Determination 861279

Defective repairs to storm-damaged timber shed and settlement amount

FirmSuncorp Group
Decided2022-08-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$17,218
Non-financial loss$1,000
Amount claimed$24,728
SourceAFCA PDF

Summary

The complainant's storm-damaged shed was repaired by the insurer's builder, but the repairs were defective and some damage was missed. AFCA found the insurer must pay $17,218.30 plus interest, including a 10% contingency, and $1,000 for non-financial loss, but refused legal costs.

The insurer must fairly settle the claim at a reasonable repair cost based on the engineer's report and quote 1, plus a contingency, with non-financial loss for claim handling delays under the fairness approach.

Issues

Subjects and remedies

home or building damagenatural disasterthird party authoritypay compensationpay interestpay non financial lossrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 861279 Financial firm AAI Limited Determination | Case number: 861279 Page 1 of 5 Case number: 861279 26 July 2022 1 Determination overview 1.1 Complaint The complainant is legally represented by NKH. For simplicity, the determination will refer to the complainant and NKH as the ‘complainant’. The complainant lodged a claim with the financial firm (insurer) for damage sustained to his shed from a falling tree during a storm event. The insurer repaired the damage to the shed. However, the complainant is dissatisfied with the standard of repairs. Further, the complainant says the insurer’s repairer has left some of the original damage unrepaired. There is no dispute the insurer’s repai rs were faulty. However, the parties disagree on the extent of the insurer’s liability for the rectification of the faulty workmanship and the missed repairs. 1.2 Issues and key findings Is the insurer required to increase its settlement offer? Yes, the insurer is required to add a 10% continency to the offered amount plus interest. Is the complainant entitled to non-financial loss compensation? Yes. The insurer is required to pay the complainant $1,000 for non-financial loss. Is the insurer liable for the complainant’s legal cost ? No. I am not satisfied the insurer is required to contribute towards the complainant’s legal fees. Why is the outcome fair? I have considered all the information provided in this complaint. NJ’s quote (quote 1) fairly reflects the costs required. Therefore, it is fair for the insurer to base its settlement on this quote and to add a 10% contingency for any potential variances and the transfer of risk. 1.3 Determination This determination is substantially in favour of insurer. Within 14 days of the insurer receiving notification the complainant accepts this determination, the insurer is required to pay the complainant  $17,218.30 for the shed repairs plus interest in accordance with Section 57 of the Insurance Contracts Act 1984 from 9 December 2021 being the date of the quote until the date of the payment  $1,000 for the non-financial loss. Determination | Case number: 861279 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer required to increase its settlement offer? Timber shed is repairable There is no dispute the repairs from the insurer’s builder (JL) are defective. Further, the exchanged information shows JL missed some of the original damage from its scope of works as identified by the insurer’s engineer (BS). Following his disagreement with the insurer, the complainant provided a number of quotes from builder NJ. This included a quote for a total rebuild of the shed. The insurer offered the complainant $15,653. This is based on one of NJ’s quotes (quote 1) for the repairs of the shed on a like for like basis. The complainant rejected this quote and seeks a higher amount. In doing so, the complainant says:  NJ’s quote was based on the insurer’s engineer’s report which does not include all rectification damage  the simplest approach is to replace the shed  the quote does not factor in the material shortage given the pandemic related challenges. There is no expert report that concludes the shed needs to be replaced. I find BS’s report persuasive and logical . This is because BS:  stepped through the nature of the defect of each area separately  separated the defects due to the poor workmanships from the unrepaired damage  outlined the rectification method in light of the relevant building code and requirement. Whilst the complainant disagre es with BS’s findings, he has not provided any expert evidence to refute it. Complainant’s other quotes are not persuasive NJ provided two other quotes. One quote was to demolish the damaged timber shed and replace it with a Colourbond shed totalling $23,914 (quote 2). I am not persuaded this is necessary given BS’s report. Further, this is an upgrade and not in line with the policy’s terms and conditions. The second quote was for $24,728 (quote 3) and was based on a similar scope of works to quote 1. In justifying the increase, the complainant says given the age, the material may not be matched. He also says quote 1 will result in a significant shortfall in costs. I note the complainant has not substantiated this assertion. Both quotes are not itemised. They do not provide details such as the breakdown of the material and labour cost involved. NJ does not substantiate why the cost has increased so significantly. I do not accept the shortage in materials adequately addresses this. I also note quote 3 states Repairs to skillion carport as required Determination | Case number: 861279 Page 3 of 5 In his report, BS says the skillion section was not altered during repairs and it appears to be mostly undamaged. In his report, NJ referred to minor issues with the weatherboards and skillion rafters. This item is therefore not substantiated. Given all this, I am not persuaded quote 3 fairly reflects the cost of the work required as a result of the insured event. The insurer is required to pay the complainant $17,218.30 plus interest Having considered the exchang ed information, I consider the insurer’s offer of $15,653 to be reasonable. It is fair for the insurer is to add a 10% contingency for any unforeseeable damage and the transfer of risk. Within 14 days of the insurer receiving notification the complainant accepts this determination, the insurer is required to pay the complainant $17,218.30 plus interest in accordance with Section 57 of the Insurance Contracts Act 1984 from 9 December 2021 being the date of the quote until the date of the payment. 2.2 Is the complainant entitled to non-financial loss compensation? AFCA can award compensation for non-financial loss AFCA will award compensation for non-financial loss (capped at $5,400) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and delays. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. The complainant is entitled to $1,000 compensation The complainant is dissatisfied with the way the insurer handled the claim. I have reviewed the exchanged material. I accept there has been delays however I consider some of these delays to be outside the insurer’s control. The complainant has notified the insurer of the defective repairs around March 2021. Having reviewed the exchanged claims notes, I accept there were delays in appointing experts and obtaining the relevant reports. For example, the insurer did not obtain a second opinion until around August 2021. This was about six months after being notified of the defects. However, some of the delays were outside the insurer’s control . The pandemic-imposed travel restrictions between regional and metro city caused delays in sourcing an engineer who is located in regional NSW. In saying that, JL unnecessarily delayed the claim. The insurer had to follow up JL on numerous occasions. I further note the complainant has initiated the contact with the insurer to follow up the outcomes of the different inspections. Given this, the insurer should pay the complainant $1,000 in non-financial loss. Determination | Case number: 861279 Page 4 of 5 2.3 Is the insurer liable for the complainant’s legal cost? Insurer not liable to pay for legal fees Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply. The complainant says he engaged legal representation due to the repair work being substandard and the manner the insurer has handled the claim. However, I note the complainant’s position was not established. Further, the issue in dispute was not a legal one. Given this, I do not accept the insurer is required to contribute towards the complainant’s legal costs. 2.4 Why is the outcome fair? I have considered all the information provided in this complaint. NJ’s quote (quote 1) fairly reflects the costs required. Therefore, it is fair for the insurer to base its settlement on this quote and to add a 10% contingency for any potential variances and the transfer of risk. Determination | Case number: 861279 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.