Home / Suncorp Group / Determination 862658

Determination 862658

Cash settlement amount for storm and water damage repairs after earlier determination

FirmSuncorp Group
Decided2023-03-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$12,718
Non-financial loss—
Amount claimed$87,280
SourceAFCA PDF

Summary

After an earlier determination made the insurer liable for 50% of storm-related damage, the complainant disputed the insurer's cash settlement and sought $87,280. AFCA found the offer largely fair but required a higher builder's margin and contingency, increasing the settlement by $12,717.61 plus interest, and awarded no compensation.

The engineer's evidence showed the house slab, flooring, kitchen and driveway damage was not caused by the insured event, but a 20% builder's margin and 20% contingency were fair, with interest payable under section 57 of the Insurance Contracts Act.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 862658 Financial firm AAI Limited Determination | Case number: 862658 Page 2 of 7 Case number: 862658 13 February 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). On 27 March 2015, she lodged a claim for damage after a storm. The claim was the subject of a previous AFCA determination (714955). The AFCA Ombudsman partially accepted the claim and held the insurer liable for 50% of the damage to the complainant’s timber deck, carport slab, carport columns and resulting internal cracking and movement. Following the determination, the insurer obtained a scope of work and a quotation. The insurer offered a cash settlement of $46,423.65. This comprised 50% of the quotation and a 10% contingency along with temporary accommodation allowance ($9,943.50) for three weeks for the complainant and her pets. The complainant obtained an independent quotation amounting to $174,560.45 for the repairs. This included the removal and replacement of the house slab amongst other things. The complainant disputes the insurer’s settlement and is seeking $87,280 for the repairs. 1.2 Issues and key findings Is the insurer required to increase its offer? Yes. The insurer should increase the builder’s margin and the contingency. The insurer’s offer is otherwise fair. Is the complainant entitled to compensation? No. The insurer acted reasonably in its handling of the complaint. The insurer is not required to pay any compensation to the complainant. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is required to increase its settlement as set out in section 2.1. Determination | Case number: 862658 Page 3 of 7 2 Reasons for determination 2.1 Is the insurer required to increase its offer? Prior determination outlined what insurer was required to do The prior AFCA determination (714955) was issued on 23 February 2021. It confirmed:  the proximate cause of damage was the unusual and excessive escape of water from the neighbour’s property  the insurer was liable for 50% of the damage to the complainant’s timber deck, carport slab, carport columns and resulting internal cracking and movement  the parties were required to work together to arrange for appropriate inspections and assessments of the claim-related damage to be conducted, scopes of work and quotes to be prepared, and for the claim to be cash settled. Following the AFCA determination, the insurer appointed its assessor and an engineer (KM) to determine the scope of work. KM provided a scope for work for the carport slab, footings, piers and its roof framing. It also recommended the rear deck be repaired. The insurer appointed a builder (AB) to provide a quotation for the claim related repairs. AB provided a quotation of $68,600.30. This included painting and plastering repairs for the areas which were suffering from internal cracking and movement. The quotation also included repairs to the toilet and bathroom along with the veranda (rear timber deck) and carport. The complainant obtained her own quotation amounting to $174,560.45. This included removal and replacement of the house slab ($64,855), kitchen ($16,850) and internal flooring ($10,650). This was from contractor BC. The panel acknowledges the prior AFCA determination was silent on the damage relating to the house slab. Evidence does not show house slab was damaged by the event The insurer says the complainant had not raised this damage before and had only raised it after the determination was issued in 2021. KM reported on the issues which were present on the complainant’s quotation and absent on the insurer’s quotation. KM reported the house floor slab was high in the north west and south east corner and low on the north east corner. It reported the slope was within normal building tolerances as per the current Australian Residential Slabs and Footing Standards. KM attributed this slope in the floor level due to the construction method and natural ground movement. KM also noticed there has previously been grout injected in the slab. This indicates ground movement of the slab has been an ongoing issue. This was also reported previously in another engineer report in 2018 and from a builder who attended the site contemporaneous to the event. KM reported it would be expected for the south western corner of the slab to be consistently high if the slab was damaged by exposed overland flow. KM reported this has not happened. This indicates the slab movement has happened over a period of time and not from one single event. Determination | Case number: 862658 Page 4 of 7 The complainant says the insurer has accepted damage to the carport slab. However, it has declined damage to the house slab which would have been directly impacted by the stormwater run-off. Based on the available information, the panel is not satisfied the house slab has been damaged by the insured event. In reaching this view, the panel considers:  KM’s report is thorough and persuasive  previous repairs, like injection of grout to relevel the house slab, indicates it has been subject to movement for over a period of time  the complainant has not provided compelling information to show the damage is due to the insured event. Flooring and kitchen have not been damaged due to insured event KM noticed there were gaps in the flooring. It reported these gaps are due to the sensitive nature of the internal finish to out of level floors as the floor planks do not have any tolerance for any natural movement. KM acknowledged there is swelling to the kitchen kickboards which would be due to water damage. The complainant says water entered through the weepholes around the south western bedroom during the storm event causing this damage. KM accepts this is possible, however, it would expect mould and damage to the internal lining if this was the case. KM says as this is not present, the isolated damage to the kitchen is consistent with overflowed water from the kitchen and/or moisture from condensation in the slab over its life. The complainant’s builder (BC) reported damage to the kitchen kickboards is consistent with water ingress to the whole kitchen area. It has included the removal and replacement of the entire kitchen in its quotation. BC also reported the floorboards in the property have shrunk due to water ingress and has accounted for the removal and replacement of flooring. Based on the available information, the panel is not satisfied the flooring has been compromised due to the subject event because:  information shows, on balance, the house slab has been subject to movement over a period of time which makes it plausible for the gaps to form in the floorboards  BC has not provided any information to support his opinion as to why the flooring has shrunk. Further, the panel is not satisfied the kitchen kickboards have been damaged by the subject event. The panel considers KM’s reasoning plausible. That is, had the insured event caused damage to the kitchen, it would be evident in other parts of the kitchen. This is not the case. Driveway has not been damaged due to the insured event The complainant says the driveway also suffered damage from the subject event. KM reported the driveway cracks appear old and are consistent with concrete shrinkage cracks. It also reported similar cracking is present in other properties on the same street. KM also says the nature of damage is consistent with lack of reinforcement, dowels and control joints in the driveway. Further, KM reported ongoing movement would have contributed to this damage. The complainant has provided photographs which she says dispute KM’s position. Having viewed the photos, the panel is not persuaded these substantiate her points. Determination | Case number: 862658 Page 5 of 7 Instead, the panel finds KM’s opinion compelling. The reasoning provided is plausible and logical. KM is qualified to provide an expert opinion on this. In the absence of any contradictory information, the panel is not satisfied the insurer is liable for the driveway damage. Insurer is required to increase its offer The panel does not accept BC’s quote is fair. It includes replacement of the kit chen as well as works to the house slab and flooring. For reasons set out above, these have not been substantiated to be claim related. The complainant says the insurer’s quotation does not include steel pillars to be installed which will hold up the carp ort roof. The panel has carefully reviewed AB’s quote and notes it includes ‘supply and install 7.5x6.0 H.D. Galv. Column’. It is not clear why this would not be sufficient. Further, the panel notes AB’s quote is comparable to BC on the veranda, carport an d toilet. This is supported by the insurer’s assessor report dated 18 March 2022. The panel notes the builder’s margin on AB’s quote is 5%. The panel does not accept that this is consistent with industry standards and 20% is more appropriate. In comparing the quotes for the other items, the panel notes the following. For the bathroom, the insurer says BC’s quote includes replacement of the ceiling, shower screen and vanity. The insurer says the ceiling does not need replacement and it would re- use the shower screen and vanity. The insurer also says that it appears BC is tiling the walls from floor to ceiling which was not consistent with its pre-existing state. BC says the vanity was damaged. On balance, the panel prefers AB’s quote on the bathroom. There i s no evidence the ceiling needs replacement. BC does not substantiate the issue with the tiling. To the extent the vanity may require replacement, this can be factored in a contingency which will be discussed later. For the other internal damage, AB’s quot e contains breakdown of materials and labour to substantiate the amounts. This is missing in BC’s quote. Further, there are aspects of BC’s quote that are not substantiated. Therefore, AB’s quote is preferred on these points. Overall, the panel considers i t fair the insurer can settle the complainant’s claim by relying on AB’s quote to cash settle its liability subject to the following:  a 20% builder’s margin be included, and  a 20% contingency be added to factor in the possible variances that may be required that is not factored in AB’s quote (e.g. replacing the vanity), the loss of the insurer’s lifetime guarantee and the transfer of risk This means the total cost of repairs should be $93,968.39. Factoring 50%, this totals $46,984.19. As the insurer has allowed $34,266.58 for the cost of repairs, it should increase its settlement by $12,717.61. The insurer should also pay interest on this additional amount pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest applies from 17 August 2021, being the date of its settlement offer, until payment is made. The panel notes the insurer has already settled for the temporary accommodation. There is no evidence to dispute the timeframe allowed or the rates. No increase is required for this. Determination | Case number: 862658 Page 6 of 7 2.2 Is the complainant entitled to compensation? Complainant is not entitled to non-financial loss compensation AFCA may award compensation (capped at $5,400) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience. AFCA expects the complainant to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. The complainant says the claims experience was difficult, protracted and stressful. The complainant says she has been bullied by the insurer in accepting a settlement. While the panel accepts the claim would have caused stress and inconvenience to the complainant, the panel is not satisfied the insurer’s overall handling of the claim since the previous determination has been unreasonable. The panel notes the insurer appointed its engineer to undertake an assessment in a timely manner and the claim notes show the claim was managed reasonably. Further, some degree of stress and inconvenience when a problem occurs is normal. In these circumstances, the panel does not accept the insurer is required to pay compensation. Determination | Case number: 862658 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.