Home / Suncorp Group / Determination 867492

Determination 867492

Strata building cyclone damage claim - scope of compliance works

FirmSuncorp Group
Decided2023-02-14
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$48,992
Non-financial loss—
Amount claimed$235,776
SourceAFCA PDF

Summary

The complainant's strata roof cyclone claim dispute concerned the extent of compliance upgrade works. AFCA accepted the insurer's scope of works as reasonable, ordering cash settlement of $48,992.39 plus a 20% uplift, or completion of works, with loss of rent to be worked out and capped professional costs contribution.

Under the policy the insurer must pay reasonable and necessary costs to make damaged parts comply with current building regulations, and the insurer's scope, supported by a qualified engineer willing to certify it, is fair.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationprovide documents

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 867492 Financial firm AAI Limited Determination | Case number: 867492 Page 1 of 11 Case number: 867492 14 February 2023 1 Determination overview 1.1 Complaint The complainant is represented by a third party. For brevity, a reference to „the complainant‟ in this determination includes his representative unless stated otherwise. The complainant ‟ s units (1 and 2) are covered under a residential strata insurance policy (policy) with the financial firm (insurer). He lodged a claim for damage to the roof of the units following cyclone Debbie in March 2017. The insurer accepts he has a valid claim for damage to the roof. It has previously cash settled his claim for $139,312.60 based on its first scope of works. However, a dispute arose because the complainant identified additional works required to make the building comply with the current building regulations and laws. The parties agree additional works are required. Where they disagree is over the extent of the work necessary to ensure the repairs are compliant. 1.2 Issues and key findings Is the insurer’s assessment of its liability under the claim reasonable? Yes. The insurer‟s assessment of its liability under the cla im is reasonable. This is because the insurer has shown its scope of works is certifiable and actionable. It is entitled to rely on the scope to determine its liability for the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is to settle the claim as set out in section 2.1. Determination | Case number: 867492 Page 2 of 11 2 Reasons for determination 2.1 Is the insurer’s assessment of its liability under the claim reasonable? Yes. The insurer‟s assessment of its liability under the claim is reasonable. This is because the insurer has shown its scope of works is certifiable and actionable. It is entitled to rely on the scope to determine its liability for the claim. Policy covers additional costs to meet compliance The policy covers the necessary and reasonable costs to repairs connected to event related damage as follows: When we are rebuilding or repairing damaged parts of your building, we will pay the reasonable and necessary costs: - To make the damaged parts of your building comply with the current building regulations and laws. Parties agree additional costs are covered The insured property is two attached single- storey strata units, configured in an „H‟ arrangement. The units are separated by a dividing wall and share a roof. There is no dispute that, in April 2017, a cyclone lifted the roof, damaging it. The insurer accepted the claim and cash settled the complainant $139,312.60 for the repairs based on its scope of works. The complainant says during repairs, his building certifier told him the building needed to be upgraded to comply with today‟s requirements before he could issue a building approval – particularly in relation to structural and fire safety requirements. The specific areas of concern he identified was the lack of a fire-rated separating wall between the two units, extending from the ground to the bottom of the roof sheeting. While there was an initial disagreement between the parties about whether the policy covered additional costs to comply with current standards and regulations, the insurer now accepts additional costs are covered under the policy. The parties‟ experts broadly agree it is necessary to construct a fire -rated separating wall extending from the ground to the bottom of the roof sheets. Where they disagree is over how the repairs should be carried out and the cost. Insurer relies on KM’s scope of works The insurer offered to cash settle the complainant a further $48,992.39 based on its engineer (KM‟s) scope of works for the additional work. KM says:  bracing is not required to upgrade unit 2 Determination | Case number: 867492 Page 3 of 11  each of the units are strata titled with the fire wall to be included on the boundary separating the two units  each of the strata units should be considered and assessed as separate structures.  there are no works proposed to the wall linings in unit 2 and, therefore, there should be no requirement to do any work to the walls in that unit. KM says it is suitably qualified to certify the structural design elements of the repairs and it is willing to certify the structural design elements specified in its report. Complainant says KM’s scope of works is inadequate The complainant disagrees with the insurer‟s scope of works. He provided a scope of works by ECM, a project engineering company, for the additional work for $235,776.23. The complainant says the costing proposed by the insurer is unrealistic and the scope of works is uncertifiable, as it does not allow for replacement of the bracing in the entire building. He says full replacement of the bracing, not just the bracing for unit 1, is required to comply with the relevant building standards and regulations. Insurer has shown its scope and quote are actionable Under the policy, the insurer is required to pay the reasonable and necessary upgrades to make the damaged parts of the building comply with current building laws and standards. The onus initially rests with the insurer to establish what is reasonable and necessary. The panel is satisfied the insurer‟s scope of works is reasonable. The information available shows the building, as it is currently constructed, can be classified as a class 2 building with two sole occupancy units. However, once the fire separation wall is installed, the building would be reclassified as two attached class 1a buildings. This is detailed in the original certifier‟s email as provided by the complainant. In the panel‟s view, the requirement for bracing should therefore be assessed for each of the units independently. Therefore, in the absence of evidence of substantial damage to the bracing in unit 2, the panel agrees with the insurer that replacing all the bracing in both units is unnecessary. KM, which is qualified to certify the works, indicated it is willing to certify the structural design as compliant in accordance with the design it has submitted. Therefore, its scope of works is actionable. The panel, based on the above, accepts the insurer‟s scope of works is a fair and reasonable assessment of the reasonable and necessary upgrades, and its liability under the policy. Therefor e, the panel prefers the insurer‟s quote because it is based on a fairer scope of works. Insurer is to cash settle the complainant in line with its scope of works The insurer offered to either:  cash settle the complainant for the remaining works based on its scope of works; or  carry out all the repairs if the complainant returned the initial cash settlement. The complainant told AFCA he already spent part of the settlement. However, given the parties dispute the extent of works, the panel considers it is fair the complainant has the Determination | Case number: 867492 Page 4 of 11 option to allow the insurer to complete the claim related repairs and to follow through with its proposed scope. If he does choose this option, he must be able to return the cash settlement he received. If the complainant either cannot return the cash settlement or does not want the insurer to complete the works, the insurer can cash settle the complainant $48,992.39 plus a 20% uplift for the additional repairs based on its scope of works. It is fair the insurer should add a 20% uplift to account for the transfer of risk and loss of its repair guarantee. Parties to work together to determine loss of rent covered The policy covers loss of rent during the period of repairs where the property cannot be lived in. If the insurer does complete the works, it is to pay for loss of rent for the duration of the repairs. If the insurer cash settles the claim, it is to:  provide the complainant an estimate for how long the repairs will take, based on its scope of works; and  work with him to calculate his entitlement to loss of rent in line with the policy terms and conditions. The complainant incurred professional costs The complainant is seeking reimbursement of the expert report costs he incurred as well as the engagement of a paid representative. Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply. The panel accepts the complainant‟s engineer did assist him. The insurer had initially refused to accept it was liable to pay for the compliance costs. It was after the co mplainant‟s engineer explained the reasons for their inclusion that the insurer overturned its decision. The insurer is liable for these report costs capped at $5,000 and subject to invoices provided in support. The panel also accepts the paid representative assisted the complainant to a degree. This is because the paid representative assisted the complainant to identify and engage the engineer that materially assisted the complainant‟s position. However, the panel is not persuaded the paid representative provided additional arguments or submissions that materially altered the outcome. Also, the panel notes the complainant‟s position was not fully substantiated. Given this, the panel considers it fair the insurer reimburses 50% of the paid representative‟s f ees, capped at $5,000 and subject to invoices in support. For clarity, the total payable for the engineer‟s report together with 50% of the representative‟s fees are capped at $5,000 in total. Determination | Case number: 867492 Page 5 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is b ased on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive insurance experience. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 867492 Page 6 of 11 3.2 Relevant information from the consultants Record Key points Financial Firms expert (ICPS) Report 27 May 2017  Visual inspection on 16 May 2017  No firewall constructed bet ween the two units. At the time of construction, this was likely not necessary.  Separation and uplift of roof battens from rafters to isolated areas across the entire roof frame, exceeding forty percent to the roof area.  Separation and uplift of roof battens from rafters to isolated areas across the roof frame of the carport  Repairs to the roof frame of the residence would only require the roof sheeting to be removed, new roof battens installed with batten screws, installation of collar ties and rafter to ridge fixings upgraded to co mply with the National Construction Code of Australia and with compliance to AS1684 Residential Timber Framed Construction Part 3 Cyclonic Areas.  Some upgrading of the Carport roof frame will be required, including the replacement of roof battens requiring removal and replacement of the roof sheeting.  Recommended certifier be appointed to consider requirement of fire separation wall in roof space. If this is not required by Building Code or Local Regulation, recommendation t hat firewall be installed in the roof spac e to provide separate fire compartments above the two units. Complainant’s SOW ECM 4 August 2021  $235,153.85 for reconstruction of property with fire rated wall Financial Firms expert (JHA) Report 11 October 2017  Site inspection on 6 October 2017  Signs of structural damage to roof due to batten uplift due to the cyclone event  Roof covering was beyond serviceable life and should have been replaced prior to cyclone event  Roof replacement required AB SOW Unit 1 15 October 2017  $130,571.30 AB SOW Unit 2 15 October 2017  $8,741.30 Determination | Case number: 867492 Page 7 of 11 Record Key points BC report 24 August 2021  Refers to response from Sedgwick: > Certifier correct , compartmentalisation required from each other > Aspects should have been installed when property was strata titled‟ > Fire separation issue unrelated to the roof cladding works > Interconnected smoke alarms are a requirement, even when fire separation is installed.  Application and approval of strata title would have included requirement for upgrades to meet the standards applic able at the time.  Fire separation wall did not exist and was not damaged by fire  Roof cladding unrelated to the fire separation issue and deemed an upgrade  Policy only covers the upgrading of damaged parts of the building COM quote 12 December 2021  $392,248.19 (Adjusted to $496, 193. 96)  $93,582.04 for non - s eparation wall  $288,666.15 separation wall Complaint’s expert ( EMP ) Report 18.12. 21  Building was constructed in 1960‟  It was constructed as a Duplex with a separation wall  Duplex was reconfigured around 22 November 2007 to form strat a title boundaries. Reconfiguration documents were lodged for approval with the local council.  Council approved the reconfiguration as development work on the basis of the mat erial lodged.  The building is an approved structure and did not require any upgrading works, as no material change of use took place.  SOW of ABS missing: > The SOW is striping the entire lining of the unit No 1. The lining material is oil tempered Masonite. In the 1960 period of construction this sheeting was the structural bracing used in conjunction with raking let - in braces that were 3” x 5/8” hardwood bra ces. > Under the “Queensland Building Act, Div 2, S81, p74 2 (i) & (ii), and Regulations, Section 9, P109 Sec. 2 (a) & (b)”, the removal of more than 20% of a building‟s structural components of the same type, then it is recommended that the whole element b e reconstructed to meet the current codes and Laws. The replacement of the entire bracing system to meet the current requirements of the NCC and AS 1684. 3 will include the gutting of the entire building, these costs are not included in the SOW. > removal of 63% of the structural bracing requires that the whole of the bracing be bought up to the current standard. This will include any over notched studs outside the requirement of AS 1684.3. From my experience there is usually many of thes e to Determination | Case number: 867492 Page 8 of 11 Record Key points contend with. The result of replacing over notched studs will cause damage to the external cladding of the building. The replacement of the carport roof is another activity that will damage the external cladding to remove the apron flashing. The exter nal cladding is Asbestos Cement (AC). > The separation wall bet ween the Unit No1 and No2 is being stripped of its lining. This will automatically require the separation wall be reconstructed to the current codes and standards. There are no allowances for th is work in the SOW. > The SOW has no allowances for smoke detection and alarms in the electrical allowances. > Removal of structural components, the modification of wet areas and installation of new water waterproofing, and the modification of a separation wal l all require a Development Application. There are no allowances in the SOW for these activities.  Refers t o an email from certifier (GY ) stating: > Extent of propos ed works trigger upgrading aspects of the building to today‟s standards > Development applicati on required for proposed works > Building in today‟s terms would be classified as a class 2 building with two sole occupancy units. > The two sole occupancy units share a common space below and are not separated by a wall wit h an FRL 60/60/60 as required by the Building Code of Australia > In order for the certifier to issue a building approval, the building will need to be upgraded to comply with today‟s requirements, particularly in relation to structural and fire safety requirements.  Duplex was built in 196 0. The Duplex was constructed before the BCA or NCC existed. The Interstate Standing Committee on creation of the BCA or NCC was established in 1965.  Replacement of the roof sheeting not being related to the separation wall of Unit 1 and Unit 2 is correct. However, the trigger for the requirement to bring the separation wall up to the current standard is the separation walls partial demolition in the first instance.  Separation wall not relat ed to the roof sheeting directly. The fire separation is due to the extent of the reconstruction works and not the re - sheeting of the roof alone. > Financial firm’s expert ( KM ) Report 30 June 2022  Report does not attempt to upgrade and/or ensure that the undamaged structural elements comply with current regulation requirements.  Existing duplex party wall is a common timber stud wall with no fire Determination | Case number: 867492 Page 9 of 11 Record Key points separation details installed. The roof cavity and sub - floor are open and have no separating walls bet ween the unit. The carport for each unit has no separating wall between the parking spaces.  In our opinion, we would have expected the upgrade of this wall to achieve fire separation of the units to have been a requirement at the time of the Strata tile (2007) in accordance with the standards of the time. To achieve fire separ ation between the units there would need to be a fire rate wall constructed from ground level to the underside of roof sheeting.  For carport boundary wall, the fire wall along the boundary would need to extend through the carport area roof. The fire wall t o provide this separation could be a continuation of the detail proposed internally bet ween the units or a full height reinforced masonry 190 thk block wall.  Requirement to upgrade the vertical bracing to unit 1 associated with the replacement of damaged i nternal wall linings would need to be confirmed by a building certifier. Complainant’s expert ( EMP ) Response 4 July 2022  No MCU required to change title of the flats.  KM report provides for new light weight wall and while this is possible, but expensive to build. Foundation being proposed and 200 series base is the same as what he has proposed. Cheaper to complete the block wall and not change construction met hods mid - stream. However, I am happy to adjust the SOW to suit but the overall cost will not diff er much.  KM report does not fire rate the walls of the carport. These walls also require fire rating this is the part (but not all) of the reason that Unit 2 has to be gutted and repaired in the first instance.  KM report does not discuss damage to the brac ing system as a whole. The bracing system has been compromised by more than 20% (QLD Building Act 1975) of it has been damaged, in this case over 75%. This leads to unit 2 being required to be upgraded with new bracing as KM has allowed for in unit 1. BC re sponse 14 March 2022  Satisfied upgrade to comply with current building regulations is required and accepted under the policy.  Building‟s roof, elements of the roof frame and wall claddings were accepted as event related damage, and therefore to complete compliant repairs an upgrade to meet current building standards is required for thes e elements. Some of these building elements are currently non - compliant with building safety laws for multi residential buildings.  Refers to KM response to bracing on Unit 2: > Do not believe that bracing is required to upgrade Unit 2 and nothing needs to be amended to our SOW as currently specified i n our report. The buildings are strata titled and with the fire wall to be included on the boundary these are separate structures. Determination | Case number: 867492 Page 10 of 11 Record Key points There are no works proposed to the wall linings in unit 2 and therefore there should be no requirement to do any work to the walls in this unit.  JLG has estimated additional works to be $49,124.39  Insurer happy to entertain cash settlement of balance or if complainant refunds the balance, JLG will perform the works. Complaints expert ( BE ) Report 14 April 2021  Damage to building not defined by single unit of occupancy, under Queensland Building Act and Regulations, damage is defined by a percentage of the buildings gross floor area  The KM report and design is indicating the replacement of what amounts to 147 kN of bracing . On a percentage basis, this is 147/210 = 70% of the required structural bracing of the building and added to this is the allowable 5% nominal bracing (the new int ernal sheeting) giving an approximate total of 75% of bracing being replaced.  For clarity, the FMPAC report - 11630 - 10 F St Proserpine - Report 01 - QLDembnem - 2022.1201.11, page 10 paragraph 36, Dot point 2, indicated 63% of the buildings bracing was affected. Refer to Annexure A.  The Australian Standards AS 4055 and AS 1684.3 require the bracing to be evenly spaced throughout the whole of the building to achieve effective bracing. The standard AS1684.3 TABLE 8.21, page 149, requires the bracing to be spaced at no greater than 8.2 met res. Refer to Annex ure A. Permit requirements for rebuilding and repairing after a flood – QBCC (28 March 2017)  For substantial repairs great er than 20% to structural and non - structural framing members , it is recommended current standards are applied where possible. You should seek advice from your builder, building certifier or even an engineer if the repair work is extensive 3.3 Relevant policy wording Page Wording 15 We cover loss or damage caus ed by storm, including cyclone 22 Other repair/ rebuilding costs We cover Determination | Case number: 867492 Page 11 of 11 When we are rebuilding or repairing damaged parts of your building, we will pay the reasonable and necessary costs: –– for the services of professionals, such as architects or surveyo rs, to repair or rebuild at the ins ured address; –– to make the damaged parts of your building comply wit h th e current building regulations and laws. 23 Loss of rent following an insured incident We cover If we accept your claim for loss or damage to a tenanted unit in your building due to an ins ured incident and we agree the unit cannot be lived in, we will pay the unit owner the weekly rental amount for the reasonable amount of time we decide it should take to repair or rebuild your building or unit so it can be lived in again. 44 We choose how we settle building claims If we agree to pay a claim for loss, theft or damage to your building, we will decide if we will: –– repair damage to your building; –– rebuild your building; –– pay you what it would cost us to repair or rebuild your building; –– pay you the sum insured for your building; –– give you a vouc her, store credit or stored value card for the amoun t it would cost us to repair or rebuild an item. If we rebuild (or pay you what it would cost us to rebuild), we will do so on a „new for old‟ basis. If we repair (or pay you what it would cost us to re pair), we will at our option repair on a „new for old‟ basis or repair to a similar condition to what your building was in before the loss or damage occurred. If we choose to pay you what it would cost us to repair or reb uild your damaged building, you are not eligible for an extra amount under the additional feat ures „Other repair/rebuilding costs‟ or „Resilienc e improvements‟.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.