Home / Allianz Australia / Determination 864220
Determination 864220
Insurer reversed approval of repair variation and sought to cash settle remaining building repairs; unpaid accommodation costs; non-financial loss
Summary
The complainant's home building claim for escape of liquid damage was accepted and repairs begun, but the insurer later withdrew approval of Variation 5 and proposed a cash settlement. AFCA found the insurer's position unfair and ordered it to complete the repairs, continue paying temporary accommodation, and pay $4,500 non-financial loss.
The insurer exercised its discretion to repair and could not reverse that decision without agreement or impossibility, and reversing approval months later on no new information breached its duty of utmost good faith.
Issues
- Poor claim handling primary · upheld
“The insurer approved Variation 5 then withdrew this several months later; its position is unfair and inconsistent with the policy.”
- Claim amount dispute secondary · upheld
“The insurer's proposed cash settlement excluded most of the works in Variation 5 and is unfair; the complainant was given substantively insufficient funds.”
- Delay secondary · unclear
“Insurer ceased all works and has not followed through with accommodation costs agreed in August 2021.”
Subjects and remedies
home or building damagepay compensationpay non financial lossrepair or rectify
Text of the determination
Determination
Case number 864220
Financial firm Allianz Australia General Insurance Limited
Determination | Case number: 864220 Page 2 of 7
Case number: 864220 14 October 2022
1 Determination overview
1.1 Complaint
The complainant held a quality care home building and contents policy with the financial firm
(insurer). He lodged a claim for damages caused by escape of liquid.
The insurer accepted the claim and elected to repair the damage. It commenced works and
agreed to emergency accommodation costs covered under the policy.
Throughout the repairs, several variations were submitted by the contractor AJG. This
included the re-stumping of the bathroom and kitchen, which was initially authorised by the
insurer. This was later retracted as the insurer says the kitchen works were not subject to the
insured event.
The insurer is now seeking to cash settle the remaining building repairs it says is covered
under the policy. This included partial costs for re-stumping the bathroom and emergency
accommodation costs over and above the policy coverage.
The complainant is dissatisfied with this outcome. The complainant says the insurer should
cover the costs for the re-stumping to the kitchen as works had already commenced.
Additionally, the insurer should cover further emergency accommodation costs as he is
unable to live in his house and the insurer agreed to do so.
1.2 Issues and key findings
Is the insurer’s position fair ?
No. The available information shows it has acted unfairly, inconsistent with the policy and its
duty of utmost good faith by not repairing the damage it agreed to do so. The insurer should
settle the claim as set out in section 2.1.
Should the insurer continue to pay accommodation costs?
Yes. The insurer agreed to cover the complainan t’s temporary accommodation costs until
repairs were completed. It should follow through with this and as set out in section 2.2.
Should non-financial loss to be awarded?
Yes. The insurer’s claims handling resulted in a significant degree of inconvenience and
interference. The insurer should pay $4,500 in non-financial loss.
1.3 Determination
This determination is substantially in favour of the complainant.
The insure must:
settle the claim related damage in the manner set out in section 2.1
continue to pay the complainant’s temporary accommodation costs as set out in section 2.2.
pay the complainant $4,500 in non-financial loss
Determination | Case number: 864220 Page 3 of 7
2 Reasons for Determination
2.1 Is the insurer’s position fair?
The insurer approved variation 5 then withdrew this several months later
There is no dispute there is a valid claim. To confirm the damages sustained, the insurer
appointed AJG to assess the damages and complete the repairs required.
Throughout the claim, AJG provided several variations. The insurer approved Variations 1 to
4 and they are not in dispute. The dispute is regarding Variation 5.
On 21 September 2021, AJG submitted Variation 5 to the insurer. This included additional
costs for the re-stumping of the bathroom and kitchen and subsequent associated repairs. An
engineer’ s report was provided in support.
The information provided confirms the insurer emailed AJG approving the repairs on 4
October 2021.
The complainant was sent a letter of dispensation to sign on 10 November 2021 for these
works. On 14 December 2021, the insurer completed an internal review of the scope. The
review confirmed the approval for Variation 5 was to be retracted as all the repairs were not
claim related.
The insurer has since ceased all works and is looking to cash settle the remaining damages it
says are covered by the policy.
Insurer’s position is unfair and inconsistent with the policy
The panel has several concerns with the insurer’s position.
First, the insurer maintains Variation 5 was to rectify compliance issues, not to repair resultant
damages. The available information does not substantiate this.
AJG’s email dated 21 September 2021 said it cannot replace the bathroom flooring without
replacing the stumps in both the bathroom and the kitchen. The replacement of the stumps
would then require removal of the kitchen cabinetry, hardwood timber floor and the structural
floor.
There is no dispute replacing the bathroom flooring is part of the claim related repairs.
AJG’s position was supported by an engineering report from IL dated 22 July 2021. IL said a
timber bearer ran north-south across the bathroom room and extended to the kitchen area of
the dwelling. IL found there was non-compliant packing evident between the bearers and floor
joists beneath the kitchen area. This means two stumps in the kitchen would require
replacement.
Based on this, it is clear the resultant damage to the bathroom cannot be repaired without
doing the re-stumping. The two are intrinsically linked. Therefore, excluding the replacement
of the kitchen stumps would mean the resultant damage cannot be repaired. This is not
consistent with the policy.
Second, the insurer exercised its discretion under the policy to repair the damage. It cannot
reverse such a decision except in limited circumstances. This may be when it is not possible
to do the works or the complainant agrees to a cash settlement. Neither is applicable. The
Determination | Case number: 864220 Page 4 of 7
works can be done and the complainant did not agree for the insurer to cash settle the
remaining repairs. Therefore, by leaving the works unfinished, and cash settling the claim, the
insurer is again acting inconsistent with the policy.
Third, this reversal substantively prejudices the complainant. It would be difficult for the
complainant to find another contractor to complete the works the insurer began. The
complainant also lost the opportunity to mitigate his loss by looking at other options, such as
selling his property, if the insurer had sought to cash settle in the first place.
Fourth, the insurer had all the relevant information when it approved Variation 5. Whilst it says
it only reviewed whether the cost is fair and reasonable at the time of approving it, this does
not justify a reversal done several months later. This is because AJG gave it all the relevant
information to explain why the variation was necessary. It is expected that when the decision
to approve the variation was made, the insurer considered all the relevant information. The
fact that it did not do so until several months after approving it speaks of poor industry
practice and is inconsistent with its duty to act with utmost good faith.
Insurer is to complete the repairs
Given all this, the panel notes the following.
The panel accepts the works in Variation 5 are necessary to repair the claim related damage.
Therefore, they must be included.
The insurer exercised its discretion to repair the claim related damage. It should follow
through with this given the damage is repairable and the complainant did not want a cash
settlement. The policy does not allow it to reverse its position.
It is plain the insurer’s proposed cash settlement would leave the complainant unable to
complete the claim related damages given it excluded most of the works in Variation 5. This is
inconsistent with the policy and is unfair.
The insurer made a decision to approve Variation 5 when in receipt of all the relevant
information. It is acting inconsistent with its duty of utmost good faith by reversing this position
several months later and based on no new information.
Therefore, the insurer should complete the repairs to the property. This should include the
scope of works set out in Variation 5 and in its proposed cash settlement, as well as any other
works that may be found to be necessary to repair the claim related damage.
However, this is contingent on the complainant co- operating with the insurer’s request to seek
an exemption for the wall. The panel notes the complainant had wanted the insurer to do the
additional compliance works. The panel does not accept this is reasonable. Such a decision
should rest with the council, not the complainant. That is, if the council refuses the exemption,
then the insurer should be required to do the additional works. Otherwise, it is not required to
do so.
Therefore, if the complainant refuses to assist the insurer in seeking an exemption, the
insurer can cash settle the claim. If a cash settlement is affected, the insurer must include the
full costs in Variation 5 as well as a 25% contingency. The contingency is to factor in the
possibility of variances, the risks of the work transferring to the complainant and the likelihood
the costs have increased in the interim.
Determination | Case number: 864220 Page 5 of 7
2.2 Should the insurer continue to pay accommodation costs?
Insurer to pay complainant’s accommodation costs until repairs are completed
The complainant is seeking further costs. He says the insurer agreed to emergency
accommodation costs until repairs were completed and the insurer’s actions have left him
with an unliveable property.
The insurer said it paid the complainant his policy entitlements on 26 April 2021. The insurer
then paid an additional $65,178.43 outside the policy limits.
The panel notes the insurer’s email to the complainant dated 9 August 2021 offered to cover
his temporary accommodation costs until the repairs were completed. This offer was done
despite the insurer already having paid out the policy limit. The complainant accepted this
proposal although had sought an additional amount to that initially offered, which the insurer
agreed to.
This supports the complainant’s position the insurer a greed to cover the temporary
accommodation costs until the repairs were completed and regardless of the limit. It appears
the insurer has failed to follow through with this agreement based on its incorrect position that
it was not liable for Variation 5. This is not a fair basis for the insurer to resile from its position.
Given this, the panel accepts it is fair the insurer should be paying all of the temporary
accommodation costs incurred by the complainant until the insurer has completed the repairs.
How ever, the insurer’s liability to pay any temporary accommodation costs incurred after this
determination is conditional on the complainant providing the insurer with reasonable
assistance to complete the claim related repairs.
If this claim is ultimately cash settled because the complainant refuses to assist the insurer in
applying for an exemption, then temporary accommodation is only payable until 12 weeks
have passed after the insurer issues the final cash settlement as set out in section 2.1. This is
because the panel considers 12 weeks should be sufficient to do the remaining works the
cash settlement would be based on.
2.3 Should non-financial loss to be awarded?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
The complaint was handled in a manner that warrants compensation
The panel does not accept the insurer has handled the claim reasonably.
The available information shows the insurer elected to repair the claim related damage and
begun works. It then reversed its position in circumstances which were unfair and inconsistent
with the policy, good industry practice and its duty of utmost good faith.
Determination | Case number: 864220 Page 6 of 7
It is clear this resulted in a significant degree of inconvenience and interference to the
complainant. He was left in a vulnerable position where he had a bathroom and toilet both
unavailable. He was given substantively insufficient funds to repair the claim related damage.
He had to arrange temporary accommodation whilst disputing the insurer’s position and in
circumstances when he had exhausted his policy entitlements. He had to dispute the insurer’s
position in circumstances when he should not have had to do. He could not use his property
or mitigate his loss in a meaningful way.
Based on all this, the panel accepts it is fair in all the circumstances the insurer pays the
complainant $4,500 non-financial loss.
Determination | Case number: 864220 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.