Home / Allianz Australia / Determination 868746

Determination 868746

impact damage claim extent and repairability

FirmAllianz Australia
Decided2022-11-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed$450,000
SourceAFCA PDF

Summary

The complainant claimed for impact damage to her home from a vehicle and sought a rebuild or cash settlement of the full sum insured. AFCA found the impact damage repairable, excluded pre-existing damage, and ordered repairs or cash settlement per the insurer's scope plus $1,000 for non-financial loss due to delays and poor communication.

Impact damage is covered under the policy, but loss from wear, gradual deterioration and lack of maintenance is excluded, so only repairable impact damage is payable and the insurer's delays warranted non-financial loss compensation.

Issues

Subjects and remedies

health or medicalhome or building damagemental healthpay compensationpay non financial lossrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 868746 Financial firm Allianz Australia General Insurance Limited Determination | Case number: 868746 Page 1 of 6 Case number: 868746 15 November 2022 1 Determination overview 1.1 Complaint The complainant held a home building insurance policy with the financial firm (insurer). On 31 December 2020, the complainant lodged a claim for damage caused when a motor vehicle drove through the fence and into the north-east side of her house. The insurer accepted the claim, assessed the damage and offered to repair the property. The complainant says the property needs to be rebuilt and is seeking that this occur or that she be cash settled for the total sum insured of $450,000. 1.2 Issues and key findings Is the insurer liable for all the claimed damage? No. The insurer is only liable for damage caused by the insured event. Other damage exists at the property which has occurred as a result of a lack of maintenance or gradual deterioration which are excluded under the policy. Is the complainant entitled to non-financial loss compensation? Yes. The complainant is entitled to $1,000 non-financial loss compensation for the insurer’s delays in reviewing her engineer’s report and providing her with an outcome. This contributed to the c omplainant’s stress and anxiety and may have exacerbated her health issues. Why is the outcome fair? The events the complainant has described are unfortunate and I understand the complainant has suffered from stress and anxiety due to reasons beyond her control. However, the insurer correctly assessed the damage as repairable and it is entitled to repair only the damage from the impact claim. It would not be fair to require it to rebuild the property. 1.3 Determination This determination is substantially in favour of the insurer. If the complainant accepts the determination, the insurer is to (within 14 days of receiving notice the complainant accepts this determination):  appoint a builder to complete the repairs based on the scope of works (SOW) prepared by AJ; or  if the complainant does not want the insurer to complete the repairs, obtain quotes from two independent builders based on the SOW prepared by AJ and cash settle the complainant based on the higher of the two quotes plus a 20% contingency to reflect the transfer of risk; and  pay the complainant $1,000.00 for non-financial loss. Determination | Case number: 868746 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer liable for all the claimed damage? No. The insurer is only liable for damage caused by the insured event. Other damage exists at the property which has occurred as a result of a lack of maintenance or gradual deterioration which are excluded under the policy. No dispute a valid claim for impact damage established The complainant is required to show she suffered a loss caused by an event she is insured for under the policy. This is known as a prima facie, or valid, claim. Once the complainant establishes a valid claim, the insurer is liable for the loss unless it shows an exclusion or condition applies. The insurer has the onus of proof in establishing the application of the exclusion. The standard of proof is the balance of probabilities. The policy is an insured events policy, providing cover to the insured building that occurs during the period of insurance. The policy includes cov er for ‘impact’. Impact cover is outlined in the policy: Impact. Covered. Loss or damage caused by collision with your building and/or contents by: …  any vehicle or its load, except to the extent that the vehicle was in your control Not covered. … Loss or damage that is predominantly caused by or arises from:  wear and tear, or gradual deterioration. Loss or damage to the extent that it is caused by or arises from:  failure to take reasonable steps to keep the insured property well maintained, structurally sound and secure… Determination | Case number: 868746 Page 3 of 6 Circumstances of the claim On 27 December 2020, a vehicle drove through the fence and then into the complainant’s property. The complainant made a claim and the insurer sent out MK and AJ to assess the damage to the property. It is not in dispute that the complainant has made a valid claim. The dispute is about the extent of the damage caused by the incident and whether the property can be repaired or not. The complainant also engaged an expert engineer, PB. She says that based on PB’s rep ort, the property cannot be repaired and needs to be rebuilt. She also says there is asbestos at the property. She says this has caused asbestosis damage to her vehicle and if she moved back into the property, it could exacerbate her chronic health issues. Impact damage is covered by the policy As indicated above, the policy covers loss or damage caused by the impact of a vehicle. The insurer engaged two experts to provide reports, MK and AJ. The complainant engaged an expert engineer, PB. I will not summarise these reports in detail as part of this determination because:  the reports have been exchanged between the parties, and  both parties have had a reasonable opportunity to respond to their contents. MK attended the property on 31 December 2020. In the report of the same date, MK said:  the fire brigade had attended following the incident and conducted a make safe on the property.  there was significant damage to the north-eastern side of the property where the vehicle impacted it.  long term water damage was observed to the wall lining and cornice in the main bedroom and that plastic had been placed inside the roof cavity to patch a hole in the roof sarking above this area.  a small crack was observed in the plasterboard in bedroom 2 which had previously been patched, indicating a long-term movement issue. The complainant believes this crack has reopened as a result of the incident, which MK disagrees with. AJ, in his report dated 6 January 2021, said:  the damage to the north-east corner of the property, where the vehicle impacted it, was significant but could be repaired.  there was no movement, distress or cracking to the rear of the property indicating there was movement from the vehicle impact.  the property was not at imminent risk of collapse and was not a hazard, beyond the north- east corner.  the scope of works to repair the damage would include fixing the fencing, removing and reinstating parts of the the damaged roof (including trusses), removal of asbestos and repairing and painting internal damage. PB, in his report dated 26 April 2021, said:  there was significant damage to the north-east corner of the property caused by the incident which required rectification work.  rectification works would include demolishing and removing the existing roof, stud walls, repairing concrete cracks and then reinstating the roof, stud walls and roof tiling in accordance with Australian standards. Determination | Case number: 868746 Page 4 of 6  PB noted there was additional damage that existed separate to the vehicle impact. PB said: Separate to the vehicle impact, there is additional damage and deterioration to the dwelling due to pre-existing issues of uncontrolled stormwater drainage, moisture ingress, and general weathering. In particular, there was severe deterioration of softwood timber wall framing at an external load bearing wall. Additionally, significant moisture ingress to wall and floor linings and deterioration of timber door frames in bedroom and bathroom wet areas presents a likely possibility of further (unseen) damage to both internal and external softwood stud walls at several locations. As a recommendation, PB advised it would be more feasible to remove all wall and roof framing and rebuild the property from the ground up. However, PB confirmed the north-east corner damage was repairable without needing to repair the pre-existing property damage. Other damage is excluded by the policy As indicated above, the complainant seeks that the property be rebuilt or that she be cash settled for the total sum insured. The complainant has sent photographs of the property that show there is moss growing on the carpets and the presence of black mould in one of the bedrooms. She attributes this damage to the insured event. The complainant’s policy is subject to exclusions, including for gradual deterioration or a lack of maintenance. Both engineer’s reports note that there was extensive damage to the property due to a lack of maintenance, water ingress, poor drainage and timber deterioration. These were pre-existing and are excluded under the terms and conditions of the policy. Whilst I acknowledge the photos provided by the complainant show extensive mould at the property, the photos are not from the north east corner of the property, but from other locations. I accept based on the evidence from both engineers that this is not damage caused by the insured event. Impact damage can be repaired or cash settled The insurer’s position is that the damage to the property cause d by the impact can be repaired. It has offered to have the repairs carried out by MK based on the scope of works provided by AJ. In reviewing the two expert reports provided by the parties, I am satisfied the property is able to be repaired and the complainant is not entitled to be cash settled for the total sum insured. This is because both engineers agree the damage caused by the impact can be repaired. The policy provides for the insurer to repair or cash settle the complainant for the damage caused by the insured event. AJ and PB have provided SOW based on their inspections. In my view, the SOW prepared by AJ is more comprehensive than that of PB in that it identifies damage to the property, fence and also includes asbestos removal and painting. This is the SOW that should be adopted. Determination | Case number: 868746 Page 5 of 6 If the complainant allows the insurer to complete the repairs, the work should be performed based on this SOW. It should also include any additional items arising from the insured event once further investigations take place. If the complainant chooses to allow the insurer to complete repairs, these will be subject to a lifetime guarantee as set out in the terms and conditions of the policy. Alternately, if the complainant is not inclined to allow the insurer to repair the property, the insurer is to obtain two quotes from builders based on the SOW from AJ. It is then to pay the complainant the higher of the two quotes obtained plus a 20% contingency allowance as a reflection of the transfer of risk and the potential for additional works being identified when repairs commence. 2.2 Is the complainant entitled to non-financial loss compensation? Yes. The complainant is entitled to $1,000 non- financial loss compensation for the insurer’s delays in reviewing her engineer’s report and providing her with an outcome. This contributed to the complainant’s stress and anxiety and may have exacerbated her health issues. AFCA may award non-financial loss compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or p eace of mind. The complainant is entitled to $1,000 non-financial loss compensation Overall, the insurer responded to the claim and complaint in a timely manner. The insurer formed the correct decision and the information from the complainant did not influence the outcome as it was reflective of the insurer’s expert opinion. While the complainant contributed to delays in the claims assessment and review process by not providing her engineers report until May 2021, the insurer did not respond to the report in a timely manner. The insurer received the complainant’s report in early May 2021 yet did not provided a response to the report for another six weeks, in late June 2021. Following this, no further proactive contact was made with the complainant until December 2021. The insurer was aware of the complainant’s vulnerability yet did not actively keep her informed of the process once her report was received. The complainant was not clearly informed the insurer did not agree the property was a rebuild and this contributed to the stress and anxiety suffered by the complainant. In all the circumstances, it is reasonable for the insurer to pay the complainant $1,000 in non- financial loss compensation. 2.3 Why is the outcome fair? The events the complainant has described are unfortunate and I understand the complainant has suffered from stress and anxiety due to reasons beyond her control. However, the insurer correctly assessed the damage as repairable and it is entitled to repair only the damage from the impact claim. It would not be fair to require it to rebuild the property. Determination | Case number: 868746 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.