The complainant claimed for water damage to the laundry and toilet ceilings after a December 2021 claim. The insurer declined, saying the damage was gradual over an extended period from a failed puddle flange and waterproofing. AFCA found the insurer entitled to decline the claim.
The complainant bears the onus to show a sudden, accidental escape of liquid under the policy; on balance the damage was gradual and excluded.
Issues
- Claim denial primary · upheld“The insurer is entitled to decline cover for the damage under the policy; damage due to gradual failure of puddle flange waterproofing, excluded.”
- Inadequate claim investigation secondary · not upheld“Insurer is not obliged to arrange further investigation; the complainant bears the onus to establish a valid claim.”
Subjects and remedies
home or building damageno remedy
Related
Text of the determination
Determination
Case number 871298
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 871298 Page 1 of 6
Case number: 871298 25 October 2022
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents policy (policy) with the financial firm
(insurer). On 23 December 2021, a claim was lodged for water damage to the insured
building in the laundry and adjacent toilet on the ground floor.
The insurer has declined the claim. The insurer says the damage is not the result of a sudden
and expected event. Rather, that the damage has been occurring gradually over an extended
period because of a gradual leaking of water through a failure of the waterproofing for or the
installation of the puddle flange in the upper level shower base.
The complainant says the insurer has failed to adequately investigate the cause of the
damage, which he says has not yet been established.
1.2 Issues and key findings
Is the insurer’s assessment of its liability under the policy reasonable?
Yes. The available information establishes, on the balance of probabilities, that the damage to
the insured property has been occurring gradually over an extended period of time due to a
failure of the puddle flange and/or its installation.
Accordingly, the insurer is entitled to decline cover for the damage to the insured building in
line with the policy.
Why is the outcome fair?
The complainant has been unable to show, on balance, the damage to the insured building is
the result of an insured event and/or is covered under the policy. The available information
shows, on balance, the damage is excluded under the policy. For these reasons, it is fair in all
the circumstances that the insurer be permitted to rely on the policy provisions to decline the
claim.
1.3 Determination
This Determination is in favour of the insurer.
The insurer is entitled to decline cover for the damage to the insured building.
Determination | Case number: 871298 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer’s assessment of its liability reasonable?
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘Escape of liquid’. Cover under these benefits is subject to the
conditions, limitations and exclusions specified in the product disclosure statement (PDS).
There is no dispute the insurer provided the complainant with the relevant policy
documentation including the PDS and certificate of insurance (COI). Therefore, I accept the
insurer is entitled to rely on the policy provisions to assess its liability under the claim.
The Escape of liquid insured event, as provided in the PDS, covers loss or damage that is
sudden, unexpected, accidental and without warning that occurs from listed items including
fixed pipes. The policy includes specific definitions for the terms event, gradual and gradual
deterioration as provided below:
Event: a single occurrence which you did not intend or expect to happen that
results in loss or damage
Gradual: something that progresses slowly and is not sudden
Gradual deterioration: change or process that occurs in small stages over a long period of
time, rather than suddenly and can be due to [but not limited to] hail, wind, snow or rain, rot,
mildew or liquid slowly leaking from any fix pipe, fixed tank, waterbed, aquarium, household
appliance or item used to hold liquid insured.
Complainant bears the onus to estab lish a valid claim under the policy
It is established law that the complainant has the onus to establish, on balance, (that is, more
likely than not) that the loss falls within the terms of the policy. Only if a valid claim is shown
to exist, will the onus shift to the insurer to show, on balance, it is entitled to decline the claim
in line with the policy provisions.
There is no dispute there is water damage to the laundry and adjoining toilet ceilings. The
onus is on the complainant to prove the damage arose from a sudden, unexpected and
accidental event in line with the policy provisions.
The complainant says the insurer’s decision to decline the claim is based on inadequate
assessments and that it has not established the damage is excluded under the policy. The
insurer, however, says the damage does not appear to be sudden and has occurred over an
extended period of time, which is not an insured event.
The insurer says the complainant has not established a valid claim. On balance, the insurer
says the damage is because of the defective installation of the shower’s puddle flange and its
waterproofing. Damage in such circumstances is excluded under the policy.
Information from the consultants’ appointed by the parties
The insurer appointed loss adjusting consultants ‘C’ to investigate the cause and extent of the
damage to the insured building. C appointed building consultants ‘AO’ who attended the
property on 23 December 2021.
Determination | Case number: 871298 Page 3 of 6
AO says the complainant said he noticed the damage on 17 December 2021 and appointed a
plumber who formed the view the leak was from a waste pipe. The complainant also advised
he had claimed for similar damage a year prior which was declined due to a leaking shower
base.
After completing its assessment, AO says potentially the leaking is from the shower base and
puddle flange at the shower waste pipe connection in the bathroom above the laundry. AO
noted the damage to the laundry ceiling did not appear recent or due to a single event. AO
noted the waste pipe within the puddle flange had recently had adhesive applied to it, which
shows a historical issue.
AO concludes there is no insured event and the complainant is required to arrange
maintenance works including engaging a suitably qualified plumber to replace the puddle
flange and waterproofing to the shower recess.
The insurer appointed restoration consultants ‘S’ attended on 30 December 2021. However,
other than confirming the damage to the laundry and toilet ceiling, it has not provided much
information of assistance, advising likely a leaking pipe is the cause for the damage.
The insurer has provided an email from C dated 11 February 2022 providing further
explanation relating to AO’s assessment and findings. C says after completing all possible
non-invasive testing, the only viable and reasonable conclusion is that the puddle flange has
not been adequately waterproofed and/or installed at time of construction.
The investigations included pressure testing the bathroom plumbing as well as flood and
spray tests to the shower, which all passed. When the shower drain was covered during the
flood test there was no leakage, however, on removing the cover water began to leak. The
fact silicone or something similar had been sprayed into the flange indicates an ongoing issue
and budget style attempt to repair.
The complainant has provided a roof report from consultants ‘E’ dated 24 June 2022. E
inspected the external roof to the insured home and found old silicone lifting and perished
around vents and flumes. E noted small teck screws were not sealed into the flashings. E
removed all old silicone and supplied new grey roof silicone reseal to all flashings and teck
screws.
Given the complainant’s dissatisfaction with the insurer’ s investigations, the insurer arranged
another assessment by consultants ‘CD’, who attended on 26 June 2022. CD confirmed the
damage in the laundry and toilet, noting the damage aligns with the upstairs bathroom waste
pipe. CD says it could not access the small space between the laundry and toilet ceilings and
the bathroom above, however, inserted a camera to take pictures.
The pictures showed water stains around the PVC waste pipe from the bathroom above. By
measuring distance from walls below and above, CD found that the damage aligns very close
to the shower recess floor waste pipe. CD also says rainwater entry is not possible to the
location in question as the area is not exposed to any upper roof area.
The complainant has provided a report from roofin g consultants ‘V’ dated 21 July 2022. V
states during periods of rain, water is tracking into the ceiling space in the laundry and
garage. In V’s opinion a destructive survey is recommended to be completed. The roof area is
not showing any visual storm-related or maintenance-related defects that would contribute to
the damage.
Determination | Case number: 871298 Page 4 of 6
Evidence form insurer is more persuasive and shows damage is not covered
The insurer is entitled to decline the complainant’s claim for damage to the insured building.
On balance, the dominant cause for the damage relates to water leaking from the upstairs
shower wastepipe/puddle flange over time. The leaking has most likely been due to the
gradual failure of the puddle flange waterproofing and issues with its installation.
The available information shows, on balance, that this has been an ongoing issue with
previous attempts of repair being made to the shower recess as well as waste pipe. Further,
there is information relating to damage to the same area in the past as well as previously
declined claim. I have not been provided with any information to show the previously noted
damage had been repaired.
The photos of the damage provided by AO, who attended the same day the claim was
lodged, in my opinion show damage that had clearly been present for some time. The nature
of the water staining, discolouration and presence of mould support the damage had been
present for some time. It is also consistent with damage that occurs gradually over an
extended period of time because of repeated instances of water leaking onto the surfaces.
Further, I am not satisfied that this damage is the result of a sudden event/occurrence or that
it first occurred on 17 December 2021. Rather, on balance, for the reasons discussed above
and the expert reports, the damage is due to gradual, ongoing and repeated occurrences of
water leaking onto the ceiling plaster.
On balance, this relates to the gradual failure of the puddle flange waterproofing over time,
most likely because of poor/incorrect installation. I am satisfied damage in such
circumstances does not meet the requirement of a prima facie claim under the policy. Further,
even it was accepted that a valid claim exists, the circumstances of the loss are excluded
from cover under the policy.
Insurer is not obliged to arrange further investigation under the claim
The complainant argues that the insurer has not established the proximate cause for the
damage. First, as noted above, the onus rests with the complainant and not the insurer to
show, on balance, the loss claimed is covered under the policy. Second, I am of the opinion
the information from the appointed consultants’ is reasonably consistent in identifying the
failure of the puddle flange and associated shower waste pipe as the issue. Further, that it
has been ongoing issue for some time due to defective installation and failure of the
waterproofing.
If the complainant is not satisfied with the insurer’s investigations, he is entitled to arrange his
own investigations and provide such information to the insurer for its consideration. This is
consistent with the complainant’s obligation to first establish there is loss or damage to the
insured building which is covered under the policy. I am not satisfied the complainant has
provided persuasive information contrary to the insurer or that establishes a prima facie claim.
I acknowledge the complainant’s expectation that the insurer be required to arrange and pay
for invasive investigations to determine the cause for the damage. However, again this is not
an obligation that to falls to the insurer. It is the complainant that is required to show the
cause and that this cause triggers cover under the policy.
The insurer is entitled to decline cover for the damage under the policy
In the absence of compelling information to the contrary from the complainant, I am satisfied
the insurer has established an entitlement to decline the claim. This is because the damage is
the result of circumstances which have not been shown to trigger under the policy and
alternatively are clearly excluded from cover.
Determination | Case number: 871298 Page 5 of 6
Accordingly, I determine the insurer is entitled to decline the claim.
2.2 Why is the outcome fair?
The complainant has been unable to show, on balance, the damage to the insured building is
the result of an insured event and/or is covered under the policy. The available information
shows, on balance, the damage is excluded under the policy. For these reasons, it is fair in all
the circumstances that the insurer be permitted to rely on the policy provisions to decline the
claim.
Determination | Case number: 871298 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Other matters
In the interest of completeness, I note the complainant whilst disputing the insurer’s decision
to decline the claim subject of this determination has also lodged a second claim. This second
claim relates to the same damage, however, on the basis the damage is due to rainwater
ingress.
The insurer has confirmed the lodgement of this claim and which it is currently assessing. The
insurer says if this new claim is declined, it will need to progress through the relevant internal
dispute resolution process before it can be lodged as a new complaint with AFCA.
I accept, given this is a new issue raised by the complainant and subject of a new claim, that
it is fair that the insurer be allowed to investigate the issue. Also, that in the instance the new
claim is declined, it will need to be considered under a new complaint lodged with AFCA.