Text of the determination
Determination
Case number 868798
Financial firm AAI Limited
Determination | Case number: 868798 Page 1 of 8
Case number: 868798 30 November 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy (policy) with the financial firm
(insurer).
In April 2020, the complainant lodged a claim (original claim) for water damage caused by a
broken stormwater drain (incident). The insurer accepted the original claim and commenced
the approved works (scope of works). Around this time, the complainant discovered that
rainwater from the patio was running toward rather than away from the house and lodged a
claim (claim). The claim involves damage to the patio and the external walls of the house
(damage). The insurer assessed the damage and concluded that it was not related to the
incident. Instead, the patio was not built correctly and has insufficient fall in the roof pitch
(defect) and does not comply with the Australian Building Codes.
The complainant disagrees. He says that the patio was damaged due to the movement of his
house and the underpinning works which constituted part of the scope of works.
The complainant seeks that the insurer accept the claim and undertake the repairs required to
the patio.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Yes. The heave which caused the additional fall after the incident and the defect are both
proximate causes of the loss. Therefore, since the defect falls within the exclusion, the
insurer is entitled to decline the claim.
Is the complainant entitled to compensation?
Yes. The insurer’s actions and poor management of the claim has caused the complainant
an unusual degree of stress, anxiety and inconvenience. Accordingly, the complainant is
entitled to $1,000 in non-financial loss compensation.
Why is the outcome fair?
There are two proximate cause of the damage, one covered by an insured event and one
covered by an exclusion. Therefore, pursuant to the Wayne Tank principle, the insurer is not
required to pay the claim. In the circumstances it is not fair to expect that the insurer will
indemnify the complainant for the damage that is not covered by the policy.
Determination | Case number: 868798 Page 2 of 8
1.3 Determination
This determination is in favour of the insurer.
If the complainant accepts the determination, the insurer must, within 14 days of acceptance,
pay the complainant $1,000 in non-financial loss compensation.
Determination | Case number: 868798 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Yes. The heave which caused the additional fall after the incident and the defect are both
proximate causes of the loss. Therefore, since the defect falls within the exclusion, the
insurer is entitled to decline the claim.
Onus on complainant to establish valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that it is
more likely than not) that the loss or damage claimed falls within the terms of the policy. This
is known as a valid (or prima facie ) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish,
on balance, the application of a policy exclusion or that it is otherwise entitled to decline the
claim under the policy.
Policy covers insured events subject to exclusions
The insurer’s policy consists of the policy schedule and product disclosure statement (PDS).
It is not in dispute the insurer provided the policy documents to the complainant.
The policy is an ‘insured events’ policy. This means not all loss and damage is automatically
covered. Rather, only loss or damage caused by one or more of the insured events, and not
subject to exclusions, is covered.
The insured events are set out in the PDS and include escape of liquid. There is no
accidental damage cover. The policy covers:
loss or damage to the building caused by liquid leaking, overflowing or bursting
from… any drain, fixed pipes, roof gutters or guttering and rainwater downpipes,
drainage and sewage systems …
The policy does however exclude cover for damage which is caused by, amongst other
things:
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or should reasonably
have known about) and did not fix before the loss or damage occurred (e.g. if
there are signs that a defect previously caused damage, we will not pay a later
claim for further damage from this defect).
(exclusion)
Complainant says damage caused by movement and underpinning
The complainant says:
the patio was constructed in about 2004. The necessary approvals were obtained from the
Council and the structure complied with Australian Building Codes in place at the time;
Determination | Case number: 868798 Page 4 of 8
the sheeting was installed after the builder completed the rest of the works but before final
certification was obtained from Council;
the complainant wanted to allow more light in so the roof sheeting material was changed
from metal to transparent corrugated roofing sheets;
Council’s final inspection certificate was provided in 2005;
he has never changed the sheeting, he has only painted and cleaned it;
he has not had any problems with the structure or its roof until the incident. Since then,
water is running from the patio area toward the house and down the walls;
prior to the incident, he did not have any issues with rainwater running in the wrong
direction. However, the paintwork is now in an appalling state because of the water
damage from the rain; and
he is seeking that the patio roof area be fixed and painted.
Insurer says damage was not caused by insured event
The insurer appointed an engineer, TPL, to comment on the damage to the patio. Their
report states that:
the rainwater running the wrong way is due to the defect;
the corrugated sheeting in use, according to manufacturer specifications, should not be
laid at a fall of less than 5 degrees. However, the fall at the insured's property is less than
1 degree;
the original plans for the patio area call for metal roof sheeting to a pitch of 2.5 degrees.
Different types of sheeting have different fall requirements based on the volume of water
they can hold;
in their opinion, the patio roof was never compliant with manufacturer specifications;
the complainant’s suggestion that the incident caused the water to run toward the house is
not plausible since the incident involved an escape of liquid from the storm water drain
which caused the soil to swell. It was only if the soil had shrunk and settled in a
downwards direction that the incident could have caused or contributed to the damage
now observed;
it is possible the soil under the patio could have expanded and contributed to the lack of
fall. However, TPL does not consider it can account for the fall changing from a compliant
200mm to nothing. This amount of movement would be too great for the soil conditions;
any change to the height of the house as a result of the underpinning work included in the
scope of works would only raise the section of the patio roof against the house. This
would only make the fall greater;
it is not possible the rectification scope of works contributed to the defect however the
sheeting should be replaced in order to be made compliant; and
the patio roof has been extended and, they believe, the timber support beam is now
undersize and not to Code. A new longer continuous beam is recommended to ensure the
structure is compliant.
The insurer’s assessor also supports TPL’s findings.
In order to address the complainant’s concerns, the insurer also referred the matter to one of
its building coordinators in September 2022 for review. The building coordinator confirmed
that there was sufficient information to decline the claim.
Complainant’s builder says he did not install the roof sheeting
The complainant ’s builder , who constructed the extension including the patio in or about
2004, has advised that:
the extension was designed by BD including a low pitched rear patio;
Determination | Case number: 868798 Page 5 of 8
BD specified to use either a double walled or triple walled polycarbonate flat sheeting for
roofing however the complainant considered these products too expensive and no
sheeting was installed at the time the construction was completed;
the construction was compliant and a final inspection certificate was provided by the
Council;
after the initial construction/certification, it appears that the roof sheeting has been
installed;
the type of sheeting used is not suitable for a low pitch roof; and
the sheeting was not installed by him in any event.
Proximate cause of the damage is escape of liquid and defect
Following the incident, the insurer accepted the original claim on the basis of an escape of
liquid (event) and agreed to the scope of works. The insurer has however declined cover for
the claim on the basis that the damage was not caused by an insured event. It also says that
even if there was an insured event, the claim is excluded.
To establish a valid claim, the complainant must show the proximate cause of the damage is,
on balance, the escape of liquid.
The proximate cause of a loss is the dominant, effective or operative cause. It does not have
to be the first, the last or the sole cause.
If there are several causes, each needs to be examined for qualities of reality, predominance
and efficiency to identify the proximate cause. For example, if one cause would have caused
the loss in any case, and the other one would not have done so without the first, then the first
is the proximate cause.
I accept that the roof sheeting was likely to have been installed in or about 2004. I also
accept that the type of sheeting used was not consistent with BD’s design and, in any event,
did not have the required degree of fall.
However, after reviewing all of the available information, I am satisfied that the escape of
liquid was the proximate cause of the damage. This is because, prior to the event, the non-
compliance had not caused any damage to the patio or the external walls of the house for
approximately 18 years. The insurer has not put forward any evidence which suggests any
long-term damage as a result of the non-compliant roof. There is also no evidence submitted
of any prior repairs which might suggest there have been prior issues related to the patio roof
before the incident.
The heave in the soil following the incident was significant and caused the insurer’s engineers
to recommend complete underpinning of the dwelling. The underpinning rectification works
have been completed. I also note the insurer’s engineer’s report says that swelling of the soil
under the patio as a result of the incident/event could have contributed to the lack of fall. TPL
says that ‘ this would not account for the fall changing from a compliant 200mm [which
assumes a fall of about 5 degrees] to nothing ’ . However, the fall was never 200mm because
the sheeting was non-compliant and the pitch was well short of 5 degrees. Therefore, on
balance, I am persuaded that the heave from the event has caused the additional lack of fall
and thus the damage at the insured property.
Accordingly, the complainant has established a valid claim since he has shown that the loss
suffered was caused by an event covered under the policy.
Determination | Case number: 868798 Page 6 of 8
It is necessary, however, to consider whether there have been any other proximate causes of
the loss. If the insurer can show that the defect (to which the exclusion would apply) was also
a proximate cause, the claim may be excluded.
The insurer has submitted that the rainwater running the wrong was due to the defect. It also
says it is not plausible that the event contributed to the lack of fall since the soil under the
house would have had to shrunk and settled in a downward direction. It does however accept
that the swelling of the soil under the patio could have contributed to the lack of fall.
In this regard, it is necessary to consider whether the damage would have occurred if the roof
was properly constructed, that is, but for the defect. I am satisfied that if the roof had been
compliant, the moisture changes in the soil under the patio would not have been so severe as
to completely erase the fall and cause the damage. This is because even if the heave
decreased the fall, it is unlikely that it would have been to such an extent as to result in the
water flowing toward the house. Accordingly, I am satisfied that the defect is also a
proximate cause of the damage.
Where there are multiple and concurrent proximate causes to a loss, an insurer can deny the
claim if one them is excluded under the policy. This is regardless of whether the other
proximate cause is an insured event. This is known as the Wayne Tank principle. As one of
the proximate causes falls within the defect exclusion, the insurer is not required to cover the
claim.
Determination is confined to claim only
The complainant presently has other active claims with the insurer in relation to the insured
property.
This determination relates only to the complaint made in respect of the patio.
Nothing in this determination affects the rights of the complainant or the insurer outside of the
patio complaint.
2.2 Is the complainant entitled to compensation?
Yes. The insurer’s actions and poor management of the claim has caused the complainant
an unusual degree of stress, anxiety and inconvenience. Accordingly, the complainant is
entitled to $1,000 in non-financial loss compensation. AFCA may award non-financial loss
compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the i nsurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Insurer has acted reasonably
Under the terms of the policy, the insurer is entitled to investigate a claim and make
appropriate enquiries. I consider the insurer’s conduct was reasonable in the circumstances
and consistent with the General Insurance Code of Practice.
Determination | Case number: 868798 Page 7 of 8
The insurer assessed the damage on the original claim in June 2020. However, a decision to
deny cover for the patio was only formally communicated to the complainant in January 2022.
While works were being undertaken, such as the underpinning works, the insurer ought to
have addressed the issue of the patio roof sooner than it did.
We understand the complainant suffers from a myriad of health issues. The insurer’s actions
and poor management of the claim has caused the complainant an unusual degree of stress,
anxiety and inconvenience.
Having reviewed all the available information, I am satisfied that insurer ought to have acted
more promptly to assist the complainant and therefore award the complainant $1,000 in non-
financial loss compensation.
2.3 Why is the outcome fair?
There are two proximate cause of the damage, one covered by an insured event and one
covered by an exclusion. Therefore, pursuant to the Wayne Tank principle, the insurer is not
required to pay the claim. In the circumstances it is not fair to expect that the insurer will
indemnify the complainant for the damage that is not covered by the policy.
Determination | Case number: 868798 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.