Text of the determination
Determination
Case number 860178
Financial firm AAI Limited
Determination | Case number: 860178 Page 1 of 8
Case number: 860178 23 January 2023
1 Determination overview
1.1 Complaint
The complainant holds home and contents insurance with the financial firm (the insurer). On
10 June 2021, she lodged a claim for storm damage to the insured property and contents.
The insurer accepted the claim. It proposed to repair the property’s roof then attend to internal
repairs and assessment of the contents claim. The insurer also offered to cash settle the cost
to repair the veranda, given that some of the damage to it was unrelated to the storm.
The complainant disagrees with the insurer’s proposed order and methods of repair and with
the decision to cash settle the veranda repairs. She also says the insurer’s poor claim
handling and delays have caused additional damage, stress and inconvenience.
1.2 Issues and key findings
Is the insurer’s claim settlement approach reasonable?
For the most part, yes. The panel is satisfied that the insurer’s scopes of works for roof and
veranda repairs are reasonable. However, though mostly not due to delay by the insurer, it
has taken too long to progress the claim. This has led to additional damage. It is therefore
reasonable for the entire claim to be cash settled as soon as possible.
Is the complainant entitled to further temporary accommodation (TA) costs?
Yes. The panel is satisfied the insurer’s proposal to pay out the remaining 33 weeks of the TA
benefit is reasonable, taking into account the extent of repairs required but given that it did
not significantly contribute to the delays experienced. The rate is to be increased for inflation.
Is non-financial loss compensation payable?
Yes. There were some deficienc ies in the insurer’s claim handling. These issues contributed
to the complainant’s stress and inconvenience. The insurer is to pay her $1,000 in non-
financial loss compensation.
Why is the outcome fair?
The insurer’s appr oach to the claim has overall been reasonable. However, the delays
experienced and resulting additional damage mean it is fair that steps be taken to cash settle
the entire claim as soon as possible. While the insurer did not significantly contribute to the
delays, there were some claim handling issues. It is fair that it pays $1,000 in compensation.
1.3 Determination
This determination is partially in favour of the complainant. If the complainant accepts this
determination, the insurer is required to:
settle the claim in the manner set out in section 2.1 of this determination
within 14 days, pay the complainant $15,675 in TA costs ($475/week for 33 weeks)
within 14 days, pay the complainant $1,000 in non-financial loss compensation.
Determination | Case number: 860178 Page 2 of 8
2 Reasons for determination
Amongst other things, the complainant says there is water leaking from the shower. The
insurer says this is unrelated to the storm event and asked the complainant to lodge a
separate claim.
No evidence has been provided that suggests the shower leak is related to the storm.
Therefore, AFCA accepts the insurer’s position this falls outside the scopes of the subject
claim and the complaint.
This determination does not deal with the shower leak. If the complainant lodges a separate
claim for the shower leak, the insurer must assess the claim in accordance with the policy.
2.1 Is the insurer’s claim settlement approach reasonable?
For the most part, yes. The panel is satisfied that the insurer’s scopes of works for roof and
veranda repairs are reasonable. However, though mostly not due to delay by the insurer, it
has taken too long to progress the claim. This has led to additional damage. It is therefore
reasonable for the entire claim to be cash settled as soon as possible.
Parties disagree on the approach to building repairs
There is no dispute that the insured property’s roof was significantly damaged by a storm
event on 10 June 2021, with numerous roofing sheets ripped off. The insurer arranged for
‘tarping’ of the roof as a temporary mak e safe repair.
The insurer engaged RM, engineers. In its report dated 1 July 2021, RM said:
internally, the storm had caused water damage to plasterboard ceilings and plaster wall
linings, detachment of a small section of ceiling trim in the kitchen and some staining of
exposed timber roof beams
water ingress through the temporary roof covers had contributed to the plasterboard ceiling
damage and had caused moisture damage to the music room’s floor
externally, the storm had detached roof sheeting from the house and the veranda as well
as damaging guttering, a satellite dish, the chimney flue and the veranda structure
the veranda was poorly constructed, with structurally inadequate rafter fixings, undersized
and inadequate footings, severe corrosion of veranda post stirrups and brickwork cracking
where the hip rafters entered the home
the veranda did not comply with current building regulations and standards
there were pre-existing gaps between window framing and corner brick piers
it appeared that the storm had damaged the roof framing, but further investigation was
necessary to determine the extent of this.
A number of attempts were made over time to ensure the tarping provided a waterproof seal
but have been unsuccessful. The insurer says this is due to wind exposure from the
property’s elevated position.
Delays were experienced due to COVID- 19 concerns, the complainant’s concerns about the
competence of RX (the restorers the insurer engaged to pack and store contents) and issues
related to obtaining building permits from the local council. It also appears the relationship
between the complainant and the insurer as well as the insurer’s builder, JL, became frayed.
In late November/early December 2021, JL confirmed from original plans and permits that the
veranda was non-compliant when it was built in 1985. On 29 November 2021, JL provided a
scope of works (SOW) and quote for covered veranda repairs totalling $32,406.61.
Determination | Case number: 860178 Page 3 of 8
The insurer says that as the veranda has pre-existing issues and damage unrelated to the
storm and is and has always been non-compliant, JL cannot warrant repairs. Accordingly, it
has offered to pay the complainant JL’s quoted amount as a cash settlement.
The complainant says the local council signed off on compliance at the time of construction.
She says the insurer should repair the veranda or, at least, obtain a second quote for
comparison purposes.
Following an emergency works order being issued by the local council to the complainant’s
mother, JL provided the complainant with a contract and SOW for roofing repairs on 21
January 2022. The complainant responded, saying that repairs to the ceilings and veranda
would need to be completed before the roofing repairs could proceed. She was also
concerned about additional damage due to the unsuccessful make safe repairs.
On 31 January 2022, following discussions with JL, the insurer advised the complainant:
it was not necessary for the veranda or the ceilings to be repaired before the roofing
repairs could be undertaken
the make safe related damage would be included in the SOW for internal damage repairs,
which could not be prepared until after the re-roofing was completed
she could either sign the contract/SOW to enable JL to commence the roof repairs or
appoint a builder to provide a ‘like for like’ quote for the insurer’s consideration .
On 30 April 2022, the complainant provided an undated letter from AP, builder. AP said:
it had inspected the insured property
the make safe was inadequate and was allowing water ingress
the roof battens were installed above pine lining boards which were installed above the
rafters
the pine lining boards were extensively water damaged
the remaining roofing and the roof battens would need to be removed before the pine lining
boards could be removed and replaced.
On 5 May 2022, the complainant provided a single page quote from JB, builder. JB said that
due to ongoing water ingress, widespread replacement work would need to be undertaken.
JB quoted the work at $495,000. The quote covered internal and external work. No itemised
costing was provided.
On 2 June 2022, the insurer provided a second additional notice of response to AFCA in
which it said:
The insurer’s paramount concern throughout the entirety of the claim has been to
have a permanent repair of the roof undertaken to prevent further damage
occurring. If the insurer is not able to undertake these repairs in the near future,
the insurer will consider a cash settlement payment to finalise its involvement in
the claim and allow the customer to undertake repairs herself.
It also submitted JL’s quote dated 27 August 2021 for the roof repairs, totalling $75,590.04.
Unfortunately, the roof remains unrepaired, with water ingress continuing to occur.
Contents have been damaged
It is not in dispute that the storm event caused damage to contents. On 10 June 2021, the
insurer arranged an emergency payment of $2,000 out of the contents sum insured. It has
also replaced an oven and re-gassed the air conditioning unit.
Determination | Case number: 860178 Page 4 of 8
The insurer says it is necessary to pack and store contents before commencing building work.
In July 2021, the insurer engaged RX to attend to contents pack-out and to inventory
damaged contents items.
It says significant delays were experienced due to the complainant cancelling scheduled
appointments for RX to attend the property. Further, RX informed the insurer on 10 March
2022, that the complainant told RX not to attend the property until her AFCA complaint was
finalised. The complainant denies this, saying the insurer or JL terminated RX’s retainer.
The insurer has provided RX’s inventory of contents damaged by the storm. All items are
noted as non-salvageable except for three items designated restorable, which the
complainant wanted restored. Those items are a timber antique dresser, a piano and a timber
glass display cabinet.
Claim is to be cash settled
The policy provides that when settling a covered claim, the insurer may choose between
attending to repairs/replacement or paying the complainant the amount it would reasonably
cost the insurer to do so (cash settling). Generally, a ‘new for old’ approach is to be adopted.
The insurer has an overarching obligation to act reasonably in exercising its policy rights.
The panel is satisfied that the all aspects of the claim should be cash settled because:
the relationship between the parties has significantly deteriorated
there is persuasive evidence of covered and uncovered damage, meaning the insurer and
its trades will not be able to warrant all repairs
the ongoing delay in resolution is resulting in further damage being sustained.
A cash settlement must be based on a quote that would be actionable and must allow an
uplift for contingencies and for the loss of warranty applying to insurer authorised repairs.
The insurer was prepared to attend to the roof repairs as 21 January 2022. On the available
information, the panel is on balance satisfied that the complainant is responsible for the delay
in having the roof repaired since then and the associated further water damage.
The panel considers that as at late January 2022, JL’s roof repair SOW/quote was actionable.
Further, the panel is satisfied that its proposed repair methodology (repair the roof then attend
to internal repairs) was reasonable.
The panel notes that JL repeatedly confirmed it would be able to attend to the ceiling repairs
after the roof was fixed. Further, if the internal repairs were attended to first, there would be a
risk of additional water ingress and damage pending completion of the roof repair. In the
circumstances, the panel does not find persuasive the brief letter from AP indicating the
internal repairs should be done first.
JB’s quote was prepared three months after the insurer indicated it was able to attend to the
roof repairs. It is reasonable to assume that additional water ingress (for which the insurer
was not responsible) occurred over those three months. Accordingly, the panel does not
consider JB’s quote dated 5 May 2022 to be a reasonable reflection of the extent of the
insurer’s liability for the roof d amage.
The panel also notes that JB’s quote lacks detail when compared to the JL SOW/quote.
Further, the quotes are not like for like as the JB quote includes internal damage items.
The only available quote in relation to the veranda damage is that provided by JL. As at
January 2022, the insurer was prepared to cash settle the veranda claim for the amount JL
Determination | Case number: 860178 Page 5 of 8
had quoted. To the extent the veranda has deteriorated since then, the panel considers the
complainant is responsible for that deterioration.
There is no objective evidence to suggest that JL’s quote is insuffic ient to account for the
veranda damage which is to be covered under the policy. Accordingly, the panel is not
satisfied that the insurer has any obligation to obtain a second quote for the veranda damage.
The panel is satisfied that a reasonable contingencies uplift to apply to JL’s quotes for the
roof and veranda repairs is 20%.
T he panel considers the insurer’s inventory to be a reasonable basis on which the content s
claim may be settled. Almost all of the listed items were unsalvageable. In terms of the three
items the complainant wanted restored, it is unclear whether that remains possible. The panel
also notes the policy limits the amount payable for unspecified antiques to $1,000 per item.
Accordingly, the panel considers it fair and reasonable for the insurer to settle the contents
claim by paying for all of the items on the inventory list on a ‘new for old’ replacement basis.
The $1,000 limit is to apply to the timber antique dresser. The same limit will apply to any
other antiques, and the total amount payable for all antiques under the policy is $5,000.
To the extent additional contents damage has been sustained due to water ingress since
January 2022, the insurer is not responsible for that damage.
No uplift is payable as the insurer will be paying the contents claim based on current pricing.
The panel acknowledges that the insurer is yet to formally assess the internal damage to the
property. However, for the reasons previously outlined, it considers that aspect of the claim
should also be cash settled promptly. The insurer and JL would have sufficient information on
file from attending trades and the complainant to enable preparation by JL of a desktop
SOW/quote on the internal damage as at the end of January 2022.
Consistent with the insurer’s commitment on 31 January 2022 , the SOW/quote is to include
all damage related to the make safe issues up to that point of time. The panel is satisfied that
the insurer is not responsible for any additional internal damage post January 2022.
Recognising that the internal damage claim is to be paid without completion of a formal on-
site assessment of the storm related damage alone as at the end of January 2022 (which,
due to the passage of time and continuing water ingress damage, is likely to be difficult), the
panel considers an appropriate uplift to be 30%.
Accordingly, if the complainant provides written notice that she accepts this determination, the
insurer is to:
within 14 days of rec eiving the notice, pay her $90,708.05 for the roof damage (JL’s roof
quote plus 20%)
within 14 days of receiving the notice, pay her $38,887.93 for the veranda damage (JL’s
veranda quote plus 20%)
within 21 days of receiving the notice, complete a ‘new for old’ valuation of the contents
claim using RX’s inventory list. All items are to be treated as non -salvageable. Policy limits
and sub limits are to apply
within 14 days of completing the contents claim valuation, provide the complainant with a
copy of the valuation and pay her the valuation amount
within 7 days of receiving the notice, request JL to complete a desktop SOW/quote for the
internal damage as at 31 January 2022, including any additional damage caused to that
point by the make safe issues
Determination | Case number: 860178 Page 6 of 8
within 14 days of receiving JL’s SOW/quote, provide a copy of it to the complainant and
pay her the quoted amount plus 30%.
To the extent any applicable excesses that apply have not been paid, the insurer is entitled to
deduct those excesses from the settlement amounts.
2.2 Is the complainant entitled to further TA costs?
Yes. The panel is satisfied the insurer’s proposal to pay out the remaining 33 weeks of the TA
benefit is reasonable, taking into account the extent of repairs required but given that it did
not significantly contribute to the delays experienced. The rate is to be increased for inflation.
Policy provides TA costs cover
The policy includes as an automatic additional benefit cover for TA costs, as follows:
When an insured event damages the building to the extent you cannot live there,
and we agree, we will pay for your reasonable temporary accommodation costs
for the time it will take to repair or rebuild the building to a liveable condition.
As the complainant holds ‘complete replacement’ building cov er, there is no monetary limit
applicable. However, the maximum indemnity period is 52 weeks.
Insurer has paid for TA
The complainant says that no ‘concrete offer of emergency housing was made’ .
However, the insurer’s claim notes confirm that the insurer offered TA 11 times between 14
June 2021 and 24 September 2021.
Further, the insurer has paid for 19 weeks of emergency accommodation.
Insurer has offered to pay further TA costs
In its second additional notice of response dated 2 June 2022, the insurer said:
The insurer is prepared to pay out the remaining 33 weeks of temporary
accommodation that is provided for under the customer’s policy (52 weeks, of
which 19 have been used) at a rate of $454 per week. To avoid all doubt, in
addition to what has already been paid the insurer is able to provide a payment of
$14,932.
The $454/week rate was calculated by averaging the rental rates for three properties in the
complainant’s area.
Insurer offer is reasonable subject to a rate increase
The panel is satisfied that the insurer is not responsible for delays experienced since January
2022. Accordingly, the insurer’s obligation to pay for TA is limited to that set out in the policy.
The insurer’s offer to pay out the remaining 33 weeks of the maximum indemnity per iod
specified in the policy is reasonable.
Determination | Case number: 860178 Page 7 of 8
However, it is reasonable to increase the applicable rate to allow for the likelihood rental rates
have increased in the six months since 2 June 2022. The panel regards $475/week as fair.
Accordingly, the insurer is to pay the complainant $15,675 for additional TA costs.
2.3 Is non-financial loss compensation payable?
Yes . There were some deficiencies in the insurer’s claim handling. These issues contributed
to the complainant’s stress and inconvenience. The insurer i s to pay her $1,000 in non-
financial loss compensation.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer’s claim handling contributed to the complainant’s stress
The complainant says the claim process and failed make-safe repairs have caused her
unnecessary stress and inconvenience. She has provided a letter dated 2 May 2022 from her
GP that states:
[the complainant] has been struggling with physical and mental health (adjustment
disorder with anxious and depressed mood) after her house was damaged by a
severe storm in June 2021.
The panel notes that the insurer has offered counselling services to the complainant on a
number of occasions, including on 24 June 2021. It is also satisfied that the insurer is not
responsible for delays experienced after January 2022.
There were issues with progression of the claim between June 2021 and January 2022.
Some delays were for reasons out of the insurer’s control, such as the impact of COVID -19
and the complainant’s cancellation of pre -arranged appointments.
However, having considered all of the available information, the panel is satisfied that during
the first seven months of the claim, the insurer did to a degree contribute to the delays
experienced. Further, there were occasions when its communications caused the
complainant confusion and concern.
The panel accepts that these issues contributed to the stress and inconvenience the
complainant experienced. While th e insurer’s contribution was not signi ficant overall, it is fair
that it pays the complainant some non-financial loss compensation. The insurer is to pay her
$1,000.
2.4 Why is the outcome fair?
The insurer’s approach to the claim has overall been reasonable. However, the delays
experienced and resulting additional damage mean it is fair that steps be taken to cash settle
the entire claim as soon as possible. While the insurer did not significantly contribute to the
delays, there were some claim handling issues. It is fair that it pays $1,000 in compensation.
Determination | Case number: 860178 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.