Home / Suncorp Group / Determination 857287

Determination 857287

Insurer denied liability for subsequent water damage to bedrooms 3 and 4 as not caused by an insured event

FirmSuncorp Group
Decided2022-10-04
ProductGeneral Insurance · Other general
OutcomeFor the complainant in part
Amount awarded$2,148
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for water damage to bedrooms 3 and 4 after a April 2021 storm, which the insurer denied after accepting the bedroom 5 damage. AFCA found the subsequent damage was not caused by the insured storm and ordered a cash settlement of $2,747.58 less the $600 excess for the bedroom 5 damage.

The complainant bears the onus of establishing a valid claim and did not prove the storm was the proximate cause of the damage to bedrooms 3 and 4, which expert reports attributed to later hose testing and construction defects.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 857287 Financial firm AAI Limited (Insurer) Determination | Case number: 857287 Page 1 of 7 Case number: 857287 1 September 2022 1 Determination overview 1.1 Complaint The complainant’s investment property suffered water damage during a storm in April 2021. The complainant sought to claim on his insurance and was initially successful. However, subsequently, the complainant rejected the settlement offer of $2,289.65 (less the $600 excess) as he disagreed with the cause of the damage. He conducted further investigations into the cause of the damage and, in the process of doing so, further water damage was sustained to the property which the complainant requests also be covered. The insurer has denied liability for the further damage on the basis the damage was not caused by an insured event. The complainant says the further investigations were necessary as the insurer had failed to properly identify the cause of the initial water damage. 1.2 Issues and key findings Does the complainant have a valid claim for the subsequent damage? No. The complainant has failed to establish he has a valid claim as he has not proved the initial storm (an insured event) was the proximate cause of the subsequent damage. Why is the outcome fair? The onus rests with the complainant to establish he has a valid claim. The available information does not show the subsequent damage was caused by a storm or any other insured event. As the complainant has not established a valid claim, it is fair for the insurer to deny liability for this damage. 1.3 Determination This determination is in favour of the insurer. Within 28 days of the date the insurer receives notice the complainant accepts this determination, the insurer is required to cash settle the complaint for $2,747.58 less the $600 policy excess. Determination | Case number: 857287 Page 2 of 7 2 Reasons for determination 2.1 Does the complainant have a valid claim for the subsequent damage? No. The complainant has failed to establish he has a valid claim as he has not proved the initial storm (an insured event) was the proximate cause of the subsequent damage. The onus is on the complainant to establish a valid claim In insurance complaints, the initial obligation is on the complainant to show they have suffered a loss or damage which was caused by an event covered by the terms and conditions of the policy. This is known as establishing a valid claim. Once this is established, the insurer will pay the claim, unless it can show, on the balance of probabilities, the loss claimed falls within an exclusion of the policy or it is otherwise entitled to decline the claim. The complainant has suffered damage to the property There is no dispute the property has sustained water damage to three of the bedrooms. There is also no dispute the damage to bedroom five was primarily caused by the April 2021 storm (the insured event). The insurer partially accepted the claim on this basis. The issue is whether the water damage in the other two bedrooms was also caused by the April 2021 storm, or that the storm was the proximate cause of that damage. The parties have obtained professional reports The parties have provided three professional reports relating to inspections at the property following the April 2021 storm event:  o n 4 May 2021, Company R attended the complainant’s property on behalf of the insurer  on 15 September 2021, Company G undertook a thermal imaging inspection on behalf of the complainant  on 25 October 2021, Company K c onducted a structural engineer’s inspection on behalf of the insurer. Relevant extracts from the conclusions in each report are contained in section 3.2 of this determination. Assessing these reports, only one (the Company R report) was conducted in proximity to the April 2021 storm, with the others coming some months later. At the time of the Company R report, the tenant only reported issues in bedroom 5. All the reports agree the point of ingress was from the slab where it adjoins the retaining wall, as well as through the retaining wall itself, due to defective water proofing. It is not until September 2021 that there are any identified issues with bedrooms 3 and 4. The Company G report, commissioned by the complainant, relevantly says: [The complainant] had flooded the front yard (up against the house) the day prior to my arrival. On arrival one could see that a lot of water had entered into the downstairs rooms and the carpet was soaked. Determination | Case number: 857287 Page 3 of 7 The following month, the Company K assessment relevantly added: There is a build-up of hydraulic pressure behind the wall which is causing water to seep through openings. It should be noted, the homeowner had commenced water testing approximately 20 minutes before the time of the inspection and it was noted water stopped leaking through as soon as the homeowner turned the hose off. This would imply water is not pooling behind the wall and generally does drain efficiently from directly behind the base. The report also says the water ingress into the home arises from inadequate construction of the home as the concrete slab abuts against the hob junction which, in turn, created a weak point allowing for water ingress. Company K concludes the likely cause of damage to the concrete slab itself to be shrinkage and expansion of the construction material. However, it does not pose any structural concerns. The complainant has not submitted any evidence to refute the findings within the Company K report and as outlined above, the other reports agree with the point of ingress. On the basis of these reports, I am satisfied it is more likely than not the damage to bedrooms 3 and 4 was not present until September 2021 when the complainant’s experiments with the garden hose led to the build-up of hydraulic pressure behind the wall and the water to seep through the openings. The storm is not the proximate cause of the subsequent damage As a result, I am not satisfied the cause of this damage was the April 2021 storm or any other insured event. Accordingly, the complainant has failed to establish a valid claim for the damage to bedrooms 3 and 4. 2.2 Why is the outcome fair? The onus rests with the complainant to establish he has a valid claim. The available information does not show the subsequent damage was caused by a storm or any other insured event. As the complainant has not established a valid claim, it is fair for the insurer to deny liability for this damage. The outcome is fair An insurer can only be held liable under a policy for claims validly made. Even on his own evidence, the water damage caused to bedrooms 3 and 4 was not caused by the April 2021 insured event, but by the complainant’s subsequent water testing. Accordingly, I am satisfied the insurer is entitled to limit its liability to bedroom 5 as the evidence shows on the balance of probabilities the cause of the water ingress was not the storm. The settlement offer proposed by the insurer is based on a quote dated 14 April 2021 for the damage to bedroom 5 in the amount of $2,289.65, less the policy excess of $600. However, due to the passage of time since the quote was prepared, I consider it fair and reasonable to include a 20% uplift. The insurer is required to cash settle the complaint for $2,747.58 less the $600 policy excess. Determination | Case number: 857287 Page 4 of 7 Determination | Case number: 857287 Page 5 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Professional reports Extract of Company R report, dated 4 May 2021 The tenant advised that during the recent rain to the region he has discovered that the carpet to the downstairs bedroom (bedroom 5) was wet The dwelling appeared approx 50+ years of age with the original dwelling being a high set on a sloped block it is likely the downstairs areas have been renovation more recently with a additional bedrooms and a kitchenette installed We have inspected bedroom 5 and have found bubbling to the plasterboard wall linings just above skirting height to the front elevation wall Moisture readings were taken at the time of our inspection to which we have found increased moisture being retained in the skirting boards and wall linings Determination | Case number: 857287 Page 6 of 7 [Company R] have engaged restoration to carry out structural drying and mitigate any mould growth due to the moisture The tenant has shown us photos of the carpet saturated during the event however they did appear dry at time of our inspection The external ground height to the front elevation wall is higher than the ground floor bedroom (bedroom 5) it is of our opinion that there may be a water proofing issue to the retaining wall We cannot locate the exact point of water ingress though we believe the deluge of rain of recent times has lead to the external ground being soaked and moisture possibly entering via the junction between the concrete block and concrete footing of the front external retaining wall Extract of Company G thermal imaging report, dated 15 September 2021 [The complainant] had flooded the front yard (up against the house) the day prior to my arrival. On arrival one could see that a lot of water had entered into the downstairs rooms and the carpet was soaked. On inspection it became apparent that the water was not coming in from the back wall as suspected but was entering from underneath the concrete slab and entering the room where the internal wall meets the floor slab. The water then flowed into the room, running underneath the carpet, into the room next door then leeching into the third. The cavity behind the plasterboard wall in front of the retaining wall was all but dry with only a small area showing colder in the camera as an indication to moisture. […] This indicated that the water was not coming from the wall but rather below the wall and into the room where the slabs join. Extract of Company K structural engineer’s report, dated 3 November 2021 The conclusion from our Structural Engineering investigation is that the water ingress to the dwelling is an ongoing issue relating to the adequacy of the original construction to provide water tightness to the lower level. From the information available to us the likely cause of water ingress to the dwelling is a result of seepage through a weak point in the floor slab and hob junction. An inadequate/damaged drainage line behind the base of the wall may not be performing to capture water before it can get to these joints. No original construction details or plans are made available to us; however, it is suspected that the floor slab of the lower level likely abuts the hob and terminates at this location. In addition to this it is likely the drainage behind the basement retaining wall has reduced in capacity due to long term deterioration. There is a build-up of hydraulic pressure behind the wall which is causing water to seep through openings. It should be noted, the homeowner had commenced water testing approximately 20 minutes before the time of the inspection and it was noted water stopped leaking through as soon as the homeowner turned the hose off. This would imply water is Determination | Case number: 857287 Page 7 of 7 not pooling behind the wall and generally does drain efficiently from directly behind the base. The cracks in the basement retaining wall are allowing moisture seepage however the moisture is not excessive and drains into the drain channel. The water leaks were primarily occurring from the bottom of the hob and affecting the floor of the rooms. No water leaks were occurring on the walls or ceiling which would directly impact the cupboards and walls of the rooms. The cracking in the cupboard slab is a non-structural concern and is likely a result of shrinkage and expansion of the construction material.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.