Summary
The complainant wanted the storm-damaged rear roof fully repaired with the structure brought up to code, but the insurer offered a cash settlement for labour only. AFCA found the code-compliance and undamaged-part work was excluded and ordered the insurer to cash settle $7,341.29 as offered.
The policy excludes additional costs of bringing buildings up to current codes and insurers may choose cash settlement where repairs cannot proceed without excluded work.
Issues
- Claim denial primary · not upheld“the insurer is not liable for additional costs of bringing the building up to current code requirements”
- Claim amount dispute secondary · not upheld“The insurer's cash settlement amount is, on balance, fair and reflects the likely reasonable cost to the complainant”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
Text of the determination
Determination
Case number 868165
Financial firm Youi Pty Ltd
Determination | Case number: 868165 Page 1 of 4
Case number: 868165 7 November 2022
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (insurer). She made a
claim in February 2021 for hail damage which she believed had occurred on 19 April 2020.
Several areas of the roofing were damaged, including the rear metal roof which needed to be
replaced. The insurer accepted the claim. It arranged for new roofing materials to be
delivered, and for work to commence. However, it became apparent that certain upgrades
would need to be carried out to ensure that rear roofing was compliant with current building
codes, and without which the insurer could not warrant repairs.
The insurer said it is not required, under the terms of the policy, to cover additional costs
arising because the building does not meet the relevant current codes/regulations. Having
already delivered the roofing materials to the complainant, the insurer then offered to cash
settle her for the labour costs involved in completing the claim-related work. The complainant
does not accept that. She wants t he damaged part of the roof to be fixed and for the
underlying structure to be brought up to code.
1.2 Issues and key findings
Is the insurer’s settlement proposal fair and reasonable ?
The product disclosure statement (PDS) in place at the time of the loss clearly excludes cover
for additional costs for previous damage or resulting from the buildings (or any part) not being
compliant with the most recent building codes/laws/regulations. The insurer is not liable for
those additional costs.
In the circumstances, it is fair and appropriate that the complainant retains the building
materials already provided by the insurer for the rear roof repair; and that the insurer cash
settles for the labour costs for the claim-related work, as it has offered to do. That is because
the insurer cannot warrant any repairs undertaken without the building compliance issues (for
which it is not responsible) also being attended to.
The insurer’s cash settlement amount is, on balance, fair and reflects the likely reasonable
cost to the complainant of having the claim-related work completed.
Why is the outcome fair?
It would not be fair to require the insurer to pay more when the policy excludes those
additional costs. Its proposal for cash settlement is fair and satisfies its liability for the claim.
1.3 Determination
This determination is in favour of the insurer. As it has offered to do, it is required to cash
settle the complainant $7,341.29 for the labour component of the rear roofing repairs. Apart
from finalising any other outstanding claim-related issues not specifically part of this
complaint, the insurer is not required to take any other action.
Determination | Case number: 868165 Page 2 of 4
2 Reasons for determination
2.1 Is the insurer’s settlement proposal fair and reasonable?
Repairs require additional work to undamaged parts of property
There is no dispute there was a storm event. The insurer accepted there was storm damage
to the rear metal roof, awning and skylights.
In the course of repairs, however, the insurer’s builder and engineer indicated additional work
would need to be carried out in order for the claim-related repairs to be warranted. The
additional work includes replacing timber rot, addressing previous termite damage, and
upgrades needed to bring the rear metal roof up to current building code compliance. The
compliance issues relate to tie-down of the patio, the size of rafters and beams, and the roof
pitch.
That has been broadly confirmed by the complainant’s engineer, DCE. T he complainant’s
builder MDC has also allowed for additional work in their quote for repairs. So while the
parties agree additional work is needed, the question is whether the insurer is liable for that
additional work under the claim.
Policy excludes cover for repairs/upgrades to undamaged parts
The product disclosure statement (PDS) sets out the policy exclusions, stating the insurer will
not pay for:
1. repair of any damage that existed prior to the start date of the policy;
2. additional costs resulting from your buildings or any part thereof not being
compliant with the most recent building codes, laws and regulations; …
I am satisfied the exclusion is clear that the insurer is not liable for additional costs of bringing
the building up to current code requirements. That applies irrespective of whether the original
construction was to code.
It is also clear that cover under the insured event of storm is for damage caused by the storm
event. The additional issues identified do not themselves represent ‘damage’ caused by the
storm. They are incidental issues which need to be addressed in order to allow safe, effective
and compliant claim-related repairs to be completed. However, that does not mean the
insurer is liable for that extra work: the policy makes it clear it is not.
Under the circumstances, the insurer entitled to cash settle the claim
The policy gives the insurer the choice as to how to settle a claim: it may undertake repairs
itself, or cash settle for the cost of the claim-related repairs.
In the circumstances – where the claim-related repairs cannot be completed without the
additional work also being addressed – it is reasonable and appropriate that the insurer cash
settles the complainant for the balance of the claim (which amounts to the labour costs of
having the roofing installed, since the roofing materials have already been provided to the
complainant).
Determination | Case number: 868165 Page 3 of 4
Insurer’s cash settlement offer is fair and reasonable
We expect an insurer, when cash settling a claim, to ensure that the settlement amount is
reasonably sufficient to allow the complainant to engage a builder and have the claim-relate
work finalised.
For the labour component of the claim-related roof repairs, the insurer has offered a cash
settlement of $7,341.29. It has explained that represents an uplift of 15% on builder ABC’s 18
February 2022 quote for $6,373.72. Given the age of the quote and the fact it is not stated as
being actionable by the complainant as a retail customer, I am satisfied the uplift is fair and
appropriate, and that th e insurer’s proposed cash settlement overall is reasonable. The
insurer is not required to increase it.
However, the insurer has also agreed that if, as repairs progress, further claim-related
damage is identified, it will review that and, as appropriate, increase the cash settlement. That
is fair.
No detriment to the complainant by change in settlement
I appreciate the complainant was upset and her tenants may have felt inconvenienced by the
change is settlement method, after the insurer discovered the additional work needed.
However, I am satisfied the insurer acted reasonably in the circumstances, as soon as it
realised there were other issues that would impact its ability to complete repairs. I do not
consider the insurer has acted inappropriately, nor that the complainant has suffered any
detriment as a result of the insurer’s handling of the matter.
I do not consider the degree of upset or inconvenience was unusual or unexpected given the
circumstances. The insurer has already agreed to waive the $750 excess in recognition of the
complainant’s claims experience. I consider that fair and reasonable.
2.2 Why is the outcome fair?
It would not be fair to require the insurer to pay more than its liability under the policy – that
includes for compliance issues and previous damage which are excluded under the policy.
Based on the currently available evidence, the insurer’s cash settlement offer is fair and
reasonable; as is its offer to consider any further claim-related damage which may become
apparent in the course of repairs being conducted by the complainant.
Determination | Case number: 868165 Page 4 of 4
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.