Home / Financial Firm (Unknown - Credit) / Determination 859914

Determination 859914

Alleged delay by broker and bank in arranging and settling loans, and incorrect rate lock fee advice leading to higher fixed rates and build costs

FirmFinancial Firm (Unknown - Credit)
Decided2023-06-21
ProductCredit · Home loan
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Borrowers with a 16-loan refinance and construction package complained that the broker and bank delayed the process and mishandled rate lock advice, causing higher interest rates and build costs. AFCA found in favour of the broker and the bank, with no compensation payable.

Given the complexity of the finance and ongoing build variations, neither firm unreasonably delayed or breached its duty of due care and skill, and the complainants chose not to rate lock.

Issues

Subjects and remedies

broker or intermediaryhome or building damageno remedy

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Determination Case number 859914 Financial firm A 864460 Connective Credit Services Pty Ltd Financial firm B 859914 Commonwealth Bank of Australia Determination | Case number: 859914 Page 1 of 12 Case number: 859914 21 June 2023 1 Determination overview 1.1 Complaint The complainants, Mr J and Ms M, are a married couple. Mr J represents both complainants in this complaint. Financial Firm A is the credit licensee which authorised Mr B (broker) as its credit representative. Financial Firm B (bank) provided 16 loans to the complainants which settled in December 2021. In October 2020, Mr J met the broker to seek finance to build dwellings on six of the ten properties he either owns in his own name or controls through J Co (a company of which he is director). A list of these properties and their respective mortgagees is set out in section 3.2 of this determination. In December 2020, Mr J and J Co signed six building contracts to build the six dwellings. In September 2021, the broker lodged two loan applications with the bank. The loan applications sought finance to a total value of about $3.854 million, as follows:  ten loans to refinance all existing loans secured by the properties (on fixed rates), and   six additional loans for construction (on variable rates).  These loan applications were approved in October 2021 and November 2021. The loans settled in December 2021. A list of the loans is set out in section 3.3 of this determination. The complainants say:  the broker and the bank unreasonably delayed the process of securing finance,   the broker advised him of the wrong rate lock fee and inappropriately advised him not to request a rate lock on the ten fixed rate loans, and   over the period of the alleged delay, the bank increased its fixed interest rates, and the builder increased its prices, causing the complainants significant loses.  An Australian Financial Complaints Authority (AFCA) senior dispute resolution specialist has provided a recommendation on the issues in dispute. The recommendation was in favour of the broker and the bank (copy attached). 1.2 Issues and key findings Were the findings in the recommendation correct? The findings in the recommendation were correct and are adopted in this determination. I have considered all the information from the parties including further submissions provided after the recommendation was issued. The further submissions do not change the outcome. Do the further submissions change the outcome in relation to the broker? The further submissions do not change the outcome, for reasons set out in section 2.2. Determination | Case number: 859914 Page 2 of 12 Do the further submissions change the outcome in relation to the bank? The further submissions do not change the outcome, for reasons set out in section 2.3. Why is the outcome fair? I acknowledge the complainants’ frustration that the finance process did not proceed as quickly as he anticipated, resulting in higher costs through higher interest rates and increased construction prices. However, these are not factors that are within the control of the broker or the bank. Given the complexity of the complainants’ finance needs, the broker and the bank did not breach its duty of due care and skill through any unreasonable delay. 1.3 Determination This determination is in favour of the broker and the bank. They are not required to compensate the complainants. Determination | Case number: 859914 Page 3 of 12 2 Reasons for determination 2.1 Were the findings in the recommendation correct? The findings in the recommendation were correct and are adopted in this determination. I have considered all the information from the parties including further submissions provided after the recommendation was issued. The further submissions do not change the findings or the outcome. The findings in the recommendation are correct Having independently reviewed all information, I am satisfied that the recommendation contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the rules and any relevant law. The findings in the recommendation are correct and are adopted in this determination, including the following key findings (page references from the recommendation):  the broker did not unreasonably delay submitting the loan applications to the bank (p.5),   the broker and the bank did not unreasonably delay settlement of the loans (p.9),   the broker did not mislead the complainant about rate lock (p.11), and   the bank did not mislead the complainants about the applicable fixed rates (p.13).  The complainants’ further submissions after the recommendation do not change the outcome. The complainants rejected the recommendation and provided further submissions In rejecting the recommendation, the complainants say,  in relation to the broker’s conduct:  > the complainants were ready to submit a loan application by March 2021. The broker should have submitted an application to the bank at that time, not enquire with Bank B, > Mr J’s repeated queries about fixed interest rate lock were ignored, > the broker did not respond to Mr J’s expressed urgency for the application processing, > the broker was unavailable to him due to over-commitment to other clients, > the broker lacked skill and care as shown by his haphazard and disorganised operation, > the broker’s own admission of errors concerning delays and fixed rates and rate lock post settlement and not progressing the formal complaint with the bank  in relation to the bank’s conduct, that it:  > failed to pay the $2,000 refinance cashback, > froze $23,983.99 in loan account (#9174) from December 2021 to July 2022, > froze funds during the extended time it took to settle the loans, and > has admitted liability through its previous compensation offers For reasons set out below, the complainants’ further submissions do not change the outcome. 2.2 Did the further submissions change the outcome in relation to the broker? For reasons below, the complainants’ further submissions do not change the outcome. Determination | Case number: 859914 Page 4 of 12 The broker had an obligation to act with due care and skill The broker provides a financial service of arranging credit facilities for clients. Under the Australian Securities and Investments Commission Act 2001, the broker had a duty to provide those services to the complainants with due care and skill (s12ED). The standard of care required is that of a reasonable broker in the same position. Further, as a credit assistance provider to the complainants within the meaning of the National Consumer Credit Protection Act 2009, the broker must also:  refrain from suggesting or assisting the complainants to apply for credit contracts that are unsuitable (that is, unaffordable without substantial hardship), and   act in the complainants’ best interests.  Acting in the complainant’s best interests involves considering the client’s specific needs, goals and financial situation, weighing up products holistically to determine whether they are consistent with the client’s best interests and recommend ing options. It also means prioritising the client’s interest above those of the broker’s or the broker’s associates. The broker is also a member of the Mortgage Finance Association of Australia (MFAA) which administers its own Code of Practice. Under that Code, the broker is required to act with appropriate skill, care and diligence (paragraph 4.13), and must disclose all relevant details known to the member and keep customers informed of all relevant information known to members relating to a proposed or current application (paragraphs 7.4 and 7.5). The broker did not unreasonably delay submitting loan applications The complainants dispute the recommendation’s finding that the broker did not delay the loan submission process. They say:  Mr J told the broker the security structure and finance requirements at the start of the broker’s engagement in October 2020. The broker indicated he would be able to get finance, and was engaged on that basis,   the complainants were ready to submit a loan application by March 2021,   the broker should never have been made enquiries with Bank B (which declined finance). He should have submitted a loan application to the bank (retail division) in the first place,   no delay in the broker’s loan submission should be attributed to changes to the security properties, as changes to the building of those properties continued after the loans settled.  Having independently reviewed the information, I agree with the recommendation’s findings that the broker did not unreasonably delay submi tting loan applications. The complainant’s finance proposal was complex. It involved:  Mr J’s desire to structure the loans as consumer loans rather than commercial loans,   Mr J’s desire to secure government grants, the eligibility of which depended upon timing of the construction,   ten security properties mortgaged to three different outgoing lenders,   four of the security properties being held by a corporate trustee (J Co), not an individual. This resulted in the need to rework one of the loan applications with J Co as guarantor.  Given the complexity of the complainants’ finance needs, I do not consider the broker made an error or showed a lack of care and skill by initially exploring finance options with Bank B, even though Bank B eventually declined to offer finance. The broker explained why he chose to proceed with Bank B, namely, because of Bank B’s appetite for high net -worth individuals. After a private banker within Bank B declined to provide credit (in April 2021), he referred the Determination | Case number: 859914 Page 5 of 12 broker to a business banker who continued to explore whether the finance proposal might still be viable. There was sufficient financial information exchanged in the communications between the broker and Bank B to suggest Bank B gave serious consideration to the broker’s finance proposal. Those discussions with Bank B (lasting until about May 2021) shows that the broker’s enquires with Bank B, though ultimately unsuccessful, were not inappropriate. It was not unreasonable to hold off until contractual variations were confirmed From April 2021, multiple variations were made to the six building contracts. Some variations (notably in April 2021) were due to “rise and fall” pricing provisions in the build contracts. Other variations (notably in August 2021) were due to changes to the scope of building works. Mr J objects to the recommendation’s attribution of delay to the ongoing variations to the security properties. He says the bank allowed building variations to the properties throughout the construction process after the loan was settled, without impacting or changing the loan. Based on my review of the correspondence, the broker requested updated building contract variations in April 2021 (after a price adjustment) and in August 2021 (after multiple variations were made to the scope of works). I do not consider the broker’s requests unreasonable, as:  the valuation of not-yet-built properties depends very much on what the finished dwelling would be and the pricing of that build, and   the complainants wanted to maximise borrowings. The build variations had the potential to change the value of the security properties and hence the borrowing capacity.  The broker says he ordered the property valuations on 25 August 2021, that is, around the time a large tranche of building contract variations was confirmed. I am satisfied the broker did not act with a lack of due care and skill by holding off ordering valuations and/or submitting loan applications until the build variations were confirmed. Once the loans were approved and the loan contracts signed, the funding of building variations became subject to the terms and conditions of the loans. That the bank subsequently allowed these variations to be funded does not mean it was not important or reasonable, at the time of application, to confirm the building contract variations. The broker’s omission to advise of updated rate lock fee was not a breach Mr J says the broker:  told him the wrong rate lock fee ($750 per loan instead of $375 per loan),   provided him with the wrong information with which to make a choice about rate lock, and   inappropriately advised him against requesting a rate lock. In response, the broker does not dispute that he:   told Mr J the rate lock fee was $750 per loan when rate lock was first discussed in May  2021 (which was correct at the time), but  did not know the bank had reduced the rate lock fee for the period from July 2021 to January 2022 to $375 per loan. As the broker did not know this, he did not update Mr J of the reduced rate lock fee when the application was lodged in September 2021.  The broker says he first became aware of the reduced rate lock fee on 23 November 2021, days before a scheduled settlement. He says he then informed Mr J of the reduced rate lock fee, but Mr J declined to apply for it, saying to the effect he should not have to pay for the bank’s delay. Mr J disputes this conversation occurring. Determination | Case number: 859914 Page 6 of 12 Mr J is a careful investor who wanted to secure the lowest possible fixed rates. He demonstrated a preparedness to rate lock, including to do so for a fee, as shown by his willingness to complete a Bank B fixed rate cap election form on 6 April 2021. I am unsure whether the form was ultimately lodged with Bank B as enquiries with Bank B did not appear to have progressed to an application. Nevertheless, having regard to all the available information, I consider the broker’s omission to advise Mr J of the updated rate lock fee from July 2021 did not amount to a breach of his obligations of due care and skill, for the following reasons:  Mr J is a sophisticated investor. He would have understood, at least in a general sense, how a rate lock worked. He would have understood a rate lock had to be applied for with the specific lender in question. He knew he had signed a form for Bank B (discussed above), but none for the bank. Accordingly, I am satisfied that he knew or should have known that no rate lock had in fact been applied for with the bank, at any stage.   Mr J chose not to apply for rate lock at the time the rate lock issue was first discussed in the context of an application to the bank in around May 2021. Mr J implicitly accepts this position by alleging the broker gave him wrong information about the rate lock fee and/or inappropriately advised him against applying for a rate lock. That is, Mr J accepts he made a choice, albeit one based on alleged misinformation, not to apply for rate lock.   Mr J conveyed to the broker his choice not to apply for a rate lock with the bank. This is consistent with the broker’s comment in his Product Recommendation (issued to the complainants in September 2021, shortly before the loan applications were lodged) that the rate lock option was “not important” (Item 5.5). The complainants did not object to this comment at the time. They had chosen not to rate lock.   A rate lock locks in the fixed rate between the time of loan approval and settlement which ordinarily occurs within weeks (in this case, about 4 weeks). A rate lock protects against interest rate increases within a relatively short period of time. Having regard to the features of a rate lock, in my view, once the broker had ascertained the complainants’ preference not to rate lock, he was not obliged (without more) to keep revisiting the question of whether the complainants wanted to rate lock. Accordingly, when the bank reduced its rate lock fee in July 2021, after the parties’ rate lock discussion, the broker’s omission to inform himself and/or to update the complainants about the fee reduction did not, in my view, amount to a breach of obligations of due care and skill.   The complainants subsequently received loan approval letters from the bank on 28  October 2021 and 1 November 2021, all quoting the bank’s then -prevailing rates. The rates were clearly stated to be “based on current interest rate which are subject to change”. The complainants must have known from these letters that: > they had not applied for any rate lock, > the fixed rates proposed to be applied were different from those at the time of application, or earlier, > the fixed rates remain subject to change until the time of settlement. The complainants made a choice not to apply for a rate lock when the broker first enquired as to their preference. That choice was made on correct information at the time. The broker’s subsequent omission to update them about the reduced rate lock fee did not amount to a breach of his obligations of due care and skill. I am not satisfied, in any event, the complainants have shown they would have made a different rate lock decision had th e fee been different. The complainants continue to elect not to rate lock, even when it was made very clear to them, in the bank’s approval letters and loan contracts, that they had not applied for any rate lock. Determination | Case number: 859914 Page 7 of 12 The broker did not mislead Mr J about whether a rate lock had been applied I have also considered whether the broker’s failure to respond to Mr J’s SMS messages on three occasions amounted to misleading conduct. On three occasions, Mr J texted the broker after the bank increased interest rates to seek reassurance that he would not be affected: 10.08.21 [Bank] just increased rates today. We locked in for your pricing request before for everything of mine with [bank]? 05.11.21 [Bank] just raised all fixed rates! We’re already locked in right? 10.11.21 You got those fixed rate forms in and backdated right? The broker either did not respond to these messages or gave a holding response. The complainants say the broker’s non -response amounted to a misleading representation that they had applied for a rate lock, or that the loans’ rates had already been fixed at earlier rates. I do not find the broker’s apparent silence amounted to misleading conduct. Mr J has only provided selected messages. The parties were communicating frequently. There could have been other messages or conversations around the same time that would have given better context to messages. Nothing of what the broker actually wrote was untrue. Further, as discussed, Mr J was an experienced borrower. He would have known how fixed rates and rate locks work generally. He would have known the earliest time a fixed rate could be “locked in” was at the point of loan approval (contrary to his message of 10 August 2021, when the loan application had not even been submitted yet). He would have known he had not signed a rate lock form with the bank. He would have known a rate lock could not be “backdated” (contrary to his message of 10 November 2021). In such circumstances, Mr J cannot establish a claim of misleading conduct by silence merely by showing the broker did not immediately contradict a statement that Mr J himself should have known to be untrue and contrary to the parties’ agreed approach to the loan application. The broker did not mislead Mr J about whether a rate lock had been or could have been applied to the loans. The broker’s failure to meet service expectations not a breach of obligations Mr J says he engaged the broker on the strength of the broker’s assurance that he would be able to obtain finance. Mr J says he repeatedly expressed to the broker the urgency of the finance application. He has provided copies of SMS messages in which he expressed frustration at the pace of the finance process, and in which the broker was apologetic and explained that some of the delay to his commitment with other clients’ work. I acknowledge Mr J became dissatisfied with the broker’s service as early as May 2021. However, a failure to meet Mr J’s service expectations does not necessarily mean the broker’s conduct fell s hort of the standard of due care and skill expected of a reasonable broker. Some of the delays were due to factors outside of the broker’s control. As discussed, the complainants’ finance requirements were complex. The urgency of the project (and hence the finance) was a result of many other considerations, including eligibility for government grants. Ultimately, the broker was able to secure finance about 8 months after he had received the necessary financial information (March 2021), and about two months after the major build variations had been confirmed (August 2021). Determination | Case number: 859914 Page 8 of 12 To the extent the broker could not prioritise the complainants’ work over other work, that conduct might have been a frustrating experience for the complainants, but that did not fall short of the standard of care the community expects from a reasonable broker. 2.3 Did the complainants’ further submissions change the outcome in relation to the bank? The complainants’ further submissions do not change the outcome in relation to the bank. The bank has provided $4,000 cashbacks The complainants say they were entitled to $6,000 in cashbacks but the bank failed to pay it. The bank has provided information to show it was offering a $2,000 refinance cashback per borrowing entity at the time. The complainants initially lodged two loan applications (the first with themselves as borrowers, the second with J Co as borrower). However, they reworked the second application at the bank’s request with themselves as applicants and J Co as guarantor. Strictly speaking, the complainants would only have been entitled to one cash back of $2,000. The bank paid this $2,000 at settlement on 14 December 2021. As part of the complaints process, the bank paid another $2,000 on 26 February 2022, a total of $4,000. The complainants are not entitled to further cashbacks. The bank did not quarantine or freeze funds The complainants say the bank “quarantined” $23,983.99 in funds in account ending #9174 from settlement in December 2021 to July 2022. Loan #9174 is a construction loan. Although $100,000 was approved as the loan limit, the loan amount in excess of finance needs is not disbursed as surplus funds at settlement. The loan was progressively drawn down as construction costs are incurred. Even though the bank credited $23,983.99 the loan’s redraw facility at settlement, those funds do not become available for drawing down until the loan was fully funded. On 19 January 2022, Mr J advised the bank the funds were not required and would contact the bank when they were needed. In August 2022, after the loan had been fully funded, the complainant directed the available redraw amount of $23,983.999 to be transferred to a transaction account. There is no information to show the bank stopped the complainants from accessing these funds once the loan was fully drawn down. The bank’s settlement offers are not admission of liability The complainants say the bank has admitted liability through its previous responses to their complaint and compensation offers which were rejected on the basis they did not cover the financial loss incurred. However, the bank’s offers were made on a commercial or “without prejudice” basis (that is, without prejudice as to their rights to defend the claim). They are not admissions of liability or fault. The bank is not required to compensate the complainants. Determination | Case number: 859914 Page 9 of 12 2.4 Why is the outcome fair? I acknowledge the complainants’ frustration that the finance process did not proceed as quickly as he anticipated, resulting in higher costs through higher interest rates and increased construction prices. However, these are not factors that are within the control or the responsibility of the broker or the bank. Given the complexity of the complainants’ finance needs, the financial firms did not unreasonable delay the finance process. Determination | Case number: 859914 Page 10 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles   applicable industry codes or guidance   good industry practice   previous decisions of AFCA or its predecessor schemes (which are not binding).  The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted our determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents   the recollections of the parties   all relevant circumstances.  We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 859914 Page 11 of 12 3.2 Properties owned by Mr J and J Co Owner Property Outgoing mortgagee before the refinance of December 2021 Mr J 127A, A Rd Bank W Mr J 127B, A Rd Bank W Mr J Unit 2, F St Firm R Mr J Unit 4, F St Firm R Mr J Unit 5, F St Firm R Mr J Unit 6, F St Bank W J Co D property Bank W J Co T Trail 1 Firm L J Co T Trail 2 Firm L J Co T Trail 3 Firm L Determination | Case number: 859914 Page 12 of 12 3.3 Loans provided to the complainants in December 2021 Loan number Amount Security Type Purpose #9305 332,000 Fixed invest Refinance #0735 332,000 127A, A Rd Fixed home Refinance #9321 312,000 127B, A Rd Fixed invest Refinance #9380 308,000 Unit 2, F St Unit 4, F St Fixed invest Refinance #9401 262,000 Unit 5, F St Unit 6, F St Fixed invest Refinance #9262 320,000 (cross Fixed invest Refinance #0743 280,000 collateralised) Var. home New Build #8590 152,000 Var. invest New Build Total 2,298, 000 #9270 216,000 Fixed Invest Refinance #9297 216,000 Fixed invest Refinance #9318 216,000 D property Fixed invest Refinance #9166 276,000 T Trail 1 T Trail 2 Var. invest New build #9174 100,000 T Trail 3 Var. invest New build #9182 100,000 (cross collateralised) Var. invest New build #9238 100,000 Var. invest New build #9292 332,000 Fixed invest Personal investment Total 1,556, 000 Recommendation Case number 859914 Financial firm A 864460 Connective Credit Services Pty Ltd Financial firm B 859914 Commonwealth Bank of Australia Recommendation | Case number: 859914 Page 1 of 20 Case number: 859914 16 March 2023 1 Recommendation overview 1.1 Complaint In October 2020, the complainants applied through financial firm A (the broker) to refinance loans with financial firm B (the bank). In December 2021 the bank provided the loans listed in section 3.3 below. The complainants say:  the original loans were with three separate credit providers, banks R, L and W   they required additional loans to finance the construction of residential investment properties   they entered six HIA contracts with a builder on 28 December 2020   prior to lodging the application with the bank, the broker advised:  > the bank’s fixed rate lock fee was $750 per loan, with 10 loans this was a fee of $7,500 > do not take up rate lock because any interest rate gain would be less that the total $7,500 rate lock fee > the bank would honour the interest rates negotiated with its pricing before the subsequent rate rises in late 2021  the bank’s rate lock fee in 2021 was $375 per loan and not $750   the refinance settlement was delayed week after week until 8 December 2021 when there was a partial settlement with full settlement on 14 December 2021   during this time interest rates and building costs increased.  1.2 Issues and key findings Did the broker delay the loan applications? No, given the complexity of the deal and ongoing changes to the proposed security in terms of building costs, construction specifications and the loans to be sought, there does not appear to be any unreasonable delay in the submission of the loan applications initially to bank BW and then to the bank. Did the bank or the broker delay settlement? No, given the complexity of the funding deal and the number of entities involved, the overall timing of the loan applications and processing to settlement was not unreasonable. Did the broker mislead the complainants regarding rate lock pricing? Even if the conclusion is reached the broker failed to notify the complainants of the reduced rate lock fee, which it has not, when they signed the credit contracts the complainants made a conscious decision not to take out rate lock after receiving the bank’s credit assessment summaries dated 8 November 2021. Recommendation | Case number: 859914 Page 2 of 20 Did the bank mislead the complainants regarding fixed interest rates? There is no information to show the bank mislead the complainants regarding interest rates which would apply to the loans. Did the broker comply with its legal obligations? There is information to show the broker acted with appropriate skill, care and diligence and met its legal obligations when it provided credit assistance to the complainants. Why is the outcome fair? The events the complainants have described are unfortunate and I understand the complainants may be suffering financial hardship due to reasons beyond their control. But when:  the broker applied for the loans and   the bank provided the loans  they both met their legal obligations, acted in line with good industry practice, and complied with applicable industry codes. So, it would not be fair to require either the broker or the bank to compensate the complainants. 1.3 Recommendation This recommendation is in favour of the broker and the bank. No compensation is payable to the complainants. Recommendation | Case number: 859914 Page 3 of 20 2 Reasons for recommendation 2.1 Did the broker delay the loan applications? No, given the complexity of the deal and the ongoing changes to the proposed security in terms of building costs, construction specifications and the loans to be sought, there does not appear to be any unreasonable delay in the submission of the loan applications initially to bank BW and then to the bank. The complainants entered building contracts In recent years Mr complainant and his company have been involved in residential development projects. In December 2020 the complainants entered construction contracts with a builder to construct residential houses on land owned by Mr complainant and his family trust. Mr complainant began discussions with the broker in October 2020 regarding the finance the borrowers required to complete these projects. The broker says although the complainants entered the building contract in December 2020 at this time specifications, plans and building agendas were not finalised. There is information to show the borrowers were slow to provide information to the broker required to progress the loan application. The construction contracts the complainants entered create a legal relationship between the parties to those contracts but do not extend to external parties such as the broker and the bank. External parties do not know the details of the construction contracts and have no right to amend or change them. If the complainants entered these construction contracts, with expectations as to how other entities such as a broker and/or the bank will assist in the contracts being implemented, they remain expectations. The lending request was complex The initial loan application was in two parts. The first part (application number xxx4263) involved refinancing existing loans with banks W and R in the names of the complainants. The complainants were applying for eight loans, with six investment loans (five fixed interest rate) and two owner occupied (one fixed interest rate). The security offered was four properties in F Street and two properties in A Road owned by Mr complainant. The F Street properties were existing investment properties. The A Road properties required construction funding. One of these properties was to become the owner occupied property of the Mr complainant so a home loan rather than investment loan was required for this part of the funding. The second part (application number xxx7859) was a request for another eight loans totalling $1,556,000 to be provided to Mr complainant’s trading company as trustee for (ATF) Mr complainant’s family trust. These were to be secured by three properties at T Trail and one at D Drive. These properties were being refinanced from bank L. The request was for eight investment property loans, four fixed rate loans and four variable rate loans. The four variable rate loans were to be used for the construction of new properties on the four blocks of vacant land being provided as security. This proposal involved six building contracts for six different sites with the borrowers refinancing three different lenders to home and investment property loans from a single Recommendation | Case number: 859914 Page 4 of 20 lender. The borrowers had to provide information regarding the type of properties being refinanced, details of the construction projects, income earned by all borrowers both corporate and personal, the level of funding sought, what amounts were being refinanced and the level of additional cash out requested. A loan application was initially made to bank BW The loan application was first made to bank BW in mid-March 2021. The information shows the complainants were seeking consumer finance and wanted to obtain a competitive interest rate. The broker engaged in various communication with bank BW. The broker information shows clarification/details were required regarding the type of properties being refinanced, the construction projects, income earned both personally by the borrowers and by the family trust etc. Bank BW queried the level of funding sought, what amounts were being refinanced and the level of additional cash out requested. Additional information was provided to bank BW from early April 2021 until mid-May 2021 when bank BW advised it was unable to assist with finance. This decline shows the proposal sought was not easily placed. The Mr complainant approached the bank In April 2021, during the time bank BW was considering the borrowers’ funding application Mr complainant contacted the private bank area of this bank directly about making a loan application for $4,100,00 in new residential property funding. In his email communications Mr complainant highlighted low fixed interest rates being offered by other banks and asked if the bank would match these rates. The bank responded it was unable to do so. By late April early May 2021, the broker began preliminary discussions with supporting information with the bank. The complainants varied construction project specifications Mr complainant has referred to his experience in the banking and finance industry to suggest he was not satisfied with the pace at which the loan processing was affected. However, this complex funding request involved multiple changes to the construction contracts (initiated by the complainants) between December 2020 and the time of lending. This included variations to specifications on each building project which added to the time taken when considering the level of funding to be provided. The broker cannot submit a proposal to the bank for a project when the complainants are still deciding some of the specifications/components of the projects. On 15 August 2021, the broker provided:  a proposed loan structure to the complainants, detailing the level of funding that would be  sought relative to each property  the opportunity for the complainants to vary what was proposed.  Mr complainant responded with his suggested amendments and details of variations to the construction project specifications. It appears the complainants made changes to the nature of the construction projects to either improve the projects, and/or provide some of the items themselves, thereby reducing the building cost. With each change the valuer and the bank needed to consider what is included in the building contract and what items are being provided by the complainants (as owner). It is reasonable for the bank to know:  the cost of these individual items (with invoices if required)  Recommendation | Case number: 859914 Page 5 of 20  how this contributes to the added value of the site   if the additional items are fixed or variable prices   if the additional items are purchased in advance   where items are stored, as the builder’s insurance during construction will not cover items he is not supplying.  These factors have added additional time to the assessment and submission of the proposal by the broker to the bank. The bank did not conduct a new valuation with each proposed change. The broker waited until there was a final position on each project before requesting the valuation. The broker was seeking to obtain the maximum amount of funding for the complainants, which had been their goal. The broker applied to the bank for funding Mr complainant confirmed the structure the borrowers were happy with on 16 September 2021. On 28 September 2021, the broker put forward a credit proposal to the bank for the refinance of the home and investment property loan applications xxx4263. The submission in the company name ATF the family trust (loan application xxx7859) was submitted on 7 October 2021. This was later as there was additional information to be provided for this application. There was no unreasonable delay in submitting the loan application Given the complexity and the ongoing changes to the security in terms of building costs etc, construction specifications and the loans to be sought, there does not appear to be any unreasonable delays in the submission of the loan applications to bank BW or the bank. The complainants appear to have expected the proposal to be processed as if it were a straightforward application, which it was not. The changes to construction contracts in the process of the application has likely contributed to the longer period required prior to the loan submission. If the broker had submitted the application earlier, it would not have allowed:  for the complainants’ further changes to the construction projects   a higher level of funding to be obtained by the complainants.  The broker has sought to maximise the funding obtained to meet the complainants’ top priority and objective. 2.2 Did the bank or the broker delay settlement? No, given the complexity of the funding deal and the number of entities involved, the overall timing of the loan applications and processing to settlement was not unreasonable. There is no information to show the refinance was urgent The available information does not show any urgency to settle the funding application on the part of the complainants prior to November 2021. This became evident in late November 2021, just before settlement in December 2021. There were no scheduled events such as the settlement of a land purchase imposing a deadline for funding approval. The complainants appear to have taken time to vary the construction contracts as required, to Recommendation | Case number: 859914 Page 6 of 20 improve the final build. There is no previous mention, in the emails of an urgency to complete the refinance. The bank declined the loan applications The broker undertook a preliminary assessment and provided a product recommendation to the complainants’ family trust dated 30 September 2021. On 25 October 2021, the bank advised the application was declined because the trading company ATF Mr complainant’s family trust was not an eligible borrower for retail lending. There was also other information missing which the bank required to support the applications. The bank approved the loan applications The applications subsequently changed to applications by the complainants as borrowers with the family trust as guarantor for some loans. The bank approved application:  xxx4263 with Mr complainant’s property as security on 28 October 2021   xxx7859 with the family trust property as security on 1 November 2021.  Following its assessment the bank issued three approval letters to the complainants to advise the loans requested had been approved. There were two letters dated 28 October 2021 and one dated 1 November 2021. All the approval letters noted:  the basic details of the loans to be provided and the indicative interest rate current at the date of issue   both related loan applications xxx4263 and xxx7858 needed to fund together   the three year fixed rates quoted in these letters noted the initial annual percentage rate was 2.29% p.a. for the investment loans and stipulated the rate was “based on current interest rates which are subject to change”.  The loan documents were returned to the bank The four credit contracts (three for application xxx4263 and one for application xxx7859) were issued as at 8 November 2021.The three year fixed rates for investment loans were shown as “Currently 2.59% p.a. (Rate lock not applied)”. The credit contracts were signed by the complainants and returned to the bank by 19 November 2021. The contracts were sent for processing in anticipation of the refinance settlement. Processing of the documents requires the bank to certify that the documents returned are acceptable and meet the bank’s requirements. The review of the documents will go into the bank’s workflow queue and be processed so that settlement can then be coordinated. Simultaneous settlement involving numerous parties was required On Tuesday, 23 November 2021, the broker asked for the file to be made ready for settlement by close of business 24 November 2021. Settlement under PEXA had been scheduled for 9 December 2021. The broker advised this proposed settlement date was not accepted. On 25 November 2021 the broker requested the certification be processed outside the normal expected service level agreement time. Consequently, the bank escalated the file for review. There is an email from the broker showing he believed the bank caused a hold up when a Recommendation | Case number: 859914 Page 7 of 20 credit manager did not put a file note for a settlement condition regarding the bank L finance on the file. The broker tracking notes refer to different comments relating to the individual applications that required follow up. Where the bank required and had notified the borrowers that all the loans needed to refinance/fund together any delay on one of the applications would impact the total refinance settlement. Additionally, the bank could not control the requirements of the other lenders being refinanced. If banks R, W or L were not satisfied with the documents they held, the bank ha d to wait until they were. The bank could not force the other banks to settle if they were not ready. The settlement also involved PEXA for a property that was being transferred into different names. The loan applications were formally approved on 30 November 2021 The decision comments (from the bank) for both loan applications xxx4263 and xxx7859 show both applications were formally approved by 30 November 2021. Formal approval refers to the date on which the bank is satisfied they have all the required documents and information to proceed to settlement. The loan contracts that had issued as at 8 November 2021 for the two different loan applications were still valid. However, there were still some outstanding conditions that the borrowers had to satisfy (such as providing various building contracts etc.) It appears once this information/documentation was provided the applications were then formally approved. Settlement could not be arranged until the applications had achieved this status. Some loans in application xxx7859 settled on 8 December 2021 For the trust assets file, the notes indicate this was progressed on 25 November 2021. However, it was identified the bank was waiting on three clear titles for the Tuart Trail properties. The discharge authority appears to only refer to one title, not three. The bank also required confirmation of the trust assets which related to the bank L debt. This was communicated to the broker. The broker contacted the bank to clarify the position on 26 November 2021. There was further clarification required regarding the mortgages to be discharged for the bank L debt, which was still outstanding prior to settlement. The bank then referred the matter back to the credit assessor for clarification on 29 November 2021. On 30 November 2021 the bank noted the simultaneous settlement requirement. The loans with bank L that were to be refinanced needed to be included in the settlement arrangements. On 2 December 2021 the bank requested some additional building contract information (complete copy of the fixed price building contract) that did not appear to be held. The broker also called in to advise settlement had been booked for 7 December 2021. On 6 December 2021 the notes refer to the request to push settlement back to 8 December 2021 at 2.30pm to match with the related application (to meet the requirement to settle simultaneously). On 7 December 2021 the PEXA settlement was proposed for 3.00 pm (AEST – noting WA file) on 8 December 2021 pending OFI (other financial institution) acceptance. Recommendation | Case number: 859914 Page 8 of 20 It appears the xxx7859 settlement was scheduled for 2.30pm with PEXA and the xxx4263 loans scheduled for 3.00 pm. However only the two loans from application xxx7859 drew down for $216,000 each on 8 December 2021. The xxx4263 loans did not settle. There is information to show the broker was kept fully informed throughout this process through the Broker Loan Tracking information used by the bank. The application xxx4263 and other xxx7859 loans settled on 14 December 2021 As with application xxx7859, the broker requested the file be ready for settlement by close of business on 24 November 2021. The scheduled settlement date of 9 December 2021 was not accepted by the broker. On 25 November 2021 the broker requested the documents be certified outside normal service level arrangements. The bank escalated the file for review. The bank noted the requirement for the refinance and the construction finance to settle (and the paper settlement) simultaneously. On 26 November 2021 the notes refer to a settlement date of 29 November 2021 as per the borrowers’ request. This was from the settlement agents coordinating settlement. There was no commitment from the settlement agents to this date. The notes then add that the borrower has advised PEXA that the settlement agents are representing three of the F Street units for bank R, but bank W held the remaining F Street unit. The settlements team then noted that bank W will need to be added to the settlement as they have the remaining F Street unit. On 30 November 2021 the broker is emailed to confirm if unit 2 at F Street is from bank W or R. Further details are noted regarding the refinance and simultaneous settlement requirements, and the paper settlement that is also involved in the total settlement arrangements. On 2 December 2021 the broker rang to advise attempts to book settlement were unsuccessful. Later comment by the bank was that there was still the Certificate of Design Compliance outstanding for an A Rd security. Additional notes on 6 December 2021 show efforts by the broker to schedule a settlement seem to be unsuccessful. A later note indicates the broker called regarding the settlement details on the xxx7859 application. On 7 December 2021 one of the settlements was scheduled for 2.30pm on 8 December 2021 with the PEXA settlement proposed for 3.00 pm (AEST – noting WA file) on 8 December 2021 pending OFI acceptance. The request was made for priority service to meet customer commitment. There is no information to show if this commitment was by the bank or the broker or made directly to the settlement agent by the Mr Complainant. Part of the settlement for xxx7859 application went ahead on 8 December 2021. The other part could not proceed because of a documentation issue raised by another bank. The remaining settlement on both applications was rescheduled for the following week and was completed on 14 December 2021. Recommendation | Case number: 859914 Page 9 of 20 The complainants wanted to contact the bank directly Mr complainant says he has 20 years finance industry experience, working as a financial advisor and had been employed as a senior banker with another bank. The complainants have complained about not being able to meet directly with the bank’s representative that was dealing with the broker. The role of the broker is to liaise with the bank in dealing with loan applications. The broker receives commission etc. for this work with the borrower. There is no expectation that a borrower dealing with a broker would also meet and deal with the lender. The complainants engaged the broker to act on their behalf to obtain the finance that was requested. If the complainants are not satisfied or do not trust their broker during this process, then it would be usual for the borrowers to change broker. There were no unreasonable settlement delays It is not clear why the complainants expected settlement would proceed quickly and within days of 23 November 2021. The two loan applications were related and the bank required them to fund together. If there was a problem or referral back on one application, it impacted the progress of both applications. Although the loan contracts issued on 8 November 2021, approval was subject to additional information and documents being provided. Until both applications were formally approved on 30 November 2021 the deal would not proceed to settlement. The bank’s settlements team will still require information (payout figures, insurance information etc.) that is obtained after formal approval was provided. They need to then coordinate with the other parties for settlement. Settlement was scheduled for 7 December 2021 but moved to 8 December 2021 to fit in with other banks. While one of the settlements was affected on 8 December 2021 the other part could not proceed because of a documentation issue raised by another bank. The remaining settlement was rescheduled for the following week and was completed on 14 December 2021. Given the complexity of the funding deal and the number of entities involved the overall timing and processing to settlement was not unreasonable. 2.3 Did the broker mislead the complainants regarding rate lock pricing? Even if the conclusion is reached the broker failed to notify the complainants of the reduced rate lock fee, which it has not, when they signed the credit contracts the complainants made a conscious decision not to take out rate lock after receiving the bank’s credit assessment summaries dated 8 November 2021. A loan application initially made to bank BW included rate lock A loan application by the borrowers through the broker was first made to bank BW in mid- March 2021. The information shows the complainants were seeking consumer finance and wanted to obtain a competitive interest rate. The complainants have provided a copy of bank BW’s “fixed rate cap election form” that Mr complainant signed on 6 April 2021 when he was dealing with the broker. The form referred to a four year loan term with a cap of 1.99%. Bank Recommendation | Case number: 859914 Page 10 of 20 BW declined the application and the election form is not relevant to the subsequent application to the bank. Mr complainant and the broker discussed rate lock The broker discussed the loan applications and supporting information with the bank in early May 2021.The broker and complainants agree in May 2021 the broker advised Mr complainant the bank’s rate lock fee was $750 per loan. If taken up by a customer, rate lock guarantees a customer’s fixed interest rate for their chosen fixed -rate period for up to 90 days. The bank reduced its rate lock fee On 5 July 2021, the bank reduced its rate lock application fee from $750 to $375 per loan for the period 5 July 2021 to 31 January 2022. The bank says all brokers received a communication email advising of the reduced rate. The broker says he was unaware of this change until 23 November 2021. The broker applied to the bank for funding On 28 September 2021, the broker put forward a credit proposal to the bank. Before doing so the broker conducted the PAPR (Preliminary Assessment and Product Recommendation) for Mr complainant’s compa ny ATF the family trust. The PAPR:  identified the top priority of the borrowers as access to the most amount of money   noted rate lock was not important (refer item 5.5).  There is no information to show the broker made a recommendation to the complainants about rate lock. The bank approved the loan applications Following the bank’s initial decline, the applications were approved with the complainants as borrowers and the family trust as guarantor for some loans. The bank issued three approval letters to the complainants. There were two letters dated 28 October 2021 showing:  five fixed rate investment loans with approval for three years fixed at a rate of 2.29% and  one variable rate investment home loan.  one fixed rate home loan with approval for three years fixed at 2.18% and one variable rate home loan.  There was one letter dated 1 November 2021 for four fixed rate investment home loans with approval for three years fixed at 2.29% and four variable rate investment home loans. These loans were secured by family trust assets. All the approval letters noted:  both related loan applications xxx4263 and xxx7859 needed to fund together   the fixed rates quoted were “based on current interest rates which are subject to change”.  The complainants signed the credit assessment summary which noted rate lock The bank prepared credit assessment summaries for the applications as follows:  xxx4263 – S (owner occupier) signed by the complainants on 12 November 2021   xxx4263 – VFI (investment home loan) signed by the complainants on 12 November 2021   xxx7859 (trust assets) signed by the complainants on 15 November 2021.  Recommendation | Case number: 859914 Page 11 of 20 The credit assessment summaries set out details of the information used and relied on by the bank to assess the credit applications and to make its credit assessment decision. The credit assessment summaries noted “fixed rates are subject to change up until the loan is funded. Our rate lock option…allows you to lock your fixed interest rates prior to the loan being funded, for a non- refundable fee per Rate Lock”. The relevant part of the clause from each credit assessment summary is set out in section 3.2 below. The complainants did not take up the rate lock option when they signed the credit assessment summaries. The complainants signed the credit contracts without rate lock applying The credit contracts with a disclosure date of 8 November 2021 for:  the fixed rate home loan contract xxx4263-S refers to the fixed rate as being 2.58% (2.84% less discount of 0.26%)   the variable and fixed rate investment home loan contract xxx4263-VFI refers to the fixed rate for loans 1,2,3,4,6 as being 2.59% (2.84% less discount of 0.25%)   the variable and fixed rate investment home loan contract xxx7859 refers to the fixed rate as being 2.59% (2.84% less discount of 0.25%).  All the contracts note:  the fixed rate is current at the time of the contract being printed, which was 8 November 2021   rate lock was not applied for each fixed rate loan.  The credit contracts were signed by the complainants and returned to the bank by 19 November 2021. An example of the relevant section of the credit contract schedule is set out in section 3.2 below. The broker was aware of the reduced rate lock fee in November 2021 The broker says the first time he realised the rate lock fee had been reduced to $375 was when he received an SMS message from the bank on 23 November 2021. He contacted Mr complainant to discuss the rate lock fee. At this time Mr complainant believed settlement was scheduled for around 25 November 2021 so he did not consider it was necessary to rate lock the loans. We do not know on what basis the Mr complainant expected settlement to occur on this date. Mr complainant denies the broker called him regarding the new rate lock fee. Where there is conflicting information regarding when and if the broker advised Mr complainant of the bank’s reduced rate lock fee a conclusion cannot be reached either way. The complainants did not rely on any representation regarding rate lock fees The complainants say:  if they had known about the reduced rate lock fee they would have rate locked the fixed interest rate offered in the loan agreement with the disclosure date of 8 November 2021   believing the fee was $750 per loan they did not take up rate lock because any interest  rate gain would be less than the total $7,500 rate lock fee. There is no information to show any interest rate gain would be less than the total of any rate lock fee. It is only after the complainants received the credit contracts that they knew the interest rates being offered by the bank. However, they could not know the amount or timing Recommendation | Case number: 859914 Page 12 of 20 of any future fixed interest rate increase. Consequently, it is impossible to know if any interest rate gain will be less than a proposed rate lock fee. The PAPR shows rate lock as not important to the complainants and there is no reference to the amount of the rate lock fee. Instead, the information shows the priority of the complainants was to access the lender which will loan them the most money at the cheapest interest rate. The difference between a rate lock fee of $7,500 against the reduced fee of $3,750 over 10 fixed rate loans does not appear to be material given the complainants priorities. In any event the PAPR was dated 30 September 2021 and had been completed by the broker. When the bank sent the complainants the credit assessment summary in mid- November 2021, the complainants elected not to take up rate lock. This election was shown in the credit contracts signed by the complainants and returned to the bank by 19 November 2021. The complainants were also aware the interest rates quoted in the approval letters and credit contracts were subject to change where rate lock was not applied. Even if the conclusion is reached the broker failed to notify the complainants of the reduced rate lock fee, which it is not, when they signed the credit contracts the complainants:  knew the bank offered rate lock and how it worked   had elected not to use rate lock.  Whilst the complainants were concerned about rising interest rates (as recorded in the PAPR) the complainants appear to have made a conscious decision not to take out rate lock after receiving the bank’s credit assessment summaries dated 8 November 2021. 2.4 Did the bank mislead the complainants regarding fixed interest rates? There is no information to show the bank mislead the complainants regarding interest rates which would apply to the loans. Fixed interest rates were set at settlement The complainants say because of the delay in the settlement, the fixed interest rates obtained for the 10 fixed rate loans were higher than they should have been. There was a fixed rate interest change on 26 November 2021 after the credit contracts were signed by the complainants and before the loans settled. Consequently, the complainants were provided with the standard fixed rates that applied less the agreed discount when the loans settled. Settlement could not be considered until the applications were formally approved on 30 November 2021. Consequently, the borrowers could not have obtained any of the fixed interest rates that applied until after this date. Where:  the interest rates at settlement were current from 26 November 2021   the borrowers had not elected to take rate lock,  the rates on the fixed rate loans would not have been any lower, irrespective of whether the loans had settled early in December, on 8 December, or on 14 December 2021. Recommendation | Case number: 859914 Page 13 of 20 The complainants did not rely on the bank’s representation to honour earlier rates The complainants say the bank represented it would honour the interest rates negotiated with its pricing before the subsequent rate rises in late 2021. The broker says following settlement on 15 December 2021 he phoned the bank and asked what the actual interest rate was for each loan. The bank advised the broker the interest rates noted in 1 November 2021 when the restructure had been accepted would be the applicable interest rates. This advice was incorrect and was corrected the next day during the brok er’s telephone conversation with the bank. Even if the bank made a misrepresentation on 15 December 2021 regarding interest rates which applied to the settled loans being lower than they were, the complainants did not rely on this representation to change their position. The interest rates increased on 26 November 2021 and the loans had settled after the increase. The complainants were bound by the terms of the credit contracts to the fixed interest rates current at the time of settlement. The complainants would still proceed with the funding Mr complainant says when he commenced the loan application in about July 2021 the residential home lending market was fiercely competitive in the fixed rate loan segment offering historically low rates. If he had known the fixed interest rates would be as high as 3.19% he would have determined the proposal was no longer commercially viable. This statement appears contrary to the reasons the complainants gave for seeking the refinance as shown in the PAPR and credit assessment summaries. There is information to show Mr complainant had experience in the finance industry and property development and that the complainants proposed to hold at least some of the properties long term. Consequently, the complainants knew the lending would be subject to interest movement over time. As borrowers/developers it would be usual to conduct some assessment of the breakeven point for a project, factoring in a reasonable margin to allow for changes (such as interest rate fluctuation) and reflecting the risk. Higher interest rates will impact expected profit but it is hoped would not derail the project completely. There is no information to support Mr complainant’s claim his proposal was no longer commercially viable with fixed interest rates set at 3.19 % for three years. 2.5 Did the broker comply with its legal obligations? There is information to show the broker acted with appropriate skill, care and diligence and met its legal obligations when it provided credit assistance to the complainants. The broker prepared a credit proposal for the complainants Relying on information provided by the complainants, the broker prepared:  a servicing assessment dated 7 August 2021   a summary of requirements and credit proposal for the complainants dated 28 September 2021   a preliminary assessment and product recommendation to Mr complainant’s trading company as trustee for his family trust dated 30 September 2021 (PAPR). The trading company was later replaced by the complainants as borrower.  Recommendation | Case number: 859914 Page 14 of 20 The broker made a preliminary assessment that the loans were not unsuitable for the borrowers. The broker assessed the ability of the complainants to service the proposed loans totalling $3,662,000. The assessment showed a monthly surplus of $1,442.65 and a maximum borrowing capacity of $4,155,292. The broker identified the complainants’ requirements and objectives which were to refinance their current home and investment loans to:  gain better interest rates   take advantage of the increased equity held and the proposed increased value after the building projects were completed   take advantage of surplus cash to enable the various construction funding.  The broker applied to the bank for funding On 28 September 2021, the broker put forward a credit proposal to the bank. The borrowers sought to refinance 10 loans from three different banks’ and aimed to maximise the amount that could be borrowed over the two borrowing structures proposed. The bank rejected the initial application. As the family trust was not an eligible borrower for retail lending the application changed to the complainants as borrowers. The broker says there was no new preliminary assessment regenerated after the structure was changed to meet the bank’s requirements. Ho wever, in both structures the complainants were responsible for servicing all the loans so there was no financial change (to servicing, assets, liabilities etc…). The broker complied with its obligations under the NCCP The information shows:  the bank was selected because it was prepared to accept a split between company/trust and personal ownership   the borrowers were seeking a major lender, fixed and variable rate loans and rate lock was not important   the borrowers’ priority was to maximise the amount of the loans, then cheap interest rates  and finally loan features. The broker:  carried out a preliminary assessment after making enquires and obtaining verification information from the complainants   made reasonable inquiries about the complainants’ requirements and objectives   made reasonable inquiries about the complainants’ financial situation and took reasonable steps to verify their financial situation,  so there is information to show the broker acted with appropriate skill, care and diligence and met its legal obligations under the NCCP when it provided credit assistance to the complainants. 2.6 Why is the outcome fair? The events the complainants have described are unfortunate and I understand the complainants may be suffering financial hardship due to reasons beyond their control. But when:  the broker applied for the loans and   the bank provided the loans  Recommendation | Case number: 859914 Page 15 of 20 they both met their legal obligations, acted in line with good industry practice, and complied with applicable industry codes. So, it would not be fair to require either the broker or the bank to compensate the complainants. The outcome is fair The complainants’ applied for 16 loans to pursue their residential property development strategy. They applied for 10 fixed rate and six variable rate loans. They wanted to refinance existing lending with three other lenders to the one lender. They offered 10 properties as security with six owned by Mr complainant and four by his family trust. They also wanted to maximise the amount of money they could borrow. Given the complexity of the funding deal and the number of entities involved, the overall timing of the loan applications and processing to settlement was not unreasonable and met good industry practice. When they signed the credit contracts the complainants appear to have made a conscious decision not to take out rate lock for the fixed rate loans and were made aware that interest rates which would apply to the loans would not be known until the loans settled. Recommendation | Case number: 859914 Page 16 of 20 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has assessed this complaint based on what is fair in all the circumstances, having regard to:  the legal principles   applicable industry codes or guidance   good industry practice   previous decisions of AFCA or its predecessor schemes (which are not binding).  The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this recommendation to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents   the recollections of the parties   all relevant circumstances.  We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Misleading conduct Section 12DA of the ASIC Act provides that financial firms must not engage in conduct in relation to financial services that is misleading or deceptive or likely to mislead or deceive. To have a successful claim for misleading and deceptive conduct (misrepresentation) the complainants must demonstrate:  the financial firm made a statement or engaged in conduct that was false or misleading;   it was reasonable for the complainants to rely on the representation; and   the complainants relied on the representation to their detriment.  This means the complainants would need to show that “but for” the misrepresentation, they would have acted differently and be in a better financial position as a result. AFCA can consider this complaint against Financial firm A Based on the information available, AFCA is satisfied:  the loans are regulated loans under the NCCP  Recommendation | Case number: 859914 Page 17 of 20  the broker Mr JB, an authorised credit representative of Financial firm A, acted as an intermediary between the bank and the complainants for the purpose of obtaining regulated credit contracts   Mr JB is a director of SF Pty Ltd where both he and SF Pty Ltd are a full member of Financial firm A’s finance broker aggregation business   Financial firm A is responsible for the conduct of its authorised representatives in relation to regulated credit activities.  For the purposes of this recommendation the term broker means Financial firm A including Mr JB and SF Pty Ltd. 3.2 Relevant supporting information Contract terms and conditions The loan agreement between the bank and the complainants is made up of the Credit Contract Schedule and the Terms and Conditions. The loan schedule of the fixed rate investment loans for application xxx7859 which applied to loans 5,6,7 and 8 included by way of example for loan 6: Recommendation | Case number: 859914 Page 18 of 20 Loan agreement includes the following terms HL1.2 Setting and locking the interest rate (a) We set the interest rate (annual percentage rate) by adding a margin to or subtracting a margin from the reference interest rate current at the beginning of the interest rate period. We state the margin for the Loan and the name of the reference interest rate at Item C on your Contract Schedule. The amount of the reference interest rate or the reference rate that applies for your Loan may change between the Disclosure Date and the Funding Date. (b) You can ask us to ‘rate lock’ your interest rate (annual per centage rate) for a fee. If we agree to do this we will hold the rate for 90 days from the date we process your request at the interest rate that applied on that date. The interest rate may vary between the dates we process any initial and subsequent request to ‘rate lock’ the interest rate. If you fail to pay the rate lock fee for an interest in advance loan, we will debit the fee from your Loan Account. Where your Loan has been funded within that 90 day period, clause HL1.5 applies. Recommendation | Case number: 859914 Page 19 of 20 Credit Assessment Summary Page 2 of 10 3.3 Loans provided to the complainants Loan no Amount Current balance 03.03.23 Current interest rate as at 03.03.23 Loan type *9262 332,000 324,685.01 3.19% Investment *9238 100,000 - 6.10% Investment *9166 276,000 - 6.10% Investment *9174 100,000 6.10% Investment *9182 100,000 - 6.10% Investment *9270 216,000 210,981.88 3.19% Investment *9297 216,000 211,948.32 3.19% Investment *9318 216,000 210,981.88 3.19% Investment *9305 332,000 325,532.16 3.19% Investment Recommendation | Case number: 859914 Page 20 of 20 *9321 312,000 304,747.20 3.19% Investment *9380 308,000 301,044.03 3.19% Investment *9401 262,000 255,909.14 3.19% Investment *8590 152,000 - 6.10% Investment *9292 320,000 312,568.65 3.19% Investment *0743 280,000 - 5.65% Home *0735 332,000 323,818.30 2.88% Home

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.