Determination 862361
Cash settlement amount for accepted building repairs after shower leak, and delay/claim handling
Summary
The complainant disputed the insurer's cash settlement offer for shower leak repairs and its claim handling. AFCA found the $11,468.92 offer fair and ordered $1,000 for non-financial loss.
The insurer's costing was expert-verified and based on a fair scope of works, while delays and unclear communications by the insurer justified a modest non-financial loss payment.
Issues
- Claim amount dispute primary · not upheld“the insurer's offer to pay $11,468.92 is fair in all the circumstances”
- Poor claim handling secondary · upheld“The insurer's delays and other claim handling issues have contributed to the complainant's stress and inconvenience”
- Delay secondary · upheld“there have been occasions when the insurer could have acted more promptly”
- Poor communication secondary · upheld“some of the insurer's communications were unclear or contradictory”
Subjects and remedies
home or building damagepay claimpay non financial loss
Related
Text of the determination
Determination
Case number 862361
Financial firm Lloyd's Australia Limited
Determination | Case number: 862361 Page 1 of 5
Case number: 862361 27 April 2023
1 Determination overview
1.1 Complaint
On 13 September 2019, the complainant lodged a claim on his home and contents insurance
policy following a leak from the shower. The financial firm (insurer) partially accepted the
claim.
The complainant says the insurer’s offers to cash settle the cost of accepted building repairs
is inadequate. Further, he says he completed all necessary repairs and the insurer has
unreasonably delayed paying for the damage. He also seeks compensation for stress caused
by the insurer’s claim handling.
1.2 Issues and key findings
Is the insurer’s cash settlement offer reasonable ?
Yes. The insurer’s costing has been verified by experts and is based on a fairer scope of
works. Therefore, the insurer’s offer to pay $11,468.92 is fair in all the circumstances
Is non-financial loss compensation payable?
Yes. The insurer’s delays and other claim handling issues have contributed to the
complainant’s stress and inconvenience. The insurer is to pay him $1, 000 in compensation
for non-financial loss.
1.3 Determination
This determination is mostly in favour of the insurer.
The insurer’s cash settlement offer of $11,468.92 is fair in all the circumstances. The insurer
should pay $1,000 in non-financial loss.
Determination | Case number: 862361 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer’s cash settlement offer reasonable ?
The claim to be cash settled
The claim was initially denied. After further assessment, it was partially accepted. However,
the complainant has since completed all the repairs.
The insurer is seeking to cash settle the claim. The complainant does not dispute this.
However, he says he is entitled to a greater sum than offered by the insurer. This is because
he says the insurer’s offer is inadequate.
In support, the complainant is relying on a quote from PO. In contrast, the insurer is relying
upon quotes from its builder and comments from its expert to support the offer is fair. The
insurer also says the claim was never payable as the cause of the leak was excluded under
the policy.
Insurer’s offer is fair in all the circumstanc es
Having carefully considered all the available information, I note the following.
The complainant is relying upon PO’s quote. However, it appears the works have been
completed. It is not clear if the amount spent matches or exceeds PO’s quote. Given this , it is
not clear if PO’s quote is a reasonable basis to base a cash settlement figure on.
The insurer makes a point that PO’s quote includes the removal of the concrete pad and the
installation of a new concrete base for an upgraded shower. This is inconsistent with the
policy which does not allow for such an upgrade. I note there is no evidence to show the
shower needed to be upgraded.
Therefore, I do not accept these costs were necessary to repair the claim related damage.
The complainant raises specific concerns about various allowances in the insurer’s quote.
However, the insurer has verified these costings through its experts . The complainant’s
position is not supported by any expert report. Whilst the complainant notes he has a diploma
in the building trade, it is not clear if this provides him with the necessary expertise to
comment. I also note his evidence is not independent.
PO’s quote also do es not include any breakdown of labour and materials. Therefore, PO’s
costing cannot be fairly assessed.
There are legitimate questions about whether the claim should have been accepted. The
complainant says the leak was likely due to a waste pipe. He has provided a report from ALD
in support. However, ALD inspected the area about one and a half years after the event. In
contrast, a more contemporaneous report by TB identified moisture high on the walls. This is
inconsistent with a leaking waste pipe. Whilst ALD said these walls were dry, that was one
and a half years after the event. TB believed the cause was due to deteriorated seals and
poor installation. This is plausible given the nature of the damage.
Given all this, I am not persuaded the complainant has shown the insurer’s offer is unfair. The
insurer’s costing has been verified by experts and is bas ed on a fairer scope of works.
Therefore, the insurer’s offer to pay $11,468.92 is fair in all the circumstances.
Determination | Case number: 862361 Page 3 of 5
2.2 Is non-financial loss compensation payable?
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer’s claim handling has caused the complainant stress and inconvenience
The complainant says the insurer caused enormous stress and inconvenience. He says that it
unnecessarily delayed progression and finalisation of the claim, has failed to adequately
communicate and has acted in an unprofessional manner.
The complainant considers that the insurer has failed to act in accordance with the General
Insurance Code of Practice (the Code).
The insurer acknowledged that ‘delays beyond expected occurred’, for which it has
apologised. However, it says that the delays were largely due to the challenges presented to
insurers and their service providers by recent significant Covid events and natural disasters.
I acknowledge insurers have been placed under considerable strain due to Covid and natural
disasters . However, having reviewed the insurer’s claim notes, there have been occasions
when the insurer could have acted more promptly.
I also consider that some of the insurer’s communications were unclear or contradictory.
These issues have contributed to the stress and inconvenience experienced by the
complainant.
I do not accept all the delays have been caused by the insurer. Part of the delays have been
due to the complainant seeking a higher amount. Given this has not been substantiated, I do
not accept the insurer is liable for these delays.
Given this, and noting our conservative approach, it is fair the insurer pays the complainant
$1,000 in non-financial loss compensation.
Determination | Case number: 862361 Page 4 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.3 Relevant policy
The insurer refers to the PDS on page 21 and pages 27-28;
What is covered
We insure You up to the Sum Insured shown on the Schedule for Section 1,
against accidental Loss or
Damage to Your Insured Property which occurs during the Period of Insurance.
What is not covered
1) We will not pay for Loss or Damage:
Determination | Case number: 862361 Page 5 of 5
c) caused by moths, termites or other insects, vermin, mice, rats, rust or
oxidisation, mildew mould,
contamination or pollution, wet or dry rot, corrosion, gradual corrosion or
deterioration, change in
colour, dampness of atmosphere or other variations in temperature, evaporation,
disease, inherent
vice or latent defect, loss of weight, change in texture or finish or pecking, biting,
chewing or scratching by birds or animals;
d) caused by Wear, Tear, fading, concrete or brick cancer, gradual deterioration
or developing flaws;
e) caused by lack of maintenance or failure to maintain Your Insured Property in a
reasonably good
state of repair.
f) caused by non-rectification of an Insured Property defect, error or omission that
You were aware of,
or should reasonably have been aware of.…
n) due to normal settling, creeping, heaving, seepage, shrinkage, or expansion in
Buildings,
foundations / footings, walls, bridges, roadways, kerbing, driveways, paths,
garden borders and other structural improvements.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.