Determination 863965
Storm damage home claim: cash settlement scope and quotation dispute, water ingress after inadequate securing, mould
Summary
The individual complainant's storm-damaged home claim was disputed over repair scope, quotations and mould. AFCA found the insurer failed to adequately secure the property, ordered an up to date quotation and a $1,000 non-economic loss payment, and allowed cash settlement with a 15 per cent uplift.
The insurer failed to adequately secure the premises, causing further water ingress, and the existing quotations required updating to reflect further damage and mould, while the policy does not require a kit home rebuild.
Issues
- Claim amount dispute primary · unclear
“Insurer to obtain an up to date actionable quotation; scope and quotation disputed; cash settlement at complainant's discretion with 15 per cent uplift.”
- Poor claim handling secondary · upheld
“I am not satisfied that the insurer adequately attempted to secure the premises and had that been done there would have been less ingress of water.”
- Repairs or contractors secondary · not upheld
“Insurer is to obtain up to date scope of works including mould assessment; mould reports conflicting, insufficient information to show mould condition.”
Subjects and remedies
home or building damagenatural disasterpay non financial lossreassess claim
Text of the determination
Determination
Case number 863965
Financial firm AAI Limited
Determination | Case number: 863965 Page 2 of 7
Case number: 863965 30 September 2022
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy for her house. The house was
substantially damaged by a storm in June 2021. The property was damaged by the ingress of
water and the complainant says that the insurer failed to adequately secure the property in a
‘ make good ’ and as a result further water has entered the property. A dispute has arisen over
the amount and extent of repairs that are required to the premises. The complainant has
obtained their own scope of works from a repairer and the insurer has provided one from its
own repairer.
The complainant has also provided details of mould damage.
1.2 Issues and key findings
Is the insurer entitled to cash settle based upon its current scope of works and
quotation?
On the information provided to me I’m satisfied as follows:
there is insufficient information provided to show the mould condition of the property
it is likely that the scope of works and quotation obtained by the insurer is now out of date
the complainant is not entitled to a new kit home
the insurer is to obtain an up to date quotation and scope of works.
This determination is partially in favour of the complainant. The insurer is to obtain an up to
date quotation for the repairs to the property. The scope of works is to take into account any
further damage that has occurred due to the failure of the covering provided to the roof. The
insurer is to obtain an actionable quotation for repairs which can be commenced within 12
weeks of acceptance of this determination.
At the discretion of the complainant, the matter may be cash settled and the insurer is to pay
a further 15 per cent uplift to cover contingencies and loss of lifetime guarantee.
Is the complainant entitled to non-economic loss?
In the circumstances I am satisfied that the insurer failed to adequately secure the premises
and as a result further ingress of water has occurred.
The insurer says that it has now secured the property, and that because it was close to the
sea it was difficult to secure. I am not satisfied that the insurer adequately attempted to
secure the premises and had that been done I accept that it is likely there would have been
less ingress of water.
In the circumstances it is appropriate that the insurer pays $1,000 non-economic loss.
Why is the outcome fair?
The complainant has been given sufficient time to provide further information in response to
the matters raised by the insurer. Whilst I am sympathetic to the complainant, the process
that has been set out in this determination provides the complainant with the opportunity to
Determination | Case number: 863965 Page 3 of 7
either have the property repaired by the insurer or to obtain a cash settlement and obtain her
own repairer.
It would be unfair to require the insurer to compensate the complainant further.
1.3 Determination
This determination is partially in favour of the complainant.
Upon acceptance of this determination the insurer is to:
obtain an up to date scope of works and actionable quotation for repairs by a repairer who
can commence the work within 12 weeks
the quotation is to also provide a scope of works and quotation in respect of mould
remediation.
the insurer is to pay the complainant $1,000 non-economic loss.
Should the complainant want to cash settle this matter the insurer is to pay an uplift of 15 per
cent to cover contingencies and loss of guarantee.
Determination | Case number: 863965 Page 4 of 7
2 Reasons for determination
2.1 Is the insurer entitled to settle based upon its current scope
of works and quotation?
The complainant suffered damage to her property in a storm in June 2021 when the roof blew
off her house. Subsequently there was water ingress and a partial failure of the insurer to
maintain the make good.
A dispute has arisen between the parties as to the appropriate matter of settling this matter.
The complainant has suggested that they should be entitled to be compensated to the extent
of being allowed to rebuild the property with a kit home.
I am not satisfied that the insurer is required to pay such sum. There is no provision in the
policy that provides this obligation on the insurer
The insurer has obtained an actionable quotation for repairs dated February 2022. This
quotation is in the sum of $177,861.20 and has subsequently offered the sum of $195,647.32
which it says is fair and reasonable in the circumstances.
The complainant has obtained their own quotation for repairs in the sum of $225,200.40 from
RG.
The complainant’s quotation states that the building can commence within 12 weeks,
however the quote also refers to the increment in cost of materials at the current time with an
indication that it is likely to rise.
The insurer has referred to the PDS in the following way:
How we settle building claims
If we agree to pay a claim for loss, theft or damage to the building, we will decide if we will:
• repair damage to the building;
• rebuild the building;
• pay you what it would cost us to repair or rebuild the building;
•
***
What we do not cover - general exclusions (cont’d)
You are not covered under any section of your policy for damage, loss, cost or legal liability that is
caused by, arises from or inv olv es:
…
Consequential losses or extra costs following an incident covered by your policy consequential
loss (financial and non-financial loss) or extra costs following an incident covered by your policy,
such as:
• loss of income or wages;
• medical expenses;
• loss or costs, including the cost of your time (e.g. inconv enience), to prov e your loss or to help us
with your claim (e.g. telephone calls, postage);
• cost of hiring appliances after yours suffer loss or damage;
• professional, expert, legal, consulting or v aluation costs unless you obtained our prior written
authority to incur these costs;
Determination | Case number: 863965 Page 5 of 7
• cost of replacing or reapplying pest control chemicals and baits in or around the insured
address;
• cleaning costs;
• any costs related to stress or anxiety;
• any costs not covered by your policy.
…
Changes to the building
If you want to change the design of the building
W hen repairing or rebuilding the building, if we agree, you can choose to change the design of
the building or upgrade parts of it, providing you pay the extra costs of doing this. If you want to
downsize the building for less cost than you are entitled to claim, we will not pay more than it costs us
to rebuild
the downsized building.
…
Lifetime guarantee on building repairs
W hen we repair or rebuild the building, we guarantee the quality of materials and workmanship of that
work for the lifetime of the building if we:
• authorise;
• arrange; and
• pay the builder or repairer directly for this work.
What we guarantee
We guarantee the material used and standard of the workmanship to be free of defects. If a
defect arises in the lifetime of the building as a result of poor quality workmanship or use of incorrect
materials, then we will rectify the problem. It is a condition of our guarantee that we reserve the right
to decide
who will undertake the rectification work.
Insurer to obtain an up to date actionable quote for the repairs
I am not satisfied that the current quotations in relation to the property would now be
inaccurate, given the passage of time. The complainant is concerned that the timber in the
property has suffered further damage due to the ongoing ingress of water.
The insurer is to obtain an up to date actionable quotation for repairs, taking into account any
further damage which may have occurred during the period that the property was not properly
secured. The quotation is to include a report by a suitably qualified mould expert, who should
provide a scope of works in relation to mould remediation.
The quotation is to contain confirmation from the builder that work will commence within 12
weeks.
I’m satisfied that there has been a breakdown in the relationship between the parties.
In that these circumstances, the complainant may request a cash settlement of the claim and
if that request is made the insurer is to pay a further 15 % to cover contingencies and loss of
guarantee.
Determination | Case number: 863965 Page 6 of 7
Mould remediation
The complainant has provided information and a report by D dated July 2022 in relation to the
mould remediation. D says that the level of mould is at grade 4 and quoted $28,000 to resolve
the issue.
The insurer has provided a report by MS, dated 3 December 2021, which says that all mould
can be removed by the builder
I am not satisfied that these reports provide sufficient information to show an accurate extra
assessment of the work required as a result of the mould in the premises. The insurer has
provided an assessment with an indication that the premises can be adequately repaired,
whilst D’ s report indicates a need for drying and further assessment.
However, I am concerned about mould in the premises and as a part of the scope of works
the insurer’s builder is to confirm that a mould assessment has been undertaken and that any
action required from that assessment has been included in the scope of works.
It is noted that the repairs to the property cannot commence until the flooring stumps have
been repaired. This is the responsibility of the complainant.
If the complainant does not choose to invoke a cash settlement, the insurer and the
complainant are to work together to establish a process for these repairs to be completed
prior to the commencement of the scope of works. If a satisfactory arrangement cannot be
agreed within six weeks of acceptance of the determination the insurer is entitled to cash
settle which is to include the uplift of 15 %.
Is the complainant entitled to non-economic compensation?
AFCA will only award compensation for non-financial loss where there has been an unusual
amount of:
physical inconvenience
time taken to resolve the situation
i nterference with the complainant’s expectation of enjoyment or peace of mind.
In assessing whether to compensate for non-financial loss, AFCA expects complainants to:
be moderately robust
bear the normal degree of inconvenience experienced when a problem occurs, and
take reasonable steps to minimise the inconvenience suffered.
In the current circumstances I am satisfied that the insurers failure to adequately secure the
property resulted in further ingress of water. I am also satisfied that the complainant has been
affected by the time taken to resolve a situation and has interfered with the complainant’s
expectation and enjoyment or peace of mind.
In the circumstances an adequate compensation is $1,000.
Determination | Case number: 863965 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Briefly describe the complaint between the complainant and financial firm. Using your own
words, explain the relationship between the parties and what has gone wrong. If there are
several matters, such as multiple accounts, claims or investments, consider using bullet
points or a simple table.