Home / XL Insurance Company Se / Determination 868399

Determination 868399

Insurer declined water damage claim to Lot 1 under residential strata policy citing wear and tear, gradual deterioration and wet rot exclusions

FirmXL Insurance Company Se
Decided2022-10-24
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$6,358
SourceAFCA PDF

Summary

A broker for a strata policyholder claimed water damage to a bathroom and ceiling below in Lot 1 after a shower leak. AFCA found the damage resulted from long-term gradual leakage excluded under the policy and that the insurer was entitled to decline the claim.

The claimant must establish a valid claim; the insurer may rely on policy exclusions for gradual deterioration, wear and tear and rot, which apply regardless of the insured's awareness.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionno remedy

Related

All XL Insurance Company Se determinations · Find similar determinations

Text of the determination

Determination Case number 868399 Financial firm XL Insurance Company Se Determination | Case number: 868399 Page 1 of 6 Case number: 868399 24 October 2022 1 Determination overview 1.1 Complaint On 27 January 2022, a claim was lodged for water damage to Lot 1 insured under a Residential Strata policy (policy) underwritten by the financial firm (insurer). The insurer has declined the claim. The insurer says the damage is due to wear and tear, gradual deterioration, wet rot and the failure of the shower tray and waterproofing. Damage in these circumstances is excluded under the policy. Broker ‘P’ is managing this complaint on behalf of the policyholder. For brevity, reference to ‘the complainant’ will include both P and the p olicyholder unless specified otherwise. 1.2 Issues and key findings Is the insurer’s assessment of its liability under the claim reasonable? Yes. The available information establishes, on the balance of probabilities, that the damage to the insured property has been occurring gradually over a period of time because of factors excluded from cover. Accordingly, the insurer is entitled to decline cover for the damage to the insured building in line with the policy. Why is the outcome fair? The available information shows the damage to the bathroom and ceiling below is, on balance, due to a gradual water leak caused by a failure of the shower waterproofing and tray. The damage has occurred gradually over an extended period, which is excluded under the policy. Therefore, it is fair in all the circumstances that the insurer be permitted to rely on the policy provisions to decline the claim. 1.3 Determination This Determination is in favour of the insurer. The insurer is entitled to decline cover for the damage to the insured building. Determination | Case number: 868399 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer’s assessment of its liability reasonable? The policy is an accidental damage contract of insurance The policy covers the insured property against sudden accidental loss or damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). There is no dispute the insurer provided the policyholder with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. Complainant bears the onus to establish a valid claim under the policy It is established law that the claimant has the onus to establish, on balance (that is, more likely than not), that the loss falls within the terms of the policy. Only if a valid claim is shown to exist, will the onus shift to the insurer to show, on balance, it is entitled to decline the claim in line with the policy provisions. There is no dispute there exists water damage to the upstairs bathroom and hallway ceiling directly below. There is no information which would reasonably show that this damage was expected and/or intended. I accept the complainant has been able to establish a valid claim. Therefore, the onus rests with the insurer to show, on balance, it is entitled to decline the claim in line with the policy provisions or otherwise. Information from the appointed consultants On being informed of the water damage by the tenant, the strata manager arranged for plumbing consultant ‘D’ to attend the insured unit. D attended the unit and sent an email to the strata manager dated 29 October 2021 saying ensuite shower tray was leaking. D recommended that a tiler or shower tray specialist be appointed to complete repairs. The strata manager appointed consultants ‘SS’ to attend the unit and provide a quote and scope of works to repair the damage. SS has provided a quote and scope of works dated 25 January 2022 in the amount of $6,358. SS advised that after demolition of the shower it found the sub-floor was made of chipboard and totally rotten. SS says this will need complete replacement. SS confirmed the damage extends beyond the shower area into the bathroom floor and the entire bathroom floor requires replacement. I note the quote provided is for the complete strip back and reinstatement of the bathroom floor and fittings. The complainant has also provided two routine inspection reports from the managing agent dated 25 March 2021 and 28 September 2021. The inspection reports do not make any reference to water damage and include photographs from the inspection. However, I note none of the photos provide a view of the areas in question i.e. the bathroom floor and base of shower or the ceiling below the bathroom. The insurer appointed building consultants ‘U’ to attend and investigate the cause and extent of the damage to the insured unit. U found the shower recess to be completely excavated leaving the sub-floor exposed. The condition of the timber sub-floor and framework was noted as being extremely rotted and deteriorated due to water damage. Determination | Case number: 868399 Page 3 of 6 U confirmed resultant water damage to the ground floor entry ceiling, which is directly below the shower in question. U noted the plasterboard showed signs of water ingress with blackened and discoloured water staining and mould. The tenant advised U that the leak had been occurring for a significant period of time. In U’s opinion, the damage wa s consistent with a failed shower recess that has caused water to leak into the ceiling cavity between the two levels. This has caused long-term decaying and rotting of the sub-floor space, including the timber structure and chipboard. This water has subsequently leaked into the ground entry landing below the shower area causing the noted damage. U says the damage has occurred over a significant amount of time given the severity of the timber rotting within the sub-floor and lower level plasterboard damage. U has provided many photos showing the extent of rotting and other damage to the sub-floor area and plasterboard ceiling below. The available information does not support the complainant’s position The complainant says the leak had not been occurring for a long period of time, rather, it was a recent and sudden event. The complainant relies on the two most recent routine inspection reports as well as saying verbal advice from the tenant cannot reasonably be relied on to decline the claim. I am not of the same opinion and accept it is fair in all the circumstances to allow the insurer to decline the claim in line with the policy provisions. This is because:  the information from all the consultants appointed by the parties is reasonably consistent in identifying a leak from the shower recess as the cause of the damage  the information from these consultants is also reasonably consistent in showing that the leak and associated damage had been occurring for quite some time  this is supported by the photos provided by D as well as U. The extent of water damage and associated deterioration and rotting to the sub-floor and timber framework is persuasive in showing this is long term gradual damage  the photos show the tile grouting in the area of the shower, prior to being stripped up by SS, was in a poor and deteriorated condition. This was allowing water to gradually seep into the sub-floor area causing damage  the photos of the ceiling plasterboard below are also telling in that they show damage had been occurring for some time with repeated exposure to water leaking from above. This is indicated by the different degrees and expansion of the water staining as well as the deterioration and development of dark patches or mould. I acknowledge the complainant’s positio n that the damage is sudden, and they could not reasonably have been aware of this occurring. However, on reviewing the policy wording, the exclusions relied on are not subject to the complainant’s awareness. The poli cy clearly excludes from cover loss or damage:  caused by wet or dry rot, corrosion, gradual corrosion or deterioration, inherent vice or latent defect  caused by wear, tear, gradual deterioration or developing flaws. I acknowledge the insurer’s reference to policy exclusions which refer to faul ty or defective materials and/or defective workmanship. However, I am not satisfied the available information establishes the damage is the result of faulty or defective materials or workmanship. The insurer is entitled to decline cover for the damage under the policy Having consi dered all the information, I find the insurer’s information and photos to be more persuasive. I am satisfied the information shows the damage is due to a leaking shower base Determination | Case number: 868399 Page 4 of 6 which has been occurring for an extended period of time. The leak is due to gradual deterioration, wear and tear and developing flaws to the tiles and waterproofing in and around the shower recess area. I accept damage that arises in such circumstances is clearly excluded from cover under the policy. I accept the complainant may not have been aware of this until more recently. However, this does not prevent the insurer from the entitlement to rely on the policy provisions to assess its liability under the claim. Accordingly, I determine the insurer is entitled to decline cover for the claimed water damage to lot 1 in line with the policy. Why is the outcome fair? The available information shows the damage to the bathroom and ceiling below is, on balance, due to a gradual water leak caused by a failure of the shower waterproofing and tray. The damage has occurred gradually over an extended period, which is excluded under the policy. Therefore, it is fair in all the circumstances that the insurer be permitted to rely on the policy provisions to decline the claim. Determination | Case number: 868399 Page 5 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy provisions Event, Events means a happening or an incident not intended to happen which occurs during a particular interval of time and causes or results in Loss or Damage, or a series of Loss or Damage happening from that one Event, that is claimable under this Policy. ... Loss or Damage Determination | Case number: 868399 Page 6 of 6 means direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded by this Policy ... What is covered We insure You up to the Sum Insured shown on the Schedule for Section 1, against accidental Loss or Damage to Your Insured Property which occurs during the Period of Insurance. What is not covered 1) We will not pay for Loss or Damage: ... c) caused by moths, termites or other insects, vermin, mice, rats, rust or oxidisation, mildew mould, contamination or pollution, wet or dry rot, corrosion, gradual corrosion or deterioration, change in colour, dampness of atmosphere or other variations in temperature, evaporation, disease, inherent vice or latent defect, loss of weight, change in texture or finish or pecking, biting, chewing or scratching by birds or animals; d) caused by Wear, Tear, fading, concrete or brick cancer, gradual deterioration or developing flaws; e) caused by lack of maintenance or failure to maintain Your Insured Property in a reasonably good state of repair. f) caused by non-rectification of an Insured Property defect, error or omission that You were aware of, or should reasonably have been aware of. 2) We will not pay for: ... b) the cost of rectifying faulty or defective materials or faulty or defective workmanship;...

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.