Home / IAG / Determination 864195
Determination 864195
Storm damage to asbestos roof declined as wear and tear; faulty 2006 roof repairs
Summary
The complainant claimed storm damage to the asbestos roof after a June 2021 storm and alleged the insurer's 2006 repairs were faulty. AFCA accepted that wear and tear excluded the roof damage, but ordered the insurer to increase the cash settlement for accepted damage and to arrange an assessment of the 2006 repairs, rectifying them if non-compliant.
The complainant bears the onus to prove storm causation, and the expert reports showing age and deterioration were more persuasive, while an insurer carrying out repairs impliedly warrants their sufficiency.
Issues
- Claim denial primary · not upheld
“I am satisfied on balance, the damage is due to wear and tear, which is excluded under the policy.”
- Claim amount dispute secondary · upheld
“It is fair in the circumstances given the substantial increase in building costs that the insurer increases the cash settlement to $5,430.09.”
- Repairs or contractors secondary · upheld
“It is fair in the circumstances that the insurer arranges a further assessment to determine if the repairs to the roof completed in 2006 met the relevant building standards at the time.”
Subjects and remedies
home or building damagenatural disasterpay claimreassess claimrepair or rectify
Text of the determination
Determination
Case number 864195
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 864195 Page 1 of 8
Case number: 864195 16 September 2022
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (insurer). A claim was
lodged for damage to the pergola, TV aerial, window adjacent to the pergola and roof,
following a storm event on 9 June 2021.
The insurer accepted the claim for damage to the pergola, TV aerial, window adjacent to the
pergola and damage to the dining room and offered to settle the damage for $4,895.66. It
declined the claim for damage to the asbestos roof and says the damage is not due to the
storm but wear and tear, which is excluded under the policy.
The complainant maintains the roof was damaged by flying debris during the storm. The
complainant also says the damage was exacerbated due to faulty/ roof repairs from 2006 that
had been performed by the insurer.
1.2 Issues and key findings
Has the complainant established a valid claim for damage to the roof?
No. There is no dispute debris may have impacted parts of the asbestos roof during the storm
however, the available information indicates the damage is due to age and deterioration. I am
satisfied on balance, the damage is due to wear and tear, which is excluded under the policy.
Is the insurer liable to rectify faulty repairs from 2006?
It is fair the insurer arranges a further assessment to determine if the repairs to the roof
completed in 2006 met the relevant building standards at the time. If not, then it is fair the
insurer rectifies the repairs.
Why is the outcome fair?
As the policy does not cover liability for damage due to wear and tear, it is fair for the insurer
to rely on the terms and conditions of the policy to decline the claim. However, given the
issues from 2006 it is fair the insurer arranges a further assessment to determine any further
liability. Further as the insurer has not cash settled the accepted damage it is fair to increase
the cash settlement to allow for possible contingencies.
1.3 Determination
The determination is substantially in favour of the insurer. Within 14 days of the complainant’s
acceptance of this determination the insurer is to:
arrange a suitably qualified expert to determine if the repairs to the roof in 2006 met
relevant building standards of the time. If not, the insurer is to rectify the repairs.
Cash settle the accepted damage for $5,430.09 being the assessed damage at $4,895.66
plus a 15% allowance for contingencies less the $200.00 excess.
Otherwise the insurer is entitled to rely on the terms and conditions of the policy to decline the
claim for damage to the asbestos roof.
Determination | Case number: 864195 Page 2 of 8
2 Reasons for determination
2.1 Has the complainant established a valid claim for damage
to the asbestos roof?
No. While there is no dispute debris may have impacted parts of the roof during the storm on
9 June 2021, the available information indicates the damage is due to age and deterioration. I
am satisfied on balance that the damage is due to wear and tear, which is excluded under the
policy.
Complainant bears onus to establish valid claim under the policy
It is established insurance law that an insured has the initial onus to prove, on the balance of
probabilities (that is more likely than not) that the loss or damage claimed falls within the
terms of the policy. This is commonly known as a prima facie claim.
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘Storm’ subject to the conditions, limitations and exclusions
specified in the product disclosure statement (PDS).
There is no dispute that a severe storm impacted the complainant ’ s home on 9 June 2021.
Damage to the pergola, TV aerial, window adjacent to the pergola and water damage to the
dining room ceiling has been accepted. The insurer offered a cash settlement of $4,895.66
less a $200 excess. While the complainant has accepted the offer the cash settlement has
not been paid. It is fair in the circumstances given the substantial increase in building costs
that the insurer increases the cash settlement to $5,430.09 being the assessed damage at
$4,895.66 plus a 15% allowance for contingencies less the $200.00 excess.
The remaining damage remains in dispute. The complainant says that during the storm,
debris from the pergola and surrounding area impacted the asbestos roof and as a result the
roof needs to be replaced. The onus is on the complainant to prove the damage was most
likely caused by the storm event.
Conflicting reports as to cause of damage to asbestos roof
The insurer appointed builder JPF to attend the property on 26 June 2021. JPF identified that
the pergola beam and Colourbond roof flew off due to the wind with damage to the asbestos
roof sheets. The antenna required replacement and the window below the pergola smashed
due to a beam that fell from the pergola. JPF noted the following damage:
Water leak in living room plaster ceiling dropped
Water leak in master ensuite ceiling dropped
Pergola frame damaged
Pergola Colourbond roof damaged
Antenna broken
Glass window smashed
Asbestos roof damaged in multiple areas.
JPF recommended a roof report be obtained to determine the cause of the leaks and the
asbestos roof damage. A roofing report was obtained from ‘NLD’, who attended the property
on 28 July 2021.
NLD says water ingress damage to the dining room is likely a result of the join in the roof
sheets which are allowing heavy wind forced rain to enter inside. Water ingress damage to
Determination | Case number: 864195 Page 3 of 8
the bathroom is likely a result of a cracked seal around the flue which causes water to flow in
when it rains.
NLD considered due to the age and deterioration of the asbestos roof, a full roof replacement
was required. NDL considered cracks and crevasses were starting to appear on the roof, the
fixings were deteriorating and there were multiple patched holes that were unrelated to the
storm.
The insurer later appointed engineer ‘C’, who attended the insured property on 27 September
2021C was unsure whether the damage to the roof is covered under the policy given there is
long-term maintenance issues and signs of wear and tear.
C noted lead flashings around the silicon joints are in poor condition and highlights the
separation of silicon joints which confirms historical repairs and ongoing maintenance issues.
The complainants builder ‘BSC’, reported on 6 June 2022 that the roof was in below average
condition prior to the storm but otherwise watertight. He considered repairs completed by the
insurer in 2006 were not compliant with current standards and the profile of the corrugated
metal sheet did not match the profile of the asbestos roof. He considered the weather event is
the predominant cause of the damage which was exacerbated by previous repairs.
Reports from NLD and C more persuasive
Having considered the reports provided by and relied on by both parties, I found the reports
provided by NLD and C to be detailed and persuasive.
BSC says the works do not comply with Australian Standards, however does not provide
further detail. BSC refers to 2018 standards when 2006 standards applied at the time of
repair. It is unclear how the previous repairs do not comply with standards or have contributed
to the current damage.
The photographs supplied by C and NLD depict a roof which is worn. Gaps in roof sheets are
clearly visible, as is growth in gutters. This supports a view the roof is not maintained and has
deteriorated over time. NLD detailed various faults with the main roof including:
Multiple holes patched with foil tape.
Cracks and crevices beginning to appear on roof.
Poorly maintained and damaged gutters with overgrowth on the roof.
Blocked gutters on the right-hand side.
Cracks and deteriorated silicone around fixings.
Sewer vent not sealed.
Rotted facia board.
Pre-existing water ingress damage to bathroom.
I am satisfied, based on the available information, that most likely the damage to the asbestos
roof was caused by wear, tear and gradual deterioration which is excluded under the terms of
the policy. I am not satisfied the complainant has shown the damage to the asbestos roof is
storm related. I am not satisfied the complainant has shown the damage to the roof is from a
single event.
2.2 Is the insurer liable to rectify faulty repairs from 2006?
It is fair the insurer arranges a further assessment to determine i the repairs to the roof
completed in 2006 met the relevant building standards at the time. If not, then it is fair the
insurer rectifies the repairs.
Determination | Case number: 864195 Page 4 of 8
No dispute roof damaged in 2006
The complainant has been insured with the insurer since 2001 and lodged a claim for storm
related damage following a storm on 25 December 2006.There is no dispute the asbestos
roof was damaged in 2006.
As indicated above the complainant’s builder ‘BSC’ considered previous repairs completed by
the insurer in 2006 were not compliant with current standards and the profile of the
corrugated metal sheet not matching the profile of the asbestos roof.
The insurer has provided a copy of its summary claim notes that confirm storm damage to the
property in 2006. Tree debris was identified to be the likely cause of a fist size hole in an
asbestos roof sheet with the potential to allow further water ingress/resultant damage.
Temporary emergency repair to cover hole, pending proper repair was arranged through JPF.
JPF was to report further once its roofer had attended. It was identified that a revised scope
of works might be required if the assumed simple repair could not be undertaken.
I accept that the complainant was not aware the repairs may have only been temporary
repairs and may have been non-compliant until receiving the summary of claim notes and
BSC report. The complainant says that after the temporary repairs were completed he heard
no more from the insurer. It is unclear if he contacted the insurer or if a roofer attended to
assess the repairs.
Fair for insurer to arrange further assessment of the roof
The insurer did not arrange a further assessment of the roof. In response to the complainant it
says it is not responsible to prove its repair was done correctly. I disagree. As part of a repair
process there is an implied warranty that the repairs are sufficient to place an insured in the
position that existed prior to the claim. If an issue arises as to the quality of repairs, it is
reasonable that an insurer will investigate that issue.
The report from BSC indicates issues with the previous repairs. While the report refers to a
2018 standard rather that 2006, it also refers to the corrugations on the sheeting not
matching. Even though this issue does not appear to have been raised for nearly 16 years, if
the repairs are faulty it is fair that the insurer rectify the repairs. It is understandable given the
sixteen years since the event that the insurer is no longer able to access reports from that
time.
It is fair in the circumstances that the insurer arranges a further assessment to determine if
the repairs to the roof completed in 2006 met the relevant building standards at the time. If
not, then it is fair the insurer rectifies the repairs.
2.3 Why is the outcome fair?
There is no dispute that a severe storm impacted the complainants home on 9 June 2021.
Damage to the pergola, TV aerial, window adjacent to the pergola and water damage to the
dining room ceiling caused by a leak has been accepted. It is fair, that this damage be cash
settled as agreed between the parties. The insurer offered $4,895.66 less a $200 excess. It is
fair to allow a 15 % increase on the assessed cost of repairs to allow for contingencies given
the current circumstances with supply chains and building costs. It is fair the insurer increases
the cash settlement to $5,430.09 to allow for a 15% allowance for contingencies less the
$200.00 excess.
Determination | Case number: 864195 Page 5 of 8
The policy does not cover liability for damage due to wear and tear and it is fair for the insurer
to rely on the terms and conditions of the policy to decline the claim. It is fair however given
the issues from 2006 that the insurer arranges a further assessment to determine any further
liability.
Determination | Case number: 864195 Page 6 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Key points from relevant expert material
Date Key points
Builder asse ssment report 26 June 2021 Builder JP F appointed .
Complainant advised due to heavy winds and rain
which occurred on date if loss, rain leaked from
multiple areas causing internal leaks in living room
and master ensuite.
Caus e of damage to identified as heavy winds and
rain which occurred on date of loss.
Defects and maintenance issues; Structural
movement in property, multiple cracks throughout
home and maintenance issues throughout home.
Roof Asse ssment Report (NLD) Builder NLD appointed to assess roof.
Determination | Case number: 864195 Page 7 of 8
28 July 2021 Roof type is asbestos .
Condition of roof is poor .
Storm created opening evident .
Caus e of leak to dining room; Join in the sheets
allowing heavy wind forced rain to enter .
Caus e of leak to bathroom; cracked seal around flue
above the leak is the likely cause.
6 pergola rood laserlite sheets blown off .
Conclusion drawn; Due to Age and deterioration of
the roof, a full re - roof with new dektites around flues
and full - length roof sheets will be required to prevent
further leaks. The asbestos will pose minimal health
hazards as it continue s to degrade.
Multiple holes on roof patched with foil tape.
Fixings to asbestos roof are starting to deteriorate.
Engineering Report (C)
27 September 2021
Engineer C appointed to assess the structural
integrity of the property .
The dwelling comprises a timber floor with cavity,
timber weatherboard, plasterboard linings and
asbestos roof sheeting.
The house was constructed circa 1960s .
Internal damage identified to be water coming
through the combined exhaust fan and light in the
hallway .
The plaster around the fan has severe deterioration
and patchwork that pre - dates the claimed event.
Roof damage identified to be lead flashings around
the roof penetrations being in poor condition and
separation of silicon joints which confirms historical
repairs and ongoing maintenance issues.
Inspection Report (BSC)
6 June 2022
Condition of the roof sheeting is below average;
however, is BSC’s opinion that the roof was water
tight prior to the weather event.
Noticeable repairs to the ACM (asbestos containing
material) roof sheeting.
Repair attempts from previous claim (December
2006) to repair the roof from a weat her event.
Repair works completed in previous repair over the
dining room and non - compliant as it does not meet
NCC Volume 3 and Australian Building Standard
1562.1:2018 .
Repairs are det eriorating, and inadequate fixing
have been us ed to secure the metal roof sheeting
used in the repair.
Standard corrugated metal roof sheeting was used
for the repair and does not match the profile of ACM
roof sheetin g and caused the water ingress to the
property.
Determination | Case number: 864195 Page 8 of 8
During a weather event the veranda polycarbonat e
roof sheeting and part of the structure have lift ed
and landed on the existing roof causing damage to
the ACM roof sheeting over the dwelling.
BSC opinion th at the weather event is the
predominant cause of the damage and was
exacerbated by previous repairs to the roof.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.