Home / QBE / Determination 870977

Determination 870977

Balcony water damage claim denied under strata policy

FirmQBE
Decided2022-10-31
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant, a strata unit owner and beneficiary under the body corporate's policy, claimed for balcony water damage after a storm and sought compensation for poor claim handling. AFCA decided the damage was caused by excluded gradual deterioration and construction defects, so the claim was validly denied and no non-financial loss was awarded.

The complainant must establish a valid claim for sudden and accidental damage, and the proximate cause of the water damage was excluded wear, maintenance and construction defects rather than the storm.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 870977 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 870977 Page 1 of 7 Case number: 870977 31 October 2022 1 Determination overview 1.1 Complaint The complainant is a beneficiary under a residential strata plan insurance policy issued by the financial firm (the insurer). The policy is issued to the owners’ corporation (body corporate) of the building in which the complainant owns a unit. On 4 November 2021, the complainant lodged a claim on the policy for damage to his unit’s balcony. The complainant said that a significant storm on 29 October 2021 had caused a tile to crack, resulting in water damage to the balcony sheeting and the soffit lining below. The insurer denied the claim. It said the balcony damage was not from a sudden and accidental cause. Rather, that damage was due to gradual deterioration, construction defects and maintenance issues, which are excluded from cover. The insurer also said the cost to repair the possible resultant damage to the soffit lining was below the policy excess. The complainant is dissatisfied with the insurer’s decision. He says the storm caused the claimed damage. He wants the insurer to cover the claim in full and pay compensation for the stress and inconvenience its poor claim handling caused him. 1.2 Issues and key findings Is the insurer entitled to deny the claim? Yes. On balance, the complainant has not established a valid claim under the policy. Instead, the balcony damage is the result of excluded causes. Further, the cost to repair the possible resultant damage to the soffit lining is well below the policy excess. Is the complainant entitled to non-financial loss compensation? No. Overall, the insurer has acted reasonably and in a manner generally consistent with the General Insurance Code of Practice (Code). Why is the outcome fair? The complainant has not established the existence of a valid claim. This means the insurer is entitled to deny the claim. It would not be fair for the insurer to have to pay the claim, when there is no policy requirement to do so. Further, as the insurer overall handled the claim in a reasonable manner, it would not be fair to require it to pay non-financial loss compensation. 1.3 Determination This determination is in favour of the insurer. It is not required to take any further action. Determination | Case number: 870977 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Yes. On balance, the complainant has not established a valid claim under the policy. Instead, the balcony damage is the result of excluded causes. Further, the cost to repair the possible resultant damage to the soffit lining is well below the policy excess. Complainant must establish a valid claim under the policy The complainant is required to show on the balance of probabilities (that it is more likely than not) that he suffered a loss caused by a risk covered by the policy. This is known as a valid, or prima facie, claim. The complainant is a beneficiary under a residential strata plan insurance policy issued by the insurer. Subject to the terms and conditions set out in the product disclosure statement and policy wording (PDS), the policy covers the complainant’s unit against ‘Damage’. The PDS defines Damage as: any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by this Policy. One of the PDS terms is that a person claiming under the policy must pay the applicable excess. In this case, that excess is $5,000. Once the complainant establishes a valid claim, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. The proximate cause of the damage must be determined The parties disagree on whether the storm was the proximate cause of the damage claimed. Proximate cause is the dominant, efficient or operative cause of a loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common sense evaluation of the evidence. Complainant says the storm caused all of the claimed damage The complainant says the storm on 29 October 2021 was classified as catastrophic and caused widespread damage throughout his home city. He says that a few days after the storm, the soffit lining under the balcony showed signs of water damage. He says there were no indications of water damage to the soffit lining or the balcony before the storm. On or about 15 November 2021, the insurer received an initial report and quote from SG, builders. SG said that the cost to repair any resultant damage would be below the excess. The complainant says the insurer told him he would need to obtain his own trade report (for example, from a plumber or tiler). The complainant obtained and relies on a report and quote dated 14 December 2021 from SC, tilers. SC’s opinion was that ‘the obvious damage on the (near the drainage point) occurred during the mo st recent storm’. Determination | Case number: 870977 Page 3 of 7 SC suggested the possible mechanism of damage was excessive water from the storm seeping into the balcony, causing the inappropriate balcony sheeting to swell, resulting in a tile near the drain lifting and cracking. SC also said the cracked tile was allowing water to leak into the floor cavity and that ‘this could potentially be the result of the recent storm.’ SC also noted numerous other issues with the balcony. These included:  incorrect particleboard sheeting had been used on the balcony, which swells/expands on getting wet  the finished floor level of the balcony was 30mm lower than the finished floor inside the unit, exposing the interior to water ingress risk  there were no skirting tiles around the balcony perimeter, allowing water to leak into the wall and floor cavity  the main junction joint seals around the balcony perimeter were discoloured, split, deteriorated, open in several sections and mouldy in others. They required replacement  grout was discoloured, had cracked or was missing in sections, indicating possible substrate movement. The grout issues allowed water penetration underneath the tiles and possible damage to the substrate  there were cracks in the rendered wall sheeting around the balcony walls, which could be a contributing factor to the leak  the soffit lining below was damaged due to possible failure of the seals or the membrane below the tiles  movement in the tiles and sheeting when stood upon, indicating possible water damage to the substrate below. SC recommended the balcony be completely stripped back, re-sheeted, waterproofed and tiled. It quoted $19,794.50 to do so but did not provide an itemised costing. Insurer says the damage is due to excluded causes The insurer appointed SG, builder, to assist it in assessing the claim. SG inspected the property on 6 November 2021 and reported that:  the water damage to the soffit lining was directly below the balcony’s drainage point  a cracked tile could be allowing water to enter the ceiling cavity  there is a possibility the entire balcony area will need to be rectified  the resultant damage was limited to the soffit lining, which required localised patching and painting  the cost to repair that damage would be $2,567.40. On 15 February 2022, SG provided a leak inspection report in which it concluded: Flood testing of the balcony confirmed water ingress into the area of damage via the aged grout, viewed visually and with thermal imaging. Heated spray testing of the balcony caulking has confirmed water ingress into the area of damage via the detached caulking, viewed with thermal imaging. The above is confirmed as the cause of damage. It appears water egress from the balcony has occurred over a period of time. SG said the cause of the damage was age/wear and tear and lack of maintenance. On 24 February 2022, SW, the insurer’s employed senior building consultant, undertook a desktop review and reported: Determination | Case number: 870977 Page 4 of 7  while SG had referred to a waterproofing Australian Standard that was not in place when the insured property was built, it was nevertheless industry standard at the time of construction to apply a waterproofing membrane to particleboard used externally  there are two points of water entry resulting in damage: > failed detail in the seal between the balcony drain and the particleboard sheeting, most likely due to timber shrinkage. The drainage flange has dropped, causing the tile to crack. This is likely a consequence of the flooring water damage rather than the cause > water appears to be breaching where the balcony floor meets the external wall. General movement, including timber floor joist shrinkage, will have caused shear. SW concluded: The proximate cause for the water damage, therefore in my opinion is due to the omission or failure of a suitable and compliant waterproofing membrane system to the balcony. The failure being contributed to by degradation of materials over time exacerbated by general and expected building movement such as timber shrinkage in the deep floor joists. The insurer submits that the reports of SG, SC and SW show that the balcony damage is not from a sudden and accidental cause. Rather, it is due to gradual deterioration, construction defects and maintenance issues. The insurer relies on the following exclusions set out on page 19 of the PDS: 1. We will not pay for Damage caused by or arising directly or indirectly from: … b. lack of maintenance, rust, oxidation, corrosion, mould, Wear and Tear, fading, concrete or brick cancer, developing flaws, wet or dry rot, gradual corrosion or gradual deterioration or, failure to maintain Your Insured Property in a reasonably good state of repair. This includes when the damage to the Insured Property is caused by light, air, sand, the climate (which includes wind or rain) or the passage of time; … 3. We will not pay for: … c. the cost of rectifying faulty or defective materials or faulty or defective workmanship, design or specification; Further, while acknowledging that SG’s first report indicated that the soffit lining dama ge had resulted from the storm, the insurer said the repair cost ($2,567.40) was below the policy excess ($5,000). Determination | Case number: 870977 Page 5 of 7 Insurer is entitled to deny the claim Based on the available information, I am not satisfied that the complainant has established a valid claim under the policy for the claimed damage. Rather, the operative causes of that damage were more likely than not gradual deterioration, construction defects and maintenance issues. The policy does not cover damage from those causes. The reasons for my finding include:  SC only suggests it is possible excessive water from the storm seeped into the balcony, causing the particleboard to swell and the tile to crack  SC then identifies issues related to gradual deterioration (for example, grout cracks) and construction defects (such as lack of skirting tiles) as the reasons for the water ingress  all three experts refer to a lack or failure of waterproofing to be causative  both SG and SW identify gradual processes and construction defects as the proximate cause of the damage  their findings are supported by the leak detection testing results  they have provided numerous photos in support of their reasoning. I acknowledge that the complainant says he was not and could not have been reasonably aware of the waterproofing issue. However, that does not mean that issue was not causative or that the insurer cannot rely on the exclusions it has identified. I also do not doubt the complainant when he says that he has maintained the property to the best of his ability. However, only six weeks after the storm event, his own expert (SC) identified aspects of the balcony that clearly needed work. These included discoloured, cracked and missing grout; deteriorated joint seals; cracked rendered wall sheeting; and mould. The complainant notes that the insurer relies on reports prepared in February 2022, three months after the storm. He says the insurer’s experts say that discolouration would take around three months to appear and that the waterproofing breach had been present for three months. The complainant says this shows the storm three months earlier must be causative. However, SC identified discolouration issues only six weeks after the storm. Further, SW did not say the waterproofing breach had been present for three months; he said he believed a breach had occurred at a minimum three months ago. In the circumstances, the complainant has not established a valid claim under the policy. The damage has not been from a sudden and accidental cause such as the storm. Instead, it was due to excluded causes. I accept that the insurer has nevertheless accepted the soffit lining damage could be covered. However, as the only costing on the repair costs is well within the policy excess, there is nothing for the insurer to pay. 2.2 Is complainant entitled to non-financial loss compensation? No. Overall, the insurer has acted reasonably and in a manner generally consistent with the Code. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience Determination | Case number: 870977 Page 6 of 7  time taken to resolve the situation  interference with the com plainant’s expectation of enjoyment or peace of mind. Insurer has not unreasonably caused stress and inconvenience The complainant says the insurer has handled the claim abysmally. He says he was forced to constantly follow up the insurer. He also says that in January 2022, he was told that his claim had been transferred to the insurer’s Catastrophe Team and that up to that point incorrect procedures had been followed. The complainant says that this and other claim handling delays have caused him major stress and inconvenience. The insurer has acknowledged that there were some delayed updates on the claim, for which it has apologised. However, it says that its Catastrophe Team did not commence handling claims until after the complainant lodged his claim and the subsequent transfer of his claim to it did not result in any delay or mean any prior actions were incorrect. The insurer submits that its investigations were legitimate and performed in a timely manner. It also notes that the complainant was overseas for a period of about a month, making communication difficult. I acknowledge that the complainant has found the claim process to be stressful and frustrating. However, the available information suggests that, overall, the insurer has acted in a manner consistent with the Code. I particularly note that the Code refers to a standard period of four months within which an insurer is to make a claim decision. While the insurer slightly exceeded that period, I do not consider that to have been unreasonable taking into account the month the complainant was overseas. I also consider the insurer’s statement in mid November 2021 that the complainant would need to get his own trade report to have been reasonable given SG’s report and quote did not support a claim payment being made. Accordingly, I am not satisfied that the complainant is entitled to an award of non-financial loss compensation. 2.3 Why is the outcome fair? The complainant has not established the existence of a valid claim. This means the insurer is entitled to deny the claim. It would not be fair for the insurer to have to pay the claim, when there is no policy requirement to do so. Further, as the insurer overall handled the claim in a reasonable manner, it would not be fair to require it to pay non-financial loss compensation. Determination | Case number: 870977 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.