Text of the determination
Determination
Case number 869062
Financial firm Youi Pty Ltd
Determination | Case number: 869062 Page 1 of 9
Case number: 869062 28 November 2022
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (insurer). He lodged a
claim for damage following a storm and an earthquake. The complainant had begun
underpinning works at the insured property when a COVID-19 restriction on construction work
began on 20 September 2020, meaning some of the footings were left unsupported. There
was an earthquake event two days later, and also a storm at around that time, following which
a section of the property collapsed.
The insurer assessed the damage and declined the claim, saying the cause of the damage
was the underpinning works being left open, which is not covered under the policy. It also
relies on exclusions for damage to a building under construction, and for rain entering the
building through an opening made for renovations or repairs.
The complainant does not accept that decision. He believes the claim should be paid.
1.2 Issues and key findings
Is the insurer liable for the claim?
Yes. The insurer is liable to the full extent of the claim.
The available evidence shows, on balance, the concurrent proximate causes of the damage
were the storm (an insured event) and the state of the incomplete underpinning works at the
time (which is not an insured event). That means the insured event prevails. The building was
not ‘ in the course of construction’; nor was the underpinning void /opening part of the
‘building s ’ . None of the exclusions relied on by the insurer applies, nor has the insurer shown
any other entitlement to decline the claim.
Why is the outcome fair?
The complainant has established a valid claim for damage from a storm. The insurer has not
established exclusions apply, or that it has any other basis for denying the claim. It would not
be fair for the insurer to decline the claim in the particular circumstances.
1.3 Determination
This determination is in favour of the complainant. The insurer is required to cover the claim-
related damage in accordance with the policy terms and conditions. If the complainant has
already conducted the repairs, then the insurer must cash settle as set out in section 2.1
below.
Determination | Case number: 869062 Page 2 of 9
2 Reasons for determination
2.1 Is the insurer liable for the claim?
Onus is on the complainant to establish a valid claim
The complainant is required to show, on the balance of probabilities, he has suffered a loss
caused by a risk insured against under the policy. This is known as a ‘valid’ or prima facie
claim.
The policy provides cover for ‘Insured Events’ to the property that occur during the Period of
Insurance. The listed Insured Events include ‘Storm’ and ‘Earthquake’ as follows:
cover applies for loss or damage caused to the insured property ‘ as a direct result of
…[earthquake]…occurring for up to 72 hours after the occurrence…’…
cover applies for loss or damage to the insured proper ty by ‘ storm, lightning, wind,
hail, snow and storm water overflow from roof gutters and their downpipes or from the
area immediately around the premises ’ .
So, to establish a valid claim, the complainant must show, on balance, the damage being
claimed occurred during the period of insurance and was caused by an insured event.
However, that cover is subject to terms, conditions and exclusions.
Once the complainant establishes a valid claim, the insurer is liable for the loss unless it
shows an exclusion applies or it is otherwise entitled to deny the claim. The insurer has the
onus of proof in establishing this.
The policy specifically excludes cover for loss or damage caused by:
rain, wind, hail or snow entering the buildings through open windows, doors or
openings made for alterations, renovations or repairs;…
Cover for ‘buildings’ under the policy excludes ‘buildings in the course of construction’.
Experts broadly agree about contributory causes of the damage
The complainant says he was conducting underpinning works to his home when Covid-19
restrictions relating to the construction industry were imposed and work onsite had to stop.
Some underpinning work had been completed to other sections of the home, but one corner
of the house had been excavated with no supports put in place when the lockdown began on
20 September 2021.
The site remained closed until 18 October 2021, when the tradespeople notified the
complainant that a wall of the home had collapsed.
The insurer organised an engineer (HE) to attend and determine the cause of the damage.
HE determined that the excavation of the footings and the delay in pouring the foundation
concrete was the cause of the collapse. He did not comment on any other contributing factors
in his report.
The complainant organised an engineer (NK) to inspect the damage. NK concluded that
water runoff from storm conditions had saturated the soils supporting the footings and caused
Determination | Case number: 869062 Page 3 of 9
the subsequent collapse. He also observed the earthquake could have contributed to the loss
of stability, but this comment is not conclusive and does not analyse the earthquake ’ s
possible impact on the home.
HE reviewed NK’s report and agreed that stormwater would have contributed to the loss of
bearing capacity of the soil supporting the footings. He maintained that the excavation of the
footings allowed this to occur, since if the footing works had been completed or relevant
temporary support been put in place, the damage likely would not have happened.
HE explained that underpinning excavations are generally filled within 24 hours to reduce the
chance of any damage occurring to the home due to movement. HE said the longer
excavations are left open, the more likely damage will happen. This could be due to
concentrated loadings or due to stormwater entering the void.
The complainant provided weather data showing the rainfall in the period between the
lockdown commencing and the collapse being discovered. HE and NK both reference storm
water saturating the soils and NK specifically notes 85mm of rainfall. Although the exact date
of the collapse is not clear since no-one was at the site, information supplied by the insurer
from a mapping service shows no evidence of collapse on 26 September 2021, and the
complainant says his builder notified him of the collapse on 18 October 2021.
The earthquake is reported to have happened on 22 September 2021. Given the evidence
that the likely timing of the actual collapse was 4 days later (and the absence of other
supporting information), the panel is not satisfied the complainant has established, on
balance, a valid claim for damage caused by the earthquake.
However, the panel is satisfied the complainant has shown, on balance, he has a valid claim
for damage caused by storm.
The question is then the extent to which the incomplete state of the underpinning work also
contributed to the damage, whether that is covered under the policy or whether exclusions
apply.
Concurrent proximate causes were storm and incomplete underpinning
Determining the proximate cause of a loss is a question of fact, depending on the
circumstances in each case. It is well established law that a proximate cause is not
necessarily the first, the last or the sole cause of the loss. It is the effective, dominant or
operative cause of the loss.
There may be circumstances where it is reasonable to conclude that there were two causes,
operating contemporaneously, which were equal or concurrent in their efficiency in bringing
about the damage. Concurrent causes can occur where there are two or more events or
situations, each of which is independently capable of causing the loss, or where there are two
events each of which, without the other, could not have caused the loss.
If one of those causes was an insured event, and the other an excluded event, then the
excluded event would prevail. However, the courts have held that if one of the causes was an
insured event and the other was not excluded, then the insured event prevails and the claim
should be accepted.
Based on the available evidence, the panel is satisfied, on balance, the incomplete
underpinning work and the storm (during which rainwater entered the underpinning void and
surrounding soils) were interdependent concurrent proximate causes of the damage.
Determination | Case number: 869062 Page 4 of 9
Building was not ‘ in the course of construction’
The insurer submits the incomplete underpinning works and delays are not covered under the
policy, and says exclusions also apply.
The insurer points out that cover for storm damage to ‘buildings’ excludes ‘buildings in the
course of construction’. The complainant argues he was completing required maintenance
work, not constructing the home, and so that exclusion should not apply.
The Macquarie Dictionary defines ‘construction’ as ‘ the act or art of constructing’. It defines
‘construct’ as ‘to form by putting together parts; build; frame; devise’.
The policy does not define ‘construction’ . However within the product disclosure statement
(PDS), as well as references to ‘construction’, there are references to ‘major repairs’, ‘repairs’,
‘earthworks’, ‘alterations’, ‘maintenance’ and ‘renovation’. That indicates the policy
distinguishes between those types of building work.
The panel is satisfied that, in that context and consistent with the dictionary definition,
‘construction’ is intended to apply to initial or original building works, rather than
repair/maintenance work being conducted in relation to existing structures.
Having regard to those distinctions in the policy wording, the circumstances giving rise to the
claim, and the evidence overall, the panel does not consider the nature of the work being
conducted at the insured property represents ‘construction’. Instead, it is reasonable to regard
it as repair and maintenance.
That means the insurer may not rely on the exclusion for damage to ‘buildings in the course
of construction’ to decline the claim.
Stormwater did not enter the ‘buildings’
The insurer also says the policy does not cover ‘water entering the buildings through …
openings made for alterations, renovations or repairs’.
T he policy definition of ‘buildings’ is:
the private domestic residence and other structures at the premises, including
permanently attached fixtures, fittings and structural improvements, but excluding
earthworks.
The complainant’s engineer NK stated:
The excavation for the underpinning was inundated with water, submerging the
soil left between the pins, affecting the stability of the soils underneath the existing
footings that were left exposed (Emphasis added).
The insurer’s engineer, HE, also referred to the ‘underpinning excavation’.
The panel considers the area excavated for the new underpinning might reasonably be
regarded as ‘earthworks’ (involving, as it did, the removal of earth to enable the underpinning
repairs to be completed), and therefore excluded fro m the policy definition of ‘building s ’ for
that reason.
Determination | Case number: 869062 Page 5 of 9
In any case, however, the panel does not consider the underpinning void (while an ‘opening’
in the ordinary sense of the word, and made for repair) w as an opening in the ‘building’.
Instead, the photographs of the void show it was not inside the house structure, but was an
opening in the ground outside and next to the building.
The expert evidence shows water entered the underpinning void and the surrounding
exposed soil. The panel is satisfied that does not represent water entering the building. That
exclusion also does not apply.
Water did not leak down the side of ‘in - ground structures’
The insurer also raised the exclusion for ‘ loss or damage to in-ground structures caused by
water leaking down the sides, against the sides or getting underneath them. These in-ground
structures include but are not limited to items such as underground water tanks, septic tanks,
ponds, pools or spas’.
The policy does not define ‘in - ground’, however given the nature of the examples given, the
panel is not satisfied the exclusion applies to the circumstances of this claim. The ‘ structure ’
in this case is presumably the house itself, which is for practical purposes above ground
(even if some elements of it are below ground). As well, this was not a case of water leaking
down or against the sides of the house; it was instead simply a case of water directly entering
the void while also saturating the exposed surrounding soil.
The panel does not accept that exclusion applies.
Insurer not entitled to decline claim
Having considered all the available evidence, the panel is not satisfied the insurer has
established, on balance, the exclusions on which it relies have been shown to apply. It is
therefore not entitled to decline the claim on that basis.
As noted above, the complainant has established a valid claim for damage from the insured
event of ‘storm’. The concurrent proximate cause of the damage was the underpinning void
being left open, which is not an exclusion, but is simply an uninsured event. In this case, the
complainant is entitled to recover on the basis that the loss was the result of the operation of
an insured event.
That means the insurer is liable for the claim.
Insurer must reimburse reasonable cost of claim-related repairs
The panel understands the complainant has now completed repairs to the property.
The insurer had not initially been able to obtain a comprehensive quote for all the claim-
related work, given safety concerns at the time of the initial assessment; and at this stage, the
complainant has also not provided quotes/invoices for the work he has since undertaken.
However, the insurer did provide a quote for $45,682.91 from builder JL, dated 14 December
2021. The complainant’s response to the JL quote is that it omits the following: gas and
electricity repairs necessitated when pipes were damaged by falling bricks; internal damage
to the house (plaster walls, cornices, flooring, skirting boards); veranda, gutter and
stormwater pipes; roof and eaves. The complainant points out he had been told by the insurer
not to recommence the underpinning work pending the claim decision being made. He says
that in that two month period, the integrity of the house was further compromised and more
damage occurred.
Determination | Case number: 869062 Page 6 of 9
The insurer is liable for the claim. That includes liability for additional damage which occurred
as a consequence of any delay in attending to the necessary work.
Given the repairs have now been completed, it is fair and appropriate that the claim be cash
settled. The complainant is required to provide the insurer with evidence of the scope of work
undertaken and costs he incurred in repairing the property (such as paid invoices). To be
clear, that information will need to clearly distinguish between claim-related work and any
other additional work the complainant may have undertaken at the time.
The insurer is entitled to assess the reasonableness of those costs. It is required to settle the
claim (subject to applicable policy limits) by paying the complainant the reasonable costs he
incurred for the claim-related damage, and otherwise in accordance with the policy terms and
conditions.
Statutory interest (under section 57 of the Insurance Contracts Act 1984 ) is to be added to
any cash settlement, calculated from the date the respective costs were incurred by the
complainant up to the date of settlement.
2.2 Why is the outcome fair?
The complainant has established a valid claim under the policy for damage caused by a
storm event. The insurer has not established exclusions apply, nor any other basis on which it
is entitled to decline the claim.
It would not be fair for the insurer to deny liability in the circumstances.
Determination | Case number: 869062 Page 7 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 869062 Page 8 of 9
3.2 Expert reports
Record Key points
Financial firm’s e ngineer
( HE)
Report
1 December 2021
HE f urther email comments
14 February 2022
HE f urther email comments
27 June 2022
Underpinning excavation had been open for approximately 3
weeks before the collapse and is deemed to be the cause of the
collapse damage
Footing system slumping into the void of the underpin
Loss of bearing and collapse of footing to the North - Eastern
corner has caused significant damage to external and internal
skins of brickwork
The amount of water within the underpin voids at the time of
inspection indicates the vo ids were open for some period of time
and the surrounding soils softened
Agrees with the conclusion that the cause of collapse is bearing
failure due to water ingress and possible heavy rainfall to soils
around the support footings
Earthquake possib ly con tributed to instabilities
It is common practice to fill the excavation void within 24 hours to
mitigate as best as possible any bearing issues due to
concentrated loadings, weat her affects or anything else that
could cause damage
The longer an excavation i s open, the greater the risk of collapse
over time
Complainant’s engineer ( NK )
Report
10 June 2022
Excavated soil or the underpinning work was left open with no
concrete poured under the exposed footings or any temporary
support being installed due to the state - wide lockdown
Common practice for concreting work for thes e excavations to be
completed as soon as possible after the excavation is approved
by the building surveyor, preferably within 24 hours
Rainwat er runoff was up to 85mm over a short period of time
The excavation for the underpinning was inundated with water,
submerging the soil left between the pins, affecting the stability of
the soils underneath the existing footings that were left expos ed
Supporting soil between the excavated pins became submerged
due to heavy rainfall and weakened, resulting in the loss of soil
support of the footings and subsequently causing them to settle.
This caused the claimed damages.
Earthquake would have contributed to the loss of integrit y to the
footing support system
3.3 Relevant policy extracts
How we settle your claim
1. If you are claiming for buildings
If we can, we will settle your buildings claim by:
Determination | Case number: 869062 Page 9 of 9
repairing the damaged parts of your buildings if it is both possible for the parts to be
repaired and economical for us to repair those parts because the cost of repair is less than
the cost of rebuilding; or
rebuilding the damaged part of your buildings if it is either not possible for those parts to be
repaired or not economical for us to repair those parts because the cost of repair is more
than the cost of rebuilding…
If we cannot repair or rebuild the damaged part of your buildings, we will pay you an amount
equal to the reasonable cost that you would incur to repair or rebuild the buildings up to the
limits noted in your policy.
We will undertake a search of the market to determine what this cost would be in your area,
based on factors including scope of works and comparison quotes from repairers or builders.