Home / Suncorp Group / Determination 857541

Determination 857541

Storm damage claim to boundary retaining wall and fence denied; fence reinstatement cost disputed

FirmSuncorp Group
Decided2022-09-13
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$8,147
Non-financial loss—
Amount claimed$18,293
SourceAFCA PDF

Summary

The complainant sought indemnity under his landlord building policy for storm damage to a boundary retaining wall and fence after the insurer denied the claim. AFCA upheld the denial for the retaining wall but ordered the insurer to pay $8,146.50 towards the fence reinstatement, net of the policy excess.

The policy excludes storm damage to retaining walls, but the fence is not excluded, and the insurer must cash settle the complainant's share of the fence reinstatement including engineering and compliance costs under the building code.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionnatural disasterpay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 857541 Financial firm AAI Limited Determination | Case number: 857541 Page 1 of 5 Case number: 857541 12 September 2022 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) under his landlord building insurance. This is for the storm damage sustained to his boundary retaining wall and fence. The insurer denied the claim on the basis:  the policy excludes storm damage to retaining walls  the cost to repair the fence is less than his policy excess. The complainant disagrees and seeks indemnity under the policy. 1.2 Issues and key findings Is the insurer entitled to deny the claim? The insurer is entitled to deny the claim for the retaining wall. However, the insurer is required to pay the complainant $8,146.50 towards the reinstatement of his portion of the boundary fence. 1.3 Determination This determination is in favour of the complainant. Within 14 days of receiving notice the complainant accepts this determination, the insurer is required to pay the complainant $8,146.50 which comprises of:  $9,146.50 being 50% of the reinstatement of the boundary fence  $500 towards the compliance costs  less $1,500 being the policy excess. Determination | Case number: 857541 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? The policy clearly excludes storm damage to retaining walls The complainant’s policy provides cover for loss or damage to the building caused by insured events listed in the policy, subject to the conditions and exclusions. The insurer does not dispute the complainant established a valid claim for the damage sustained to the boundary retaining wall under the storm peril following a wind event. However, the insurer says the policy specifically excludes any storm damage to retaining walls. I note there is no dispute that the damaged timber wall is a retaining wall as defined by the policy. Having reviewed the insurer’s policy wording, I note the ‘ storm ’ event specifically excludes loss or damage to retaining walls, revetments, sea walls, garden borders and free-standing outdoor walls; I am satisfied the insurer is entitled to rely on the above exclusion and deny the storm damage to the retaining wall. New fence requires engineering, building permit and compliance certificate There is no dispute the storm has damaged the fence which is constructed above the retaining wall. Further, I accept the above exclusion does not extend to exclude the boundary bamboo fence. This is consistent with the insurer’s assessor (DG) findings. Parties are in dispute regarding the fair and reasonable reinstatement cost of the fence. Initially the complainant provided a replacement quote from supplier (WP) for $1,547.70. However, the complainant later advised this costing is not accurate as it lacks the engineering input and the new proposed construction method suggested by his engineer. The complainant later provided:  structural engineering fee proposal from (IL) for the retaining wall and fence of approximately $5,515 – this is expected to rise due to other costings such as the CCTV, leak detection, planning permit  a builder’s (MB) quote for the reinstatement of the boundary fence totalling $18,293 ($16,630 excluding GST). IL recommended the new fence to be installed away from the wall or deep behind the wall beyond the backfill material. This is to ease any loading on the newly installed retaining wall to mitigate future damage. The complainant’s building surveyor (SP) says the new fence will require a building permit and is not exempt under Schedule 3 of the building regulation. Further, due to the location of the retaining wall, the new fence will need to be designed by a structural engineer. Whilst the insurer says the fence does not require an engineering input, it has not provided any expert evidence to substantiate its position. Determination | Case number: 857541 Page 3 of 5 In the absence of any other information, I accept the new fence is required to be constructed away from the retaining wall and it will require an engineering input. Further, it will require a permit and a compliance certificate. The insurer is required to pay the complainant $8,146.50 towards the fence Parties are in dispute regarding the extent of the insurer’s liability for the subject boundary fence. Having reviewed IL’s fee proposal, I do not accept all of the proposed costs are related to the boundary fence. Some of the costs would be incurred during the construction of the retaining wall such as the title reestablishment fees, soil testing, CCTV and leak detection. However, I accept some of the engineering costs would be associated with the fence. This includes the assessment, design, drafting and the compliance certificate and planning. This is because the fence will be constructed in conjunction with the retaining wall. I consider it is fair the insurer contributes towards these costs. Further I note MB’s quote factors in some of these costs as ‘preliminaries’:  warranty insurance  building surveyor  land surveyor  engineer and geotechnical engineer I accept MB’s quote is actionable and captures the majority of the costs in IL’s fee proposal. However, I accept the complainant will be incurring further costs for a building permit and a compliance certificate. The insurer disputes M B’s quote and says it is excessive and WP is a more reasonable quote. I do not accept WP’s quote is an accurate reflection of the insurer’s liability given IL ’s and SP ’s findings. In addressing MB’s quote, the insurer says  the labour allowance is over scoped by 5 days  the material allowance is $1,700 over the trade recommended rate of the insurer’s builder. Insurers should act fairly to ensure the cash settlement covers all the repairs. It should reflect the cost the complainant will incur to repair the damage as a result of the storm. I accept a cash settlement transfers all risks from the insurer to the complainant for any unforeseen damage and any additional work required once repairs commence. I accept the new fence is required to be constructed to the current building code. I accept WP lacks details in that regard. Further, I accept there is a cost increase in the building industry following all the challenges brought by the Covid-19 pandemic such as shortage of labour and materials. Further, the way the current fence is constructed (being on top of the current retaining wall), will require the builder to excavate the posts and soil from the retaining wall. I accept this could be an extensive job. Whilst I note the insurer’s arguments and concerns , I consider MB’s quote to be comprehensive and actionable. The insurer has not provided a comparable quote which factors in IL’s and SP’s findings. Determination | Case number: 857541 Page 4 of 5 The insurer is required to pay the complainant $9,146.50 being 50% of MB’s quote for the reinstatement of the boundary fence. Further, the insurer is required to pay the complainant $500 towards his share of any compliance costs associated with the fence. Within 14 days of receiving notice the complainant accepts this determination, the insurer is required to pay the complainant $8,146.50 which comprises of:  $9,146.50 being 50% of the reinstatement of the boundary fence  $500 towards the compliance costs  less $1,500 being the policy excess. 2.2 Why is the outcome fair? The insurer must act fairly in cash settling the complainant’s share of the fence in light of the building code and compliance requirement. Determination | Case number: 857541 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.