Home / Blue Zebra / Determination 866481

Determination 866481

claim denial for foundation slab water damage

FirmBlue Zebra
Decided2022-12-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$6,060
Non-financial loss$5,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed under his home insurance for slab damage from water ingress after heavy rain, which the insurer declined as gradual or pre-existing. AFCA found the damage accidental and not excluded, and ordered the claim settled with temporary accommodation costs, expert report costs, interest and $5,000 non-financial loss.

The policy covers accidental damage during the period of insurance, and the insurer failed to establish that exclusions for defect, gradual deterioration or climatic conditions applied.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial lossreinstate policy or contract

Related

All Blue Zebra determinations · Find similar determinations

Text of the determination

Determination Case number 866481 Financial firm Blue Zebra Insurance Determination | Case number: 866481 Page 1 of 6 Case number: 866481 8 December 2022 1 Determination overview 1.1 Complaint The complainant lodged a claim under his home and contents insurance policy held with the financial firm (insurer) for water damage to his property in March 2021. The complainant advised there was unprecedented rainfall and water had come through the slab. The complainant says up to eight water ingress events then occurred over a period of months. The insurer accepted the resultant water damage. However it declined cover for the foundation slab itself. The insurer says the damage to the slab occurred gradually, and pre- dates the policy. The complainant wants the insurer to cover the damaged slab, which he says will effectively require a rebuild of the house. 1.2 Issues and key findings Did the insurer correctly assess the claim? No, the insurer incorrectly declined cover for the slab damage. The complainant established a valid claim for accidental damage. The insurer has not established, on balance, that exclusions apply or that it is otherwise entitled to decline the claim. The insurer is required to accept and cover the claim for the damage to the foundation slab. If that means the property is a total loss, then the insurer is required to cover the building sum insured (together with the safety net, as necessary). That is in addition to applicable Additional Benefits (including temporary accommodation during the repair/rebuild), and damaged contents. To be clear, the insurer is not required to also pay separately for previously accepted resultant water damage which would now be encompassed within a total loss settlement. Is the complainant entitled to other compensation? Yes. Subject to him providing evidence of costs incurred, the complainant is entitled to his temporary accommodation costs (up to $5,400) from the time he lodged the claim; as well as the $660 cost of his expert (CSI) report. Statutory interest is payable on those costs calculated from the respective dates of payment to the date of settlement. As well, the complainant is entitled to $5,000 compensation for non-financial loss, due to the significant upset and inconvenience suffered because of the insurer’s handling of the claim . Why is the outcome fair? It would not be fair for the insurer to avoid liability when the complainant has established a valid claim and the insurer has not shown it is entitled, under the policy, to decline it. 1.3 Determination This determination is in favour of the complainant. The insurer is required to accept and settle the claim for the damaged slab (and other resultant damage, Additional Benefits and contents, as appropriate) in accordance with the policy terms and conditions, and as set out in this determination below. Determination | Case number: 866481 Page 2 of 6 2 Reasons for determination 2.1 Did the insurer correctly assess the claim? No, the insurer incorrectly declined the claim for the slab damage. The insurer is required to cover that accidental damage, together with the resultant water damage already accepted; and other relevant policy benefits, and contents. Complainant has established a valid claim The policy covers buildings that are ‘accidentally destroyed, accidentally lost or accidentally damaged during the period of insurance.’ That cover is subject to conditions, limitations and exclusions. The policy does not define ‘ accidental ’ , and so it is appropriate to apply the normal and ordinary meaning, which is ‘ happening by chance or accident, or unexpectedly ’ . The complainant lodged the first claim following a period of excessive rainfall when water rose up through the slab. I am satisfied the circumstances represent unintended and unexpected damage, from the perspective of the complainant. The complainant has established a valid claim for accidental damage under the policy. Insurer ’s expert says the damage was long-term, possibly due to boreholes When purchasing the insured property (in the four months before the claimed incident), the complainant obtained a pre-purchase inspection report (26 October 2020). This report found the property was adequately drained, there were no major defects and the high moisture readings in the floors were likely from the recent mopping completed. The report found there were no high moisture readings to the base of the walls or anywhere in the brickwork, and no visual evidence inside or outside the house of high moisture/excessive moisture issues. On 1 April 2021, plumber CP attended the property and completed an investigation of the storm water and sewage drainage lines, looking for damage, subsidence, breaks or blockages. CP also used drain cameras where possible. CP found there were areas where previous maintenance had been completed, including the addition of sub-surface and surface draining systems. Flood testing and pressure testing both passed, and no leaks were found at the property. CP did comment that the rear of the property was higher than the front and could impact ground water levels during rain. On 5 August 2021, soil testing service ST attended the property to complete a site classification report. The report found the propert y to be rated ‘P’, likely due to trees around the property causing abnormal moisture conditions in the soils. ST commented there were two excavated boreholes on the land but did not comment on any significance to the building. ST reported not finding the water table in their investigations. In August 2021, the insurer also engaged its engineer, SW, to assess the property. SW found:  video footage showed significant water ingress through the cracks in the concrete foundation slab and tile grouting  no evidence of overland flow Determination | Case number: 866481 Page 3 of 6  previous assessments (by builder MB, and contrary to SW’s opinion ) found the water was due to cracks across the slab due to inadequate construction and a deteriorated vapour barrier  SW disagreed, as the cracks were consistent with shrinkage, a normal process after pouring  the presence of shrinkage cracks does not mean inadequate construction or design  concrete x-ray showed the structural drawings and standards were followed  no evidence of cracking, distress or movement to walls and ceilings to indicate foundation movement  subterranean moisture permeation through the slab could not have resulted in the significant water ingress experienced  the amount of water ingress was beyond normal ingress and was not due to a failed vapour barrier  the existing concrete slab thickness is adequate in accordance with the original structural drawings  the land was previously used for farm cultivation and a map from 1889 showed deep irrigation boreholes had possibly been implemented on the property  it is ‘ possible ’ these boreholes were not adequately filled or removed  this is not due to a design or construction defect. SW considered the ‘presence of historical irrigation bore holes underneath the property to be the most plausible cause for the experienced water ingress during rainfall’. The complainant arranged for an investigation by CSI into the possibility of damage to the slab from water ingress. CSI found no issues with the concrete slab as constructed, but did find the slab had been severely compromised (to below acceptable Australian Standard levels). SW did not dispute the CSI findings, but maintained the slab had been losing strength gradually over a period of time due to long term water exposure. Insurer has not established the cause of damage is excluded from cover The insurer relies on multiple exclusions to decline the claim. Pages 60-61 of the PDS sets out the exclusions. It states there is no cover for loss or damage caused by, arising from or involving:  a defect, structural fault or design fault that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred  rust, corrosion, oxidisation, mould or mildew  wear, tear, gradual deterioration, fading  atmospheric or climatic conditions, other than storms  any event that does not occur within the period of insurance. As confirmed by engineer SW, I do not consider the damage was due to a defect, structural or design fault. The insurer has also not provided any information to support its submission that the damage is due to rust, corrosion, oxidisation, mould or mildew, or atmospheric or climatic conditions. Nor am I persuaded, on the available evidence, that the damage had gradually occurred over a period of time. This is because SW has not confidently identified the cause of the water ingress. While SW speculates about the possible impact of historic boreholes based on a Determination | Case number: 866481 Page 4 of 6 map that is over 100 years old and an article from 1931, there is no information to confirm the accuracy or current relevance of that material, or the current status of any such boreholes. As well, the suggestion of progressive damage of the slab does not adequately account for the recent water damage to the internal areas of the house which the insurer accepted, but which had not been evident (because, on balance, it had not occurred) before the policy was taken out or before the claimed events. The complainants provided their pre-purchase inspection which did not show any significant water damage or ingress. The complainants contacted the insurer multiple times during the course of the claim to advise of further rainwater events and provided BOM data to support unprecedented rainfall in the time they have owned the property. I am not satisfied, on balance, the damage to the slab occurred outside the policy period or gradually over time such that it should be excluded. The insurer is not entitled to decline the claim for the damaged slab. Insurer must cover claim/additional benefits in accordance with policy terms The insurer is required to settle the claim in accordance with the policy terms and conditions, having regard to the recommendations of its engineer SW as to the nature and scope of the necessary repair/rebuild work. I note that if the cost of the necessary rebuild exceeds the sum insured amount of $400,000, then the Additional Benefit safety net of a further 30% should apply as outlined on page 33 of the product disclosure statement (PDS). In that case too, the insurer is required to refund any excess the complainant has paid, in line with the excess waiver for a total loss claim, outlined on page 38 of the PDS. T he insurer must also cover the complainant’s temporary accommodation in line with the policy provisions outlined on page 34 of the PDS (Additional Benefits), while the property is being rebuilt. It is also required to cover any of the other applicable ‘additional benefits’ available under the policy. To be clear, to the extent the resultant internal water damage previously accepted by the insurer now falls within the scope of a total loss settlement, the insurer is not required to cover that twice. 2.2 Is complainant entitled to other compensation? Fair that complainant’s other costs be reimbursed The policy excludes cover for any additional, indirect or consequential costs incurred, except as covered under the Additional Benefits or Additional Covers. However, AFCA may award compensation for indirect financial losses where the loss arose from the actions of the insurer. In the current case, the complainant has already been living elsewhere for over a year, as the insured home was uninhabitable due to the claim-related damage. Given the delays experienced because the claim was incorrectly declined, the complainant is entitled to $5,400 in indirect financial loss compensation (the maximum allowed under the AFCA Rules) for temporary accommodation costs incurred in that time. The complainant must provide evidence of any temporary accommodation costs incurred so the appropriate reimbursement can be made. To be clear, this is separate from and in Determination | Case number: 866481 Page 5 of 6 addition to the complainant’s entitlement to temporary accommodation under the policy’s Additional Benefits. Under the AFCA Rules, we can also require an insurer to reimburse an insured the professional costs incurred in pursuing the complaint, up to a maximum of $5,000. The complainant engaged expert CSI to investigate the water penetration into the slab. The invoice shows a cost of $660. I am satisfied the CSI report assisted in resolution of this complaint. The insurer is required to cover that cost, subject to the complainant providing reasonable evidence of payment of the invoice. Statutory interest is to be added to these amounts, calculated from the dates the respective costs were incurred, to the date of settlement. Compensation for non-financial loss is warranted in the circumstances AFCA can also award compensation when a financial firm’s action has caused a complainant to suffer significant undue stress and inconvenience. The claim was incorrectly declined and, as a result, the complainant has had the uncertainty and upset of not being able to live in (or take steps to repair) their property for over a year. The insurer also did not actively engage in the AFCA complaints process and did not provide its responses when requested. The insurer did not handle the complaint in a timely and efficient manner and this had a direct negative impact on the complainant. I am satisfied the considerable delays and failings by the insurer caused the complainant an unusual and significant degree of upset and inconvenience. It is fair in the circumstances for the insurer to pay the complainant $5,000 in non-financial loss compensation. 2.3 Why is the outcome fair? The outcome is fair in all the circumstances because the complainant established a valid claim for accidental damage, and the insurer did not establish any exclusions applied to entitle it to decline the claim. The insurer’s handling of the matter caused the complainant significant avoidable stress, upset and inconvenience. Determination | Case number: 866481 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.