Amount of cash settlement for storm-damaged shed, professional fees and non-financial loss
Text of the determination
Determination
Case number 863899
Financial firm Insurance Australia Limited
Determination | Case number: 863899 Page 1 of 6
Case number: 863899 12 July 2023
1 Determination overview
1.1 Complaint
The complainant lodged a claim for damage to his home and shed because of a storm event
which occurred in January 2021.
The insurer accepted liability for the claim under the policy terms and conditions. It has
offered a cash settlement for the damage to the home and shed. The complainant has
accepted the insurer’s offer to pay $80,484 plus interest for the home damage.
The complainant is dissatisfied with the insurer’s offer for the shed reinstatement. He says the
offer is insufficient. Instead, the complainant seeks $547,751.44. Further to above, the
complainant seeks $15,812.73 towards claims preparation and advice fees incurred in
relation to the claim and the complaint.
1.2 Issues and key findings
Should the insurer increase its offer for the shed reinstatement?
The insurer should increase the contingency to 20% given the potential for unseen variations.
The panel otherwise considers the insurer’s offer for the shed to be fair.
Should the insurer increase its offer for the professional fees?
Yes. The insurer should contribute to the complainant’s professional representation costs
given the complexity and history of the claim. The insurer should pay $5,000 in this regard.
Should the insurer pay non-financial loss compensation?
Yes. The insurer should pay the complainant $2,500 as non-financial loss compensation.
Why is the outcome fair?
An increase in the contingency is fair given the potential for unseen variations. The insurer
should contribute to the complainant’s profession al costs given the complexity and history of
the claim. The insurer should pay $2,500 in non- financial loss due to the complainant’s claims
experience.
1.3 Determination
This determination is partially in favour of the complainant. Within 21 days of receiving notice
the complainant accepts this determination, the insurer is required to pay the complainant:
$336,968.63 plus 20% contingency ($67,393.73) for the shed reinstatement
interest on the shed settlement amount under section 57 of the Insurance Contracts Act
1984 (Cth) from 3 May 2023 to the date of payment
$4,820 to cover the cost of the report fees from F
$5,000 to cover the professional representative’s costs
$2,500 for non-financial loss compensation.
Determination | Case number: 863899 Page 2 of 6
2 Reasons for determination
The complainant is represented by L. For brevity, both the complainant and L are referred to
as the complainant in this determination.
During the AFCA complaint process, the parties resolved the issue surrounding the home
damage settlement. Therefore, this determination only addresses the issue relating to the
shed settlement, the professional fees and non-financial loss.
2.1 Should the insurer increase its offer for the shed
reinstatement?
Insurer offered the complainant a cash settlement
The parties agree there is damage to the shed at the property and it was caused by storm,
which is an insured event under the insurance policy. Since the event, the complainant has
engaged several of his preferred trades to reinstate the shed, including some upgrades.
Recently, the insurer offered the complainant a cash settlement for the repairs in the amount
of $336,968.63 based on its repairer’s (P) estimate and C’s SOW. Further to this, the insurer
offered an additional 10% of the repair estimate to factor in contingencies.
The insu rer says P’s estimate is actionable because P is willing to carry out the works with
minimal variations should the insurer authorise the works. Therefore, the insurer considers its
offer, including the 10% contingency, to be fair in the circumstances and says this offer
discharges its liability under the policy.
Complainant says the insurer’s offer is inadequate
The complainant disagrees with the insurer’s position and says P’s estimate is insufficient.
The complainant says it is missing certain scopes and is not reflective of the retail costs
accessible to the complainant. Further, the complainant says P’s estimate is not based on a
site assessment.
In his correspondence dated 18 May 2023, the complainant says it is fair the insurer pays
$547,751.44 for the shed reinstatement based on the adjusted costs and estimate(s). This
factors in a reduction for any upgrades done by the complainant.
The complainant also says P’s estimate is not reflective of C’s SOW as there is an allowance
for one shed, whereas C’s SOW includes two sheds. The complainant also provides an
estimate from S in the amount of $266,372 and says the estimate for the shed only is much
higher than P’s estimate of $113,090 .
Insurer’s offer is fair in the circumstances
The policy gives the insurer the option of attending to claim related repairs or paying (cash
settling) an insured the reasonable cost of those repairs. In exercising its right to choose, the
insurer must act reasonably.
Given that the relationship between the parties has deteriorated during the course of the
claim, and the complainant wants to make some changes to the shed, the panel is satisfied it
is reasonable the claim is cash settled.
The complainant has appointed several trades to carry out the repairs and says an adjusted
figure of $547,751.44 is fair and reasonable.
Determination | Case number: 863899 Page 3 of 6
For the reasons noted here, the panel does not accept the complainant’s position:
the parties do not dispute the complainant is making changes to the original structure
including some upgrades – for instance, the size of the shed is 28% greater than the
original.
the adjusted figure ($547,751.44) includes a 28% deduction to reflect the upgrades. The
panel is not persuaded this deduction is a true and fair reflection of the upgrades.
the adjusted figure is not based on an actionable quote for a like for like reinstatement, but
rather based on an adjustment of the complainant’s costs for the upgraded shed .
Therefore, it is not a true reflection of the scope of works relating to the storm damage and
applicable retail costs.
Regarding the complainant’s concerns about P’s estimate, the panel is n ot persuaded these
are all established. For instance, the complainant refers to an estimate provided by S about
the shed structure alone that is more than double. However one quote, of itself, does not
establish P’s estimate is unfair. This is because it i s not clear if P’s estimate is unreasonably
low or S’s estimate is excessive.
Instead, the panel accepts P’s estimate is mainly based on the agreed scope of works. The
complainant’s figures are not. The panel does not accept there is sufficient basis to doubt P
would honour those rates and allowances in line with the agreed SOW. Therefore, it is fair to
base a cash settlement on P’s quote.
The insurer has only allowed a 10% contingency given it says P’s estimate was actionable
and would likely lead to minimal variation. The panel is not persuaded by this. It is clear that
when P provided this estimate, it knew it would not have to do the works given the
complainant had done works already. It is also not clear why P is so confident that such an
extensive job like this would result in minimal variations. The panel also notes P has not
attended the site. This can bring some limitations to the preparation of such an extensive job.
The panel also acknowledges there is a discrepancy in P’s estimate about the supply of the
shed. It appears to include only one (C’s SOW includes two) although the width of this is
double compared to the two sheds included in C’s SOW. This discrepancy is not clarified. The
panel also notes the prime cost allowance in C’s SOW is $176,400, which is quite higher than
P’s estimate.
Given these factors, the panel considers it is fair the contingency be substantively increased
to 20%. This is because the panel is not persuaded the quote is actionable, it is likely
variations would have been required given the complications of such an extensive job and
there is a discrepancy about the supply of the shed.
Therefore, the insurer should pay $336,968.63 plus a 20% contingency ($67,393.73) towards
the shed. The insurer should pay interest on any outstanding amount payable in this regard
pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from
3 May 2023, being about one month after P issued its estimate, until payment is made.
2.2 Should the insurer increase its offer for the professional
fees?
Complainant seeks cover for professional fees
The complainant engaged L to assist him in the claim process. The complainant asks the
insurer to cover the professional fees incurred in the amount of $20,632.73. This includes
both L and an engineer appointed to confirm the proximate cause of loss.
Determination | Case number: 863899 Page 4 of 6
The complainant says this cost was necessary to establish a valid claim (for the shed),
substantiate the repair costs and assist the complainant with the claim and complaint
handling. In the complainant’s opinion, the insurer did not appropriately handle the claim and
caused unnecessary delays.
The complainant is relying on this policy provision in support:
If a listed event causes loss or damage to your home and you need to confirm
that it was caused by a listed event.
Covered under Buildings Insurance
• the reasonable costs you have paid to find the cause of damage if we agree the
loss or damage was caused by a listed event.
Conditions
• the costs must relate directly to the part of your home that suffered the loss or
damage
• we must agree to pay the costs before you make any arrangements.
Insurer’s offer to cover the cost of expert report is fair
The insurer accepts the policy responds to the costs associated with finding the cause of
damage and agrees to cover the engineer fee incurred by the complainant in the amount
$4,820.
In the panel’s opinion, this offer is fair and reasonable in the circums tances and the insurer
has met its obligations under the terms and conditions of the insurance policy by accepting
this cost.
Complainants have not proven an entitlement to claim preparation costs
The panel appreciates the complainant needed to engage L to assist him in the preparation of
the claim and establishing the extent of the loss. However, the panel does not accept the
complainant has established a valid claim under the insurance policy for the fees associated
with claim preparation.
This is because the panel does not accept the additional benefit for locating the cause of
damage can extend to L’s costs. It is clear such costs were to prepare and advocate the
claim. Such costs cannot reasonably be said to be costs to ‘find the cause of damage’ .
AFCA can award costs of dealing with the complaint
Under the AFCA Rules, we can require the insurer to reimburse the complainant for
professional costs incurred in making the complaint. This may include legal costs, expert
report fees, or travel expenses. If the complainant asks the insurer to contribute to these
costs, we will consider whether they were reasonable, and they helped resolve the complaint.
Unless there are exceptional circumstances, we will not require the insurer to contribute more
than $5,000 to these costs.
Determination | Case number: 863899 Page 5 of 6
The panel acknowledges the issues were not straightforward. The insurer was raising
technical arguments both to do with the cause of damage and the amount offered. The
amount at stake is fairly significant. The insurer’s offer s at the start were substantively low
compared to the final amounts awarded, particularly with respect to the shed.
Given this, the panel accepts it was reasonable for the complainant to engage professional
representatives to assist him in clearly setting out his arguments and the quantum involved.
The panel is not persuaded that exceptional circumstances apply. The complainant is a
plumber and experienced in the building industry. Reviewing his correspondence, it is clear
he was able to advocate and articulate some of his concerns. Further, one of the main
complex issues was the cause of damage to the shed. In that case, the technical evidence
from the engineer was key.
Therefore, whilst the engagement of professional representation was reasonable, the panel is
not persuaded that exceptional circumstances should apply. Given this, the insurer should
contribute $5,000 to the complainant’s professional representative’s costs.
2.3 Should the insurer pay non-financial loss compensation?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss. This is where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind due to the insurer’s conduct.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Insurer should pay $2,500 as non-financial loss compensation
The insurer has taken an unusually long period to resolve the issues surrounding the scope of
works and the quantum of settlement. It is likely the complainant would have experienced
unnecessary stress and inconvenience.
However, these issues have been mitigated to a degree by the various payments made under
the policy, interest, expert fees and updated quotes and costs.
Given all this, and considering our conservative approach, it is fair the insurer pays the
complainant $2,500 in non-financial loss.
Determination | Case number: 863899 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.