Home / Suncorp Group / Determination 857480

Determination 857480

Flood damage claim cash settlement amount

FirmSuncorp Group
Decided2023-02-24
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$184,777
Non-financial loss—
Amount claimed$318,649
SourceAFCA PDF

Summary

The complainant, represented by his building consultant BD, claimed flood damage to a landlord property and sought $318,648.68. AFCA found the insurer's cash settlement based on KB's SOW was generally reasonable but applied a 22% uplift, ordering $184,776.58 and reimbursement of BD's fees up to $5,000; LOR and non-financial loss were refused.

Cash settlement must be based on an actionable quote with an uplift for contingencies and loss of lifetime guarantee, and the claimed building movement damage was proximately caused by pre-existing or gradual factors excluded under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterthird party authoritypay claimrefund fees or charges

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 857480 Financial firm AAI Limited Determination | Case number: 857480 Page 1 of 8 Case number: 857480 10 February 2023 1 Determination overview 1.1 Complaint The complainant holds landlord insurance issued by the financial firm (insurer). On 20 March 2021, he lodged a claim after the insured property was damaged in a flood event. The insurer accepted the claim. However, it said that some of the damage was not caused by the flood but was due to excluded factors or was pre-existing. Based on a scope of works (SOW)/quote from KB, builder, the insurer offered to cash settle the claim related repair costs. The complainant says the KB ’s SOW does not cover all the required claim related repairs. Relying on his builder’s quote, the complainant wants the insurer to pay $318,648.68 (more than double the insurer’s offer). He also seeks an amount for loss of rent, reimbursement of professional costs and compensation for stress and inconvenience he has experienced. 1.2 Issues and key findings I s the insurer’s cash settlement offer reasonable ? For the most part, yes. On balance, the complainant has not established that KB ’s most recent SOW and quote is inadequate. However, the panel is satisfied that a 22% uplift should be applied for contingencies and l oss of the insurer’s lifetime guarantee on authorised repairs. Is the insurer required to pay LOR? No. The complainant did not purchase LOR cover. Further, as the insurer has overall not unreas onably delayed the claim’s progression, it is not responsible for any delay related LOR. Is the insurer required to make any other payments? Yes. BD, the complai nant’s building consultant, caused KB to increase its quote. The insurer is to reimburse BD’s fees (up to $5,000) paid by the complainant. As VE, the complainant’s engineer, did not affect the outcome, the insurer is not required to pay VE’s fees . The insurer overall handled the claim reasonably, so non-financial loss compensation is not payable. Why is the outcome fair? A cash settlement based on KB’s SOW/quote is generally reasonable, but it is fair that a 22% uplift applies for contingencies and risk transfer. It is also fair that the insurer reimburses fees BD charged as BD caused KB to increase its quote. However, it would be unfair for the insurer to have to pay LOR or compensation given the policy terms and its claim handling. 1.3 Determination This determination is partially in favour of the complainant. If the complainant accepts this determination, the insurer is required to:  Within 21 days, pay him $184,776.58 ($151,456.21 plus 22%), less the excess if unpaid  Within 14 days of receiving from the complainant proof of payment, reimburse him fees (up to $5,000) he paid to BD. Determination | Case number: 857480 Page 2 of 8 2 Reasons for determination The complainant is represented by his building consultant, BD. In this determination, the complainant and BD will be referred to as ‘the complainant’ unless context requires otherwise. Both parties provided numerous submissions, reports and documents to AFCA. While this determination does not refer to all those materials, the AFCA panel has read them all and taken them into account in reaching their decision. 2.1 Is the insurer’s cash settlement offer reasonable? For the most part, yes. On balance, the complainant has not established that KB’s most recent SOW and quote is inadequate. However, the panel is satisfied that a 22% uplift should be applied for contingencies and loss of insurer’s lifetime guarantee on authorised repairs. Complainant has shown a claimable loss under the policy The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured. The complainant holds landlord insurance with the insurer, covering his investment property. Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers damage to the property caused by a listed insured event. One of the listed events is ‘Flood’. The property damage sum insured is $385,000. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. The insurer acknowledges that the insured property was damaged in a flood event on 19 March 2021. Accordingly, it has accepted that the complainant has proven a claimable loss under the policy. However, it disputes that all the claimed damage was caused by the flood. The insurer says that some damage was pre-existing and that other aspects were proximately caused by gradual processes. These are excluded as the PDS states that the policy does not cover damage caused by, arising from or involving: wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light or gradual deterioration such as but not limited to:  Tiles and their adhesive or grouting breaking down;  Weathering of roof tiles or roof ridge capping;  Gradual weathering and breakdown of bricks, mortar or concrete. Proximate cause is the dominant, efficient or operative cause of the loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common sense evaluation of the evidence. Determination | Case number: 857480 Page 3 of 8 It is reasonable for the claim to be cash settled Due to dissatisfaction with the conduct of the insurer and its trades and a desire to have his trades attend to repairs, the complainant wants the claim to be cash settled. For its part, the insurer says that as some of the damage was not caused by the flood, KB would not be able to either undertake or warrant claim related repairs on a stand alone basis. Accordingly, it proposes to resolve the claim on a cash settlement basis. Given that both parties are willing to cash settle and allowing for their deteriorating relationship, the panel is satisfied it is reasonable that the claim be cash settled. A cash settlement must be based on a quote that would be actionable by a retail customer and must allow an uplift for contingencies and the loss of the lifetime guarantee applying to insurer authorised repairs. Insurer has made cash settlement offers Following the claim’s lodgement, the insurer appointed KB to arrange make safe repairs and to assess and report on the claimed damage. On 30 April 2021, KB provided an SOW/quote for flood related repairs. The quoted amount was $94,282.16. Given concerns raised by the complainant, the insurer decided that further investigations were required to clarify its liability under the policy. On 10 May 2021, KB undertook a further property inspection with the insurer’s assessor and the complainant. On 13 May 2021, the insurer appointed MC, engineers, to report on the cause of floor movement damage. After receiving MC’s report, on 17 June 2021, KB provided its updated SOW. The quoted cost to repair claim related damage had increased to $115,893.53. On 21 June 2021, the insurer offered that amount to the complainant as a cash settlement. Following receipt of the complainant’s expert reports and an SOW from his builder (MS) quoting repair costs at $318,648.68, the insurer asked KB to revisit its SOW. On 15 August 2022, KB provided an expanded SOW and currently priced quote, totalling $151,456.21. The insurer is prepared to pay the complainant $151,456.21 as a cash settlement. C omplainant says the insurer’s offer is inadequate The complainant maintains that the insu rer’s cash settlement offers have been manifestly inadequate. In a report dated 18 November 2021, BD identified 26 perceived deficiencies in KB’s SOW dated 17 June 2021. Allowing for the additional items included in KB’s SOW dated 15 August 2022, the following items from BD’s list appear to be the main areas remaining in dispute: 2. Failure to include the replacement of timber flooring in all rooms. 3. Failure to include the re levelling of the floor to all areas. 4. Failure to include the removal of the external wall cladding and the painting of the wall cladding. 23. Failure to include the engineering design of the footings. Determination | Case number: 857480 Page 4 of 8 24. Failure to include the submission of plans to the council and associated fees. 25. Failure to include the amended Home Owner Warranty insurance premium for the work outlined above. 26. Failu re to include a realistic builder’s margin which should be estimated at 20%. The complainant relies on an expert report dated 29 October 2021, from VE, engineers. The report was prepared on a desktop basis (but did involve testing of a soil sample from the site provided by BD) and is relatively brief. On causation, VE concludes: it is evident that the structures have suffered some differential movement within the floor frames due to the flooding, as the footings are not founded on sufficiently deep enough concrete pad footings to be able to resist such settlement caused by the flooding. Insurer’s experts say further claimed damage not flood related The insurer’s experts ( MC, engineers, and KB, builders) maintain all damage caused by the flood has been taken into account by the insurer and included in its cash settlement offer. In relation to the further damage claimed, MC says:  damage/movement to the brick piers underneath the house was not caused by the claimed event. Rather, there is significant evidence of pre-existing movement and attempted repairs to the non-compliant piers through packing  damage to the timber floors (cupping) has not been substantiated or (in the case of the claimed ‘hump’ in the floor) is pre-existing  damage to the bathroom cannot be attributed to the claimed event as there is no way of knowing if damage to waterproofing membrane was pre-existing  damage to the wall cladding (rear wall elevation where the house has been extended) is minor in nature, not related to the claimed event but due to poor construction techniques  it does not agree with VE’s opinion that relative settlement behaviour of the piers and its resulting effect on the levels of the flooring as well as the undulations in the external cladding is due to the claim event  VE has ignored the evidence of pre-existing factors (behaviours) including lack of external paintwork cracking despite flooring undulations and ignored the pier packings. Insu rer’s cash settlement offer is generally reasonable To be entitled to a higher cash settlement amount, the complainant must demonstrate that the insurer’s offers do not reasonably reflect the likely retail costs of repairs. This requires the complainant to show one or more of the following:  the SOWs the insurer relies on do not adequately encompass the required repairs  the quotes the insurer relies on are under priced  the insurer has failed to include a reasonable contingencies uplift. On the available information, the panel is not satisfied that the complainant has established it is more li kely than not that KB’s SOW/ quote dated 15 August 2022 does not cover the required claim related repairs or is under priced. Determination | Case number: 857480 Page 5 of 8 The original home is over 80 years old. The subfloor area shows clear evidence of previous work (primarily packing) to address issues of the home not maintaining its intended level over time. The flooring movement is located at the junction of the original building and an extension added in the 1980s. The building is supported by concrete stumps and the extension by brick piers. The panel is persuaded by MC’s findings, due to the methodology and detailed analysis it has provided, compared to that of VE. The panel does not agree the cause of damage to the piers or the flooring was the flood. MC’s reasoning on the likely cause is more plausible. The damage is more likely to have been pre-existing and/or proximately caused by gradual deterioration, which is not covered. The panel acknowledges that the complainant has provided real estate inspection reports and an affidavit from the former tenant of the property in an effort to demonstrate there was no pre-existing hump. However, the panel is not satisfied that information without a supporting supplementary report from VE is sufficient to discredit MC’s finding s. The panel also prefers MC’s view in relation to the wall cladding for similar reasons. KB’s quote dated 17 June 2021 totalling $115,893.53 included a builder’s margin of 7.5%. Its quote dated 15 August 2022 added a builder’s margin of 15% to the $115,893.53 figure. Accordingly, KB has allowed a total builder’s margin of 22.5%, 2.5% above BM’s suggested realistic margin of 20%. However, the panel accepts that there is some uncertainty about the extent to which allowance have been made for home warranty insurance and council fee. Further, while it seems that the bathroom has been stripped out, it is not clear on the available information whether the insurer obtained the hygienist’s report it said would be obtained after strip out. From the information provided, the panel is not able to empirically assess the likelihood that each of home warranty insurance, council fees and hygienist report costs will need to be incurred or estimate the amounts involved. Leaving those issues aside, the panel is satisf ied that KB’s SOW/quote dated 15 August 2022 is a reasonable basis on which the insurer may calculate a cash settlement offer. However, when seeking to cash settle a claim, an insurer should apply an uplift to allow for contingencies and the loss of the lifetime guarantee that would apply to insurer authorised repairs. The panel is satisfied that a 22% uplift is appropriate in the circumstances, including to make an allowance for home warranty insurance, council fees and hygienist report costs. Accordingly, if the complainant accepts this determination, the insurer must pay him $184,776.58 ($151,456.21 plus 22%). The insurer is entitled to deduct the $2,000 excess if that has not yet been paid. 2.2 Is the insurer required to pay LOR? No. The complainant did not purchase LOR cover. Further, as the insurer has overall not unreasonably delayed the claim’s progression, it is not respons ible for any delay related LOR. Complainant did not purchase LOR cover The complainant says the insurer’s refusal to adequately assess and include all claim related repairs has unreasonably delayed the repair process. He says he has been precluded from Determination | Case number: 857480 Page 6 of 8 re-leasing his investment property. The complainant wants the insurer to pay LOR from November 2021 (when the complainant provided his expert reports) at $390 per week. The complainant accepts that he did not purchase LOR cover. Therefore, the LOR optional benefit does not form part of the policy. Insurer did not cause unreasonable delay The panel does not consider that the insurer unreasonably delayed the claim and repair of the insured property. The main issue in dispute between the parties has been whether the insurer is required to cover the building movement damage. As noted above, the panel is satisfied that the proximate cause of the building movement was not the flood event. Further, the panel notes that after receiving in January 2022 MS’s SOW totalling $318,648.68, the insurer promptly offered to arrange a dual assessment of the property involving experts for both parties to progress consideration of the areas in dispute. Accordingly, the panel is not satisfied that the insurer unreasonably delayed the claim’s progression. It would not be reasonable for it to pay delay related LOR. 2.3 Is the insurer required to make any other payments? Yes. BD, the complainant’s building consultant, caused KB to increase its quote. The insurer is to reimburse BD’s fees ( up to $5,000) paid by the complainant. As VE, the complainant’s engineer, did not affect the outcome, the insurer is not required to pay VE’s fees. The insurer overall handled the claim reasonably, so non-financial loss compensation is not payable. AFCA may require insurer to contribute to a complainant’s professional costs The AFCA rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply. When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. Insurer is to reimburse BD’s fees proven to have been paid The panel is overall satisfied that BD’s involvement in the claim, both as an expert and an advocate, materially contributed to the insurer arranging for KB to revisit its SOW and quote. This ultimately resulted in the proposed cash settlement increasing from $115,893.53 to $151,456.21. In the circumstances, the panel is satisfied that BD’s involvement assisted the complainant in establishing an entitlement to a larger claim amount. Accordingly, within 14 days of receiving from the complainant proof of payment, the insurer must reimburse him the fees he paid to BD. The maximum amount payable by the insurer is capped at $5,000. However, the panel has preferred the views of MC over those of VE. This means that VE’s reports did not affect the outcome, so the insurer is not required to reimburse fees VE charged the complainant. Determination | Case number: 857480 Page 7 of 8 AFCA can award compensation for poor claim handling Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s action s have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Complainant is not entitled to non-financial loss compensation The complainant says that the insurer has unreasonably delayed progression of the claim, has communicated poorly and has acted in a non-transparent and adversarial way. He says these issues have caused he and his wife to experience stress, anxiety and inconvenience, and has placed them under considerable financial duress. The insurer says that the claim assessment process has been fair and reasonable. It says it did not unreasonably delay progression of the claim and that any delay experienced was largely due to factors it could not control. The panel acknowledges that the complainant has found the claim process challenging and stressful. However, having carefully reviewed the available information, the panel considers that overall the insurer has handled the claim in a reasonable manner. The insurer considered the complainant’s submissions and reports and undertook further investigations as they were provided. It also offered a dual assessment process in an effort to resolve the SOW differences. The insurer also offered the complainant access to counselling. Accordingly, the panel is not satisfied it would be reasonable to require the insurer to pay non-financial loss compensation. 2.4 Why is the outcome fair? A cash settlement based on KB’s SOW/quote is generally reasonable, b ut it is fair that a 22% uplift applies for contingencies and risk transfer. It is also fair that the insurer reimburses fees BD charged as BD caused KB to expand its SOW. However, it would be unfair for the insurer to have to pay LOR or compensation given the policy terms and its claim handling. Determination | Case number: 857480 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.