Home / Suncorp Group / Determination 865158
Determination 865158
Liability for further mould remediation, building repairs, kitchen cabinets, temporary accommodation and expert costs after water damage claim
Summary
The complainants claimed further mould remediation, building repairs, kitchen cabinets, temporary accommodation, non-financial loss and expert costs after a dishwasher leak. AFCA found the ongoing mould was not caused by the insured event or the insurer's conduct and dismissed the complaint.
The complainants bore the onus of showing ongoing mould was caused by an insured event or the insurer's actions, and they did not establish this on the balance of probabilities.
Issues
- Claim denial primary · not upheld
“The panel is satisfied that any ongoing mould contamination is not due to the claimed event but likely caused by carpet removal which was not part of an insured event.”
- Inadequate claim investigation secondary · not upheld
“The panel is not satisfied the complainants have shown the insurer mishandled the claim.”
- Repairs or contractors secondary · not upheld
“If the cross contamination was due to PP not properly remediating the property that would be an issue between PP and the complainants.”
Subjects and remedies
health or medicalmental healththird party authorityno remedy
Text of the determination
Determination
Case number 865158
Financial firm AAI Limited
Determination | Case number: 865158 Page 1 of 9
Case number: 865158 14 December 2022
1 Determination overview
1.1 Complaint
On 19 March 2021 the complainants lodged a claim on their home building and contents
policy with the financial firm (insurer) for water damage to the property caused by a leaking
dishwasher.
The insurer accepted the claim and commenced remediation works. The complainants
engaged PP, a hygienist, after ongoing concerns with the remediation and possible mould
cross contamination. The insurer agreed to cash settle the mould remediation to allow the
complainants to appoint PP to complete the mould remediation. After PP provided a
clearance certificate, the insurer completed repairs to the building.
The complainants say the insurer failed to properly remediate the property and seeks the
insurer to pay the costs to complete the remediation, the necessary building repairs and costs
to replace contaminated contents. The complainants also seek ongoing temporary
accommodation costs whilst the repairs are rectified and compensation for non-financial loss.
1.2 Issues and key findings
Is the insurer liable for further remediation costs?
No. The panel is satisfied that any ongoing mould contamination is not due to the claimed
event but likely caused by carpet removal which was not part of an insured event.
Is the insurer liable to replace the kitchen cabinets?
No. The works carried out to the upper cabinets were unrelated to the insured event. The
insurer is not liable for private works between the complainants and their contractor.
Are the complainants entitled to non-financial loss?
No. The insurer has acted fairly and reasonably in handling this claim.
Are the complainants entitled expert’s costs ?
No. The panel is not satisfied the costs were necessarily obtained to establish the claim.
reports.
Why is the outcome fair?
The outcome is fair because the evidence provided does not establish that the current mould
contamination was due to the claimed event or due to the insurer’s claims handling.
1.3 Determination
The determination is in favour of the insurer.
The insurer is entitled to rely on the terms of the policy to deny further liability for the claim.
Determination | Case number: 865158 Page 2 of 9
2 Reasons for determination
2.1 Is the insurer liable for further remediation costs?
No. The panel is satisfied that any ongoing mould contamination is not due to the claimed
event but likely caused by carpet removal which was not part of an insured event.
Complainants have onus to prove claim falls within terms of the policy
It is established insurance law that an insured has the initial onus to prove on the balance of
probabilities (that is, more likely than not) that the loss or damage claimed falls within the
terms of the policy. This is commonly called a prima facie claim.
The complainants ’ home and contents policy is an insured events policy that covers loss or
damage arising from a series of insured events including escape of liquid, subject to several
limitations and exclusions. The complainants also held optional accidental damage cover.
On 19 March 2021, the complainants contacted the insurer to lodge a claim after noticing
water damage to the floorboards and walls, which was caused by a leaking dishwasher. The
insurer accepted the claim and appointed RCC to commence repairs. RCC was informed that
a complainant suffered heightened sensitivity to mould and recommended temporary
accommodation be provided until repairs.
Complainants raised concerns as to possible cross contamination
RCC inspected the property on 23 March 2021, organised restoration, commenced the drying
process and boarded up the rest of the house to try and mitigate further damage and prevent
cross contamination. RCC identified water damage to kitchen corner carcass, kickboards and
end panels, skirting in the hallway and study and damage to the pantry architraves. The
kitchen was removed and taken off site for storage so further restoration can be completed.
The complainants notified the insurer on 26 March 2021 of concerns with the containment put
in place by RCC and the risk of cross contamination to the rest of the property.
The insurer then appointed JMB to provide an environmental report. JMB attended the
property on 30 March 2021 and found active mould growth related to the claim in the
following areas:
Kitchen skirtings adjacent to mould affected plasterboard
North east kitchen plasterboard wall behind cabinets
Kitchen backing boards of exposed cabinets
Active mould growth un-related to the claim, was identified in:
Bathroom window sill
Bathroom shower unit grout
Garage shelving unit
Garage fridge door
JMB considered water ingress had affected the low-level plasterboard wall and skirtings in the
kitchen, pantry and along the hallway to the adjacent dining room. However, in the dining
room water damage was only observed to the walls contacting the kitchen. Due to the water
ingress and mould growth trends observed to the low-level skirtings, plasterboard walls
behind the cabinets and the backing boards of the cabinets, there was evidence to suggest
that there may be further hidden water damage and mould growth behind the low-level
Determination | Case number: 865158 Page 3 of 9
cabinets within the kitchen. Airborne mould testing results were acceptable for indoor airborne
mould ecology.
JMB made various recommendations with respect to remediation works.
The complainants raised concerns with the report and a dual assessment was completed with
RCC, the Insurers Internal assessor and the complainants on 22 April 2021.
The complainants appointed PP a hygienist, to provide a report and quote for the mould
remediation. PP attended the home on 29 April 2021 and identified further mould remediation
was required within the containment zone, and further structural drying of timbers, the
concrete slab and tiled floors to mitigate the risk of further mould contamination. After the
scope of works was completed a post remediation evaluation (PRV) was completed to
confirm the affected areas had been returned to condition one level.
Insurer cash settled the complainants to complete mould remediation
A further dual assessment took place on 2 June 2021 with PP, RCC and the complainants in
attendance. A SOW was agreed and d ue to the complainant’s co ncerns with RCC, the insurer
agreed to a cash settlement to remediate the property based on the PP’s scope of works. T he
complainants confirmed they wanted PP to complete the mould remediation.
The insurer cash settled the complainants $12,464 based on the quotation provided by PP
and paid by the complainants. The complainants say they did not understand this meant the
work performed by PP would be considered private work for which the insurer was not
responsible. The complainants say the work was arranged by agreement after a site visit
because they were unhappy with RCC.
The panel disagrees with the complainants. The complainants engaged PP to carry out an
assessment. PP is referred to in references from the insurer as ‘the customers hygienist’. PP
is clear from whom it is getting instructions in its engagement, reporting and post remediation
work. The panel is satisfied taking all things into consideration that the complainants had
requested a cash settlement having used PP before and because of their health issues. The
panel is satisfied the cash settlement finalised the insurer’s liability for the mould related
component of the claim.
Reports indicate possible ongoing mould contamination
On 24 August 2021, the complainants raised concerns about the repairs and possible cross
contamination of mould due to one of the complainant’s medical symptoms appearing after
entering the insured property.
PP had completed a PRV on 29 June 2021 after the remediation works were complete. The
report states that the PRV criteria in relation to airborne mould was met for all samples.
Further, PP confirmed it was satisfied with the results from the samples and the insurer’s
builders were able to commence the required repairs.
A further assessment was conducted with RCC on 1 September 2021. The report notes the
complainants claimed that the study area had been sealed off during remediation. They had
the carpet removed but now found they were getting sick on entering the room. The carpet
had been removed recently to lay new flooring. The study was not part of the accepted
damage arising from the claimed event. RCC considered the mould was likely due to the
complainants removing the carpet in the study room for private repairs.
The complainants provided a report from PP dated 25 September 2021. PP has stated that
the lounge room carpet when removed was contained. The carpets were HEPA vacuumed,
Determination | Case number: 865158 Page 4 of 9
cut and wrapped within the containment zone. No carpet had been left outside from areas it
had remediated.
The complainants provided reports from MY, a microbial assessor, dated 29 May 2022 that
state:
cross contamination was due to the absence of negative pressure and required
containment did not occur
the assessor removed a section of the bottom wall plate between the kitchen bench and
sliding glass door which showed contamination
the assessor noted seven types of water damage mould species were present in the
bottom wall plate and the whole house dust samples
96% of bacteria found in bottom wall plate were found in dust throughout the home
the failure to remediate the bottom wall plate contributed to cross contamination of the
whole house.
The complainants provided a further report from a mycologist (NSJ), which reviewed the
previous reports related to the claim. NSJ states the report from PP failed to identify the level
of spore count/m 3 in the areas outside the containment. Further, NSJ sates that PP failed to
retest the rooms outside of the containment or surface sample the wall timber.
NSJ agreed with the findings in the report provided by MY and considered that cross
contamination has occurred from the bottom wall plate to the rest of the house, which was not
appropriately remediated by PP.
The insurer provided a report from consulting hygienist MPC. The report is critical of both MY
and NSJ and says the methodology used in both reports was not industry best practice. The
complainants dispute this although there is no response from either MY or NSJ.
In the panel ’ s view this is not relevant as the issue is whether the contamination was caused
by the initial event or the insurer’s contractors. The panel accepts the reports provided
support a finding of ongoing mould contamination within the home
Complainants have not established ongoing mould caused by insured event.
The panel accepts there is mould present in the building. MY says there was mould in the
timber plate on the wall between the kitchen bench top and sliding door. This should have
been remediated by PP. MY also suggest a possibility of another source of water damage
such as rain which may have caused new mould growth. New mould growth would not be
covered unless caused by an insured event.
The complainants say water normally drains away from the home. The complainants had
lodged a claim for mould related damage in 2018. That claim was denied due to improper
drainage. There is no evidence of recommended maintenance work at that time, being
completed. The panel accept there could be ongoing issues with seepage from stormwater
contributing to the moist conditions in the home.
JMB identified non-event related mould in the bathroom and garage. This suggests ongoing,
although mild, issues with mould at the house.
In the panel’s view, b ased on the expert reports including those provided by the
complainants, if there was any cross contamination, that most likely occurred as part of the
remediation performed by PP or following removal of the carpet from the study floor post
remediation.
Determination | Case number: 865158 Page 5 of 9
If the cross contamination was due to PP not properly remediating the property that would be
an issue between PP and the complainants. PP was acting for the complainants when
remediating the mould. If it was caused by the removal of the study carpet, then that was post
remediation and not because of an insured event.
The onus is on the complainants to prove that most likely the further contamination and
damage arose from the insured event or the insurer’s actions. As the complainants have not
established the ongoing mould issues we re caused by an insured event or the insurer’s
actions, the insurer is entitled to deny the claim
Insurer is not liable for further temporary accommodation costs
The policy provides cover for temporary accommodation where the home is damage by an
insured event and the insured cannot live in the property. The insurer pays reasonable
temporary accommodation costs for the time it takes to repair or rebuild the property. The
policy also provides cover for temporary accommodation for domestic pets.
The insurer provided temporary accommodation for the time taken to complete mould
remediation and the claim related repairs. As outlined above, as there is insufficient
information to support the ongoing mould was due to the claimed event or the insurer’s
actions, the insurer is not required to pay for further temporary accommodation.
2.2 Is the insurer liable to rectify the kitchen cabinets?
No. The works carried out to the upper cabinets were unrelated to the insured event. The
insurer is not liable for private works between the complainants and their contractor.
Complainants say the insurer is liable for rectification works
The complainants say the insurer initially accepted liability for the upper cabinets of the
kitchen on the basis that the floor to ceiling vertical boards were damaged due to the claim.
As such, the upper cupboards adjacent to the vertical boards were covered by the insurer.
The insurer states that it only authorised replacement of the lower cabinets. The insurer
states that the upper cabinets were not damaged due to the claimed event. The insurer’s
position is the complainant paid the insurer’s contractor privately to replace the cupboards to
create a uniform appearance. On the information provided the panel agrees.
The policy provides a guarantee for authorised repairs
The policy provides a lifetime guarantee for materials and workmanship to the property for
works that are authorised and repaired directly by the insurer.
As the replacement of the upper cupboards were private repairs paid for by the complainants,
the insurer is not required to rectify any defects. The insurer is only liable for any rectification
works related to the claim-related and authorised repairs.
2.3 Are the complainants entitled to non-financial loss?
No. The insurer has acted fairly and reasonably in handling this claim.
Determination | Case number: 865158 Page 6 of 9
AFCA can award non-financial loss
Under AFCA ’s Rules, AFCA can award up to $5,400 compensation for non-financial loss
where there has been an unusual amount of physical inconvenience, time taken to resolve a
situation, or interference with expectation of enjoyment or peace of mind.
However, AFCA takes a conservative approach to assessing compensation for non-financial
loss. AFCA expects complainants to be moderately robust and tolerate a normal degree of
inconvenience when making a claim.
Insurer did not mishandle the claim
The complainants seek compensation due to the insurer’s manag ement of the claim. The
complainant says the insurer’s actions has caused mould contamination to other parts of the
property and the complainants contents. The complainants have been unable to return home
due to their sensitivity to mould and are paying for temporary accommodation.
The panel accept the circumstances were very stressful and the complainants have not been
able to live in their property. The added financial stress of paying for temporary
accommodation is no doubt significant.
However, having reviewed the claim notes and submissions by both parties, the panel is not
satisfied the complainants have shown the insurer mishandled the claim.
The information exchanged confirms the insurer responded immediately to the claim,
appointing RCC and through RCC BR to complete the mould remediation and repairs. The
insurer responded to the complainant’s request for their own hygienist PP to complete the
remediation and any delay there was not caused by the insurer’s claims handling. On
completion of the mould remediation the insurer had RCC complete repairs. The
complainants may have disagreed with the insurers assessor or trades but this of itself does
not indicate the insurer mishandled the claim or did not appreciate the health issues faced by
the complainants.
The delay and inconvenience now caused is not due to the insurer’s claims handling but in
the panel ’ s view, due to the dispute itself. In the circumstances it is not appropriate to award
compensation for non-financial loss.
2.4 Are the complainants entitled to financial loss?
No. The panel is not satisfied the costs were necessarily obtained to establish the claim.
reports.
Insurer is not liable to reimburse the complainant’s expert costs
The complainants are seeking to be reimbursed for the costs of expert reports they obtained
to support their position.
AFCA may require an insurer to contribute to a complainant ’ s professional costs. In doing so,
AFCA considers the complexity of the dispute and whether the expert report assisted the
complainant’s position.
The panel accepts the complainants required a report to confirm the level of mould
contamination at the property. However, the reports do not assist the complainants position
that the insurer is liable any further costs for mould remediation, building repairs or contents.
Accordingly, the insurer is not required to pay the complainants expert costs.
Determination | Case number: 865158 Page 7 of 9
2.5 Why is the outcome fair?
Outcome is fair
The available information does not establish on the balance of probabilities that the ongoing
issues with mould contamination are due to the actions of the insurer.
While there are several possible causes for the ongoing contamination, the expert reports
there is insufficient information to support a finding that the current mould contamination at
the property was caused the claimed event or by the insurer’s actions.
In the circumstances it is fair that the insurer can rely on the terms and conditions of the
policy to refuse payment of the claim.
Determination | Case number: 865158 Page 8 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes an ombudsman, a member with significant experience in consumer and small
business advocacy and a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information. If there are conflicting recollections and these are evenly weighted, we may find
that a claim cannot be established.
3.2 Relevant expert information
Record Key points
Complainant’s expert (PP)
Report
29 - 04 - 2021
The two areas sampled outside of the containment area recorded
‘normal mould ecology’. It is unlikely that the areas outside the
containment are impacted by cross contamination from the water
damage area. There were no saturation moulds e vident in the
sample, and moisture indicator moulds were at lower levels to
those recorded inside the containment zone.
The tape samples collected from the base plate timber confirms
visual assessment that the water stains areas remain
contaminated. It is also likely that the base plate timbers and door
Determination | Case number: 865158 Page 9 of 9
jamb are the source of the mould found in the airborne samples
collected.
Complainant’s expert (PP)
Report
29 - 06 - 2021
Moisture survey
All moisture content checks showed substrate were at the dry
standard fo r the substrate type
Visible mould
Locations where visible mould had previously been identified had
been cleaned and floor to base plate junction had been sealed
Post remediation evaluation - Airborne Mould
The post remediation evaluation criteria in relation to airborne
mould was met in all samples. We have advised RC that we are
satisfied with the results of sampling and that the builders can
proceed to reinstatement.
Complainant’s report (MY)
Report
19 - 04 - 2022
96% of all bacterial orders found throughout the dust in the
home were found under the bottom wall plate, confirming
there has been cross contamination from the original wat er
damage event. Eight water damaged moulds found under the
bottom wall plate were also found throughout the ho me.
cross contamination allowed to occur due to absence of
negative pressure and containment did not occur and likely
exacerbated by high - pressure fans and heaters installed
Complainants report (NS J )
Report
31 - 05 - 2022
PP post remediation evaluation
…the rooms outside of cont ainment were not retested after
remediation and
surface sampling of the wall timber was not done after
remediation
Report from MY
…
comparing the bacterial orders from the contaminated bottom
wall plat e and what was found in the dust throughout the
house confirms that a level of cross contamination has
occurred…confirming that cross contamination from the
bottom plate to the rest of the hous e has occurred and not
been appropriately addressed ruing remediation by the
insurer’s contracto r (PP).
Conclusions
…
After the initial water ingress event, [NS J ] concluded that
deficient assessment has let to inadequate remediation of the
consequential mould and microbial amplification that has
contaminated much of the property