Defective repairs to storm-damaged timber shed and settlement amount
Summary
The complainant's storm-damaged shed was repaired by the insurer's builder, but the repairs were defective and some damage was missed. AFCA found the insurer must pay $17,218.30 plus interest, including a 10% contingency, and $1,000 for non-financial loss, but refused legal costs.
The insurer must fairly settle the claim at a reasonable repair cost based on the engineer's report and quote 1, plus a contingency, with non-financial loss for claim handling delays under the fairness approach.
Issues
- Repairs or contractors primary · upheld
“There is no dispute the repairs from the insurer's builder (JL) are defective.”
- Claim amount dispute secondary · upheld
“Insurer required to pay $17,218.30 plus interest, a 10% contingency added to the offered quote 1 amount.”
- Delay secondary · upheld
“I accept there were delays in appointing experts and obtaining the relevant reports.”
- Third-party or outsourcing failure secondary · upheld
“JL unnecessarily delayed the claim. The insurer had to follow up JL on numerous occasions.”
Subjects and remedies
home or building damagenatural disasterthird party authoritypay compensationpay interestpay non financial lossrepair or rectify
Text of the determination
Determination
Case number 861279
Financial firm AAI Limited
Determination | Case number: 861279 Page 1 of 5
Case number: 861279 26 July 2022
1 Determination overview
1.1 Complaint
The complainant is legally represented by NKH. For simplicity, the determination will refer to
the complainant and NKH as the ‘complainant’.
The complainant lodged a claim with the financial firm (insurer) for damage sustained to his
shed from a falling tree during a storm event.
The insurer repaired the damage to the shed. However, the complainant is dissatisfied with
the standard of repairs. Further, the complainant says the insurer’s repairer has left some of
the original damage unrepaired.
There is no dispute the insurer’s repai rs were faulty. However, the parties disagree on the
extent of the insurer’s liability for the rectification of the faulty workmanship and the missed
repairs.
1.2 Issues and key findings
Is the insurer required to increase its settlement offer?
Yes, the insurer is required to add a 10% continency to the offered amount plus interest.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer is required to pay the complainant $1,000 for non-financial loss.
Is the insurer liable for the complainant’s legal cost ?
No. I am not satisfied the insurer is required to contribute towards the complainant’s legal
fees.
Why is the outcome fair?
I have considered all the information provided in this complaint. NJ’s quote (quote 1) fairly
reflects the costs required. Therefore, it is fair for the insurer to base its settlement on this
quote and to add a 10% contingency for any potential variances and the transfer of risk.
1.3 Determination
This determination is substantially in favour of insurer.
Within 14 days of the insurer receiving notification the complainant accepts this
determination, the insurer is required to pay the complainant
$17,218.30 for the shed repairs plus interest in accordance with Section 57 of the
Insurance Contracts Act 1984 from 9 December 2021 being the date of the quote until the
date of the payment
$1,000 for the non-financial loss.
Determination | Case number: 861279 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer required to increase its settlement offer?
Timber shed is repairable
There is no dispute the repairs from the insurer’s builder (JL) are defective. Further, the
exchanged information shows JL missed some of the original damage from its scope of works
as identified by the insurer’s engineer (BS).
Following his disagreement with the insurer, the complainant provided a number of quotes
from builder NJ. This included a quote for a total rebuild of the shed.
The insurer offered the complainant $15,653. This is based on one of NJ’s quotes (quote 1)
for the repairs of the shed on a like for like basis. The complainant rejected this quote and
seeks a higher amount. In doing so, the complainant says:
NJ’s quote was based on the insurer’s engineer’s report which does not include all
rectification damage
the simplest approach is to replace the shed
the quote does not factor in the material shortage given the pandemic related challenges.
There is no expert report that concludes the shed needs to be replaced.
I find BS’s report persuasive and logical . This is because BS:
stepped through the nature of the defect of each area separately
separated the defects due to the poor workmanships from the unrepaired damage
outlined the rectification method in light of the relevant building code and requirement.
Whilst the complainant disagre es with BS’s findings, he has not provided any expert evidence
to refute it.
Complainant’s other quotes are not persuasive
NJ provided two other quotes. One quote was to demolish the damaged timber shed and
replace it with a Colourbond shed totalling $23,914 (quote 2). I am not persuaded this is
necessary given BS’s report. Further, this is an upgrade and not in line with the policy’s terms
and conditions.
The second quote was for $24,728 (quote 3) and was based on a similar scope of works to
quote 1. In justifying the increase, the complainant says given the age, the material may not
be matched. He also says quote 1 will result in a significant shortfall in costs.
I note the complainant has not substantiated this assertion.
Both quotes are not itemised. They do not provide details such as the breakdown of the
material and labour cost involved. NJ does not substantiate why the cost has increased so
significantly. I do not accept the shortage in materials adequately addresses this.
I also note quote 3 states
Repairs to skillion carport as required
Determination | Case number: 861279 Page 3 of 5
In his report, BS says the skillion section was not altered during repairs and it appears to be
mostly undamaged. In his report, NJ referred to minor issues with the weatherboards and
skillion rafters. This item is therefore not substantiated.
Given all this, I am not persuaded quote 3 fairly reflects the cost of the work required as a
result of the insured event.
The insurer is required to pay the complainant $17,218.30 plus interest
Having considered the exchang ed information, I consider the insurer’s offer of $15,653 to be
reasonable. It is fair for the insurer is to add a 10% contingency for any unforeseeable
damage and the transfer of risk.
Within 14 days of the insurer receiving notification the complainant accepts this
determination, the insurer is required to pay the complainant $17,218.30 plus interest in
accordance with Section 57 of the Insurance Contracts Act 1984 from 9 December 2021
being the date of the quote until the date of the payment.
2.2 Is the complainant entitled to non-financial loss
compensation?
AFCA can award compensation for non-financial loss
AFCA will award compensation for non-financial loss (capped at $5,400) if there has been an
unusual degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and delays. AFCA
expects complainants to be moderately robust and to bear the normal degree of
inconvenience experienced when a problem occurs and to take reasonable steps to manage
the situation.
The complainant is entitled to $1,000 compensation
The complainant is dissatisfied with the way the insurer handled the claim.
I have reviewed the exchanged material. I accept there has been delays however I consider
some of these delays to be outside the insurer’s control.
The complainant has notified the insurer of the defective repairs around March 2021. Having
reviewed the exchanged claims notes, I accept there were delays in appointing experts and
obtaining the relevant reports. For example, the insurer did not obtain a second opinion until
around August 2021. This was about six months after being notified of the defects.
However, some of the delays were outside the insurer’s control . The pandemic-imposed
travel restrictions between regional and metro city caused delays in sourcing an engineer who
is located in regional NSW.
In saying that, JL unnecessarily delayed the claim. The insurer had to follow up JL on
numerous occasions. I further note the complainant has initiated the contact with the insurer
to follow up the outcomes of the different inspections.
Given this, the insurer should pay the complainant $1,000 in non-financial loss.
Determination | Case number: 861279 Page 4 of 5
2.3 Is the insurer liable for the complainant’s legal cost?
Insurer not liable to pay for legal fees
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded if the
complainant needed an expert to understand or establish their claim. These costs are
normally capped at $5,000 unless exceptional circumstances apply.
The complainant says he engaged legal representation due to the repair work being
substandard and the manner the insurer has handled the claim.
However, I note the complainant’s position was not established. Further, the issue in dispute
was not a legal one. Given this, I do not accept the insurer is required to contribute towards
the complainant’s legal costs.
2.4 Why is the outcome fair?
I have considered all the information provided in this complaint. NJ’s quote (quote 1) fairly
reflects the costs required. Therefore, it is fair for the insurer to base its settlement on this
quote and to add a 10% contingency for any potential variances and the transfer of risk.
Determination | Case number: 861279 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.