Home / IAG / Determination 863899

Determination 863899

Amount of cash settlement for storm-damaged shed, professional fees and non-financial loss

FirmIAG
Decided2023-07-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$409,183
Non-financial loss$2,500
Amount claimed$563,564
SourceAFCA PDF

Summary

The insurer accepted a storm claim but the complainant disputed its cash settlement offer for the shed and sought professional fees. AFCA increased the contingency to 20%, and ordered payment of report fees, $5,000 toward representative costs and $2,500 non-financial loss.

The insurer's repairer's estimate was a fair basis for cash settlement, but the 10% contingency was inadequate given the unactionable quote and scope discrepancies; AFCA can award complaint costs up to $5,000 and conservative non-financial loss.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 863899 Financial firm Insurance Australia Limited Determination | Case number: 863899 Page 1 of 6 Case number: 863899 12 July 2023 1 Determination overview 1.1 Complaint The complainant lodged a claim for damage to his home and shed because of a storm event which occurred in January 2021. The insurer accepted liability for the claim under the policy terms and conditions. It has offered a cash settlement for the damage to the home and shed. The complainant has accepted the insurer’s offer to pay $80,484 plus interest for the home damage. The complainant is dissatisfied with the insurer’s offer for the shed reinstatement. He says the offer is insufficient. Instead, the complainant seeks $547,751.44. Further to above, the complainant seeks $15,812.73 towards claims preparation and advice fees incurred in relation to the claim and the complaint. 1.2 Issues and key findings Should the insurer increase its offer for the shed reinstatement? The insurer should increase the contingency to 20% given the potential for unseen variations. The panel otherwise considers the insurer’s offer for the shed to be fair. Should the insurer increase its offer for the professional fees? Yes. The insurer should contribute to the complainant’s professional representation costs given the complexity and history of the claim. The insurer should pay $5,000 in this regard. Should the insurer pay non-financial loss compensation? Yes. The insurer should pay the complainant $2,500 as non-financial loss compensation. Why is the outcome fair? An increase in the contingency is fair given the potential for unseen variations. The insurer should contribute to the complainant’s profession al costs given the complexity and history of the claim. The insurer should pay $2,500 in non- financial loss due to the complainant’s claims experience. 1.3 Determination This determination is partially in favour of the complainant. Within 21 days of receiving notice the complainant accepts this determination, the insurer is required to pay the complainant:  $336,968.63 plus 20% contingency ($67,393.73) for the shed reinstatement  interest on the shed settlement amount under section 57 of the Insurance Contracts Act 1984 (Cth) from 3 May 2023 to the date of payment  $4,820 to cover the cost of the report fees from F  $5,000 to cover the professional representative’s costs  $2,500 for non-financial loss compensation. Determination | Case number: 863899 Page 2 of 6 2 Reasons for determination The complainant is represented by L. For brevity, both the complainant and L are referred to as the complainant in this determination. During the AFCA complaint process, the parties resolved the issue surrounding the home damage settlement. Therefore, this determination only addresses the issue relating to the shed settlement, the professional fees and non-financial loss. 2.1 Should the insurer increase its offer for the shed reinstatement? Insurer offered the complainant a cash settlement The parties agree there is damage to the shed at the property and it was caused by storm, which is an insured event under the insurance policy. Since the event, the complainant has engaged several of his preferred trades to reinstate the shed, including some upgrades. Recently, the insurer offered the complainant a cash settlement for the repairs in the amount of $336,968.63 based on its repairer’s (P) estimate and C’s SOW. Further to this, the insurer offered an additional 10% of the repair estimate to factor in contingencies. The insu rer says P’s estimate is actionable because P is willing to carry out the works with minimal variations should the insurer authorise the works. Therefore, the insurer considers its offer, including the 10% contingency, to be fair in the circumstances and says this offer discharges its liability under the policy. Complainant says the insurer’s offer is inadequate The complainant disagrees with the insurer’s position and says P’s estimate is insufficient. The complainant says it is missing certain scopes and is not reflective of the retail costs accessible to the complainant. Further, the complainant says P’s estimate is not based on a site assessment. In his correspondence dated 18 May 2023, the complainant says it is fair the insurer pays $547,751.44 for the shed reinstatement based on the adjusted costs and estimate(s). This factors in a reduction for any upgrades done by the complainant. The complainant also says P’s estimate is not reflective of C’s SOW as there is an allowance for one shed, whereas C’s SOW includes two sheds. The complainant also provides an estimate from S in the amount of $266,372 and says the estimate for the shed only is much higher than P’s estimate of $113,090 . Insurer’s offer is fair in the circumstances The policy gives the insurer the option of attending to claim related repairs or paying (cash settling) an insured the reasonable cost of those repairs. In exercising its right to choose, the insurer must act reasonably. Given that the relationship between the parties has deteriorated during the course of the claim, and the complainant wants to make some changes to the shed, the panel is satisfied it is reasonable the claim is cash settled. The complainant has appointed several trades to carry out the repairs and says an adjusted figure of $547,751.44 is fair and reasonable. Determination | Case number: 863899 Page 3 of 6 For the reasons noted here, the panel does not accept the complainant’s position:  the parties do not dispute the complainant is making changes to the original structure including some upgrades – for instance, the size of the shed is 28% greater than the original.  the adjusted figure ($547,751.44) includes a 28% deduction to reflect the upgrades. The panel is not persuaded this deduction is a true and fair reflection of the upgrades.  the adjusted figure is not based on an actionable quote for a like for like reinstatement, but rather based on an adjustment of the complainant’s costs for the upgraded shed . Therefore, it is not a true reflection of the scope of works relating to the storm damage and applicable retail costs. Regarding the complainant’s concerns about P’s estimate, the panel is n ot persuaded these are all established. For instance, the complainant refers to an estimate provided by S about the shed structure alone that is more than double. However one quote, of itself, does not establish P’s estimate is unfair. This is because it i s not clear if P’s estimate is unreasonably low or S’s estimate is excessive. Instead, the panel accepts P’s estimate is mainly based on the agreed scope of works. The complainant’s figures are not. The panel does not accept there is sufficient basis to doubt P would honour those rates and allowances in line with the agreed SOW. Therefore, it is fair to base a cash settlement on P’s quote. The insurer has only allowed a 10% contingency given it says P’s estimate was actionable and would likely lead to minimal variation. The panel is not persuaded by this. It is clear that when P provided this estimate, it knew it would not have to do the works given the complainant had done works already. It is also not clear why P is so confident that such an extensive job like this would result in minimal variations. The panel also notes P has not attended the site. This can bring some limitations to the preparation of such an extensive job. The panel also acknowledges there is a discrepancy in P’s estimate about the supply of the shed. It appears to include only one (C’s SOW includes two) although the width of this is double compared to the two sheds included in C’s SOW. This discrepancy is not clarified. The panel also notes the prime cost allowance in C’s SOW is $176,400, which is quite higher than P’s estimate. Given these factors, the panel considers it is fair the contingency be substantively increased to 20%. This is because the panel is not persuaded the quote is actionable, it is likely variations would have been required given the complications of such an extensive job and there is a discrepancy about the supply of the shed. Therefore, the insurer should pay $336,968.63 plus a 20% contingency ($67,393.73) towards the shed. The insurer should pay interest on any outstanding amount payable in this regard pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 3 May 2023, being about one month after P issued its estimate, until payment is made. 2.2 Should the insurer increase its offer for the professional fees? Complainant seeks cover for professional fees The complainant engaged L to assist him in the claim process. The complainant asks the insurer to cover the professional fees incurred in the amount of $20,632.73. This includes both L and an engineer appointed to confirm the proximate cause of loss. Determination | Case number: 863899 Page 4 of 6 The complainant says this cost was necessary to establish a valid claim (for the shed), substantiate the repair costs and assist the complainant with the claim and complaint handling. In the complainant’s opinion, the insurer did not appropriately handle the claim and caused unnecessary delays. The complainant is relying on this policy provision in support: If a listed event causes loss or damage to your home and you need to confirm that it was caused by a listed event. Covered under Buildings Insurance • the reasonable costs you have paid to find the cause of damage if we agree the loss or damage was caused by a listed event. Conditions • the costs must relate directly to the part of your home that suffered the loss or damage • we must agree to pay the costs before you make any arrangements. Insurer’s offer to cover the cost of expert report is fair The insurer accepts the policy responds to the costs associated with finding the cause of damage and agrees to cover the engineer fee incurred by the complainant in the amount $4,820. In the panel’s opinion, this offer is fair and reasonable in the circums tances and the insurer has met its obligations under the terms and conditions of the insurance policy by accepting this cost. Complainants have not proven an entitlement to claim preparation costs The panel appreciates the complainant needed to engage L to assist him in the preparation of the claim and establishing the extent of the loss. However, the panel does not accept the complainant has established a valid claim under the insurance policy for the fees associated with claim preparation. This is because the panel does not accept the additional benefit for locating the cause of damage can extend to L’s costs. It is clear such costs were to prepare and advocate the claim. Such costs cannot reasonably be said to be costs to ‘find the cause of damage’ . AFCA can award costs of dealing with the complaint Under the AFCA Rules, we can require the insurer to reimburse the complainant for professional costs incurred in making the complaint. This may include legal costs, expert report fees, or travel expenses. If the complainant asks the insurer to contribute to these costs, we will consider whether they were reasonable, and they helped resolve the complaint. Unless there are exceptional circumstances, we will not require the insurer to contribute more than $5,000 to these costs. Determination | Case number: 863899 Page 5 of 6 The panel acknowledges the issues were not straightforward. The insurer was raising technical arguments both to do with the cause of damage and the amount offered. The amount at stake is fairly significant. The insurer’s offer s at the start were substantively low compared to the final amounts awarded, particularly with respect to the shed. Given this, the panel accepts it was reasonable for the complainant to engage professional representatives to assist him in clearly setting out his arguments and the quantum involved. The panel is not persuaded that exceptional circumstances apply. The complainant is a plumber and experienced in the building industry. Reviewing his correspondence, it is clear he was able to advocate and articulate some of his concerns. Further, one of the main complex issues was the cause of damage to the shed. In that case, the technical evidence from the engineer was key. Therefore, whilst the engagement of professional representation was reasonable, the panel is not persuaded that exceptional circumstances should apply. Given this, the insurer should contribute $5,000 to the complainant’s professional representative’s costs. 2.3 Should the insurer pay non-financial loss compensation? Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss. This is where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind due to the insurer’s conduct. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Insurer should pay $2,500 as non-financial loss compensation The insurer has taken an unusually long period to resolve the issues surrounding the scope of works and the quantum of settlement. It is likely the complainant would have experienced unnecessary stress and inconvenience. However, these issues have been mitigated to a degree by the various payments made under the policy, interest, expert fees and updated quotes and costs. Given all this, and considering our conservative approach, it is fair the insurer pays the complainant $2,500 in non-financial loss. Determination | Case number: 863899 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.