Insurer's liability for additional damage to driveway, tap, hose reel and fence during repairs after tree fall, plus delays and claims handling

FirmIAG
Decided2023-05-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$20,000
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

A tree fell on the complainants' property and repairs by the insurer's contractors were delayed and allegedly caused further damage. AFCA ordered $20,000 towards the driveway, $3,000 non-financial loss and completion of the boundary fence repair, rejecting the tap and hose reel claims.

Contractors' machinery most likely accelerated driveway damage on a deteriorated surface so a one-third apportionment was fair, while tap and hose reel damage was not shown, and delays justified non-financial loss under Rule D3.3.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 863961 Financial firm Insurance Australia Limited Determination | Case number: 863961 Page 1 of 8 Case number: 863961 14 April 2023 1 Determination overview 1.1 Complaint The complainants lodged a claim on 2 November 2018 on the Home and Contents policy held with the financial firm (insurer) after the property was damaged by a fallen tree. The initial damage was identified to the boundary fence and electricity supply. However, further damage arose during the repairs and associated delays. The current dispute relates to damage caused to:  a driveway by machinery used in the repair process  damage to a leaking tap  damage to a retractable hose reel  damage to a boundary fence. The complainant also seeks compen sation associated with the delays and the insurer’s claims handling. 1.2 Issues and key findings Is the insurer liable to contribute to the cost to repair the driveway? Yes. Although the driveway had pre-existing damage, the use of machinery during the repair process to the property has most likely caused additional and accelerated damage. In the circumstances, I consider it fair that the insurer pays $20,000 being one third of the cost incurred towards the cost of repairs Is the insurer liable for the repair of the leaking tap? No. There is no evidence that the tap was damaged by the builders during the repair process. Is the insurer liable for the damage to the retractable hose reel? No. Based on the available evidence, the insurer has already provided the complainant with a voucher to cover the cost of replacement of the hose reel. Is the insurer liable for the repair of the boundary fence? Yes, the insurer has accepted liability for the installation of a new metal chain wire fence. Are the complainants entitled to compensation for non-financial loss? Yes. Given the delays in the communication and repairs since lodgement of the claim on 2 November 2018, I consider an award of $3,000 compensation for non-financial loss is fair. Why is the outcome fair? The outcome is fair as based on the available information, additional damage was caused to the complainants’ driveway, although it is accepted that the driveway was in a deteriorated condition. Determination | Case number: 863961 Page 2 of 8 1.3 Determination This determination is substantially in favour of the complainants. Within 14 days of the complainants ’ acceptance of this determination, the insurer is to pay the complainants:  $20,000 as contribution to the driveway  $3,000 compensation for non-financial loss in accordance with AFCA Rule D3.3 The insurer must also appoint a builder to complete the repairs to the boundary fence as accepted. The insurer is otherwise entitled to deny liability for the balance of the complainants’ claim. Determination | Case number: 863961 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer liable to contribute to the cost to repair the driveway? Yes. The insurer should contribute $20,000 being one third of the cost of repairing the driveway. The complainants have the onus to establish the claim within the terms of the policy It is established insurance law that an insured person has the initial onus to prove on the balance of probabilities (that is more likely than not) that the loss or damage claim falls within the terms of the policy. The complainants’ policy is a Home and Contents policy that provides cover for a series of insured events including impact damage and storm related damage subject to several conditions and exclusions. Circumstances of the claim It is not disput ed that the complainants’ property was impacted by a falling tree. According to the exchanged information on 2 November 2018, the complainants contacted the insurer after a neighbour’s tree fell across their property. The initial claim lodgement identified damage to a boundary fence and electrical wires requiring the complainants to move to temporary accommodation. No other damage was identified on lodgement of the claim, although it is apparent from the insurer’s contact notes that there was damage to retaining walls. The contact notes confirm there were significant delays in completing any required repairs. There were issues raised with the make safe completed by the insurer’s builder, the method of repair and the scope of works. It is also clear that there were issues with communication from the insurer’s builder and the insurer regarding the scope of works. Issues also arose with the completed works and the insurer eventually appointed an engineer to assess the extent of damage. Repairs had not been completed by March 2020 with the rectification of the repairs then being delayed by the advent of Covid 19. Extensive repairs were required to retaining walls and during the repair process, further damage caused by the extreme weather. Engineers reported damage to the car park area caused by machinery. In November 2021, the complainants informed the insurer that there was additional damage to the driveway, with the driveway shoulder having been damaged by the insurer’s trades, a dripping tap caused by the trades and damage to a retractable hose reel, again caused by the insurer’s trades. The complainants say the property has three driveways. Driveway three is not used and is not an issue. Driveway two is used to get to the garage and was not used by the insu rer’s builders and has not suffered damage. Driveway one was used by the insurer’s contractors and it is this driveway that has been damaged. Determination | Case number: 863961 Page 4 of 8 The complainants say that due to the works contractors use of the driveway to access the site during periods of heavy rainfall, further damage has been sustained to the driveway. The complainants believe the driveway degradation accelerated during the construction period, raising concern as to the long-term future of the driveway. Engineering reports indicate the driveway had deteriorated The insurer initially obtained an engineering report from SCE in September 2020. SCE in its initial report confirmed there was pavement damage to the bitumen paved driveway and car park bay, most likely caused because of crane usage. Based on this report, the insurer cash settled the claim for the damage to the car park area for $22,000. A second report was obtained from SCE on 29 October 2021 following claims of additional damage caused by the insurer during constructions work. SCE considered damage patterns on the driveway were consistent with defective original design, construction and long-term wear and tear. Photographs provided indicate non-compliant thickness to the asphalt tarmac based on the Australian standards. Photographs of the leaking tap showed no change in the tap direction or impact related damage with the leak considered consistent with wear and tear and not caused by construction works. Photographs of the retractable hose reel indicate it was in poor condition prior to commencement of repair works. SCE noted the retractable spring mechanisms were known to fail with age and did not consider the damage related to the constructions works. A further engineering report was obtained from IE dated 13 September 2022. The report is detailed and notes as follows:  Over the years the complainant had patched pot holes along the driveway surface  Contractors were using the steep and narrow driveway to the complainants’ property and the complainants noticed the deterioration of the dr iveway with some shoulder points breaking off  The insurer’s contractor R had patched a curved driveway edge adjacent to the upper parking bay IE concluded that the steep section of the driveway was in a deteriorated state, widespread cracking affecting the surface. Other parts were found to be loose and partially detached. A review of the documentation provided indicated the driveway surface was in a deteriorated state prior to the commencement of works, and it is likely that parts of the surface such as the outer edges of the driveway may have worsened during these works. IE was not able to establish which parts of the driveway had been wholly damaged by R and their sub-contractors. R by applying concrete to the affected areas has only provided a short- term solution which is likely to deteriorate further especially after periods of rainfall. IE noted that the insurer should allow for the installation of a new metal chain wire fence on the northern boundary. The hose reel was aged, and IE could not confirm if this spring tension mechanism had failed because of its use by contractors. There was no physical damage to the external garden tap and it was unlikely the leaking tap because of the contractors use. The complainant provided an engineering report from FE. FE noted as follows:  significant defects and a range of remedial works, some concrete, some bitumen to the section of pavement from the upper level car space to the top of the retaining wall Determination | Case number: 863961 Page 5 of 8  concrete and bitumen remedial type works had been undertaken in an adhoc manner. This method of remedial repairs was not adequate and would only attract further degradation  the current extent of concrete and bitumen defects did not exist before the remedial works.  FE concluded that most of the defects have occurred because of high traffic volume during the excessive rainfall periods and that 80% of the defects to the relevant area appeared to be directly attributed to construction traffic. The insurer provided a further desktop review from IE in response to FE’s report. IE noted:  photographs captured prior to the commencement of damage identified damage similar to what was observed during their first inspection in August 2022  there was no supporting evidence to substantiate damage to the driveway had worsened during the construction works  a bitumen sealed driveway surface in the environment observed will have a finite life and require continual maintenance to prevent runoff erosion  the driveway would have performed as intended during the construction works  if the driveway was not in a deteriorated state prior to the works, damage to the driveway is unlikely to have happened during these works. Insurer liable to contribute to the cost of the driveway repairs Having reviewed the various engineering reports and the dilapidation report provided by DWK, I am satisfied that the driveway was in a deteriorated state prior to the commencement of works. I am satisfied however that most likely the use of construction vehicles on the site has accelerated the damage to the driveway resulting in the need for more extensive remedial works. Neither party provided any assessment of the extent of the remedial works required. FE has indicated that the remedial works performed were inadequate and that a much greater area than the outline of each patch must be removed to create a capable long-term repair. FE estimated 80% of the damage associated with the construction works. I do not accept that the construction works contributed to 80% of the overall deteriorated condition of the driveway. I accept based on the information provided that it is likely there was further deterioration to the driveway caused by the construction works. In these circumstances, I consider it fair that the insurer contributes to the cost of completing those repairs. The complainants have advised that they have now had the driveway repaired as quoted by JD for $60,000. In repairing the driveway, they have fixed the pre-existing issues as well as the damage associated with the construction works. In the absence of any precise breakdown of the damage which I accept would be difficult if not impossible to achieve, I consider it fair to apportion one third of the remedial work required to damage from the construction works and two thirds to wear, tear and gradual deterioration. Based on the quote from JD of $60,000, I consider it fair that the insurer contributes $20,000 to those costs being one third of the costs of repairs. 2.2 Is the insurer liable for the cost to repair the leaking tap? No. Based on the available evidence, the insurer has already provided the complainant with a voucher to cover the cost of replacement of the hose reel. Determination | Case number: 863961 Page 6 of 8 No evidence of damage to the tap The complainants say that in using the tap, the insurer’s trades have damaged the tap causing it to leak. The insurer’s engineer inspected the tap and found there was no observable damage to the tap and that most likely, the leak was caused by general wear and tear. No other evidence has been provided to establish the leak was caused by an action of one of the trades people. In the circumstances, and in the absence of any additional information, I am satisfied that the insurer is not liable for the cost to repair the leaking tap. 2.3 Is the insurer liable for the damage to the retractable hose reel? No. Based on the available evidence, the insurer has already provided the complainant with a voucher to cover the cost of replacement of the hose reel. Insurer has settled claim for retractable hose The complainants say that the hose reel was da maged by the insurer’s trades and that the spring mechanism no longer works. There is no dispute that the insurer’s trades had used the hose when working at the property. IE confirmed he could not say whether the spring mechanism had been damaged by the in surer’s trades but noted the hose reel was aged and that the spring mechanism is likely to fail with age. Having reviewed photographs of the hose mechanism, I accept that it was aged and in a deteriorated condition. The complainants have provided no persuasive evidence to indicate the hose reel was damaged by the insurer’s trades. The insurer however has accepted liability for the hose reel. Available information indicates the insurer provided a voucher to cover the costs of replacement of the hose reel. Although the complainants say that they have not been cash settled for the hose reel, I accept based on the information provided by the insurer that they have met their liability under the terms of the policy. 2.4 Is the insurer liable for the repair of the boundary fence? Yes, the insurer has accepted liability for the installation of a new metal chain wire fence. Boundary fence was damaged in the event There is no dispute that the north boundary fence was damaged. The insurer has indicated that it accepts liability for the damage and it had instructed its builder to complete the repairs. According to the complainants, the repairs have not been completed nor has the cost of repairs been cash settled. The insurer has provided no information to dispute this. In the circumstances, I consider it fair that within 14 days of the complainants’ acceptance of this determination, the insurer appoints a builder to complete the repairs to the damaged boundary fence. Determination | Case number: 863961 Page 7 of 8 2.5 Are the complainants entitled to compensation for non- financial loss? Yes, the complainants have suffered an unusual degree of inconvenience and time taken to resolve the situation. In the circumstances, I consider compensation of $3,000 for non- financial loss fair. AFCA can award compensation for non-financial loss Under AFCA Rule D3.3, AFCA can award compensation for up to $5,400 for non-financial loss where a complainant suffers an unusual degree of physical inconvenience or time taken to resolve the situation or interference with their enjoyment or peace of mind due to an insurer’s claims handling. AFCA takes a conservative approach to the award of compensation and recognises that all claims, involved a degree of inconvenience and stress. Complainants have suffered an unusual degree of physical inconvenience A review of the insurer’s claim notes indicate that the claim was first lodged in November 2018. Despite this, it appears that only limited repairs were completed. The claim notes reveal considerable delays in the attendance of the various trades by the insurer and the assessment and completion of repairs. It is apparent and not unreasonable that the complainants became frustrated with the lack of communication, in particular from the initial builder appointed by the insurer. These frustrations continued and were exacerbated by the impact of Covid-19. I accept that further delays from March 2020 were largely outside the insurer’s control due to Covid-19 although again there were issues with the communication that would have further frustrated the complainants. Given the time that has elapsed, and the issues raised by the complainants, I consider it fair that the insurer pays compensation for non-financial loss in this matter. In the circumstances, I believe a figure of $3,000 compensation is fair. 2.6 Why is the outcome fair? The outcome is fair as based on the available information, additional damage was caused to the complainants’ driveway, although it is accepted that the driveway was in a deteriorated condition. The damage claimed to the tap is not supported by any evidence while the insurer has based on the exchanged information settled the claim for the hose reel. It would be unreasonable and unfair to require further payment for these items. The insurer has agreed to repair the boundary fence which is fair and consistent with the terms of the policy Finally, compensation for non-financial loss is fair given the delays and communication with the complainants. While not all the delays or issues can be attributed to the insurers claims handling it is fair given it is now nearly four and a half years since the original claim that compensation be paid. Determination | Case number: 863961 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.