Liability for further mould remediation, building repairs, kitchen cabinets, temporary accommodation and expert costs after water damage claim

FirmSuncorp Group
Decided2022-12-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed further mould remediation, building repairs, kitchen cabinets, temporary accommodation, non-financial loss and expert costs after a dishwasher leak. AFCA found the ongoing mould was not caused by the insured event or the insurer's conduct and dismissed the complaint.

The complainants bore the onus of showing ongoing mould was caused by an insured event or the insurer's actions, and they did not establish this on the balance of probabilities.

Issues

Subjects and remedies

health or medicalmental healththird party authorityno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 865158 Financial firm AAI Limited Determination | Case number: 865158 Page 1 of 9 Case number: 865158 14 December 2022 1 Determination overview 1.1 Complaint On 19 March 2021 the complainants lodged a claim on their home building and contents policy with the financial firm (insurer) for water damage to the property caused by a leaking dishwasher. The insurer accepted the claim and commenced remediation works. The complainants engaged PP, a hygienist, after ongoing concerns with the remediation and possible mould cross contamination. The insurer agreed to cash settle the mould remediation to allow the complainants to appoint PP to complete the mould remediation. After PP provided a clearance certificate, the insurer completed repairs to the building. The complainants say the insurer failed to properly remediate the property and seeks the insurer to pay the costs to complete the remediation, the necessary building repairs and costs to replace contaminated contents. The complainants also seek ongoing temporary accommodation costs whilst the repairs are rectified and compensation for non-financial loss. 1.2 Issues and key findings Is the insurer liable for further remediation costs? No. The panel is satisfied that any ongoing mould contamination is not due to the claimed event but likely caused by carpet removal which was not part of an insured event. Is the insurer liable to replace the kitchen cabinets? No. The works carried out to the upper cabinets were unrelated to the insured event. The insurer is not liable for private works between the complainants and their contractor. Are the complainants entitled to non-financial loss? No. The insurer has acted fairly and reasonably in handling this claim. Are the complainants entitled expert’s costs ? No. The panel is not satisfied the costs were necessarily obtained to establish the claim. reports. Why is the outcome fair? The outcome is fair because the evidence provided does not establish that the current mould contamination was due to the claimed event or due to the insurer’s claims handling. 1.3 Determination The determination is in favour of the insurer. The insurer is entitled to rely on the terms of the policy to deny further liability for the claim. Determination | Case number: 865158 Page 2 of 9 2 Reasons for determination 2.1 Is the insurer liable for further remediation costs? No. The panel is satisfied that any ongoing mould contamination is not due to the claimed event but likely caused by carpet removal which was not part of an insured event. Complainants have onus to prove claim falls within terms of the policy It is established insurance law that an insured has the initial onus to prove on the balance of probabilities (that is, more likely than not) that the loss or damage claimed falls within the terms of the policy. This is commonly called a prima facie claim. The complainants ’ home and contents policy is an insured events policy that covers loss or damage arising from a series of insured events including escape of liquid, subject to several limitations and exclusions. The complainants also held optional accidental damage cover. On 19 March 2021, the complainants contacted the insurer to lodge a claim after noticing water damage to the floorboards and walls, which was caused by a leaking dishwasher. The insurer accepted the claim and appointed RCC to commence repairs. RCC was informed that a complainant suffered heightened sensitivity to mould and recommended temporary accommodation be provided until repairs. Complainants raised concerns as to possible cross contamination RCC inspected the property on 23 March 2021, organised restoration, commenced the drying process and boarded up the rest of the house to try and mitigate further damage and prevent cross contamination. RCC identified water damage to kitchen corner carcass, kickboards and end panels, skirting in the hallway and study and damage to the pantry architraves. The kitchen was removed and taken off site for storage so further restoration can be completed. The complainants notified the insurer on 26 March 2021 of concerns with the containment put in place by RCC and the risk of cross contamination to the rest of the property. The insurer then appointed JMB to provide an environmental report. JMB attended the property on 30 March 2021 and found active mould growth related to the claim in the following areas:  Kitchen skirtings adjacent to mould affected plasterboard  North east kitchen plasterboard wall behind cabinets  Kitchen backing boards of exposed cabinets Active mould growth un-related to the claim, was identified in:  Bathroom window sill  Bathroom shower unit grout  Garage shelving unit  Garage fridge door JMB considered water ingress had affected the low-level plasterboard wall and skirtings in the kitchen, pantry and along the hallway to the adjacent dining room. However, in the dining room water damage was only observed to the walls contacting the kitchen. Due to the water ingress and mould growth trends observed to the low-level skirtings, plasterboard walls behind the cabinets and the backing boards of the cabinets, there was evidence to suggest that there may be further hidden water damage and mould growth behind the low-level Determination | Case number: 865158 Page 3 of 9 cabinets within the kitchen. Airborne mould testing results were acceptable for indoor airborne mould ecology. JMB made various recommendations with respect to remediation works. The complainants raised concerns with the report and a dual assessment was completed with RCC, the Insurers Internal assessor and the complainants on 22 April 2021. The complainants appointed PP a hygienist, to provide a report and quote for the mould remediation. PP attended the home on 29 April 2021 and identified further mould remediation was required within the containment zone, and further structural drying of timbers, the concrete slab and tiled floors to mitigate the risk of further mould contamination. After the scope of works was completed a post remediation evaluation (PRV) was completed to confirm the affected areas had been returned to condition one level. Insurer cash settled the complainants to complete mould remediation A further dual assessment took place on 2 June 2021 with PP, RCC and the complainants in attendance. A SOW was agreed and d ue to the complainant’s co ncerns with RCC, the insurer agreed to a cash settlement to remediate the property based on the PP’s scope of works. T he complainants confirmed they wanted PP to complete the mould remediation. The insurer cash settled the complainants $12,464 based on the quotation provided by PP and paid by the complainants. The complainants say they did not understand this meant the work performed by PP would be considered private work for which the insurer was not responsible. The complainants say the work was arranged by agreement after a site visit because they were unhappy with RCC. The panel disagrees with the complainants. The complainants engaged PP to carry out an assessment. PP is referred to in references from the insurer as ‘the customers hygienist’. PP is clear from whom it is getting instructions in its engagement, reporting and post remediation work. The panel is satisfied taking all things into consideration that the complainants had requested a cash settlement having used PP before and because of their health issues. The panel is satisfied the cash settlement finalised the insurer’s liability for the mould related component of the claim. Reports indicate possible ongoing mould contamination On 24 August 2021, the complainants raised concerns about the repairs and possible cross contamination of mould due to one of the complainant’s medical symptoms appearing after entering the insured property. PP had completed a PRV on 29 June 2021 after the remediation works were complete. The report states that the PRV criteria in relation to airborne mould was met for all samples. Further, PP confirmed it was satisfied with the results from the samples and the insurer’s builders were able to commence the required repairs. A further assessment was conducted with RCC on 1 September 2021. The report notes the complainants claimed that the study area had been sealed off during remediation. They had the carpet removed but now found they were getting sick on entering the room. The carpet had been removed recently to lay new flooring. The study was not part of the accepted damage arising from the claimed event. RCC considered the mould was likely due to the complainants removing the carpet in the study room for private repairs. The complainants provided a report from PP dated 25 September 2021. PP has stated that the lounge room carpet when removed was contained. The carpets were HEPA vacuumed, Determination | Case number: 865158 Page 4 of 9 cut and wrapped within the containment zone. No carpet had been left outside from areas it had remediated. The complainants provided reports from MY, a microbial assessor, dated 29 May 2022 that state:  cross contamination was due to the absence of negative pressure and required containment did not occur  the assessor removed a section of the bottom wall plate between the kitchen bench and sliding glass door which showed contamination  the assessor noted seven types of water damage mould species were present in the bottom wall plate and the whole house dust samples  96% of bacteria found in bottom wall plate were found in dust throughout the home  the failure to remediate the bottom wall plate contributed to cross contamination of the whole house. The complainants provided a further report from a mycologist (NSJ), which reviewed the previous reports related to the claim. NSJ states the report from PP failed to identify the level of spore count/m 3 in the areas outside the containment. Further, NSJ sates that PP failed to retest the rooms outside of the containment or surface sample the wall timber. NSJ agreed with the findings in the report provided by MY and considered that cross contamination has occurred from the bottom wall plate to the rest of the house, which was not appropriately remediated by PP. The insurer provided a report from consulting hygienist MPC. The report is critical of both MY and NSJ and says the methodology used in both reports was not industry best practice. The complainants dispute this although there is no response from either MY or NSJ. In the panel ’ s view this is not relevant as the issue is whether the contamination was caused by the initial event or the insurer’s contractors. The panel accepts the reports provided support a finding of ongoing mould contamination within the home Complainants have not established ongoing mould caused by insured event. The panel accepts there is mould present in the building. MY says there was mould in the timber plate on the wall between the kitchen bench top and sliding door. This should have been remediated by PP. MY also suggest a possibility of another source of water damage such as rain which may have caused new mould growth. New mould growth would not be covered unless caused by an insured event. The complainants say water normally drains away from the home. The complainants had lodged a claim for mould related damage in 2018. That claim was denied due to improper drainage. There is no evidence of recommended maintenance work at that time, being completed. The panel accept there could be ongoing issues with seepage from stormwater contributing to the moist conditions in the home. JMB identified non-event related mould in the bathroom and garage. This suggests ongoing, although mild, issues with mould at the house. In the panel’s view, b ased on the expert reports including those provided by the complainants, if there was any cross contamination, that most likely occurred as part of the remediation performed by PP or following removal of the carpet from the study floor post remediation. Determination | Case number: 865158 Page 5 of 9 If the cross contamination was due to PP not properly remediating the property that would be an issue between PP and the complainants. PP was acting for the complainants when remediating the mould. If it was caused by the removal of the study carpet, then that was post remediation and not because of an insured event. The onus is on the complainants to prove that most likely the further contamination and damage arose from the insured event or the insurer’s actions. As the complainants have not established the ongoing mould issues we re caused by an insured event or the insurer’s actions, the insurer is entitled to deny the claim Insurer is not liable for further temporary accommodation costs The policy provides cover for temporary accommodation where the home is damage by an insured event and the insured cannot live in the property. The insurer pays reasonable temporary accommodation costs for the time it takes to repair or rebuild the property. The policy also provides cover for temporary accommodation for domestic pets. The insurer provided temporary accommodation for the time taken to complete mould remediation and the claim related repairs. As outlined above, as there is insufficient information to support the ongoing mould was due to the claimed event or the insurer’s actions, the insurer is not required to pay for further temporary accommodation. 2.2 Is the insurer liable to rectify the kitchen cabinets? No. The works carried out to the upper cabinets were unrelated to the insured event. The insurer is not liable for private works between the complainants and their contractor. Complainants say the insurer is liable for rectification works The complainants say the insurer initially accepted liability for the upper cabinets of the kitchen on the basis that the floor to ceiling vertical boards were damaged due to the claim. As such, the upper cupboards adjacent to the vertical boards were covered by the insurer. The insurer states that it only authorised replacement of the lower cabinets. The insurer states that the upper cabinets were not damaged due to the claimed event. The insurer’s position is the complainant paid the insurer’s contractor privately to replace the cupboards to create a uniform appearance. On the information provided the panel agrees. The policy provides a guarantee for authorised repairs The policy provides a lifetime guarantee for materials and workmanship to the property for works that are authorised and repaired directly by the insurer. As the replacement of the upper cupboards were private repairs paid for by the complainants, the insurer is not required to rectify any defects. The insurer is only liable for any rectification works related to the claim-related and authorised repairs. 2.3 Are the complainants entitled to non-financial loss? No. The insurer has acted fairly and reasonably in handling this claim. Determination | Case number: 865158 Page 6 of 9 AFCA can award non-financial loss Under AFCA ’s Rules, AFCA can award up to $5,400 compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with expectation of enjoyment or peace of mind. However, AFCA takes a conservative approach to assessing compensation for non-financial loss. AFCA expects complainants to be moderately robust and tolerate a normal degree of inconvenience when making a claim. Insurer did not mishandle the claim The complainants seek compensation due to the insurer’s manag ement of the claim. The complainant says the insurer’s actions has caused mould contamination to other parts of the property and the complainants contents. The complainants have been unable to return home due to their sensitivity to mould and are paying for temporary accommodation. The panel accept the circumstances were very stressful and the complainants have not been able to live in their property. The added financial stress of paying for temporary accommodation is no doubt significant. However, having reviewed the claim notes and submissions by both parties, the panel is not satisfied the complainants have shown the insurer mishandled the claim. The information exchanged confirms the insurer responded immediately to the claim, appointing RCC and through RCC BR to complete the mould remediation and repairs. The insurer responded to the complainant’s request for their own hygienist PP to complete the remediation and any delay there was not caused by the insurer’s claims handling. On completion of the mould remediation the insurer had RCC complete repairs. The complainants may have disagreed with the insurers assessor or trades but this of itself does not indicate the insurer mishandled the claim or did not appreciate the health issues faced by the complainants. The delay and inconvenience now caused is not due to the insurer’s claims handling but in the panel ’ s view, due to the dispute itself. In the circumstances it is not appropriate to award compensation for non-financial loss. 2.4 Are the complainants entitled to financial loss? No. The panel is not satisfied the costs were necessarily obtained to establish the claim. reports. Insurer is not liable to reimburse the complainant’s expert costs The complainants are seeking to be reimbursed for the costs of expert reports they obtained to support their position. AFCA may require an insurer to contribute to a complainant ’ s professional costs. In doing so, AFCA considers the complexity of the dispute and whether the expert report assisted the complainant’s position. The panel accepts the complainants required a report to confirm the level of mould contamination at the property. However, the reports do not assist the complainants position that the insurer is liable any further costs for mould remediation, building repairs or contents. Accordingly, the insurer is not required to pay the complainants expert costs. Determination | Case number: 865158 Page 7 of 9 2.5 Why is the outcome fair? Outcome is fair The available information does not establish on the balance of probabilities that the ongoing issues with mould contamination are due to the actions of the insurer. While there are several possible causes for the ongoing contamination, the expert reports there is insufficient information to support a finding that the current mould contamination at the property was caused the claimed event or by the insurer’s actions. In the circumstances it is fair that the insurer can rely on the terms and conditions of the policy to refuse payment of the claim. Determination | Case number: 865158 Page 8 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes an ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant expert information Record Key points Complainant’s expert (PP) Report 29 - 04 - 2021  The two areas sampled outside of the containment area recorded ‘normal mould ecology’. It is unlikely that the areas outside the containment are impacted by cross contamination from the water damage area. There were no saturation moulds e vident in the sample, and moisture indicator moulds were at lower levels to those recorded inside the containment zone.  The tape samples collected from the base plate timber confirms visual assessment that the water stains areas remain contaminated. It is also likely that the base plate timbers and door Determination | Case number: 865158 Page 9 of 9 jamb are the source of the mould found in the airborne samples collected. Complainant’s expert (PP) Report 29 - 06 - 2021  Moisture survey All moisture content checks showed substrate were at the dry standard fo r the substrate type  Visible mould Locations where visible mould had previously been identified had been cleaned and floor to base plate junction had been sealed  Post remediation evaluation - Airborne Mould The post remediation evaluation criteria in relation to airborne mould was met in all samples. We have advised RC that we are satisfied with the results of sampling and that the builders can proceed to reinstatement. Complainant’s report (MY) Report 19 - 04 - 2022  96% of all bacterial orders found throughout the dust in the home were found under the bottom wall plate, confirming there has been cross contamination from the original wat er damage event. Eight water damaged moulds found under the bottom wall plate were also found throughout the ho me.  cross contamination allowed to occur due to absence of negative pressure and containment did not occur and likely exacerbated by high - pressure fans and heaters installed Complainants report (NS J ) Report 31 - 05 - 2022 PP post remediation evaluation  …the rooms outside of cont ainment were not retested after remediation and  surface sampling of the wall timber was not done after remediation Report from MY …  comparing the bacterial orders from the contaminated bottom wall plat e and what was found in the dust throughout the house confirms that a level of cross contamination has occurred…confirming that cross contamination from the bottom plate to the rest of the hous e has occurred and not been appropriately addressed ruing remediation by the insurer’s contracto r (PP). Conclusions …  After the initial water ingress event, [NS J ] concluded that deficient assessment has let to inadequate remediation of the consequential mould and microbial amplification that has contaminated much of the property