects in the concrete slab unrelated
to any stormwater issue.
Insofar as the complainant relies upon his own engineer’s report, that report suggests the
damage to the slab was caused by either hydrostatic pressure, that is the build-up of water
pressure under the slab or alternatively water including rainwater after it had disappeared
beneath the surface of the land. Both are general exclusions under the terms of the policy.
It is fair in the circumstances that the insurer relies upon the terms and conditions of the
policy to refuse payment for the further mitigation works and repair of the concrete slab.
2.3 Is the complainant entitled to compensation?
AFCA can award compensation in certain circumstances
AFCA’s Rules enable it to aw ard compensation of up to $5,400 to a complainant for non-
financial loss where because of the claims handling there has been:
an unusual amount of physical inconvenience;
time taken to resolve a situation; or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss and expects a
complainant to be moderately robust and bear the usual degree of inconvenience when
managing an insurance claim.
Complainant seeks compensation for claims handling experience
The complainant is dissatisfied with his claims experience. He highlighted the fact it was
stressful, the insurer was difficult to contact, the property was not made safe and advise
ignored on how to complete the make safe.
Determination | Case number: 871662 Page 7 of 8
The available information shows the difficulty the complainant had communicating with the
insurer and arranging the make safe immediately after the loss. T he insurer’s outright refusal
to consider the claim and communication issues caused significant stress to the complainant.
The panel also notes that the complainant informed the insurer that mould was developing
throughout the property and despite this, the insurer did not arrange any remediation for the
mould. The panel is concerned that the mould could not only have developed in the lower
ground floor area but also in the upper floor area of the property given the delays in assisting
the complainant with the make safe works.
In the circumstances, the panel considers it fair that the insurer pay compensation for non-
financial loss of $3,000.
The complainant has also incurred professional costs in obtaining an engineer report from ST
as to the cause of the damage. While the report is only partially supportive of the
complainant’s cl aim, it has nevertheless been relied upon and was reasonably obtained by
the complainant to respond to the insurer’s denial of the claim.
The complainant has provided an invoice of $1,320 for the report. The panel is satisfied that it
is fair that the ins urer contributes $1,320 to the complainant’s professional costs.
2.4 Why is the outcome fair?
The outcome is fair as the panel is satisfied the proximate cause of the internal damage was
the storm. It is fair in the circumstances that the insurer while not liable for the structural
damage to the slab or mitigation costs, covers the cost of the damage caused by the storm
including any mould remediation.
Determination | Case number: 871662 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive insurance industry experience
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.