Summary

The complainant disputed the insurer's cash settlement offer for shower leak repairs and its claim handling. AFCA found the $11,468.92 offer fair and ordered $1,000 for non-financial loss.

The insurer's costing was expert-verified and based on a fair scope of works, while delays and unclear communications by the insurer justified a modest non-financial loss payment.

Issues

Subjects and remedies

home or building damagepay claimpay non financial loss

Related

All Lloyd's determinations · Find similar determinations

Text of the determination

Determination Case number 862361 Financial firm Lloyd's Australia Limited Determination | Case number: 862361 Page 1 of 5 Case number: 862361 27 April 2023 1 Determination overview 1.1 Complaint On 13 September 2019, the complainant lodged a claim on his home and contents insurance policy following a leak from the shower. The financial firm (insurer) partially accepted the claim. The complainant says the insurer’s offers to cash settle the cost of accepted building repairs is inadequate. Further, he says he completed all necessary repairs and the insurer has unreasonably delayed paying for the damage. He also seeks compensation for stress caused by the insurer’s claim handling. 1.2 Issues and key findings Is the insurer’s cash settlement offer reasonable ? Yes. The insurer’s costing has been verified by experts and is based on a fairer scope of works. Therefore, the insurer’s offer to pay $11,468.92 is fair in all the circumstances Is non-financial loss compensation payable? Yes. The insurer’s delays and other claim handling issues have contributed to the complainant’s stress and inconvenience. The insurer is to pay him $1, 000 in compensation for non-financial loss. 1.3 Determination This determination is mostly in favour of the insurer. The insurer’s cash settlement offer of $11,468.92 is fair in all the circumstances. The insurer should pay $1,000 in non-financial loss. Determination | Case number: 862361 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer’s cash settlement offer reasonable ? The claim to be cash settled The claim was initially denied. After further assessment, it was partially accepted. However, the complainant has since completed all the repairs. The insurer is seeking to cash settle the claim. The complainant does not dispute this. However, he says he is entitled to a greater sum than offered by the insurer. This is because he says the insurer’s offer is inadequate. In support, the complainant is relying on a quote from PO. In contrast, the insurer is relying upon quotes from its builder and comments from its expert to support the offer is fair. The insurer also says the claim was never payable as the cause of the leak was excluded under the policy. Insurer’s offer is fair in all the circumstanc es Having carefully considered all the available information, I note the following. The complainant is relying upon PO’s quote. However, it appears the works have been completed. It is not clear if the amount spent matches or exceeds PO’s quote. Given this , it is not clear if PO’s quote is a reasonable basis to base a cash settlement figure on. The insurer makes a point that PO’s quote includes the removal of the concrete pad and the installation of a new concrete base for an upgraded shower. This is inconsistent with the policy which does not allow for such an upgrade. I note there is no evidence to show the shower needed to be upgraded. Therefore, I do not accept these costs were necessary to repair the claim related damage. The complainant raises specific concerns about various allowances in the insurer’s quote. However, the insurer has verified these costings through its experts . The complainant’s position is not supported by any expert report. Whilst the complainant notes he has a diploma in the building trade, it is not clear if this provides him with the necessary expertise to comment. I also note his evidence is not independent. PO’s quote also do es not include any breakdown of labour and materials. Therefore, PO’s costing cannot be fairly assessed. There are legitimate questions about whether the claim should have been accepted. The complainant says the leak was likely due to a waste pipe. He has provided a report from ALD in support. However, ALD inspected the area about one and a half years after the event. In contrast, a more contemporaneous report by TB identified moisture high on the walls. This is inconsistent with a leaking waste pipe. Whilst ALD said these walls were dry, that was one and a half years after the event. TB believed the cause was due to deteriorated seals and poor installation. This is plausible given the nature of the damage. Given all this, I am not persuaded the complainant has shown the insurer’s offer is unfair. The insurer’s costing has been verified by experts and is bas ed on a fairer scope of works. Therefore, the insurer’s offer to pay $11,468.92 is fair in all the circumstances. Determination | Case number: 862361 Page 3 of 5 2.2 Is non-financial loss compensation payable? AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer’s claim handling has caused the complainant stress and inconvenience The complainant says the insurer caused enormous stress and inconvenience. He says that it unnecessarily delayed progression and finalisation of the claim, has failed to adequately communicate and has acted in an unprofessional manner. The complainant considers that the insurer has failed to act in accordance with the General Insurance Code of Practice (the Code). The insurer acknowledged that ‘delays beyond expected occurred’, for which it has apologised. However, it says that the delays were largely due to the challenges presented to insurers and their service providers by recent significant Covid events and natural disasters. I acknowledge insurers have been placed under considerable strain due to Covid and natural disasters . However, having reviewed the insurer’s claim notes, there have been occasions when the insurer could have acted more promptly. I also consider that some of the insurer’s communications were unclear or contradictory. These issues have contributed to the stress and inconvenience experienced by the complainant. I do not accept all the delays have been caused by the insurer. Part of the delays have been due to the complainant seeking a higher amount. Given this has not been substantiated, I do not accept the insurer is liable for these delays. Given this, and noting our conservative approach, it is fair the insurer pays the complainant $1,000 in non-financial loss compensation. Determination | Case number: 862361 Page 4 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.3 Relevant policy The insurer refers to the PDS on page 21 and pages 27-28; What is covered We insure You up to the Sum Insured shown on the Schedule for Section 1, against accidental Loss or Damage to Your Insured Property which occurs during the Period of Insurance. What is not covered 1) We will not pay for Loss or Damage: Determination | Case number: 862361 Page 5 of 5 c) caused by moths, termites or other insects, vermin, mice, rats, rust or oxidisation, mildew mould, contamination or pollution, wet or dry rot, corrosion, gradual corrosion or deterioration, change in colour, dampness of atmosphere or other variations in temperature, evaporation, disease, inherent vice or latent defect, loss of weight, change in texture or finish or pecking, biting, chewing or scratching by birds or animals; d) caused by Wear, Tear, fading, concrete or brick cancer, gradual deterioration or developing flaws; e) caused by lack of maintenance or failure to maintain Your Insured Property in a reasonably good state of repair. f) caused by non-rectification of an Insured Property defect, error or omission that You were aware of, or should reasonably have been aware of.… n) due to normal settling, creeping, heaving, seepage, shrinkage, or expansion in Buildings, foundations / footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders and other structural improvements.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.