Storm damage claim: roof cover declined, internal damage settlement disputed, delayed make safe works
Text of the determination
Determination
Case number 866299
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 866299 Page 2 of 10
Case number: 866299 14 October 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy (policy) with the financial firm
(insurer). On 4 February 2022, she lodged a claim for damage to the insured property
because of a storm event on 2 February 2022.
The insurer has accepted the claim. However, it has limited its liability to the damage it
accepts to be due to or related to the storm event subject to the policy exclusions.
The complainant disputes the insurer’s claim settlement offer for the internal damage as well
as its decision to decline cover for the external roof. The complainant also says the insurer’s
delay in and the inadequacy of make safe works completed by its representative resulted in
further damage to the property.
1.2 Issues and key findings
Is the insurer entitled to decline cover for the roof?
Yes. This is because the complainant has not established a valid claim for the roof. The
issues with the roof have been shown to, on the balance of probabilities, be pre-existing and
not related to the storm event.
Did the insurer unreasonably delay completing the make safe works?
Yes. The available information shows there was an unreasonable delay by the insurer’s
consultants in their attempts to compete make safe works to the roof. This resulted in further
water ingress into the home increasing the level of internal damage and mould infestation.
Is the insurers ’ assessment of its liability under the claim fair ?
No. The insurer is to increase the level of cover it has accepted for damage to the internal
areas within the home as well as expenses relating to the mould remediation.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer’s management of the claim has not been satisfactory, especially relating to
the make safe works and communications surrounding the temporary accommodation
arrangements for the complainant and her young children. It is fair that the insurer pays the
complainant $3,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair as it accepts the insurer is entitled to limit its liability to only such damage
which was caused by the insured event. However, the decision also requires the insurer to
take responsibility for loss and damage which is related to the storm event as well its failures
in managing the claim. It is fair in all the circumstances that the insurer be required to pay
non-financial loss compensation for the stress, anxiety and physical inconvenience it has
caused the complainant and her two young children.
Determination | Case number: 866299 Page 3 of 10
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of the complainant’s acceptance of this determination, the insurer is to
arrange further payment to the complainant in line with section 2.3 of this determination.
The insurer is to pay the complainant $3,000 in non-financial loss compensation in line with
the AFCA Rules.
Determination | Case number: 866299 Page 4 of 10
2 Reasons for determination
2.1 Is the insurer entitled to decline cover for the roof?
Onus on complainant to establish claimable loss
When making a claim, an insured party has the onus of establishing, on balance, they
suffered a loss for which their insurance policy provides cover. If a claimable loss is
established, the insurer has the onus of establishing the application of any exclusion it relies
on to reduce its liability under the claim.
The complainant holds a listed events policy which covers loss or damage caused by one or
more of the listed insured events, including Storm. Cover under these insured events is
subject to the limitations, conditions and exclusions specified in the policy.
Ther e is no dispute a storm occurred at the complainant’s property . The complainant says
this event damaged the external roof of her home. I am satisfied the onus first rests with the
complainant to show, on balance, the claimed damage to the external roof is due to the storm
event.
The roof has not been shown to have been damaged by an insured event
There is no dispute that stormwater ingress did occur during the storm and that this has
caused internal damage to the home. However, the insurer says the complainant has not
shown that the external roof has sustained any storm damage.
The complainant relies on a report from her preferred building consultants ‘BR’ in claiming
cover for the roof. BR in its report of 10 March 2022, says due to storm damage the ridge
capping became unsecured and lifted off the roof. The roof screws were only subject to
surface rust and that this has nothing to do with the roof damage. BR has provided a roof
replacement quote for $24,992.00.
The insurer has provided reports from two consultants ‘P’ and ‘RR’, appointed to investigate
the cause and extent of damage to the roof. In its report dated 10 February 2022, P
acknowledges the complainant says she had maintenance works completed to the roof some
two years prior. However, P opines this repairer either did not complete the works invoiced or
that the works were of poor quality.
P says there was no storm damage noted to the roof. P notes screws and brackets to the roof
were very rusted and the ridge capping had not been finished correctly. There were several
large gaps noted between the ridge capping and roof sheets, which could allow stormwater
ingress. F identified several maintenance related works needed to the roof.
RR has provided a report dated 11 March 2022, confirming the roof is not water tight. RR
noted various points of water ingress, including both skylights, the installation of the solar hot
water system, lead flashing and the vent pipe. RR noted old holes in the roof sheeting and
rusting. RR says there was no signs of storm damage and recommended complete
replacement of a 75sqm section of the roof including flashing and the skylights.
The insurer is entitled to decline cover for the roof
I find the reports from the insurer’s appointed consultants to be more persuasive. This is
because their views are supported by compelling reasoning and photographs which, on
balance, are consistent with the physical condition of the roof. Although, BR claims there is
Determination | Case number: 866299 Page 5 of 10
storm damage to the ridge capping, there is an absence of any supporting information to his
statement.
The photos and findings from the two different consultants (P and RR) show there is no
evidence of storm damage to the roof. Further, that there exist various areas in need of
maintenance and which could allow storm water ingress through wind driven rain. These
locations, do for the most part, align with areas of internal damage and/or mould within the
home.
For the reasons discussed, I am not satisfied the complainant has shown a valid claim exists
for storm damage to the roof. It is fair in all the circumstances that the insurer be allowed to
decline cover for the roof in line with the policy.
Insurer is entitled to decline cover for other external works
In addition to seeking cover for the roof, the complainant has also provided quotes and
invoices for other external repairs. I accept the insurer’s position that the below listed
expenses for external works are also excluded given the findings relating to the roof:
BR invoice dated 20 July 2022 quote for cutting and installation of skylights $2,499.00
BR Maintenance Plumber invoice dated 9 June 2022 $843.10
External painting costs in PH invoice dated 31 May 2022 $1,675.00 as well as front timber
deck $665.00 and bio wash external walls $385.00.
2.2 Did the insurer unreasonably delay the make safe works?
The insurer unreasonably delayed attempts to make safe the roof
The complainant says the insurer’s appointed consultants failed to complete the necessary
make safe works within a reasonable period of time. Also, that when they did attempt to
complete the make safe works, the measures taken were inadequate and poorly installed.
The complainant says the insurer’s failure to complete the make safe works resulted in further
water ingress and associated damage to the internal areas of her home. To prevent further
loss, she was forced to arrange for her preferred consultant BR to complete the necessary
make safe works.
The insurer refutes the complainant’s opinion and says the necessary make safe works were
completed by its appointed representatives. I accept the information from both parties
surrounding this time period and recollection of events differs, with each party claiming to
have completed the make safe works. However, I find the complainant’s version of events
and associated information to be more compelling.
It is clear from the information that the complainant and her children had to leave their home
due to the increasing nature of the internal damage and associated mould infestation.
Further, that the complainant was continuously visiting the property and then following up with
the insurer and its representatives about the make safe works not having been completed.
I am satisfied when the insurer’s consultant finally got around to placing a tarp over the roof,
this was a single tarp and insufficient to make safe the property. The insurer’s claim file notes
confirm on 20 February 2022, it agreed for the complainant to arrange the make safe works
herself and to send in the invoice. The insurer has paid this invoice from BR in the amount of
$737.00.
Determination | Case number: 866299 Page 6 of 10
It is reasonable to accept further damage caused by delayed make safe works
Given the above, I am satisfied it is reasonable to accept the insurer’s failures relating to the
make safe works, will have resulted in additional internal building and contents damage. More
significantly, this will have contributed to the extensive spreading of mould within the home.
I am satisfied that this will have had an adverse impact on the complainant’s confidence in the
insurer as well as been a source of undue stress and anxiety. This will be considered further
under section 2.4 of this determination.
2.3 Is the insurer’s assessment of its liability fair?
There is no dispute the insurer has accepted to cover the resultant internal water ingress
damage. However, the parties differ in their assessment of the damage to the internal areas
of the home. I accept the insurer has paid the complainant $30,000.00 towards contents
cover under the claim, which represents her maximum (sum insured) entitlement under the
contract for contents cover.
Therefore, consideration of this complaint will focus on the internal building damage and
whether the i nsurer’s assessment of its liability under the claim is fair in all the circumstances.
The complainant is seeking higher settlement for damage to home
Having considered the available information, I am satisfied the below list of quotes and
invoices represent the internal damage and repair costs in dispute between the parties and
before AFCA for consideration:
Expenses accepted by the insurer since complaint lodged with AFCA
‘K’ invoice dated 10 June 2022 $5,170.00 (falls within contents cover for which maximum
entitlement paid under the claim)
K invoice dated 16 June 2022 $1,430.00 (falls within contents cover for which maximum
entitlement paid under the claim)
Happy to help move invoice dated 25 May 2022 $113.00 (insurer has accepted on ex-
gratia basis)
Builder clean-up 2 June 2022 $250.00 (insurer has accepted on ex-gratia basis)
‘SW’ Power and Air in voice to reinstate solar panels dated 8 June 2022 $973.50
‘N’ invoice for removing solar panels dated 6 March 2022 $2,299.00
‘ES’ pool care invoice dated 5 May 2022 $1,235.00
$200 for the difference in power bills due to solar panels having been removed
I am satisfied the above listed expenses have since been accepted by the insurer and are no
longer in dispute between the parties. The insurer, if it has not already done so, is to pay
these invoices and/or reimburse the complainant for any these expenses she has paid, within
14 days of her acceptance of this determination.
Expenses that remain in dispute between the parties
‘BE’ electrical invoice dated 6 May 2022 (new fans and lights) $6,350.08
‘MM’ mould assessment and treatment invoices dated 24 March 2022, $495.00 and
$2,105.00
‘F’ plastering invoice dated 26 April 2022 $9,710.80
Carpet replacement invoice 11 May 2022 $2,500.00
PH Invoice dated 31 May 2022 for internal paintwork $9,685.00
Medical costs – relating to the complainant advising she suffered pneumonia and a
collapsed lung due to the mould
Determination | Case number: 866299 Page 7 of 10
Insurer to increase cover but not obliged to cover all expenses claimed
For the reasons discussed below, I am satisfied it is fair in all the circumstances that the
insurer increases the level cover it has offered under the claim. However, it is not obliged to
cover all of the loss and/or damage claimed.
I have considered the electrical works invoice provided by BE which relates to installation of
new lights and fans. I am not of the view there is any information provided that shows these
items had been damaged and/or required replacement due to the internal water ingress
damage.
The insurer has offered to contribute $2,116.70 towards this invoice, which I accept is
generous in the circumstances. The insurer is not obliged to cover the full extent of this
invoice under the claim.
There is no dispute the insured building presented with mould infestation after the stormwater
ingress event. I accept the information before me shows this mould infestation then spread to
almost all areas of the home because of subsequent water ingress events due to delay in
arranging the necessary make safe works and repairs to the building.
I accept the insurer made several attempts to clean up and deal with the mould infestation.
However, in my opinion, the available information shows the mould kept re-appearing and
had not been remediated at the time the complainant appointed consultants MM to
investigate and remediate the mould infestation.
Given this, I do not accept it is fair in all the circumstances for the insurer to refuse cover for
MM’s costs. The insurer is to cover the complainant for MM’s costs in the amount of
$2,600.00 within 14 days of her accepting this determination.
I have reviewed the tax invoice dated 26 April 2022 in the amount of $9,710.80 from
consultants ‘F’. The invoice provides the below scope of works:
Batten, insulate, sheet and set with square set of entire house ceilings and 2
external ceilings. Sand and ready for paint
I am not satisfied there is any compelling information to support that there was a requirement
to the above noted items due to storm damage. I accept various ceilings presented with
mould, however, this does establish they required complete replacement or that all the
ceilings within the home needed replacement. In the absence of such information, it would not
be fair to require the insurer to cover these works.
The complainant has provided an invoice from consultants PH for the re-painting of the
external and internal areas of the dwelling plus a few additional works. As noted above, the
external works are not covered under the claim. Therefore, I accept it is only the internal
paintwork component of the invoice ($9,685.00) that is relevant for consideration.
The insurer says the cost of the works completed by PH are not fair and reasonable and
relies on a quote dated 17 March 2022 from ‘T’ , in the amount of $7,128.88 as a fair
settlement for the internal paintworks. I note this estimate from T is not an actionable quote,
given T was not prepared to complete the works due to a breakdown in the relationship with
the complainant.
I also accept the insurer’s view that PH has includ ed costs to paint areas such as window
frames, doors, skirting, architraves and the like, which have not been shown to have been
Determination | Case number: 866299 Page 8 of 10
damaged due to the storm event. I accept these areas will have needed cleaning and
decontamination from the mould, however, this will have been completed by MM and for
which the insurer will be indemnifying the complainant in line with this determination.
Therefore, considering what is fair in all the circumstances, I determine it is reasonable that
the insurer be allowed to limit its liability for the internal re-painting works to $8,000.00. The
insurer is to arrange this payment within 14 days of the complainant accepting this
determination.
Other matters
The complainant has also referred to medical expenses incurred and seeking treatment for
conditions she has suffered due to the mould infestation and the insurer’s delay in dealing
with the necessary make safe works. However, I have not been provided with any information
that would allow me to come to an informed decision on:
whether the complainant did suffer the said medical conditions and if so, was this related
to the mould infestation; and
what expenses the complainant is claimed to have incurred in seeking medical treatment.
Without such information, I am not able to come to an informed decision of this aspect of the
complainant’s claim.
I also note reference to a carpet replacement invoice in the amount of $2,500. Again, I have
not been provided with any information which could assist in determining where this carpet
was located and whether it was damaged by the claimed insured event. Therefore, in the
absence of supporting information, I am not satisfied it has been shown this expense is
covered under the policy.
Given the above, I determine the insurer is to pay the complainant a further $12,717.00 under
the claim. The insurer is to pay interest on this amount in line with section 57 of the Insurance
Contracts Act 1984, from the date the invoices were paid by the complainant to the day on
which payment is arranged to the complainant under the claim.
2.4 Is the complainant entitled to compensation?
Insurer is to pay the complainant $3,000 in non-financial loss compensation
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
Having considered the information from the parties, I am of the opinion it is fair in all the
circumstances to require the insurer to pay the complainant non-financial loss compensation.
This is because I am satisfied the insurer’s management of the claim has caused the
complainant and her young children to experience an unusual degree of stress, anxiety and
physical inconvenience over the life of the claim.
I am satisfied, although the insurer’s appointed consultants may have reported otherwise, the
available information shows there did occur repeated failures and delays in arranging
necessary make safe works. I accept this has resulted in further damage to the home, an
increase in the mould infestations and the length of time the family was away from their
home.
Determination | Case number: 866299 Page 9 of 10
I also accept, despite the insurer’s claim that temporary accommodation arrangements were
confirmed and paid for in time, that it seems this was not communicated to the complainant or
the management of the accommodation. This resulted in the complainant having to frequently
follow up the insurer about extensions of the temporary accommodation as well as being
repeatedly told by the accommodation that their booking was coming to an end and/or had
not been extended.
In this instance and considering AFCA’s approach to compensation, I accept certain aspects
of the insurer’s management of the claim were poor. Accordingly, I determine the insurer is to
pay the complainant $3,000 in non-financial loss compensation within 14 days of her
accepting this determination.
2.5 Why is the outcome fair?
The outcome is fair as it accepts the insurer is entitled to limit its liability to only such damage
which relates to the insured event. However, the decision also requires the insurer to take
responsibility for loss and damage which has been shown to be due to the storm and/or its
failures whilst managing the claim. It is fair in all the circumstances that the insurer be
required to pay non-financial loss compensation for the stress, anxiety and physical
inconvenience it has caused the her and the children over the course of the claim.
Determination | Case number: 866299 Page 10 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate
the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has occurred to
the Complainant’s feelings or humiliation has been suffered by the Complainant;
or
b) for other complaints – an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with the Complainant’s
expectation of enjoyment or peace of mind has occurred.