Determination 869754

repair delay and handling of storm/leak water damage claim

FirmSuncorp Group
Decided2022-11-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home water damage claim remained unrepaired almost four years after the loss, with the insurer delaying repairs citing soil movement concerns. AFCA found the insurer should proceed with repairs now if the complainant wishes and pay $3,000 for non-financial loss.

Insurer's ongoing delay in carrying out covered repairs was unfair given ample time had passed for soil to dry, and it showed insufficient urgency and consideration of the complainant's circumstances, warranting non-financial loss compensation.

Issues

Subjects and remedies

family violencehealth or medicalhome or building damagepay non financial lossrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 869754 Financial firm AAI Limited Determination | Case number: 869754 Page 2 of 6 Case number: 869754 27 October 2022 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy underwritten by the financial firm (insurer). She lodged a claim on 21 November 2018 for damage caused to the home. The claim was the subject of a previous AFCA determination (644624). The AFCA Ombudsman denied the claim for balcony damage but agreed damage due to the pipe leaks from the sewerage and stormwater system were covered by the policy. Repairs could be undertaken after permitting a drying period of 12 months after the pipe repairs were undertaken. Since that time, the insurer has reviewed the damage and determined it requires more time before it attends to repairs. The complainant rejects this. She says her family has been disadvantaged by the delays. She wants the insurer to repair the damage now and to pay compensation. 1.2 Issues and key findings Is it fair to further delay the repairs? No. The insurer should arrange for a builder to attend to the repairs and provide a lifetime guarantee if that is the complainant’s preference. Is an award of compensation warranted? Yes. The complainant has been forced to wait almost four years and been severely inconvenienced by the delays. Whilst this is not solely the insurer’s fault, some of this was avoidable. The insurer should pay compensation of $3,000. Why is the outcome fair? The insurer’s experts prefer to wait for the soil to dry out before attempting repairs. This relates to issues which did not affect the original loss. Should repairs be undertaken and issues arise which are proven to not be repair related, this will not be the insurer’s responsibility. On balance, it is fairer for the insurer to attend to the necessary work now, than to make the complainant wait any longer (unless she prefers to do so). 1.3 Determination This determination is in favour of the complainant. If the complainant chooses for repairs to proceed now, the insurer is required to arrange for a builder to attend to the repairs at the insured property. These repairs will be subject to a lifetime guarantee. The insurer is also required to pay compensation of $3,000 within 14 days of the complainant accepting this determination. Determination | Case number: 869754 Page 3 of 6 2 Reasons for determination 2.1 Is it fair to further delay the repairs? No. The insurer should arrange for a builder to attend to the repairs and provide a lifetime guarantee if that is the complainant’s preference. Prior determination outlined what insurer was required to do The prior AFCA determination for 644624 was issued on 31 January 2020. It confirmed:  the insurer was required to cover damage caused to the property by leaking stormwater and sewerage pipes  it could not do this until the leaking pipes were repaired by the complainant and ‘sufficient time’ had been allowed for the soil to dry out  one year after the complainant repairs the damaged pipes, the insurer was to reassess the damage and attend to repairs. The complainant reportedly completed the pipe repairs on 10 July 2020. The insurer says it contacted the complainant in August 2021 to arrange a further assessment. Several experts have provided further opinions on the matter since August 2021. In summary, the insurer believes the surrounding soils at the home are not conducive to proceeding with the required repairs. It believes at least another 24 months of settlement is required before repairs can be safely undertaken. The complainant says this is not fair and she wants the repairs done now. Insurer ’s experts say repairs cannot be safely undertaken yet After the complainant completed the required pipe repair work, the insurer arranged for engineer MO to assess whether the work to the home could be undertaken. MO initially said the building had not ‘achieved adequate stability’ yet and further drying of the property was required. It recommended the complainant remove trees from the backyard before any work is done. MO further noted:  the rear half of the building is affected by settlement caused by root drying from the eight trees at the rear of the property  the situation is ‘unlikely to fully resolve’ even if all the trees are removed  if the trees were removed, the site ‘could’ experience a sudden uplift at the rear of the home, which could also could cause new cracking if there is a sudden recovery of the slab  it might be best to remove only four of the trees and wait another two years to re-evaluate  if the trees were not moved ‘a stable condition of soil movements may be achieved’ but some issues with the slab may persist. MO concluded: any changes in the moisture regime or conditions to the foundation soils have the potential to exacerbate the existing foundation soil movements further or trigger new movements, which could result in structural damage to the building with a minimal or moderate change of the current conditions The insurer’s internal assessor ML reviewed these recommendations a nd largely agreed, although he proposed that all trees be removed from the property. He further suggested there Determination | Case number: 869754 Page 4 of 6 should be no flower or garden beds adjoining the building and that the artificial grass in the backyard be replaced with real grass. The insure r’s building co -ordinator found:  if trees are not removed the concrete slab could be permanently deformed and may encourage further settlement  discretion should be with complainant as MO noted there would be problems either way. MO later provided a supplementary report, appearing to change its view on some issues. It maintains it is ‘not prudent to conduct warrantable repairs’ whilst the site remains affected by abnormal moisture conditions. It also appears to now agree all trees should be removed. No compelling evidence the complainant should wait for further developments It is not known why the insurer did not use the engineer (MF) who originally inspected the property in 2019, when revisiting the issues in 2021. The insurer says it is currently not able to proceed with repairs. It is unable to specify when it may be able to do so. It has now been more than 28 months since the complainant completed the required pipe repairs specified in the previous determination. The focus of the insurer’s concerns has moved from the drying out of the soil relevant to the claim circumstances in 2019, to drying out the soil due to other issues. The concern is no longer focussed on the claim but the perceived issues with the trees on the site. Historically, these issues have always have been present. The home was built in 2004. There were more trees on the property at the time of the loss than there are now. MO was initially unsure of the impact of removing all trees, speculatively suggesting removing half of them. The insurer now suggests the complainant should remove all the trees and shrubbery on site. The exchanged material is not compelling as to the value of this. MO was unsure of its impact or whether the site would ever be stable enough for repairs to be undertaken. The insurer did not obtain a quote from an independent repairer to address whether it could repair and warrant the damage which occurred in 2019. I am not satisfied the insurer’s approach has been fair to the complainant. Fair that the insurer attends to the repairs now if the complainant prefers In my view, the evidence is not compelling that the damage related repairs cannot be completed now. It is more than 11 months since MO visited the property. It has been nearly four years since the claimed loss. This means there has been ample time for soil dampening from the source of damage to the home (the leaking pipe) to dry out. I am not satisfied the insurer’s experts will agree on a date to commence repairs. Their main concerns appear to relate to other issues at the property not relevant to the claimed loss. After carefully considering the exchanged material, I am of the view the insurer should be able to proceed with the repairs now if that is the complainant’s preference . I acknowledge that if this is done, there might be problems in the future. This is true of any repair work. The consideration (if problems develop) will be whether those problems are repair-related or due to other reasons for which the insurer may not be liable. Determination | Case number: 869754 Page 5 of 6 I consider the fair approach is to allow the complainant to decide if she wants to wait for an additional period or to proceed now. If the complainant elects to proceed now, the insurer should retain a contractor to undertake these repairs. The insurer will also be liable to warrant the quality of repairs. Should an issue arise in the future which is not related to the quality of the work but the documented issues at the property, the complainant must be aware this is something the insurer may not cover. 2.2 Is an award of compensation warranted? Yes. The complainant has been forced to wait almost four years and been severely inconvenienced by the delays. Whilst this is not solely the insurer’s fault, some of this was avoidable. The insurer should pay compensation of $3,000. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Complainant has had to wait nearly four years for repairs to be done The complainant is frustrated by the long delays and differing advice coming from the insurer for this matter. She notes her family situation is difficult and the delays from the insurer have made this more so. I appreciate not all of this is the in surer’s fault. I accept there was a need to wait and allow the property dry out before repairs could be attempted. However, I also consider the insurer has not shown enough urgency about attending to the repairs or consideration for the complainant’s situation. As the home remains unrepaired, the complainant says her family sleep in the lounge room to attend to the needs of a dependent child with medical requirements. Medical evidence confirms this child cannot use the upstairs bedrooms because of his situation. I am not satisfied this has been adequately considered or catered for by the insurer. Personal information about the complainant was also shared by the insurer with another party. This was an inadvertent breach of privacy which the complainant says left her distressed. It added to her frustration with this matter not being resolved. I acknowledge the insurer reported the privacy breach, informed the complainant and took responsibility. However, I also accept this added to the complainant’s concern an d frustration. Insurer should compensate the complainant $3,000 Considering the delays, the complainant’s situation and the insurer’s apparent reluctance to attend to repairs, I accept the complainant has suffered an unusual degree of stress and inconvenience. I also accept it is appropriate that the insurer pays compensation. The insurer should pay non-financial loss compensation of $3,000 to the complainant. Determination | Case number: 869754 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.