Determination 863687

Storm/flood water damage claim settlement amount and scope of repairs

FirmAllianz Australia
Decided2022-08-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$26,754
Non-financial loss$750
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home kitchen was flooded by a burst pipe and she disputed the scope of the insurer's cash settlement offer and sought temporary accommodation. AFCA found the settlement should increase to $26,753.79, awarded eight weeks temporary accommodation on receipts, and confirmed $750 non-financial loss plus waiver of the $600 excess.

The policy covers reasonable costs of repairing damaged parts of the building to the same condition as new, limiting liability to damaged items, while the benchtop, appliance and contingency allowances were found fair.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay non financial lossrefund fees or charges

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 863687 Financial firm Allianz Australia Insurance Limited Determination | Case number: 863687 Page 1 of 6 Case number: 863687 27 July 2022 1 Determination overview 1.1 Complaint The complainant holds a Home Insurance policy with the financial firm (insurer) and lodged a claim on or about 27 December 2021 after a kitchen pipe burst on 17 December 2021 flooding the kitchen. After assessing the claim, the insurer agreed to complete the repairs to the complainant ’s property based on the scope of works and quotation from WB. The complainant disputes the scope of works and wants the claim cash settled. The insurer has offered the complainant $17,479.22 in settlement of the claim based largely on the quote from WB. The complainant disputes the cash offer and seeks compensation for temporary accommodation. 1.2 Issues and key findings Should the insurer increase its offer to settle the damage claimed? Yes. For the reasons set out under section 2.1 of this determination, the insurer should increase the offer to cash settle the claim to $26,753.79. Is the complainant entitled to compensation for temporary accommodation? Yes. The complainant is entitled to an additional eight weeks temporary accommodation subject to the complainant providing relevant receipts. Is the complainant entitled to compensation for non-financial loss? Yes. The insurer has handled the claim fairly. The insurer agreed to waive the complainant’s excess of $600 and offered an additional $750 as a good will payment. I consider this sufficient to cover any entitlement to non-financial loss. Why is the outcome fair? The outcome is fair as the policy sets out the extent of the insurer’s liability. The outcome provides cover for the assessed damage, potential temporary accommodation and a fair allowance for non-financial loss. 1.3 Determination This determination is partially in favour of the complainant. Within 21 days of the complainant’s acceptance of this offer, the insurer is to pay the complainant $26,753.79 in settlement of the complainant’s claim for damage to the property. In addition, the insurer is to waive the complainant’s excess of $600 and pay the complainant $750 compensation for non-financial loss. Subject to the complainant providing recei pts, the insurer is to cover the complainant’s temporary accommodation for a maximum additional period of eight weeks. Determination | Case number: 863687 Page 2 of 6 2 Reasons for determination 2.1 Should the insurer increase its offer to settle the damage claimed? Yes. For the reasons set out, the insurer should increase the offer to cash settle the claim to $26,753.79. Claim accepted subject to the terms of the policy The complainant’s policy covers a series of insured events including loss or damage resulting from the bursting, leaking, discharging or overflowing of any fixed pipes. On 27 December 2021, the complainant lodged a claim following an incident on 17 December 2021 when she returned home to find the kitchen had flooded due to a burst pipe. This had caused the power to trip out and had damaged the dish washer. The insurer assessed the claim and accepted liability for the damage sustained. Policy does not cover cost to repair the leaking pipe The policy provides that in the event of the insurer agreeing to pay a claim, it will pay for the exploratory work to locate a leak. This does not extend to cover the costs of repairing the leaking pipe. That is the insureds responsibility. The insurer however has agreed to cover the pipe repair costs of $419 because of delays. The insurer’s offer to cover these costs is fair in the circumstances. Policy covers reasonable costs of repairing and rebuilding damaged parts of the building The complainant’s policy provides the insurer may settle a claim by either repairing or paying the reasonable costs of repairing or rebuilding the damaged parts of the building to the same condition as when it was new. The policy provides that when it is not possible to use original materials during the repair or rebuilding process, the insurer will make the best efforts to use the nearest available equivalent to the original materials. The insurer had the complainant’s property assessed by BDS. A quote was subsequently obtained from WB to repair the property. WB quoted $14,039.32. The insurer has confirmed the quote is an actionable quote and that WB is prepared to complete the work for that price. The complainant disputes the quote and says that as the kitchen cabinetry colour cannot be matched, the insurer should replace the entire kitchen as well as the relevant appliances. The complainant requested that the insurer cash settle the claim and provided quotes from:  DH ($36,896)  QN ($33,599) and  SC ($37,988) The insurer says the quotes provided are not consistent with the scope of works as set out in the quote from WB. I have reviewed the various quotes. The complainant’s quotes provide for the supply and installation of a new kitchen carcass, doors and end panels as they were unable to match the Determination | Case number: 863687 Page 3 of 6 existing kitchen cabinets. The quotes also include the supply and installation of a new stone bench top as the existing bench top is bowing and supply and installation of a new stove and dishwasher. Insurer not liable to replace all the kitchen cabinetry The terms of the policy are clear. The insurer is only liable to repair or replace or cash settle the cost of repairing or replacing those items that are damaged. The policy provides that in the event of a building claim that the insurer will agree to pay the reasonable costs of repairing or rebuilding the damaged part of your buildings to the same condition as when it was new. When it is not possible to use original materials during the repair or rebuilding process, the insurer will make its best efforts to use the nearest available equivalent to the original materials. The insurer is not required to repair undamaged parts of the building. The reports provided by the insurer confirm that the damage to the kitchen cabinetry was largely to the kitchen carcass under the sink area and to the floor end panels. There was also some damage identified to the kitchen kickboards, but otherwise the kitchen cabinetry was undamaged. The quotes provided by the complainant provide for the replacement of all the kitchen cabinetry including the undamaged area as the builder may not be able to match the kitchen colour. This is not consistent with the terms of the policy. I accept that the insurer is entitled to limit its liability to repairing that part of the kitchen cabinetry that was damaged and in accordance with the terms of the policy to match the existing cabinetry as close as possible. The quote from WB generally covers this damage and it is fair given WB is prepared to complete the work, for the insurer to rely on the quote when making its cash offer. Insurer should increase settlement to allow for the kitchen benchtop The three quotes provided by the complainant all reference that the existing stone benchtop was bowing and needs replacement. The quote provided by WB does not mention damage to the kitchen benchtop. The insurer has not disputed thi s assessment. The insurer’s reports do not comment on the benchtop nor does the desktop assessment referenced by the insurer report on the bowing of the benchtop. I accept in these circumstances it is fair that an allowance be made for the replacement of the benchtop. Based on the complainant’s reports, it is fair to allow a further $6,750 to supply and install a new stone benchtop and a further $1,000 to remove the existing splashback tiles and install new tiles because of the benchtop removal. Insurer should increase allowance for appliances The insurer’s quote from WB provides an allowance for $1,600 to replace the complainant’s stove and $700 to replace the compl ainant’s dishwasher. Based on the available information, both the stove and dishwasher are discontinued models and therefore it will be necessary to replace those models with the nearest equivalent models. The complainant has provided quotes for a Westinghouse oven of $2,468 and an Asko dishwasher of $2,078. A review of the relevant models indicates that the Westinghouse oven being proposed in the complainant’s quotes is similar to the complainant’s existing oven. I Determination | Case number: 863687 Page 4 of 6 accept it would be fair in these circumstances that the allowance for the replacement oven be increased to $2,468. The dishwasher does not appear to be a match. The complainant’s existing dishwasher is a TEAC model. On research through the internet, it appears that a similar model dishwasher would cost in the order of $799. It is fair in these circumstances that the allowance for the dishwasher be increased by $99 to $799. Insurer to increase cash settlement Based on the above assessments, I am satisfied the insurer should increase its cash settlement as follows:  $14,039.32 (quote from WB)  $7,750 – benchtop and splashback tiles (quote from SC)  $868 – additional allowance for replacement stove (quote from SC $2,468)  $99 – additional allowance for dishwasher TOTAL - $22,756.32 The insurer should allow 15% for contingencies ($3,413.47) bringing the cash settlement to $26,169.79. The insurer has also agreed to pay $165 being the complainant’s electrician’s report fee and $419 being the cost of pipe repairs making a total sum payable of $26,753.79. 2.2 Is the complainant entitled to temporary accommodation costs? Yes. The complainant is entitled to an additional eight weeks temporary accommodation subject to the complainant providing relevant receipts. Policy provides cover for temporary accommodation The terms of the policy provide that in the event of an insurer accepting a claim, it will pay the necessary temporary accommodation costs for a maximum period of 12 months. Rent payable is based on the weekly rent equivalent of the buildings rentable value prior to the damage up to 10% of the building sum insured. At the time of the damage, the building sum insured was $343,470. Based on the available information, temporary accommodation has been paid at least until 25 February 2022. It is unclear whether temporary accommodation has been required beyond that date. Fair the insurer pays for temporary accommodation for repair period Information on files indicates the likely period to repair the damage would be six weeks. A file note from the insurer indicates that there could be a delay of at least a further two weeks in arranging for the repair. In my view, it is fair that the insurer pays the complainant’s temporary accommodation costs for an additional period of eight weeks from the complainant’s acceptance o f this determination subject to the complainant providing the receipt to cover the temporary accommodation costs incurred. Alternatively, the insurer may pay the complainant a lump sum for the temporary accommodation costs based on the assessed weekly ren t equivalent of the complainant’s home rentable value as per the terms of the policy. Determination | Case number: 863687 Page 5 of 6 2.3 Is the complainant entitled to compensation for non- financial loss? Yes. The insurer has handled the claim fairly and agreed to waive the complainant’s excess of $600 and offered an additional $750 as a good will payment. I consider this sufficient to cover any entitlement to non-financial loss. AFCA can award compensation for non-financial loss Under AFCA Rule D3.3, AFCA can award compensation of up to $5,400 where a complainant suffers an unusual degree of physical inconvenience or time taken to resolve the situation because of the insurer’s handling of the claim. AFCA takes a conservative approach to the award of compensation and expects a complainant to be moderately robust in dealing with the normal inconvenience that arises in any claim situation. The insurer has handled the claim reasonably Whilst the complainant maintains she has suffered considerable stress and inconvenience because of the insurer’s handling of the claim, I am not satisfied there is any evidence that the insurer handled the claim poorly. The available information indicates that the insurer arranged for the relevant trades to attend the complainant’s property and to complete any make safe that was required. The insurer arranged and obtained relevant quotes and was prepared to complete the repairs based on the quotes from WB. The complainant objected to the insurer completing the repairs and it is the complainant who sought to cash settle the claim. Whilst it has taken time to arrange further quotes and for those quotes to be assessed, the insurer has not caused the delay. The insurer’s offer is fair in the circumstances The insurer acknowledges some slight delays and has offered to waive the complainant’s excess of $600 and make a goodwill payment of $750 to the complainant. I consider this to be fair in these circumstances. I consider the insurer’s offer is fair and sufficient to cover any compensation payable for non-financial loss. 2.4 Why is the outcome fair? There is no dispute the complainant had been provided the relevant policy documents. The documents clearly set out the terms and conditions of cover. There is no evidence the insurer misled the complainant as to the cover provided. The insurer is entitled to rely on the terms and conditions of the policy when settling the claim. While the complainant may be disappointed the cover does not include matching undamaged items, the policy is clear. Liability is limited to using the nearest available material to match the original material damaged. The outcome is fair as the policy sets out the extent of the insurer’s liability. The outcome provides cover for the assessed damage, potential temporary accommodation and a fair allowance for non-financial loss. Determination | Case number: 863687 Page 6 of 6 3 Supporting information 3.1 The AFCA process AF CA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.