Home / Suncorp Group / Determination 866051

Determination 866051

Claim denied for late lodgement of storm damage claim after Cyclone Marcia

FirmSuncorp Group
Decided2022-08-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant lodged a home insurance storm damage claim about four and a half years after Cyclone Marcia and the insurer denied it. AFCA found the late lodgement breached the policy and prejudiced the insurer, and found no basis for non-financial loss.

Late lodgement breached the policy's notification terms and substantially prejudiced the insurer's ability to assess pre-existing damage, so denial was fair.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionnatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 866051 Financial firm AAI Limited Determination | Case number: 866051 Page 2 of 9 Case number: 866051 9 August 2022 1 Determination overview 1.1 Complaint The complainant held home and contents insurance with the financial firm (the insurer). He lodged a claim on 6 September 2019 for storm damage he says was caused by Cyclone Marcia in February 2015. The insurer denied the claim because it says the complainant did not disclose the condition of the property at renewal on 16 June 2014. The insurer also says it can deny the claim because it has been prejudiced by the four-year delay in lodging the claim. The complainant disputes the decision. 1.2 Issues and key findings Is the insurer entitled to deny the claim? Yes. The complainant breached the policy by lodging the claim more than four years after the claimed event. This prejudiced the insurer to the full extent of the claim. Is the complainant entitled to non-financial loss? No. I am not persuaded the insurer’s investigator acted inappropriately. The complainant is not entitled to non-financial loss. 1.3 Determination This determination is in favour of the insurer. The insurer can deny the claim. Determination | Case number: 866051 Page 3 of 9 2 Reasons for determination 2.1 Can the insurer deny the claim? Complainant breached the policy There is no dispute the complainant did not lodge the claim until four and a half years later. The policy says the complainant is required to contact the insurer as soon as possible. If he does not do so, the policy says the following: If you do not comply with ‘What you must do’ and ‘What you must not do’ we can reduce or refuse your claim and/or recover costs from you or cancel your policy. The complainant said he had attempted to contact the insurer but had trouble doing so. However, the insurer noted he lodged a food spoilage claim for the same event which was accepted. It is therefore difficult to accept the complainant could not lodge a claim any earlier than he did. Insurer prejudiced to the full extent of the claim The insurer provided reports from an engineer (J) and a builder (A). They highlighted various issues with the property. J highlighted the following as defects, pre-existing or maintenance related issues:  water damaged ceilings and walls  wood rot  termite damage  broken windows  broken awning  loose roof sheets, fixings and flashings  rusted roof  prior relevelling and packing  paint deterioration and flaking A’s report was broadly supportive of this. Photos of the property prior to the claimed event showed there was a tarp over a certain area and issues with the awning. It also showed extensive rust on the roof. However, it is difficult to see from the photos that this rust comprised its ability to prevent water entry. J also said part of the damage claimed was likely contributed to by these pre-existing issues. The complainant said he had regularly maintained the property and provided a list of work undertaken. When I consider all the available information, I accept the delay in lodging the claim has prejudiced the insurer to the full extent of the claim due to the following reasons. First, given the substantive passage of time, and the fact the complainant has not undertaken all the repairs, it is likely the damage has increased. The insurer should not be liable for this. Second, the insurer was not able to realistically assess, to what extent, the pre-existing factors may have caused or contributed to the damage. Attempting to do so more than four years later would be impossible because it would be difficult to distinguish what damage Determination | Case number: 866051 Page 4 of 9 might have occurred during the four and a half year delay compared to what was pre-existing the claimed event. Third, there were clearly pre-existing issues that migh t have affected the insurer’s willingness to offer renewal. For instance, the photos in 2014 and before show rust on the roof, a tarp over part of the roof and issues with the awning. This shows there is a realistic possibility the property was not in good condition at the time the policy renewed in 2014 such that there may have been a failure to disclose this. T he complainant’s late lodgement substantively prejudiced the insurer’s ability to investigate and consider this issue because:  the available photos provide limited evidence,  the insurer’s expert evidence are based on inspections five years after the fact – it would be very difficult for them to ascertain what the state of the property was back in 2014 Fourth, there is extensive damage being claimed. It is not obvious from the material if all this damage occurred from the claimed event or due to any other event during the intervening period. The insurer’s ability to distinguish this would be impossible given the passage of time. Insurer can deny the claim Given all this, I accept the complainant’s failure to lodge a claim breached the policy and has prejudiced the insurer to the full extent of the claim. It follows it is fair in all the circumstances for the insurer to deny liability for the claim. 2.2 Is the complainant entitled to non-financial loss? Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. No evidence of inappropriate conduct The complainant is dissatisfied with the conduct of the insurer’s investigator . He seeks non- financial loss for the physical inconvenience and interference with his peace of mind. He says the investigator was late to call and asked intrusive questions. Having reviewed the transcript of the interviews, I am not persuaded by the complainant’s position. The investigator acknowledged he was late for the interview and apologised for this several times. Part of the questions the complainant did not want to answer was whether he was insured elsewhere in the period between the cyclone and lodging the claim. I do not consider this question was unreasonable. There is extensive damage and it is not clear all of it occurred from one event more than four years ago. It is possible some of the damage may have been covered under a different policy if the complainant had arranged insurance elsewhere in the intervening period. Given this, I am not persuaded it is fair for the insurer to pay non-financial loss. Determination | Case number: 866051 Page 5 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Other reasons for decline Failure to disclose the property ’s condition In denying the claim, the insurer also said the complainant failed to disclose the property was not in good condition before the 2014 renewal. If he had done so, it would not have agreed to offer renewal. I have not addressed this as I am satisfied the insurer can deny the claim due to the complainant’ s late lodgement. Determination | Case number: 866051 Page 6 of 9 3.3 Relevant policy terms Good condition means your home or unit and contents do not have any faults or defects that might cause loss or damage to your home and contents, loss or damage to property of others or injury to people. This includes but is not limited to the following:  the roof does not leak when it rains;  there are no areas of the roof that are rusted through;  there is no wood rot, termite or white ant damage to your home or unit;  there are no holes in floors, walls, ceilings or any other parts of your home or unit (e.g. external wall cladding, internal plaster, floorboards);  there are no boarded up or broken windows;  there are no steps, gutters, flooring, walls, ceilings or any other areas of your home or unit that are loose, falling down, missing or rusted through;  all previous damage including damage caused by flood has been repaired;  your home or unit is not infested with vermin;  there are no squatters or unauthorised persons occupying your home or unit. 3.4 Relevant expert evidence Record Key points Determination | Case number: 866051 Page 7 of 9 Record Key points Financial firm’s expert (A) Report 15 - 11 - 2019  The dwelling roof and general condition of the dwelling would be considered poor with little to no owner maintenance completed over the life of the structure. On close inspection of the corroded roof sheeting it was evident that the roof sheeting and gutters are past their serviceable repair life and a full roof sheet and perimeter gutter replac ement is required to comply with a water tight roof installation.  I nternal ceiling linings wher e found to be in a poor condition with neglected maint enance and evidence of long term water ingress damage from multiple heavy rain events.  The structure of the roof is heavily corroded with failed nail fixings installed and heavily corroded valley gutter s and perimeter gutters. On close inspection of the installed roof sheeting it was evident that the roofing iron was original sheeting installed over 120 years approximately.  The insured has advised that the resultant damage was first noticeable after the 2015 TC Marcia event and the claim was lodged in 2019.  Due to the very poor unmaintained condition of the dwelling, the presence of lead paint coatings to the interior of the dwelling, the heavily corroded roof sheeting and gutters, a warrant able repair sc ope cannot be provided and any claim repairs would be considered a liability  To summaris e it is in my professional opinion the damage to the insured dwelling is not consistent with a single storm or cyclone event but is consistent with multiple historical storm events and neglected required owner maintenance. The dwelling is past its serviceable repair life. In my professional recommendation the claim should be considered decline due to the inability to correctly assess the damage due to the extended time l apse from the event to the claim lodgement and that the ins ured has not met the policy responsibilities by not keeping the dwelling in a good maintained condition. Please refer to page 80 of the PDS regarding keeping the insured property in good condition. Determination | Case number: 866051 Page 8 of 9 Record Key points Financial firm’s expert (JHA) Report 15 - 11 - 2019  The damage sustained by the cyclone event in regard to the broken windows could not have been prevented.  Damages such as roof sheets flying off and water ingress issues through the roof may have been prevented or at least minimised via upgrades/timely maintenance of the roof. The site evidence indicated that a strong wind event had caused uplift to the roof s heeting of the main dwelling. Uplift caused seven roof sheets of the dwelling to separate from the roof battens and travelled into adjacent properties. Timely maintenance would have seen aged, deteriorated, and loose sheet fixings, replaced with effective fixings which would not given way during the cyclone event.  Inspection of the roof indicated that the structure had been subject to deterioration. Nail fixings were used to attach roof sheets to battens, where uplift is greatest at this connection. This s ystem of attachment has been superseded by screw connections.  The roof presented multiple issues and concerns regarding the structural integrity and performance of the roof, which are the result of age deterioration. Several areas were identified that would affect both the structural integrity of the roof and the aesthetic appearanc e.  The roof was built to the then standard practice before codes and standards applied, and due to age and deterioration, connections have loos e ned and become ineffective. The then standard practice does not comply with current codes and requirements.  When the roof sheeting is replaced due to its rusted and deteriorated condition, the work is required to be undertak en in accordance with Queenslan d Development Code doc uments which will require an upgrade to the tie down.  The available evidence indicates the other defects and issues found on the property could have been avoided through home maintenance.  The aged, deteriorat ed, and loose sheet fix ings have resulted in a weak point in the roof sheet fixings to battens, which have subsequently failed during the cyclone event. Had an upgrade to the roof sheet fixings been implemented with current relevant codes and standards, the roof sheet removal an d water ingress through the roof would have been minimised or mitigated. The dwelling was considered in poor condition at the time of the event.  The dwelling experienced a cyclone event on the 20th February 2015 and the Insured advised the cyclone event ca used roof sheets to fly off and wat er to ent er into the dwelling through the roof.  The available evidence indicates the cyclone event caused seven roof sheets to come off the roof because of the aged, det eriorated, and loose sheet fixings. The cyclone eve nt has caused several windows to crack and break around the dwelling.  The observable evidence indicated most of the defects and issues were not caused by the single cyclone event but due to long - term aged deterioration and lack of adequate maintenance.  The dwelling is currently in poor condition and is believed to have been in poor condition prior to the cyclone event. Determination | Case number: 866051 Page 9 of 9

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.