Storm water damage claim; hail damage treated as separate event requiring second excess
Summary
The complainant lodged a storm water damage claim and the insurer treated pre-existing hail damage as a separate event requiring a second excess. AFCA found the hail damage more likely occurred on 31 October 2020, ordered the insurer to cover the tile replacement cost less the 2020 excess after itemisation, complete outstanding repairs, and pay $2,700 for non-financial loss.
The complainant failed to show the hail damage occurred in the 26 October 2021 storm, so it falls under the policy in force on 31 October 2020, while poor claim handling and delay warranted non-financial loss compensation.
Issues
- Claim amount dispute primary · upheld
“The insurer is to cover the cost the complainant paid to replace the damaged roof tiles, less the 2020 policy excess.”
- Claim denial secondary · not upheld
“It has not been shown that the hail damage was from the 26 October 2021 storm.”
- Poor claim handling secondary · upheld
“I am satisfied that the insurer's claim handling has been inadequate and not in keeping with the standards set out in the General Insurance Code of Practice.”
- Delay secondary · upheld
“I accept that the insurer has not progressed the claim in a sufficiently timely manner and has communicated poorly.”
- Poor communication secondary · upheld
“I accept that the insurer has not progressed the claim in a sufficiently timely manner and has communicated poorly.”
Subjects and remedies
pay compensationpay non financial lossrepair or rectify
Text of the determination
Determination
Case number 865446
Financial firm RACQ Insurance Limited
Determination | Case number: 865446 Page 1 of 6
Case number: 865446 14 October 2022
1 Determination overview
1.1 Complaint
The complainant and Mr DG hold home and contents insurance with the financial firm (the
insurer). On 26 October 2021, the complainant lodged a claim on the policy for water damage
to the insured property due to a storm earlier that evening.
The insurer accepted the claim but said the p roperty’s roof showed signs of previous hail
damage and maintenance issues. The insurer told the complainant the hail damage would
have to be separately claimed and a second excess paid. It determined that the complainant
would need to fix the maintenance issues before claim related repairs could be completed.
The complainant suggests that the hail damage occurred during the storm on 26 October
2021, not in a separate event. She also says that the insurer’s poor claim handling and
extensive delays have caused her stress and inconvenience.
1.2 Issues and key findings
Is the hail damage from a separate claim event?
Yes. It has not been shown that the hail damage was from the 26 October 2021 storm. The
hail damage more likely than not occurred on 31 October 2020. The insurer is cover the cost
the complainant paid to replace the damaged roof tiles, less the 2020 policy excess.
Is non-financial loss compensation payable?
Yes. The insurer’s poor claim handling and delays unreasonably caused the complainant
stress and inconvenience. It is to pay her $2,700 in non-financial loss compensation.
Why is the outcome fair?
The available information on balance establishes that the hail damage was sustained on 31
October 202 0. The insurer’s delays mean that it was reasonable for the complainant to
replace the affected roof tiles. Accordingly, it is fair that the insurer covers the replacement
cost after deducting the 2020 policy excess. The insurer’s poor claim handling has caused the
complainant stress and inconvenience. It is fair that the insurer pays her compensation.
1.3 Determination
This determination is substantially in favour of the complainant.
If the complainant accepts this determination, the following steps are to be taken:
the complainant is to obtain from her roofer (SO) written confirmation of how much of its
invoice dated 17 March 2022 was for or related to ‘Remove and Replace Broken Tiles’
within 14 days of receiving a copy of the roofer’s written confirmation from the complainan t,
the insurer is to pay her the amount specified, less the excess as at 31 October 2020
within 14 days of receiving written notice the complainant accepts this determination, the
insurer is to pay her $2,700 in non-financial loss compensation
the insurer is as a matter of urgency complete any outstanding claim related repairs.
Determination | Case number: 865446 Page 2 of 6
2 Reasons for determination
2.1 Is hail damage from a separate claim event?
Yes. It has not been shown that the hail damage was from the 26 October 2021 storm. The
hail damage more likely than not occurred on 31 October 2020. The insurer is cover the cost
the complainant paid to replace the damaged roof tiles, less the 2020 policy excess.
Complainant lodged a claim for storm damage
DG and the complainant hold a home and contents insurance policy issued by the insurer.
Subject to the terms and conditions set out in the insurer’s product disclosure statement
(PDS), the policy covers loss or damage caused by a listed insured event.
One of the listed insured events is ‘Storm’. The PDS includes the statement:
A storm has very strong winds and may also involve heavy rain, hail or snow. For
example, a cyclone. A storm is not just continuous bad weather on its own.
On the evening of 26 October 2021, the complainant lodged the claim online. She provided
the following details:
With the rain, water started coming through a ceiling fan in a bedroom. Up in the
roof to investigate we identified a number of leaks occurring, they ranged from
slight drips to a faster leak which resulted in it making it through insulation.
The complainant said that the required repairs would involve rectification of the leaking roof
and noted rain as being the cause of the damage.
Insurer’s experts say there was pre -existing hail damage
The insurer engaged JL, builder, to assist it in assessing the claim. After inspecting the
property on 4 November 2021, JL reported:
DG advised that water ingress was observed following a storm involving heavy rain on 26
October 2021
it considered that the observed plasterboard ceiling sheet and cornice damage was a
direct result of water ingress into the ceiling cavity from the storm
its roofer (TB) had identified 20 to 30 hail damaged roof tiles above the affected area
‘We have reviewed the BOM on the claimed date of loss and can confirm there was no hail
on or around the claimed date of loss. It is the opinion of [JL] that these cracked tiles could
have been the result of a previous storm .’
TB also identified ridge capping deterioration, which was a maintenance issue.
The insurer has provided a copy of TB’s report dated 9 November 2021. TB’s findings were
as summarise d by JL. However, TB also noted that it ‘ was reported damages may have
occurred during a recent hail storm ’.
On 23 November 2021, t he insurer emailed a copy of JL and TB’s reports to the complainant.
The insurer said that as the hail damage was from a different event, it could not cover it under
the current claim. It also told the complainant that she was welcome to lodge a separate claim
relating to the hail damage, but that a second excess would be payable.
Determination | Case number: 865446 Page 3 of 6
The complainant told the insurer she was not aware of when the hail damage had occurred.
The insurer told the complainant it would assist in investigating that issue. It asked JL to
provide additional information on the likely age of the hail damage.
Despite a number of follow ups, JL did not do so and its engagement was terminated. While
the insurer subsequently engaged another builder (OS) and another roofer (UR), neither of
those entities commented in their reports on the hail damage. It appears they may not have
been asked to do so.
It is apparent from the insurer’s claim notes that it had some concerns that t he hail damage
may have occurred prior to it being on risk as the policy only commenced a few years earlier.
However, the insurer’s claim not es include an entry dated 4 January 2022:
‘ In relation to the hail damage found - searched postcode and found that claim
could be lodged under cat169 CAT CODE: CAT169 NAME OF EVENT: SEQLD
Severe Storms LOSS DATES: 31/10/2020 … JLG will need to provide a quote on
the hail damaged tiles.
and an entry dated 5 January 2022:
ROOF - await new roof report and review Insured has been with us for almost four
years, in that time has not made a claim for water ingress, and no other pre-
existing damage was found internally for water ingress, indicating that the hail
damage to the roof MAY be recent, if no other ingress occurred in the last four
years. Due to member experience and circumstances I would recommend
accepting the hail damaged roof tiles as there are only 20-30 tiles broken – this is
NOT maintenance it is caused by an insured event as stated in the report. The
only factor is whether it occurred in the POI. Recommend either covering under
this claim, or new claim with waived XS.
Complainant suggests the hail damage occurred in the storm
The complainant says that she did not lodge a separate claim for the hail damage because
she had been waiting on the information on timing the insurer said it would obtain. She says
that the insurer did not provide the information despite her numerous follow up enquiries .
She says that, in any event, she told the insurer that the storm on 26 October 2021 did
involve hail falling in her local area. The complainant submits that the insurer has failed to
prove that hail was not part of the storm.
The complainant says that due to the insurer’s continuing delays, she had to arrange
restoration of the roof. She has provided a copy of an invoice dated 17 March 2022 totalling
$9,200 from SO for the restoration work. The invoice:
does not itemise the amounts charged for each identified work item
does not contain any reference to hail damage
confirms that the work included:
> ‘Remove and Replace Broken Tiles’
> ‘Repoint all Hips and Ridges’
> maintenance items such as pressure cleaning the roof surface and cleaning and
flushing the guttering to remove leaf litter and debris.
Determination | Case number: 865446 Page 4 of 6
Hail damage to be covered as a separate claim event
It is not in dispute that some of the insured property’s roof tiles were hail damaged . The point
of disagreement between the parties is when that damage occurred.
I am satisfied that the complainant has not shown on the balance of probabilities that the 26
October 2021 storm involved hail. The available information indicates the hail damage was
more likely than not sustained on 31 October 2020. I particularly note the following:
the complainant does not say that the hail damage did occur on 26 October 2021. Rather,
she refers to hail having fallen in her local area during the storm
the complainant did not mention hail when she lodged the claim
the reports of JL and TB indicate the hail was pre-existing
based on JL’s report, it appears th at the Bure au of Meteorology’s records do not show hail
fell on or around 26 October 2021
the insurer’s staff identified that severe storm activity on 31 October 2020 affected the
complainant’s local area and involved hail . The hail damage claim could be lodged under
the associated catastrophe code
the insurer’s staff accepted that the hail damage could be relatively recent and was not
maintenance related.
The insurer was on risk as at 31 October 2020. It is to cover the cost of replacing the hail
damaged tile under the policy in place at that time. It is entitled to apply that policy ’s excess.
I am satisfied that the complainant acted reasonably in arranging for SO to attend to roof
restoration works in March 2022. By then, it had been approximately four months since the
insurer said it would ascertain when the hail damage occurred to assist the complainant to
lodge a second claim. Despite follow ups from the complainant and the fact that its staff had
identified relevant information, the insurer did provide further assistance.
SO’s invoice is for $9,200 in total but does not provide any itemisation of amounts charged for
specific tasks. The work included ‘Remove and Replace Broken Tiles’. I am satisfied that this
item relates to the hail damage. However, the invoice also refers to unrelated work such as
dealing with the deteriorated ridges and attending to maintenance work.
Accordingly, the following steps are to be taken:
the complainant is to obtain from SO written confirmation of how much of its invoice dated
17 March 2022 was for or related to ‘Remove and Replace Broken Tiles’
within 14 days of receiving a copy of the roofer’s written confirmation from the complainant,
the insurer is to pay her the amount specified, less the excess as at 31 October 2020.
Given that the complainant has attended to the maintenance issues, the insurer is also to as
a matter of priority complete any outstanding claim related repairs.
2.2 Is non-financial loss payable?
Yes. The insurer’s poor claim handling and delays unreasonably caused the complainant
stress and inconvenience. It is to pay her $2,700 in non-financial loss compensation.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
Determination | Case number: 865446 Page 5 of 6
interference with the com plainant’s expectation of enjoyment or peace of mind.
Insurer has unreasonably caused stress and inconvenience
The complainant says the insurer has caused her major stress and inconvenience. She wants
a maximum non-financial loss award. Amongst other things, she refers to:
regular and ongoing delays on the part of the insurer and its service providers, including a
four month delay in informing her that maintenance works would need to be completed
before the covered repairs could proceed
poor communication, meaning she was forced to constantly chase the insurer for
information and updates
document falsification, noting that one of the insurer’s IDR responses is dated 15 April
2021 (well before the claim event on 26 October 2021)
worsening of her asthma due to ongoing moisture and mould issues
lack of empathy and customer care.
On 18 January 2022, the insurer wrote to the complainant to ‘sincerely apologise’ for her
claims experience, which was certainly not the claims experience for which it prided itself.
Th e available information shows that problems with insurer’s claim handling nevertheless
continued to occur.
The insurer has acknowledged the date error on the IDR response. It says the response was
uploaded onto its system on 14 March 2022 but cannot explain why it is dated 15 April 2021.
I am satisfied that the insurer’s claim handling has been inadequate and not in keeping with
the standards set out in the General Insurance Code of Practice. I accept that the insurer has
not progressed the claim in a sufficiently timely manner and has communicated poorly. I am
not satisfied that the complainant has proven the serious allegation of document falsification.
It is important to emphasise that AFCA is not a regulator of the insurance industry. Our
approach to non- financial loss focuses on the impact of an insurer’s unreasonable actions on
a complainant. It is not punitive.
I am satisfied that the insurer has unreasonably caused the complainant stress and
inconvenience over many months. However, without seeking to denigrate the complainant’s
experience, I do not consider it appropriate to make a maximum award.
Taking into account all the available circumstances, the insurer is to pay the complainant
$2,700 in non-financial loss compensation.
2.3 Why is the outcome fair?
The available information on balance establishes that the hail damage was sustained on 31
October 2020. The insurer’s ongoing delays mean that it was reasonable for the complainant
to replace the affected roof tiles. Accordingly, it is fair that the insurer covers the replacement
cost after deducting the 2020 policy excess. The insurer’s poor claim handling has caused the
complainant stress and inconvenience. It is fair that the insurer pays her compensation.
Determination | Case number: 865446 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.