Home / IAG / Determination 857935
Determination 857935
Water damage claim cash settlement and handling
Summary
The complainant's dishwasher leak caused water and mould damage to her home, and asbestos discovery led to her displacement and a cash settlement offer for part of the repairs. AFCA found the insurer liable for the whole loss, ordered it to carry out repairs, extend temporary accommodation and storage payments, and pay $1,000 for non-financial loss.
The insurer bears the burden of proving an exclusion, was unable to establish maintenance issues, and the discretion to cash settle must be exercised fairly, so repair was required.
Issues
- Claim amount dispute primary · upheld“Insurer is not entitled to cash settle; insurer is required to proceed with repair of the water and mould damage.”
- Claim denial secondary · not upheld“The insurer has the burden of proof if it wishes to rely on an exclusion; evidence insufficient to reduce damage for maintenance issues.”
- Poor claim handling secondary · upheld“The insurer's claims handling did add to the stress and inconvenience and the insurer is to pay $1,000 compensation.”
- Poor communication secondary · upheld“Communications could have been improved; complainant received confusing messages as to her risk of exposure to asbestos.”
- Repairs or contractors secondary · upheld“The insurer's contractors should have identified the continuing presence of moisture much sooner than 4 weeks from the initial date of loss.”
Subjects and remedies
health or medicalhome or building damagemental healththird party authoritypay compensationpay non financial lossprovide documentsrepair or rectify
Related
Text of the determination
Determination
Case number 857935
Financial firm Insurance Australia Limited
Determination | Case number: 857935 Page 2 of 10
Case number: 857935 2 February 2023
1 Determination overview
1.1 Complaint
On 30 October 2021 the complainant’s dishwasher leaked causing water damage. Within a
few days the complainant lodged a claim on her home and contents insurance policy with the
financial firm (insurer).
Due to the discovery of asbestos the complainant had to vacate her home. The complainant
is dissatisfied with the handling of the claim and the insurer’s decision to cash settle for only
part of the repairs.
1.2 Issues and key findings
Is the insurer obliged to indemnify the complainant for all or part of her loss?
Yes. The insurer is to indemnify the complainant in respect of all the water and mould
damage to her home.
Is the insurer entitled to cash settle the complainant?
No, The insurer is required to proceed with repair of the water and mould damage.
What is the position with contents and temporary accommodation?
The insurer is to total loss the contents and continue paying contents storage fees to the end
of April 2023. Temporary accommodation is to continue until the repairs are complete.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer’s claims handling did add to the stress and inconvenience and the insurer is
to pay $1,000 compensation.
Why is the outcome fair?
The outcome is fair because but for the escape of water from the dishwasher the complainant
would not have been required to vacate her home for over a year, and further, requiring the
insurer to complete the repairs is likely to return the complainant to her home at the earliest
time.
1.3 Determination
This determination is in favour of the complainant.
The insurer is to commence undertaking such steps as necessary for repairing the water and
mould damage to the complainant’s home .
The insurer is to continue paying temporary accommodation until repairs are complete.
The insurer is to continue paying any contents storage fees to the end of April 2023.
The insurer is to pay $1,000 compensation in non-financial loss.
Determination | Case number: 857935 Page 3 of 10
2 Reasons for determination
2.1 Is the insurer obliged to indemnify the complainant for all
or part of her loss?
Yes. The insurer is to indemnify the complainant in respect of all the water and mould
damage to her home.
Complainant has burden of proving loss comes within Policy coverage
No issue has been raised as to the Policy having been provided to the complainant.
Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions,
limitations, and exclusions, to determine its obligations to the complainant. The relevant
provisions are below at 3.2.
It is accepted insurance law that the complainant carries the initial onus to establish, on the
balance of probabilities (that is, more likely than not), a loss which is covered by the terms
and conditions of the policy.
Once the complainant has established a loss which is covered under the policy, the onus
transfers to the insurer to establish the application of a condition, limitation or exclusion upon
which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim.
There is no dispute that the dishwasher caused flooding in the kitchen. This is a loss covered
by the policy. However, in the present case much of the loss resulted from events that
followed the initial flooding. Accordingly, to determine responsibility for that loss it is
necessary to summarise below the sequence of these events.
Water escapes to downstairs area
On 1 November 2021, the complainant lodged a claim for water damage caused by water
escaping from her dishwasher. Her home, the original construction of which is about 45 years
old, sustained damage to the flooring and cabinet work in the upstairs kitchen as well as to
the ground floor.
The insurer engaged builders (A) and restoration specialists (B) to attend on 5 November to
assess the damage. B placed an air scrubber onsite. On 12 November B re-attended and
reported moisture in the downstairs bathroom ceiling and a strong smell of mould.
Presence of asbestos detected
On 25 November 2021 whilst pulling up layers of flooring in the kitchen an asbestos like
material was detected by B and samples were sent off for analysis. The complainant stayed
in the home another three days before leaving on a short holiday. She informed her teenage
son to stay elsewhere for the time being. It seems that either no covering or no adequate
covering was placed over the area sampled. During that three days the complainant used the
kitchen but avoided contact with the area of concern.
On about 30 November 2021 the Complainant was away when she was informed that the
substance was asbestos. The insurer arranged alternative accommodation for the next 2
weeks.
Determination | Case number: 857935 Page 4 of 10
Insurer’s expert finds maintenance issues
Also on 30 November 2021 a leak detection test by C found water ingress due to
maintenance issues in the rear window, balcony and wall. C expressed the opinion that 60%
of the damage to the kitchen sub-floor was due to the dishwasher leak but that window seals
and waterproofing failures contributed to the damage.
During December 2021 and January 2022 a number of certificates of analysis of samples
were issued by D (asbestos specialists) in respect of various parts of the house. Asbestos
was also detected on the floor in a bedroom and the loungeroom. The complainant believes
that during the three days she remained at home at the end of November she may have
inadvertently walked the exposed asbestos to other parts of the home. In December the
Complainant was moved to longer term accommodation which was some three hours away
by car. Shortly afterwards, further short term accommodation was found closer to the
complainant’s home.
Complainant rejects cash settlement
It was indicated to the complainant that any repair work of the water damage could not be
warranted due to the maintenance issues and that accordingly she would be cash settled.
The complainant was offered a cash settlement for 50% of the water damage. The
complainant expressed dissatisfaction with this offer. She stressed she did not want a cash
settlement and wanted the insurer to do the work. One reason for this was the shortage of
suitable contractors in the area.
Complainant’s expert finds no plumbing issues
The complainant obtained a report dated 17 December 2021 from a building consultant E
which found that there were no external water leaks contributing to the moisture in the
property. E wore fully protective clothing. E was instructed that the insurer had been dilatory
in not removing the kitchen floor coverings until 25 November and that this resulted in the
ongoing moisture problems. E ’s report agreed with this view. He stated this was supported by
water marks and signs of residual staining from dark mould spores. Further, E was very
critical of the report by C.
House was off limits pending asbestos clean up
In the meantime the complainant was advised she must not attend the property and nothing
could be removed from the house due to the presence of asbestos. The insurer obtained a
scope of work for removing the asbestos and indicated it would appoint A to organise experts
to carry out this work. The complainant was concerned and upset that she had received
different and confusing messages as to the asbestos problem.
Insurer offers to carry out asbestos clean up
The insurer conducted an internal review and on 23 December 2021 issued a decision that it
would proceed with removal of the asbestos, following which it said it would send in a
plumber to again check if there were maintenance issues. The insurer also agreed to pay for
E ’s report. The insurer agreed to check the home contents for asbestos contamination. It
apologised that its claim handling had not met the complainant’s expectations.
In mid-January 2022 D issued a certificate advising that following clean- up work, no asbestos
was detected on the ground floor. On 24 January 2022 the complainant arranged for a builder
to attend the downstairs part of the property. The builder cut a section out of the ceiling and
detected the presence of moisture and mould. On 31 January 2022 the complainant attended
Determination | Case number: 857935 Page 5 of 10
the property without entering the building. She noticed that the power had been turned off and
the contents of two refrigerator/freezers had been spoiled and leaked. It seems likely a
contractor had turned off the power.
A further leak detection test was carried out in mid-February 2022 by F who conducted
pressure tests and spray tests and found no plumbing issues present. The complainant had
been pressing for this report to be obtained but did not receive a copy until early March 2022.
Home safe for reoccupation in April 2022
In early April 2022 D issued a certificate confirming the areas inspected were safe for re
occupation. However, mould was then a problem no doubt partly due to the house being
closed up during a period of high humidity. The parties arranged for mould damage experts
to inspect and conduct assessments.
On 16 May 2022 a report was issued by mould specialists F stating their opinion that “the
cause of the mould growth identified throughout the property appeared to have been due to
incomplete remediation following water intrusion from the dishwasher ” . However in saying
this, F appeared to be reciting the instructions it received from the complainant. On 20 June
2022 a report was issued by restoration experts G, which noted also that extreme wet
weather events contributed to the damage.
The complainant has the burden of proving that the mould damage as described in the
reports of F and G was caused by the escape of water from the dishwasher. The complainant
asserts that the contractors engaged by the insurer were remiss in failing to detect the water
accumulated on the subfloor until about 3 weeks after the initial flooding.
Maintenance Issues
The parties have focussed their submissions on whether there were maintenance issues
contributing to the entry of water and moisture in the house. The policy contains exclusions
for loss or damage from gradual deterioration, wear and tear, the property not being in good
repair and condition, watertight and structurally sound. There is also an exclusion for mould
unless arising from damage covered by a listed event.
The insurer has provided a document described as an Internal Property Assessment Report
dated 18 August 2022 prepared by its own technical assessor. The report contains
photographs of the property including brief commentary as to a lack of flashing and failed
sealant. The attachments are not properly explained making it difficult to place reliance on the
report. It also attaches a 2011 pre-purchase inspection report of the property. The 2011
report contains reference to mould staining caused by water entry at the right-hand side of the
ground floor rumpus room. There is also reference to water staining to certain parts of the
flooring.
The evidence on moisture entering from other sources is contradictory. The inability for
relevant experts to even enter the house over four months due to asbestos has not assisted.
The insurer has the burden of proof if it wishes to rely on an exclusion. On balance I think it
likely there were other sources of water entry especially during the storms experienced.
However, the evidence is insufficient and lacking in specificity for the insurer to persuade me
that maintenance issues warrant some overall reduction of the damage.
Scope of works for repairs
On 5 November 2021 A completed a scope of work for repairs to the house in the sum of
$38,155. The insurer in its final submission dated 26 August 2022 says its technical assessor
Determination | Case number: 857935 Page 6 of 10
confirmed this scope as at August 2022. I am unable to see any comments by the
complainant on the detail in this scope of work. I do not seem to have any actual statement
by the technical advisor confirming how it is that the scope prepared by A at a stage before
the mould developed and before asbestos was discovered could still be accurate a year later
after significant remediation work has been done including removal of flooring and cupboards.
Asbestos contamination a contributing factor
In my view a significant contributing factor was the enforced stoppage of remediation works
due to asbestos and the closure of the home for over four months of summer.
Neither party addressed AFCA as to whether the asbestos contamination protocols operated
as an independent cause of loss or if their activation could be attributed to one or other party.
The insurer’s contractors exposed the asbestos as a result of the water leaking from the
dishwasher. An air scrubber was in use and possibly dryers before work stopped. The
contractors instigated the asbestos testing. The evidence suggests the suspected material
was not adequately sealed whilst the complainant was still in the home.
The insurer appears to have accepted responsibility for asbestos removal. The insurer paid
for the costs of the testing and removal of the asbestos. It would have been obvious that the
mould problem would worsen. Pehaps it was regarded as the lesser of two evils.
There is no express asbestos exclusion in the property section of the policy. There is an
exclusion for loss or damage from pollutants or contaminants that discharge or escape. (page
65). The insurer has not sought to rely on this exclusion. It is not apparent to me as to the
basis for the payment of asbestos removal costs by the insurer. I do not regard it as an
admission of liability.
The fact that the insurer arranged and paid for the asbestos removal costs does not of itself
make the insurer liable for the occurrence of mould damage during this four month period. So
far as I can tell the testing and removal process was carried out within a reasonable time
period. In all the circumstances I accept the mould contamination as at April 2022 was part of
the damage caused by the water leaking from the dishwasher. Accordingly, I find the insurer
liable for the whole of the loss and damage.
2.2 Is the insurer entitled to cash settle the complainant?
No, The insurer is required to proceed with repair of the water and mould damage.
Insurer has a discretion to cash settle
The policy states that if the insurer agrees to cover a building damage claim then the insurer
will pay the costs to repair or rebuild. The policy further states the insurer can choose to settle
the claim in one of two ways: 1. If the insured agrees, the insurer can arrange for its preferred
repairers to repair or rebuild the home or, 2. pay the reasonable costs to repair.
In effect, the policy seeks to reserve a discretion to the insurer to cash settle the complainant.
The policy sets out examples of when the insurer will do this, such as, if there has been
delay, or if not all damage is covered by the policy. The discretion must be exercised fairly.
The complainant has opposed a cash settlement and expressed concern due to a lack of
available contractors.
Determination | Case number: 857935 Page 7 of 10
Cash settlement is most desirable outcome
The insurer has offered a cash settlement. One immediate problem is that for the reasons
referred to above I am not satisfied the proposed scope of works is adequate and or up to
date. The complainant has indicated that rather than herself taking on the burden of dealing
with building contractors she wants the insurer undertake the repair work.
The complainant has been out of her home for 14 months. The monitoring by the
complainant of the performance of the insurer and its contractors has been a major source of
anxiety and unhappiness for the complainant. The complainant has requested the insurer
fund independent experts to assist her through the repair process.
On balance I am of the view that the insurer should itself be required to proceed with repairs.
This should be arranged and conducted as expeditiously as possible. The insurer is to
engage a builder other than A. I recommend the insurer enter some arrangement with the
complainant to ensure the process is as stress free as possible.
2.3 What is the position with contents and temporary
accommodation?
The insurer is to total loss the contents and continue paying contents storage fees to the end
of April 2023. Temporary accommodation is payable till the repairs are complete.
Contents
I have received limited information as to contents which were placed in storage and in respect
of which there was mould damage as well as concerns about asbestos. I believe a number of
contents were irremediable and were thrown out. I am aware the complainant has a number
of antique items which may need to continue in storage. I am informed that the insurer is
willing to treat contents as a total loss. On this basis this Determination does not deal with
contents other than that it is fair that in respect of items for which the insurer is paying storage
that the insurer remain liable for such storage to the end of April 2023. This gives the
complainant time to make new arrangements.
Temporary Accommodation
I have seen screen shots which indicate that temporary accommodation for the complainant
has been paid up to 21 March 2023. This is well over the 12 month cap under the policy
(page 47). The complainant has submitted that due to delays and the poor handling of the
claim the accommodation should be provided until the home is repaired. The major part of the
delay is the fault of neither party. However In the circumstances I agree it is appropriate the
temporary accommodation be extended till the repairs are complete.
2.4 Is the complainant entitled to compensation for non-
financial loss?
Yes. The insurer’s claims handling did add to the stress and inconvenience and the insurer is
to pay $1,000 compensation for non-financial loss.
AFCA can award compensation for non-financial loss
AFCA can award the complainant compensation for non-financial loss under its rules. This is
usually considered where the insurer takes an excessive amount of time to resolve the claim,
Determination | Case number: 857935 Page 8 of 10
causes unusual inconvenience or unusually interferes with his expectation of enjoyment or
peace of mind. This type of compensation is capped at $5,400.
AFCA takes a conservative approach to compensation for non-financial loss. AFCA generally
expects complainants to be moderately robust and bear the usual degree of stress and
inconvenience experienced during an insurance claim or in ordinary dealings with an insurer.
AFCA’s ability to award non -financial loss compensation is not intended to penalise an insurer
just because it made some errors, or its service may not have been completely perfect.
Compensation is warranted in the circumstances
In this case the loss occurred during a significant period of trauma and anxiety for the
complainant. The claim undoubtedly contributed to her suffering panic attacks. The difficulty is
how to compensate the complainant for that portion of stress and inconvenience which was
caused or contributed to by the conduct of the insurer in its handling of the claim.
The insurer’s contractors should have identified the continuing presence of moisture much
sooner than 4 weeks from the initial date of loss. Further the scope of repair works should
have been updated as soon as the building was free from contamination in April 2022.
Communications could have been improved. On some occasions a phone call from the
complainant was passed to three different officers of the insurer. The complainant says she
received confusing messages as to her risk of exposure to asbestos. This is likely correct but
the complainant being a medical practitioner was likely more aware of the risks than some of
the contractors involved.
The complainant accepts that due to her circumstances at that time she was very difficult to
deal with. She accepts she made repetitive phone calls. She experienced panic attacks in
dealing with the insurer and its staff. The insurer and its staff were aware of the complainant’s
level of anxiety. It is clear they tried to accommodate for this. To the insurer’s credit it chose
to fund removal of the asbestos and promptly arrange emergency accommodation. It would
be unfair to attribute to the insurer all the difficulties and inconveniences endured by the
complainant staying in short term accommodation.
Taking into account all the circumstances and considering the very limited compensation cap
for non-financial loss, an award of $1,000 is appropriate. It is not intended as a measure of
the complainant’s distress and it reflects the fact that there were other factors involved other
than the insurer’s conduct.
2.5 Why is the outcome fair?
The outcome is fair because but for the escape of water from the dishwasher the complainant
would not have been required to vacate her home for over a year, and further, requiring the
insurer to complete the repairs is likely to return the complainant to her home at the earliest
time.
Determination | Case number: 857935 Page 9 of 10
3 Supporting information
3.1 AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Policy terms
The policy covers “loss and damage caused by water leaking from a (dishwasher)” (page 33)