Text of the determination
Determination
Case number 867492
Financial firm AAI Limited
Determination | Case number: 867492 Page 1 of 11
Case number: 867492 14 February 2023
1 Determination overview
1.1 Complaint
The complainant is represented by a third party. For brevity, a reference to „the complainant‟
in this determination includes his representative unless stated otherwise.
The complainant ‟ s units (1 and 2) are covered under a residential strata insurance policy
(policy) with the financial firm (insurer). He lodged a claim for damage to the roof of the units
following cyclone Debbie in March 2017.
The insurer accepts he has a valid claim for damage to the roof. It has previously cash settled
his claim for $139,312.60 based on its first scope of works. However, a dispute arose
because the complainant identified additional works required to make the building comply
with the current building regulations and laws.
The parties agree additional works are required. Where they disagree is over the extent of the
work necessary to ensure the repairs are compliant.
1.2 Issues and key findings
Is the insurer’s assessment of its liability under the claim reasonable?
Yes. The insurer‟s assessment of its liability under the cla im is reasonable. This is because
the insurer has shown its scope of works is certifiable and actionable. It is entitled to rely on
the scope to determine its liability for the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is to settle the claim as set out in section 2.1.
Determination | Case number: 867492 Page 2 of 11
2 Reasons for determination
2.1 Is the insurer’s assessment of its liability under the claim
reasonable?
Yes. The insurer‟s assessment of its liability under the claim is reasonable. This is because
the insurer has shown its scope of works is certifiable and actionable. It is entitled to rely on
the scope to determine its liability for the claim.
Policy covers additional costs to meet compliance
The policy covers the necessary and reasonable costs to repairs connected to event related
damage as follows:
When we are rebuilding or repairing damaged parts of your building, we will pay
the reasonable and necessary costs:
- To make the damaged parts of your building comply with the current building
regulations and laws.
Parties agree additional costs are covered
The insured property is two attached single- storey strata units, configured in an „H‟
arrangement. The units are separated by a dividing wall and share a roof.
There is no dispute that, in April 2017, a cyclone lifted the roof, damaging it.
The insurer accepted the claim and cash settled the complainant $139,312.60 for the repairs
based on its scope of works. The complainant says during repairs, his building certifier told
him the building needed to be upgraded to comply with today‟s requirements before he could
issue a building approval – particularly in relation to structural and fire safety requirements.
The specific areas of concern he identified was the lack of a fire-rated separating wall
between the two units, extending from the ground to the bottom of the roof sheeting.
While there was an initial disagreement between the parties about whether the policy covered
additional costs to comply with current standards and regulations, the insurer now accepts
additional costs are covered under the policy.
The parties‟ experts broadly agree it is necessary to construct a fire -rated separating wall
extending from the ground to the bottom of the roof sheets. Where they disagree is over how
the repairs should be carried out and the cost.
Insurer relies on KM’s scope of works
The insurer offered to cash settle the complainant a further $48,992.39 based on its engineer
(KM‟s) scope of works for the additional work.
KM says:
bracing is not required to upgrade unit 2
Determination | Case number: 867492 Page 3 of 11
each of the units are strata titled with the fire wall to be included on the boundary separating
the two units
each of the strata units should be considered and assessed as separate structures.
there are no works proposed to the wall linings in unit 2 and, therefore, there should be no
requirement to do any work to the walls in that unit.
KM says it is suitably qualified to certify the structural design elements of the repairs and it is
willing to certify the structural design elements specified in its report.
Complainant says KM’s scope of works is inadequate
The complainant disagrees with the insurer‟s scope of works.
He provided a scope of works by ECM, a project engineering company, for the additional
work for $235,776.23.
The complainant says the costing proposed by the insurer is unrealistic and the scope of
works is uncertifiable, as it does not allow for replacement of the bracing in the entire building.
He says full replacement of the bracing, not just the bracing for unit 1, is required to comply
with the relevant building standards and regulations.
Insurer has shown its scope and quote are actionable
Under the policy, the insurer is required to pay the reasonable and necessary upgrades to
make the damaged parts of the building comply with current building laws and standards. The
onus initially rests with the insurer to establish what is reasonable and necessary.
The panel is satisfied the insurer‟s scope of works is reasonable. The information available
shows the building, as it is currently constructed, can be classified as a class 2 building with
two sole occupancy units. However, once the fire separation wall is installed, the building
would be reclassified as two attached class 1a buildings. This is detailed in the original
certifier‟s email as provided by the complainant.
In the panel‟s view, the requirement for bracing should therefore be assessed for each of the
units independently. Therefore, in the absence of evidence of substantial damage to the
bracing in unit 2, the panel agrees with the insurer that replacing all the bracing in both units
is unnecessary.
KM, which is qualified to certify the works, indicated it is willing to certify the structural design
as compliant in accordance with the design it has submitted. Therefore, its scope of works is
actionable.
The panel, based on the above, accepts the insurer‟s scope of works is a fair and reasonable
assessment of the reasonable and necessary upgrades, and its liability under the policy.
Therefor e, the panel prefers the insurer‟s quote because it is based on a fairer scope of
works.
Insurer is to cash settle the complainant in line with its scope of works
The insurer offered to either:
cash settle the complainant for the remaining works based on its scope of works; or
carry out all the repairs if the complainant returned the initial cash settlement.
The complainant told AFCA he already spent part of the settlement. However, given the
parties dispute the extent of works, the panel considers it is fair the complainant has the
Determination | Case number: 867492 Page 4 of 11
option to allow the insurer to complete the claim related repairs and to follow through with its
proposed scope. If he does choose this option, he must be able to return the cash settlement
he received.
If the complainant either cannot return the cash settlement or does not want the insurer to
complete the works, the insurer can cash settle the complainant $48,992.39 plus a 20% uplift
for the additional repairs based on its scope of works. It is fair the insurer should add a 20%
uplift to account for the transfer of risk and loss of its repair guarantee.
Parties to work together to determine loss of rent covered
The policy covers loss of rent during the period of repairs where the property cannot be lived
in.
If the insurer does complete the works, it is to pay for loss of rent for the duration of the
repairs. If the insurer cash settles the claim, it is to:
provide the complainant an estimate for how long the repairs will take, based on its scope
of works; and
work with him to calculate his entitlement to loss of rent in line with the policy terms and
conditions.
The complainant incurred professional costs
The complainant is seeking reimbursement of the expert report costs he incurred as well as
the engagement of a paid representative.
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded if the
complainant needed an expert to understand or establish their claim. These costs are
normally capped at $5,000 unless exceptional circumstances apply.
The panel accepts the complainant‟s engineer did assist him. The insurer had initially refused
to accept it was liable to pay for the compliance costs. It was after the co mplainant‟s engineer
explained the reasons for their inclusion that the insurer overturned its decision. The insurer is
liable for these report costs capped at $5,000 and subject to invoices provided in support.
The panel also accepts the paid representative assisted the complainant to a degree. This is
because the paid representative assisted the complainant to identify and engage the engineer
that materially assisted the complainant‟s position. However, the panel is not persuaded the
paid representative provided additional arguments or submissions that materially altered the
outcome. Also, the panel notes the complainant‟s position was not fully substantiated. Given
this, the panel considers it fair the insurer reimburses 50% of the paid representative‟s f ees,
capped at $5,000 and subject to invoices in support.
For clarity, the total payable for the engineer‟s report together with 50% of the
representative‟s fees are capped at $5,000 in total.
Determination | Case number: 867492 Page 5 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is b ased on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive insurance experience.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 867492 Page 6 of 11
3.2 Relevant information from the consultants
Record Key points
Financial Firms expert
(ICPS) Report
27 May 2017
Visual inspection on 16 May 2017
No firewall constructed bet ween the two units. At the time of
construction, this was likely not necessary.
Separation and uplift of roof battens from rafters to isolated areas
across the entire roof frame, exceeding forty percent to the roof
area.
Separation and uplift of roof battens from rafters to isolated areas
across the roof frame of the carport
Repairs to the roof frame of the residence would only require the
roof sheeting to be removed, new roof battens installed with batten
screws, installation of collar ties and rafter to ridge fixings
upgraded to co mply with the National Construction Code of
Australia and with compliance to AS1684 Residential Timber
Framed Construction Part 3 Cyclonic Areas.
Some upgrading of the Carport roof frame will be required,
including the replacement of roof battens requiring removal and
replacement of the roof sheeting.
Recommended certifier be appointed to consider requirement of
fire separation wall in roof space. If this is not required by Building
Code or Local Regulation, recommendation t hat firewall be
installed in the roof spac e to provide separate fire compartments
above the two units.
Complainant’s SOW
ECM
4 August 2021
$235,153.85 for reconstruction of property with fire rated wall
Financial Firms expert
(JHA) Report
11 October 2017
Site inspection on 6 October 2017
Signs of structural damage to roof due to batten uplift due to the
cyclone event
Roof covering was beyond serviceable life and should have been
replaced prior to cyclone event
Roof replacement required
AB SOW
Unit 1
15 October 2017
$130,571.30
AB SOW
Unit 2
15 October 2017
$8,741.30
Determination | Case number: 867492 Page 7 of 11
Record Key points
BC report
24 August 2021
Refers to response from Sedgwick:
> Certifier correct , compartmentalisation required from each other
> Aspects should have been installed when property was strata
titled‟
> Fire separation issue unrelated to the roof cladding works
> Interconnected smoke alarms are a requirement, even when fire
separation is installed.
Application and approval of strata title would have included
requirement for upgrades to meet the standards applic able at the
time.
Fire separation wall did not exist and was not damaged by fire
Roof cladding unrelated to the fire separation issue and deemed
an upgrade
Policy only covers the upgrading of damaged parts of the
building
COM quote
12 December 2021
$392,248.19 (Adjusted to $496, 193. 96)
$93,582.04 for non - s eparation wall
$288,666.15 separation wall
Complaint’s expert ( EMP )
Report
18.12. 21
Building was constructed in 1960‟
It was constructed as a Duplex with a separation wall
Duplex was reconfigured around 22 November 2007 to form strat a
title boundaries. Reconfiguration documents were lodged for
approval with the local council.
Council approved the reconfiguration as development work on the
basis of the mat erial lodged.
The building is an approved structure and did not require any
upgrading works, as no material change of use took place.
SOW of ABS missing:
> The SOW is striping the entire lining of the unit No 1. The lining
material is oil tempered Masonite. In the 1960 period of
construction this sheeting was the structural bracing used in
conjunction with raking let - in braces that were 3” x 5/8”
hardwood bra ces.
> Under the “Queensland Building Act, Div 2, S81, p74 2 (i) & (ii),
and Regulations, Section 9, P109 Sec. 2 (a) & (b)”, the removal
of more than 20% of a building‟s structural components of the
same type, then it is recommended that the whole element b e
reconstructed to meet the current codes and Laws. The
replacement of the entire bracing system to meet the current
requirements of the NCC and AS 1684. 3 will include the gutting
of the entire building, these costs are not included in the SOW.
> removal of 63% of the structural bracing requires that the whole
of the bracing be bought up to the current standard. This will
include any over notched studs outside the requirement of AS
1684.3. From my experience there is usually many of thes e to
Determination | Case number: 867492 Page 8 of 11
Record Key points
contend with. The result of replacing over notched studs will
cause damage to the external cladding of the building. The
replacement of the carport roof is another activity that will
damage the external cladding to remove the apron flashing. The
exter nal cladding is Asbestos Cement (AC).
> The separation wall bet ween the Unit No1 and No2 is being
stripped of its lining. This will automatically require the separation
wall be reconstructed to the current codes and standards. There
are no allowances for th is work in the SOW.
> The SOW has no allowances for smoke detection and alarms in
the electrical allowances.
> Removal of structural components, the modification of wet areas
and installation of new water waterproofing, and the modification
of a separation wal l all require a Development Application. There
are no allowances in the SOW for these activities.
Refers t o an email from certifier (GY ) stating:
> Extent of propos ed works trigger upgrading aspects of the
building to today‟s standards
> Development applicati on required for proposed works
> Building in today‟s terms would be classified as a class 2
building with two sole occupancy units.
> The two sole occupancy units share a common space below
and are not separated by a wall wit h an FRL 60/60/60 as
required by the Building Code of Australia
> In order for the certifier to issue a building approval, the building
will need to be upgraded to comply with today‟s requirements,
particularly in relation to structural and fire safety requirements.
Duplex was built in 196 0. The Duplex was constructed before the
BCA or NCC existed. The Interstate Standing Committee on
creation of the BCA or NCC was established in 1965.
Replacement of the roof sheeting not being related to the
separation wall of Unit 1 and Unit 2 is correct. However, the trigger
for the requirement to bring the separation wall up to the current
standard is the separation walls partial demolition in the first
instance.
Separation wall not relat ed to the roof sheeting directly. The fire
separation is due to the extent of the reconstruction works and not
the re - sheeting of the roof alone.
>
Financial firm’s expert ( KM )
Report
30 June 2022
Report does not attempt to upgrade and/or ensure that the
undamaged structural elements comply with current regulation
requirements.
Existing duplex party wall is a common timber stud wall with no fire
Determination | Case number: 867492 Page 9 of 11
Record Key points
separation details installed. The roof cavity and sub - floor are open
and have no separating walls bet ween the unit. The carport for
each unit has no separating wall between the parking spaces.
In our opinion, we would have expected the upgrade of this wall to
achieve fire separation of the units to have been a requirement at
the time of the Strata tile (2007) in accordance with the standards
of the time. To achieve fire separ ation between the units there
would need to be a fire rate wall constructed from ground level to
the underside of roof sheeting.
For carport boundary wall, the fire wall along the boundary would
need to extend through the carport area roof. The fire wall t o
provide this separation could be a continuation of the detail
proposed internally bet ween the units or a full height reinforced
masonry 190 thk block wall.
Requirement to upgrade the vertical bracing to unit 1 associated
with the replacement of damaged i nternal wall linings would need
to be confirmed by a building certifier.
Complainant’s expert ( EMP )
Response
4 July 2022
No MCU required to change title of the flats.
KM report provides for new light weight wall and while this is
possible, but expensive to build. Foundation being proposed and
200 series base is the same as what he has proposed. Cheaper to
complete the block wall and not change construction met hods mid -
stream. However, I am happy to adjust the SOW to suit but the
overall cost will not diff er much.
KM report does not fire rate the walls of the carport. These walls
also require fire rating this is the part (but not all) of the reason that
Unit 2 has to be gutted and repaired in the first instance.
KM report does not discuss damage to the brac ing system as a
whole. The bracing system has been compromised by more than
20% (QLD Building Act 1975) of it has been damaged, in this case
over 75%. This leads to unit 2 being required to be upgraded with
new bracing as KM has allowed for in unit 1.
BC re sponse
14 March 2022
Satisfied upgrade to comply with current building regulations is
required and accepted under the policy.
Building‟s roof, elements of the roof frame and wall claddings were
accepted as event related damage, and therefore to complete
compliant repairs an upgrade to meet current building standards is
required for thes e elements. Some of these building elements are
currently non - compliant with building safety laws for multi
residential buildings.
Refers to KM response to bracing on Unit 2:
> Do not believe that bracing is required to upgrade Unit 2 and
nothing needs to be amended to our SOW as currently specified
i n our report. The buildings are strata titled and with the fire wall
to be included on the boundary these are separate structures.
Determination | Case number: 867492 Page 10 of 11
Record Key points
There are no works proposed to the wall linings in unit 2 and
therefore there should be no requirement to do any work to the
walls in this unit.
JLG has estimated additional works to be $49,124.39
Insurer happy to entertain cash settlement of balance or if
complainant refunds the balance, JLG will perform the works.
Complaints expert ( BE )
Report
14 April 2021
Damage to building not defined by single unit of occupancy, under
Queensland Building Act and Regulations, damage is defined by a
percentage of the buildings gross floor area
The KM report and design is indicating the replacement of what
amounts to 147 kN of bracing . On a percentage basis, this is
147/210 = 70% of the required
structural bracing of the building and added to this is the
allowable 5% nominal bracing (the new int ernal sheeting) giving
an approximate total of 75% of bracing being
replaced.
For clarity, the FMPAC report - 11630 - 10 F St Proserpine - Report
01 - QLDembnem - 2022.1201.11, page 10 paragraph 36, Dot
point 2, indicated 63% of the buildings bracing was affected.
Refer to Annexure A.
The Australian Standards AS 4055 and AS 1684.3 require the
bracing to be evenly spaced throughout the whole of the building
to achieve effective bracing. The standard AS1684.3 TABLE
8.21, page 149, requires the bracing to be spaced at no greater
than 8.2 met res. Refer to Annex ure A.
Permit requirements for
rebuilding and repairing
after a flood – QBCC (28
March 2017)
For substantial repairs great er than 20% to structural and non -
structural framing members , it is recommended current standards
are applied where possible. You should seek advice from your
builder, building certifier or even an engineer if the repair work is
extensive
3.3 Relevant policy wording
Page Wording
15 We cover loss or damage caus ed by storm, including cyclone
22 Other repair/ rebuilding costs
We cover
Determination | Case number: 867492 Page 11 of 11
When we are rebuilding or repairing damaged parts of your building,
we will pay the reasonable and necessary costs:
–– for the services of professionals, such as architects or surveyo rs,
to repair or rebuild at the ins ured address;
–– to make the damaged parts of your building comply wit h th e
current building regulations and laws.
23 Loss of rent following an insured incident
We cover
If we accept your claim for loss or damage to a tenanted unit in your
building due to an ins ured incident and we agree the unit cannot be
lived in, we will pay the unit owner the weekly rental
amount for the reasonable amount of time we decide it should take
to repair or rebuild your building or unit so it can be lived in again.
44 We choose how we settle building claims
If we agree to pay a claim for loss, theft or damage to your building,
we will decide if we will:
–– repair damage to your building;
–– rebuild your building;
–– pay you what it would cost us to repair or rebuild your building;
–– pay you the sum insured for your building;
–– give you a vouc her, store credit or stored value card for the
amoun t it would cost us to repair or rebuild an item.
If we rebuild (or pay you what it would cost us to rebuild), we will do
so on a „new for old‟ basis.
If we repair (or pay you what it would cost us to re pair), we will at our
option repair on a „new for old‟ basis or repair to a similar condition
to what your building was in before the loss or damage
occurred.
If we choose to pay you what it would cost us to repair or reb uild
your damaged building, you are not eligible for an extra amount
under the additional feat ures „Other repair/rebuilding costs‟ or
„Resilienc e improvements‟.