Text of the determination
Determination
Case number 866273
Financial firm AAI Limited
Determination | Case number: 866273 Page 1 of 7
Case number: 866273 16 February 2023
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm (insurer).
They lodged a claim for damage to their home following a storm event on 20 October 2021.
The insurer accepted the claim. However, there is a dispute regarding th e insurer’s settlement
of the claim. The complainants also raise concerns with the insurer’s handling of the claim.
1.2 Issues and key findings
What are the insurer’s obligations regarding the repairs to the roof ?
The insurer should appoint a new builder that has not already been involved in the claim to
repair the roof, based on the previous scope of works (SOW) provided dated 10 November
2022 . I also consider it fair for the insurer’s builder to paint the tiles, if necessary, to ensure
the tiles match.
Is th e insurer’s offer for the internal damage fair?
No. I consider it fair for the insurer to increase its cash settlement offer to include the
complainants ’ quotes.
Are the complainants entitled to compensation for non-financial loss?
Yes. There were delays on the claim which led to stress and inconvenience for the
complainants. An award of $4,000 in compensation is fair.
Why is the outcome fair?
The determination is fair in the circumstances because I am satisfied it captures the damage
covered under the claim and the damage due to the insurer’s negligence .
1.3 Determination
This determination is substantially in favour of the complainants.
If the complainants accept this determination, the insurer is to:
appoint a new builder to attend to repairs to the roo f in line with its previous builder’s SOW
dated 10 November 2022
paint the roof if necessary to ensure the replaced tiles match the existing roof
pay the complainants $7,587 for the internal damage
within a reasonable timeframe, arrange for a quote for repairs to the damaged timber joists
in the kitchen and cash settle this amount, including a 30 per cent uplift. Alternatively, the
complainants can submit a quote for these works to the insurer and the insurer is to
assess the fair and reasonable sum and cash settle for these works
pay the complainants $4,000 in non-financial loss compensation.
Determination | Case number: 866273 Page 2 of 7
2 Reasons for determination
2.1 What are the insurer’s obligations regarding the repairs to
the roof?
The insurer should appoint a new builder that has not already been involved in the claim to
repair the roof, based on the previous SOW provided dated 10 November 2022. I also
consider it fair for the insurer’s builder to paint the tiles, if necessary, to ensure the tiles
match.
No dispute a storm damaged the property
The complainants’ policy covers several listed events including storm, subject to several
conditions and exclusions.
There is no dispute the storm damaged the roof and internal areas of the property. The
complainants also say the current issues with the roof that require repair are due to the
insurer’s repairer’s poor workmanship.
The insurer is willing to repair the damage to the roof. It says it can engage another repairer
to complete the work as its previous builder confirmed it could not due to a relationship
breakdown with the complainants. The previous builder (RC) provided a SOW for the roof
repairs dated 10 November 2022. This provides the following description:
The roof and valley defects require the removal of the roof tiles directly in this
area, installation of sarking, reinstatement of roof tiles, repairs to the roof valley
and transition flashing.
Recommended is a flexible flashing under the downpipe spreader to prevent
excessive rainwater ingress in through the tiles. The pergola side flashing
requires an over flashing from there fascia onto the existing apron flashing.
The complainants raised concerns with tiles not matching on the roof. However, the insurer
says it is not liable to repaint the roof. It refers to sections of the policy that state it is not
required to replace undamaged roof tiles and if it cannot find materials to match undamaged
parts, it will use the closest match available.
Complainants want the insurer to repair the roof
The complainants want the insurer to complete the repairs to the roof because they say the
damage is due to the insurer’s repairer’s poor workmanship . They say:
these repairs should include transitional flashing, which was initially agreed to, and the roof
valley repair
the works required include replacing the sarking and tiles in the affected area to ensure
waterproof as the previous builder damaged the sarking
they have lost confidence in the insurer’s builder
they will need to paint the entire roof due to mismatched tiles
t he insurer’s offer should ensure roof colour uniformity based on ‘like for like’ under the
policy.
Determination | Case number: 866273 Page 3 of 7
Fair for the insurer to repair the roof with a new builder
The insurer has agreed to appoint a new builder to complete the repairs to the roof. I consider
this to be fair. The insurer should appoint a new company that has not already been involved
in the claim, given the relationship breakdown between the parties. I am satisfied RC’s SOW
dated 10 November 2022 broadly captures the damage to be repaired under this claim and
any repairs should be based on this SOW (except for painting, which is discussed below).
This is because it includes the damage the complainants seek, including the transitional
flashing, roof valley repair, and the replacement of the sarking and tiles in the affected area.
Regarding the issue of the roof matching, the complainants say the roof is damaged due to
the insurer’s builder’s poor workmanship. The insurer has not disputed this. RC also included
in its SOW dated 10 November 2022 reference to the roof and valley ‘ defects ’ . This shows
the repairs relate to defective works.
As the loss flows from the insurer’s negligence, the policy wording does not apply in the
circumstances. The insurer is required to place the complainants in the position they were in
before the loss. Before the loss, the complainants did not have mismatched roof tiles.
Given this, I do not consider the insurer’s proposed method of repairing the roof is fair.
As the information shows the roof is already painted, the repairs to the roof should include
painting the roof to match the existing colour.
The insurer is therefore required to:
appoint a new builder to attend to repairs to the roof in line with RC’s SOW dated 10
November 2022
also paint the roof if necessary to ensure the replaced tiles match the existing roof.
2.2 Is the insurer’s offer for the internal damage fair?
No. I consider it fair for the insurer to increase its cash settlement offer to include the
complainants ’ quotes.
Insurer says its offer is fair
The insurer accepted the claim for internal damage. However, there is a dispute regarding the
SOW. The insurer provided a SOW totalling $5,021.87 and confirmed it would provide a 20
per cent uplift to the cash settlement.
The SOW provides the following:
kitchen remove and replace cornice - $204
kitchen remove and replace damaged plasterboard for 23 metres squared - $1,380
kitchen painting for ceiling and cornice for 23 metres squared - $460
kitchen remove and dispose of damaged ceiling insulation for 23 metres squared - $230
kitchen supply and install new ceiling insulation for 23 metres squared - $368
electrical works to remove and replace ceiling fan and three lights - $660
waste removal - $270
protection of surfaces - $130
prepare and pain ceiling and cornice in the entry for 12 metres squared - $200
Total - $5,021.87.
The insurer says a specialist report will be required in respect to damaged timber joists in the
kitchen. It says it is willing to arrange this assessment with the complainants.
Determination | Case number: 866273 Page 4 of 7
Compl ainants say the insurer’s offer for internal damage is not fair
The complainants are willing to accept a cash settlement for the internal works but say the
amount offered is inadequate. They say:
the insurer continues to use wholesale rates for its quotes that have no reflection of local
rate cost or market rates available to them
the rates quoted do not consider the inflationary spiral in materials and labour that has
occurred during the more than 14 months this claim has been in progress
painting remains quoted at $20 per metr e in the insurer’s SOW even though the current
local rates are far higher
this method of under quoting is also reflected in the areas to be repaired and in the cost of
materials used
the SOW does not include the costs to repair the bowed ceiling joists in the kitchen and it
is impossible to obtain a quote from a carpenter for this item.
The complainants want the insurer to base a cash settlement on quotes that are at current
market rates for trades and materials and for a 30 per cent uplift to be applied.
The complainants provided detailed submissions addressing the insurer’s SO W. They also
provided some quotes for the internal damage, including:
quote to paint the kitchen and hallway ceilings and cornice for $1,450 (excluding GST)
quote to remove, supply, fix 25 square metres of kitchen ceiling, and supply fix and finish
seven metres of cornice to kitchen for $2,051.50 (including GST)
quote to replace ceiling batts for $550 (including GST).
The complainants estimated the amount for the internal work to be $12,971.64 (not including
the work to the bowed ceiling joist).
Fair for the insurer to increase the cash settlement
I am satisfied t he complainants’ quotes reflect a higher value for certain items included in the
insurer’s SOW. This includes:
the quote for painting amounts to $1,595 including GST
the quote for the ceiling batts is $550 including GST just to supply and install
for the replacement of the kitchen ceiling, the complainant’s quote amounts to $ 2,051.50
including GST.
Based on the above, I am satisfied the insurer’s cash settlement offer should be increased.
This is because the cash settlement should be based on current market rates.
The total amount for these items is $4,196.50.
However, for other items included on the SOW, including the removal and disposal of the
damaged ceiling insulation, electrical work, waste removal and protection of surfaces, the
complainant did not provide quotes. In the circumstances, I consider it fair to base the
settlement on the SOW figures, plus the builder’s mark-up, and plus GST. The total amount
for these items is $1,639.
However, given the loss of lifetime guarantee and unexpected contingencies, I consider a
further uplift on the total cash settlement amount is fair. Given the complainants’ particular
vulnerabilities and the difficulty in being able to obtain current quotes, I consider a further
uplift of 30 per cent is fair in all the circumstances.
The total amount to be settled is $7,587 (rounded up).
Determination | Case number: 866273 Page 5 of 7
I appreciate the complainants believe other aspects of the SOW are not accurate. However, it
is difficult to consider these submissions without other quotes provided. I consider the fairest
outcome, and in the interests of providing finality to the complaint, is to provide an increase in
the cash settlement offer based on the quotes the complainants provided, and a further uplift
of 30 per cent, to account for the transfer of risk to the complainants.
Within a reasonable timeframe, the insurer is also to arrange a quote for repairs to the
damaged timber joists in the kitchen and cash settle this amount. This amount should also
include a 30 per cent uplift to the amount cash settled. Alternatively, the complainants can
submit a quote for these works to the insurer and the insurer is to assess the fair and
reasonable sum and cash settle for these works.
2.3 Are the complainants entitled to compensation for non-
financial loss?
Yes. There were delays on the claim which led to stress and inconvenience for the
complainants. An award of $4,000 in compensation is fair.
Compensation may be awarded in certain circumstances
Under our Rules, AFCA may award compensation for non-financial loss where there has
been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with a complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a
normal degree of inconvenience during a claim or when a problem occurs.
Complainants raise concerns with the insurer’s handling of the claim
The complainants say due to the presence of black mould growth, they had to vacate their
property and live in a partially build house some distance away. They say they cannot live in
the property due to the damage still present and the mould. The complainants are in their 70s
and say they both have cancer and are therefore concerned for their health.
The complainants say the insurer did not initially offer temporary accommodation. They also
say they did not consider it suitable to take up the offer of temporary accommodation when it
was offered because they were concerned about contracting COVID-19 if in a well-populated
area like a hotel, given their health concerns and vulnerabilities. They say this has been going
on for more than 14 months which has been a nightmare.
The complainants refer to the inadequate repairs to the roof leading to damage, several
different assessors being sent to the property and the insurer delaying the claim. They also
refer to certain assessors dismissing their concerns, the insurer’s case handler trying to
pressure them into accepting cash settlements and not contacting the correct phone number
despite repeated requests.
Compensation warranted in the circumstances
During the course of the complaint being at AFCA, the insurer acknowledged the claim
experience and offered $4,000 in recognition of this.
Determination | Case number: 866273 Page 6 of 7
The information shows there were continual delays in the assessments and cash settlements
on the claim. The information shows the complainants are both vulnerable consumers, in their
70s and both living with cancer. I can understand their concerns regarding the property given
the presence of mould and ongoing water damage issues.
I acknowledge there has been a breakdown of relationship between the complainants and the
previous builder. However, I do not consider the insurer has adequately explained why the
accepted repairs to the roof could not be completed earlier. I consider this has led to
considerable delays on the claim and prevented the complainants from returning to their
home sooner.
The insurer’s internal assessor provided a report dated 1 April 2022, which stated: ‘ Assessor
could not see any reason as to why repairs had not started ’ . This supports the complainants’
allegations of delays in repairing the property.
I consider the ongoing delays led to unusual amount of physical inconvenience, time taken to
resolve the situation and interference with the complainants ’ expectation of enjoyment or
peace of mind.
An award of $4,000 is fair in the circumstances.
Determination | Case number: 866273 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approac h is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.