Storm damage claim dispute: insurer limited liability; complainant sought cash settlement of sum insured
Text of the determination
Determination
Case number 867502
Financial firm Insurance Australia Limited
Determination | Case number: 867502 Page 1 of 15
Case number: 867502 13 October 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
A claim was lodged on the policy after the home was damaged by a fallen tree during a storm
on 15 December 2018.
In March 2019 the insurer accepted liability for damage to the main house and garage roof,
pool and balcony area and pergola. It declined the claim for the remaining damage due to
long term maintenance issues and wear and tear. In May 2020, the insurer accepted liability
for damage to the upper storey roof but says it is necessary to further inspect the property to
assess the extent of storm related damage.
The complainant says the insurer has had ample opportunity to assess the damage and
prepare a scope of works (SOW). The complainant has provided various reports and quotes
for the repairs and seeks to cash settle the claim for the sum insured.
1.2 Issues and key findings
Has the complainant established a valid claim within the terms of the policy?
Yes. The panel is satisfied the complainant has established a valid claim for damage to the
home and contents caused by an insured event.
Has the complainant’s conduct prejudiced the Insurer’s assessment of the
damage?
Yes. The panel is satisfied the insurer has been prejudiced by the complainant ’ s continued
refusal to allow the insurer to reassess the damage to the property. The refusal to allow a
further inspection has prevented the insurer developing an accurate SOW.
Should there be a further assessment of the damage?
Yes. It is fair that an independent building consultant be appointed to develop a SOW for the
storm related damage and an independent builder appointed to prepare an actionable
quotation to complete the repairs. The insurer can then cash settle the claim based on the
actionable quote plus a 15% allowance for contingencies.
Is the complainant entitled to compensation for non-financial loss?
Yes. The initial conduct of the claim and delays caused by the first builder have caused the
complainant stress and inconvenience. It is fair the insure pays the complainant $2,000
compensation for non-financial loss.
Why is the outcome fair?
While the insurer ’ s initial conduct of the claim has caused delays, stress and inconvenience
for the complainant, it is fair the insurer be given the opportunity of assessing the claim
Determination | Case number: 867502 Page 2 of 15
related damage to determine a fair cash settlement. It would be unfair to require the insurer to
settle the claim for the sum insured based only on the complainant’s quotes.
1.3 Determination
This determination is substantially in favour of the complainant. Within 14 days of the
complainant acceptance of this determination the insurer is to:
pay the complainant non-financial loss compensation of $2,000
provide the complainant the names of three independent building consultants and
independent builders available to reinspect and assess the storm related damage to the
property.
within 14 days of receiving the names of the independent consultant and builder the
complainant must notify the insurer of her preferred consultant and builder from the list
provided.
the insurer is to then engage the consultant and builder to assess the damage and prepare
a SOW and actionable quote for the repairs.
The insurer can then cash settle the claim based on the quote provided plus a 15% uplift to
allow for contingencies. No interest is payable as the quote will be based on current
values.
Should the complainant require temporary accommodation during the repair process the
insurer can cash settle the complainant in accordance with the terms of the policy for the
temporary accommodation and any relocation costs based on the estimated repair period
determined in the SOW.
Determination | Case number: 867502 Page 3 of 15
2 Reasons for determination
2.1 Has the complainant established a valid claim within the
terms of the policy?
Yes. The panel is satisfied the complainant has established a valid claim for damage to the
home and contents caused by an insured event.
The complainant must establish a valid claim under the policy
It is established insurance law that an insured has the initial onus to prove, on the balance of
probabilities, (that is, more likely than not) that the loss/damage claimed falls within the terms
of the policy. This is commonly known as a prima facie claim.
The complainant’s home building and contents insured her home and contents for $581,931
and $425,405 respectively from 23 August 2018 to 23 August 2019. The policy provides
cover for a series of insured events including storm subject to several conditions and
exclusions as set out in the Product Disclosure Statement (PDS).
The complainant says that on 15 December 2018 storms caused major damage both
internally and externally to the home due to impact damage from a fallen tree and water
ingress.
There is no dispute the complainant’s home was impacted by a storm on 15 December 2018
or that she suffered loss/ damage as a result. The issue in dispute is the extent of the storm
related damage and the insurer ’ s conduct of the claim.
Insurer sought to limit liability
After the complainant lodged the claim in December 2018, the insurer appointed several
experts to assess the damage.
Builder/assessor ’s (CC) completed an inspection on 14 January 2019. CC confirmed the
State Emergency Service (SES) had partly removed a fallen tree, presence of a tarp and
suggestion of pre-existing roof damage. CC identified:
mould was present
a scope of works (SOW) was being reviewed under a separate claim.
the complainant advised that bedroom 3 (with the skylights) had not been included in the
SOW, and
skylight flashing needed to be addressed
property has wear and tear issues
A leak detection expert (SL) provided a report confirming:
a large tree branch had collapsed over the area where water service runs into the property.
SL said there was no leak at the time, but it recommended further investigation once the
tree/tree branch in question was removed
In March 2019 the insurer accepted liability for damage to the main house and garage roof,
pool and balcony area and pergola. It declined the claim for the remaining damage as due to
long term maintenance issues and wear and tear.
A restorer (LR) attended the premises on 11 April 2019. LR confirmed mould was present in
three rooms, the complainant reported her cleaner had wiped the mould down, and LR
Determination | Case number: 867502 Page 4 of 15
recommended that a hygienist be appointed to attend to the mould on contents. CC provided
a further report dated 17 May 2019 which identified mould in three bedrooms and a skylight
shaft.
Due to the time taken and concerns which the complainant had raised about CC and its
trades, the insurer appointed another builder (BB) who inspected the property on 14 June
2019 BB reported:
damage which the complainant pointed out as claim related including damage to external
decking, veranda roof sheets and timber, garage roof, brushwood fencing around the pool,
metal posts
recommended that a technical assessor attend, and scope required works
BB provided a roof report following an inspection on 21 June 2019. In addition to the areas
above, the report says the complainant reported that the fallen tree had also knocked down
the power and cable network. In relation to the roof, BB says:
tree impact has caused 60% of tiles to break and damage to 3 battens at the front. It also
mentions the possibility that rafters were damaged but recommended an engineer’s
opinion should be obtained in that regard
there was damage to 3 sections of the polycarbonate pergola roof sheeting and as
sections cannot be replaced, a full replacement is required in this area
rear skylight impacted by fallen tree and this resulting in dislodgment of the dome
found about 100 cracked tiles. Considers this occurred from hail impact and questioned
whether it relates to a separate event/claim
concluded the cause of damage is impact from fallen tree, hail, wind and rain.
In April 2020 the insurer maintained its acceptance of damage , based on CC’s repair scope of
works (SOW) of January 2019 for a total amount of $19,340.47. After the complainant
registered a complaint with AFCA the insurer reviewed its position. On 1 May 2020, the
insurer agreed to cover damage to the upper storey roof and any resultant damage due to the
storm. As CC’s SOW pre-dated this, the insurer requested a re-inspection of the property to
establish a current SOW.
Complainant refused to allow insurer to reinspect the property
Although the insurer offered to reinspect the property and obtain a further SOW the
complainant refused the insurer’s request .
The complainant had raised concerns and refused the insurer’s re -attendance requests
towards the end of 2019. Complaints were raised with the insurer about CC and other trades.
The complainant raised issues about trades showing up at her home without warning or pre-
arranged appointments. The complainant was also dissatisfied with the number of inspections
that has occurred since the claim was lodged.
The complainant says the insurer should rely on existing information from its experts/trades to
develop a SOW for settling the claim. The insurer says it attempted to establish SOW on the
existing information however has been unable to do so because of the additional information
from the complainant along with what it had, is insufficient to make an accurate assessment
without a reinspection.
The insurer however made limited offers based on this information which included:
$36,598 (including $1,500 non- financial loss and $3,000 for temporary accommodation
on 13 July 2021
Determination | Case number: 867502 Page 5 of 15
$58,600 (including $2,000 non-financial loss compensation) on 5 May 2022
These offers were rejected. The complainant seeks payment of the sum insured based on the
quotes she has provided. The complainant relies on the following reports and quotes to argue
that the insurer should pay the sum insured to settle the claim;
Removalist LPR…. $23,303.90
Painter MP… $15,400
Roofer RR… $59,600
Electrical and air conditionin g consultant HQ… $23,000
Electrician RSPL … $38,940
Mould remediation ML… $8,198.41
Pool specialist PP $15,200
Builder AH … $177,980
Home builder HH $626,725
There is no dispute the complainant’s home was impacted by a storm on 15 December 2018
or that she suffered loss/ damage as a result. The issue in dispute is the extent of the storm
related damage and the insurer ’ s conduct of the claim.
2.2 Has the compla inant’s conduct prejudiced the insurer’s
assessment of the damage?
Yes. The panel is satisfied the insurer has been prejudiced by the complainant ’ s continued
refusal to allow the insurer’s request to reassess the damage to t he property. The refusal to
allow a further inspection has prevented the insurer developing an accurate SOW.
Reports as to roof damage inconclusive
The complainant says the reliability of the insurer’s reports insofar as they relate to the roof of
the insured building is questionable.
The panel accepts that the contractors have incorrectly referred to the home as being double
storey and that tarpaulins were in place from 2016. Nevertheless, the panel does not consider
this invalidates the reports/submission. This is because it is sufficiently clear in the
documents, which roof area/s are being referenced. The panel takes references to main roof,
upper storey roof, main building roof to refer to the same area of the home, which is the
building (other than the garage and pergolas or veranda) roof.
The panel also notes that BB reported finding 100 cracked roof tiles. In relation to cracks to
the roof tile, BB suggests they were caused by hail/storm. P hotographs provided with BB’s
report show cracks to what appears to be the main roof.
BB discusses cracks to the ‘main roof’ separate to the 60% of damage identified to the
garage roof. It does so after commenting on a skylight in the roof (skylight is over bedroom 3
in the main building) where it suggests there was some movement of the skylight frame
caused by impact from tree branch/es. BB observed large amounts of leaves and debris
across all elevations before suggesting the cracks were from hail impact from a ‘ recent event ’ .
BB refers to the issue with leaves and debris across all elevations of the roof as maintenance
related issues.
Determination | Case number: 867502 Page 6 of 15
If there is any remaining doubt about the roof area BB was referring to, the quotes from RB
(appointed by BB) includes costs for replacing 100 tiles on the main roof; it also provides for
refixing a skylight dome (also on the main roof).
The panel is not satisfied that there is sufficient information (across reports/quotes from both
the insurer and complainant) to support the complainant’s requ est for the entire roof to be
replaced/repaired. The report which the complainant currently relies on (from engineer NH)
does not have sufficient analysis of observed and obtained evidence to show all damage
relating to the main roof was caused by an insured event.
The panel notes the complainant ’ s structural engineer NH concludes that the storm is
responsible for the main roof (as well as other listed) damage. However, this conclusion is
‘ based on the nature of these damages ’ (which NH does not explain in any detail), the
complainant’s input and the ‘ overall condition ’ of the property (which is also not explained in
detail).
It is fair that the insurer has the opportunity to further assess the damage to the roof.
Failure to remediate mould has likely led to spread of mould
LR and BB both reported mould in their reports, as outlined above. Their reports show that
mould became evident following the storm event. P hotographs in LR’s report of April 2019
appear to show quite a bit of mould damage. There is no suggestion in the reports that the
mould predates or is unrelated to the storm event claimed.
The complainant refused the insurer ’ s offer to arrange its preferred hygienist to attend saying
at the time that the insurer had sent numerous trades, and repeatedly inspected the home.
She had bad experiences with the contractors and has lost trust in the insurer/its trades.
In July 2020 the complainant provided a report from mould expert (MC) to the effect that the
mould caused by the December 2018 storm, had not been addressed. Mould was identified
on the garage ceiling and contents, bedroom 1, lounge room, ensuite, toilet and office ceiling
and/or walls, as well as cupboard/ contents in bedroom 1 and a second bedroom. MC
recommended roof repairs to prevent further damage from leaks.
The insurer accepts mould was an issue at the home however, it says the mould relates to a
separate claim (for flood). It also offered a settlement based on MC’s quote/SOW for the
complainant to remediate the mould under that claim, but she rejected it.
The panel has reviewed the insurer’s file notes which shows that at some point, the insurer
considered the mould related to a separate claim, but it did not appear to separate its dealing
(including assessments for mould) from the storm claim.
The panel accepts that mould damage is likely the result of a leaking roof and the December
2018 event. In the absence of any evidence to the contrary, the panel accepts on balance
that the mould relates to the storm event. The c omplainant’s refusal to remediate the mould
following the insurers offer based on MC’s report has likely resulted in the spread of mould
and increased the damage. The panel does not agree the insurer can rely on prejudice alone
to decline liability for all mould damage or limit its liability for mould damage to MC ’s
scope/quote of July 2020 because:
the initial decline to cover the roof was overturned around two months prior to MC’s report
MC recommended roof repairs before any remediation could occur
at the time, the insurer was wanting further inspections to determine the scope of works
Determination | Case number: 867502 Page 7 of 15
remediation works could not have occurred until the roof (which was part of the claim) had
been repaired, or the claim for the roof damage had been settled.
There is no actionable SOW or quote to remediate the mould. The panel is unable to make a
finding as to the likely costs to remediate the mould. It is fair in the circumstances that the
insurer further assesses the extent of the mould related damage.
Garage roof requires further assessment
The insurer accepts liability for damage to the garage roof. The available information
(including photographs provided by the parties and in several reports) show the garage was
damaged due to impact from a fallen tree during the storm.
The insurer accepted liability for 15 damaged tiles (identified by CC in its initial SOW) as this
is the only SOW it has. It has repeatedly expressed willingness to change this if allowed to re-
inspect and produce a current SOW. It maintains a re-attendance is needed to correctly
establish settlement under the claim, including for the garage.
The insurer had several attendances at the premises including by builder BB in June 2019.
BB confirms the fallen tree impacted the front of the garage causing about 60% of the tiles to
break. BB found cracks to 3 battens and that the rafters and ceiling frame required further
engineering review. BB’s report clearly shows the damage to the garage roof (and arguably
other roof members, interior and contents) extends well beyond 15 roof tiles.
The complainant’s structural/civil engineer ’s report from NH seems to echo BB in its view
about damage to the garage roof. NH says among oth er things that the garage roof ‘… was
seriously impacted by the storms, more than half of the roof tiles are broken, in addition to 3
battens. ’ NH reported mould and structural issues saying in relation to the garage:
… the rafters are not broken, however, they are no longer stable due to the impact
caused by the falling tree, timber to timber connections are loose and deemed to
be unstable. I also observed cracking on the main supporting brick wall indicative
of weight bearing impact from the tree. A replacement of the entire timber framing
is recommended and part of the suppor ting brick wall…
As there is no dispute that the storm caused damage to the garage roof, the question which
remains is the extent of storm or claim related damage and settlement for that damage.
The insurer and complainant provided quotes from builders RB and AH through the course of
the claim and complaint which address repairs to the garage roof however, the quotes are out
of date given they date back to June 2019 and August 2020, respectively.
The panel is not satisfied the quotes reflect the claim related damage and/or provide sufficient
detail. It is unclear for instance, what portion of AH ’s total estimate relates to the garage roof
repairs as its quote is not itemised. It is fair for the insurer to further assess the damage to the
garage roof.
Pool (native brush) fence does not require replacement
The insurer does not dispute there was some damage to the fencing and retaining wall, it has
included repairs for affected portions of the fencing and retaining wall in previous offers which
the complainant rejected.
Determination | Case number: 867502 Page 8 of 15
BB provided photographs with its report which includes photographs of the brushwood
fencing. A bent pole is visible in a photograph (showing area where temporary fencing
appears to have been placed behind the brushwood fencing). There also appears to be a
dislodged timber sleeper around vegetation near the fencing.
BB says ‘ [t]he insured also advise me that the brushwood fencing around the pool area, was
also damaged due to the fallen tree. With the general condition of the metal post, I cannot
understand why the posts are bent and damaged ’ .
The complainant relies on reports NH and quotes and seeks for settlement to cover
repairs/replacement of the entire fencing.
The panel does not accept the evidence shows the entire perimeter fence was damaged or
that repairs cannot be completed without replacing all fencing. The insurer is entitled to limit
its liability to cover the cost of replacing/repairing the storm damaged section of the fence.
Damage to timber pool steps limited
While the complainant is seeking entire replacement of the steps along with pool decking and
surround, the evidence does not show any storm related damage beyond the two steps.
The panel has considered all available information including photographs and accepts only
two pool steps suffered impact damage. The panel is satisfied the insurer can limit its liability
to the area/quantity provided for in CC ’s SOW which allows for the removal and replacement
of ‘ 4x90x18mm treated pine decking boards at base of pool steps. ’
Damage to pool area/decking limited
The insurer is only required to cover damage caused by an insured event. The available
information does not show the pool area and/or decking area suffered any damage other than
to the timber handrail and stainless wire. The panel is satisfied the insurer is entitled to limit
cover for repairs to this specific damage.
BB inspected the premises on 14 June 2019 and reported:
damage identified by the complainant include damage to handrail and stainless wire
this damage was a result of poor maintenance as the decking boards are rotten and very
possible that the joist condition will be in the same poor state
BB believes this to be a maintenance issue.
Photographs provided, including those in BB’s report support BB’s conclusion. The impact
damage in the area is visibly limited to the specific storm damage identified by BB.
Pool & pool surroundings damage limited
The panel is not satisfied the information provided shows any damage to the pool structure,
or that such damage is related to the storm, or any other event for which the policy provides
cover.
The panel has reviewed the complainant’s information including comments from her pool
cleaner suggesting the pool was not damaged prior to the storm and was in good condition.
The photographs provided with some of the reports do not show impact damage to the pool
or its surrounding other than damage to some panels encasing the spa bath next to the
impacted native brushwood fencing around the pool area.
Determination | Case number: 867502 Page 9 of 15
The SOW from CC includes ‘ remove and replace two treated pine steps supply and install
two end panels to match existing side panels as close as possible to spa bath ’ in item number
10. The insurer is only required to cover this damage.
In the absence of evidence showing the pool was damaged due to the claimed event, the
insurer is entitled to decline cover for replacement/repair of the pool which the complainant is
claiming.
Tree (removal and clearing) to be assessed
The insurer says CC did some tree removal from the site and it agreed to cover removal of
remaining tree debris. It says the cost of removal of remaining tree/tree debris is included in
CC’s S OW and the cash settlement which the complainant rejected.
There is no dispute the affected tree debris requires further removal. There is also no
evidence that the scope of tree removal required exceeds CC’s estimate.
The panel is satisfied it is fair that the insurer covers the cost of tree lopping to cut up and
remove the fallen remaining gum tree which CC estimates at being of approximately 10x600
in diameter, as well as tree rubble from the front area of the insured premises.
Damage to Front eaves inconclusive
The complainant relies on the report from NH to support her position that there is storm
related damage to the eaves at the front of the building.
The insurer says the report does not show the water damage to the eaves was caused by the
storm event. Given the function of the eaves is to prevent water ingress, the insurer says any
failure in this function means the water d amage could have occurred ‘ with or without the
claimed event ’ and amounts to a design issue.
The panel notes NH reports there is visible water damage. NH has not provided details about
the cause of water damage. There is insufficient information in NH’s report to show how it
concluded some of the damage identified was caused by the claimed event or is otherwise
covered under the policy. It is fair this damage be reassessed.
No evidence of further damage to contents
The complainant has not made any submissions in relation to contents or provided evidence
of loss (other than saying the insurer should pay the full sum insured due to mould).
The insurer says it has settled the complainant for contents damaged by the insured event
(separate to this claim/complaint). Nevertheless, it says it is willing to review any evidence
provided of additional claim related contents damage in line with the policy terms and
conditions, if the complainant provides new evidence of such loss.
Insufficient evidence of additional damage to electricals
The complainant made several calls to the insurer about electrical issues experienced after
the storm from around 21 January 2019. The complainant advised the insurer she would get
her own electrician to attend to address any immediate safety issue and that she would also
get the electrician to check all wiring and provide a quote.
The insurer offered for CC to arrange electrical make-safe however, the complainant advised
she wanted her own electrician to attend. The insurer’s file notes show it approved the
Determination | Case number: 867502 Page 10 of 15
complainant ’s request to attend to electrical make-safe herself and it asked her to keep and
provide invoice/receipts.
The complainant is now seeking for the insurer to cover to costs of full rewire of the electricals
in her home. She provided a quote from RSPL dated 3 July 2020 with an estimated cost of
$38,940 for the rewiring. The insurer says RSPL ’s statement and the information provided
does not show that the rewiring of the home is needed due to the claimed storm event.
The panel notes that o ther than the insurer’s reports which mention that the complainant
reported tree impact to power line/s, and the file notes showing discussion of electrical make-
safe, there is no evidence of the impact itself and/or the extent of damage this may have
caused.
While RSPL suggests the issues are related to water ingress, there is insufficient information
on how this conclusion has been reached. In view of the above, the panel does not consider
the available information sufficient to make a finding about the insurer’s liability for electrical
works claimed. It is fair that the claimed damage to the electricals be reassessed.
No evidence air- conditioning damaged in event
The complainant says the air-conditioning unit was damaged by the storm however, she has
not provided any information to support this. The quote she provided from HQ dated 19
March simply says the unit was water damaged, it does not explain when or how this damage
occurred.
The panel is not satisfied the complainant has shown a valid claim for the air-conditioning.
Therefore, the insurer is not required to cover this aspect of her claim.
No evidence windows and doors impacted during storm.
There is no evidence the windows were impacted during the storm.
The complainant provided quotes for replacement of windows and doors at the premises.
BB’s report includes that it ‘ noticed all pointing is showing signs of deterioration along with the
timber window sill on the rear spare room (also the room which the insured is experiencing
mould issues)’ The photos provided with the report show the timber window frames and they
support BB’s statement about their deteriorated condition.
The panel is satisfied the insurer is not liable for the claimed damage to the windows and
doors.
Evidence of damage to fascia and gutters limited
Th e complainant’s expert NH says the fascia and gutters are partially falling or missing due to
the claimed event. The insurer says it does not dispute this damage exists however, it says
the available information is insufficient to show the how the damage occurred and in turn that
its liability for it.
The panel does not consider the available information sufficient to make a finding about the
extent of the insurer’s liability for any fascia or gutter replacement needed. It is fair that this
damage is reassessed.
Determination | Case number: 867502 Page 11 of 15
Insurer has been prejudiced by complainant’s conduct
For the reasons set out above the panel considers the refusal of the complainant to allow the
insurer to reinspect the property has prejudiced the insurer ’ s ability to fully assess the extent
of the claim related damage.
The panel accepts the complainant was likely frustrated by the delays initially experienced
when dealing with CC and the allegations of previous tarping on the roof. The initial delays
were unacceptable given the presence of mould. The panel accepts there were further delays
in reviewing the information from BB. It is also unclear why the insurer did not accept the
‘ upper roof damage ’ until May 2020.
The complainant refused proposals by the insurer for it to attend and complete a make safe in
or around July -August 2020. There is no evidence the complainant took reasonable steps to
mitigate against further damage.
The policy requires the complainant take all reasonable steps to mitigate the loss as well as
cooperating with the insurer in its investigation of claims. AFCA discussed the benefit of
allowing the insurer to re-inspect the premises to resolving the claim/complaint with the
complainant.
The panel considers it would have been reasonable for the complainant to allow investigation
after the matter was brought to this service and the insurer overturned its partial decline of the
claim. This is particularly the case given mould was involved and the issues which the
complainant has raised around this. The panel does not consider the complainant has fully
complied with the obligations under the policy to cooperate with the investigation of the claim.
2.3 Should there be a further assessment of the damage?
Yes. The available information is not sufficient to make a fair determination about settlement
of the claim. It is fair in the circumstances that an independent building consultant be
appointed to develop a SOW for the storm related damage and an independent builder
appointed to prepare an actionable quotation to complete the repairs. The insurer can then
cash settle the claim based on the actionable quote plus a 15% allowance for contingencies.
Insurer to appoint independent building consultant and builder to prepare SOW
As mentioned in preceding paragraphs, the complainant refused re-attendance/reinspection
by the insurer. Most recently, she provided a report from NH and says this sufficiently shows
all the damage claimed is claim related and the extent of repairs which she is requesting is
appropriate.
The pa nel has considered NH’s report . It accepts NH is appropriately qualified to report on
the damage. However, in the panel ’ s view, the focus of the report is establishing structural
damage and what needs to be done to rectify it. In terms of the cause of damage, NH seems
to assume all damage was caused by the 2018 storm based on the reports of the
complainant rather than its own analysis of what it observed and any information it may have
been provided. The introduction of the report includes that NH’s inspection was to ‘ to assess
the structural integrity of the house, garage and outside structures due to storm damage that
occurred in late December 2018 ’ .
The panel does not accept there is sufficient information in NH’s report relating to causation,
particularly in relation to water intrusion or mould in the main building. There is no information
Determination | Case number: 867502 Page 12 of 15
in NH’s report of the testing conducted to establish the extent of moisture in the main roof,
insulation and plasterboard.
The panel is not satisfied the information in the report is sufficient to form a view that all the
reported mould damage was caused by or relates to the claimed storm (or any other
claimed/insured event).
The insurer has offered a cash settlement of $58,600 while the complainant seeks the sum
insured of over $500,000. In view of this, the panel considers it fair that reinspection/s occur
to determine the scope and settlement amounts for the damage which the panel accepts
have been shown to be related to the subject claim/s or event.
Consultants to be appointed to reinspect and prepare SOW
Given the extended claims history, it is fair that the insurer appoints an independent building
consultant and independent builder to reinspect the property to provide a SOW and
actionable quote to cover the accepted repairs.
The insurer should provide the complainant, within fourteen days of the complainant’s
acceptance of this determination, the names of three independent building consultants and
three independent builders. The complainant can select from the nominated building
consultants and builders, the building consultant and builder to attend the property for the
reinspection. Both the building consultant and builder are to be provided copies of all the
reports exchanged and this determination.
The building consultant will prepare a SOW for the accepted damage and the builder will
prepare an actionable quote for the repairs. On receipt of the SOW and actionable quote the
insurer is to cash settle the claim based on the actionable quote with a 15% uplift for
contingencies.
Should the complainant require temporary accommodation during the repair process the
insurer should cash settle the complainant in accordance with the terms of the policy for the
temporary accommodation and any relocation costs based on the estimated repair period
determined in the SOW.
2.4 Is the complainant entitled to compensation for non-
financial loss??
AFCA may award non-financial loss compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, AFCA may award compensation for non-financial
loss (capped at $5,4 00) where the insurer’s actions have caused an unusual amount of
physical inconvenience, time taken to resolve the situation or interference with the
complainant’s expectation of enjoyment or peace of mind.
Where a complainant has contributed to their loss arising from the insurer’s conduct, their
level of compensation may be reduced accordingly.
Insurer ’s handling of the claim was less than ideal
The complainants say that the insurer’s failure to promptly and sufficiently assess the storm
damage or prevent mould and the overall time taken with her claim/complaint has caused
significant stress and inconvenience. She suggests that the insurer has been difficult to
Determination | Case number: 867502 Page 13 of 15
contact, unsympathetic and has approached the claim in a manner focused on trying to
decline rather than appropriately cover the claimed loss.
The panel particularly notes the information provided by the complainant about her and her
partner’s health condition, inability to have family and friends over and the isolation she has
endured as a result. The complainant says they have not had use of the garage for their
vehicle after it was repaired at a relatively high cost.
The panel cannot award compensation for physical incapacity or injury. However, the panel
accepts the insurer’s handling of the claim , the delays and the lack of adequate coordination
between it and its trades was less than ideal. This has caused the complainant significant
stress and inconvenience.
The panel notes in its response to this service of 14 July 2020, the insurer offered to waive
the complainant’s excess in acknowledgment of delays and its conduct of the claim.
Insurer is to pay compensation for non-financial loss
Given the stress that the complainant was under, the panel considers it fair that the insurer
pays the complainant $2,000 in compensation for non-financial loss. In reaching that figure,
the panel has had regard to the maximum amount it may award in non-financial loss
compensation and the complainant’s own contribution particularly due to the lack of co-
operation with the insurer’s assessment of the damage.
2.5 Why is the outcome fair?
There is no dispute that the complainant had been provided copies of the relevant policy
documents. Under the policy, t he insurer’s liability is limited only to loss/ damage caused by
an event.
The insurer is entitled to obtain all necessary information to establish its liability and the policy
imposes several conditions when a complainant lodges a claim including the that the insured
cooperate with the insurer and take steps to mitigate against further damage following a
claimed event.
The refusal to give further access to the insurer to establish a scope of works following
overturn of the initial partial claim decline resulted in the insurer not having reasonable
opportunity to examine the damage property and the extent of its liability (at least from the
date its decision was overturned on or around 1 May 2020).
The panel accepts the complainant had reasons for the refusal and the panel does not seek
to minimise these reasons. However, the panel remains of the view that it is fair, given the
nature of the damage, that the insurer can reinspect the property and prepare a revised SOW
and actionable quote on which to settle the claim.
Determination | Case number: 867502 Page 14 of 15
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes an ombudsman, a member with significant experience in consumer and small
business advocacy and a member with extensive experience in general insurance.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
The complainant says the insurer’s conduct in relation to delays and number of assessments
caused her a lot of distress and did not result in appropriate action being taken. As a result,
Determination | Case number: 867502 Page 15 of 15
she advised she did not trust or allow the insurer’s trades to reattend the home or complete
any further assessment or repairs.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.