Hail/storm roof repair; code-compliance upgrades refused; cash settlement of labour

FirmYoui
Decided2022-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$7,341
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant wanted the storm-damaged rear roof fully repaired with the structure brought up to code, but the insurer offered a cash settlement for labour only. AFCA found the code-compliance and undamaged-part work was excluded and ordered the insurer to cash settle $7,341.29 as offered.

The policy excludes additional costs of bringing buildings up to current codes and insurers may choose cash settlement where repairs cannot proceed without excluded work.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 868165 Financial firm Youi Pty Ltd Determination | Case number: 868165 Page 1 of 4 Case number: 868165 7 November 2022 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). She made a claim in February 2021 for hail damage which she believed had occurred on 19 April 2020. Several areas of the roofing were damaged, including the rear metal roof which needed to be replaced. The insurer accepted the claim. It arranged for new roofing materials to be delivered, and for work to commence. However, it became apparent that certain upgrades would need to be carried out to ensure that rear roofing was compliant with current building codes, and without which the insurer could not warrant repairs. The insurer said it is not required, under the terms of the policy, to cover additional costs arising because the building does not meet the relevant current codes/regulations. Having already delivered the roofing materials to the complainant, the insurer then offered to cash settle her for the labour costs involved in completing the claim-related work. The complainant does not accept that. She wants t he damaged part of the roof to be fixed and for the underlying structure to be brought up to code. 1.2 Issues and key findings Is the insurer’s settlement proposal fair and reasonable ? The product disclosure statement (PDS) in place at the time of the loss clearly excludes cover for additional costs for previous damage or resulting from the buildings (or any part) not being compliant with the most recent building codes/laws/regulations. The insurer is not liable for those additional costs. In the circumstances, it is fair and appropriate that the complainant retains the building materials already provided by the insurer for the rear roof repair; and that the insurer cash settles for the labour costs for the claim-related work, as it has offered to do. That is because the insurer cannot warrant any repairs undertaken without the building compliance issues (for which it is not responsible) also being attended to. The insurer’s cash settlement amount is, on balance, fair and reflects the likely reasonable cost to the complainant of having the claim-related work completed. Why is the outcome fair? It would not be fair to require the insurer to pay more when the policy excludes those additional costs. Its proposal for cash settlement is fair and satisfies its liability for the claim. 1.3 Determination This determination is in favour of the insurer. As it has offered to do, it is required to cash settle the complainant $7,341.29 for the labour component of the rear roofing repairs. Apart from finalising any other outstanding claim-related issues not specifically part of this complaint, the insurer is not required to take any other action. Determination | Case number: 868165 Page 2 of 4 2 Reasons for determination 2.1 Is the insurer’s settlement proposal fair and reasonable? Repairs require additional work to undamaged parts of property There is no dispute there was a storm event. The insurer accepted there was storm damage to the rear metal roof, awning and skylights. In the course of repairs, however, the insurer’s builder and engineer indicated additional work would need to be carried out in order for the claim-related repairs to be warranted. The additional work includes replacing timber rot, addressing previous termite damage, and upgrades needed to bring the rear metal roof up to current building code compliance. The compliance issues relate to tie-down of the patio, the size of rafters and beams, and the roof pitch. That has been broadly confirmed by the complainant’s engineer, DCE. T he complainant’s builder MDC has also allowed for additional work in their quote for repairs. So while the parties agree additional work is needed, the question is whether the insurer is liable for that additional work under the claim. Policy excludes cover for repairs/upgrades to undamaged parts The product disclosure statement (PDS) sets out the policy exclusions, stating the insurer will not pay for: 1. repair of any damage that existed prior to the start date of the policy; 2. additional costs resulting from your buildings or any part thereof not being compliant with the most recent building codes, laws and regulations; … I am satisfied the exclusion is clear that the insurer is not liable for additional costs of bringing the building up to current code requirements. That applies irrespective of whether the original construction was to code. It is also clear that cover under the insured event of storm is for damage caused by the storm event. The additional issues identified do not themselves represent ‘damage’ caused by the storm. They are incidental issues which need to be addressed in order to allow safe, effective and compliant claim-related repairs to be completed. However, that does not mean the insurer is liable for that extra work: the policy makes it clear it is not. Under the circumstances, the insurer entitled to cash settle the claim The policy gives the insurer the choice as to how to settle a claim: it may undertake repairs itself, or cash settle for the cost of the claim-related repairs. In the circumstances – where the claim-related repairs cannot be completed without the additional work also being addressed – it is reasonable and appropriate that the insurer cash settles the complainant for the balance of the claim (which amounts to the labour costs of having the roofing installed, since the roofing materials have already been provided to the complainant). Determination | Case number: 868165 Page 3 of 4 Insurer’s cash settlement offer is fair and reasonable We expect an insurer, when cash settling a claim, to ensure that the settlement amount is reasonably sufficient to allow the complainant to engage a builder and have the claim-relate work finalised. For the labour component of the claim-related roof repairs, the insurer has offered a cash settlement of $7,341.29. It has explained that represents an uplift of 15% on builder ABC’s 18 February 2022 quote for $6,373.72. Given the age of the quote and the fact it is not stated as being actionable by the complainant as a retail customer, I am satisfied the uplift is fair and appropriate, and that th e insurer’s proposed cash settlement overall is reasonable. The insurer is not required to increase it. However, the insurer has also agreed that if, as repairs progress, further claim-related damage is identified, it will review that and, as appropriate, increase the cash settlement. That is fair. No detriment to the complainant by change in settlement I appreciate the complainant was upset and her tenants may have felt inconvenienced by the change is settlement method, after the insurer discovered the additional work needed. However, I am satisfied the insurer acted reasonably in the circumstances, as soon as it realised there were other issues that would impact its ability to complete repairs. I do not consider the insurer has acted inappropriately, nor that the complainant has suffered any detriment as a result of the insurer’s handling of the matter. I do not consider the degree of upset or inconvenience was unusual or unexpected given the circumstances. The insurer has already agreed to waive the $750 excess in recognition of the complainant’s claims experience. I consider that fair and reasonable. 2.2 Why is the outcome fair? It would not be fair to require the insurer to pay more than its liability under the policy – that includes for compliance issues and previous damage which are excluded under the policy. Based on the currently available evidence, the insurer’s cash settlement offer is fair and reasonable; as is its offer to consider any further claim-related damage which may become apparent in the course of repairs being conducted by the complainant. Determination | Case number: 868165 Page 4 of 4 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.