Home / IAG / Determination 857006
Determination 857006
hail damage roof repair defective, make safe work, concrete stump, claim handling delay
Summary
The complainant disputed defective hail roof repairs and make safe work by the insurer's repairers. AFCA found the insurer must replace the roof and correct drainage, reimburse expert fees, and pay $3,500 non-financial loss, while rejecting the mould and septic tank claims.
The policy's replacement benefit requires repair to a condition as close as possible to new, so the roof must be replaced per the complainant's expert evidence.
Issues
- Repairs or contractors primary · upheld“There is no dispute the roof repair is defective... It follows the insurer must replace the roof in line with DR's evidence.”
- Poor claim handling secondary · upheld“I am satisfied the complainant has suffered an unusual degree of inconvenience and interference due to the insurer's claims handling.”
- Inadequate claim investigation secondary · not upheld“I am not satisfied the complainant has shown the mould claimed is the result of the errors noted in this determination.”
- Delay secondary · unclear“The claim has been ongoing now for almost two years, with substantive rectification work to the roof required.”
Subjects and remedies
home or building damagenatural disasterthird party authoritypay non financial lossreassess claimrepair or rectify
Related
Text of the determination
Determination
Case number 857006
Financial firm Insurance Australia Limited
Determination | Case number: 857006 Page 1 of 9
Case number: 857006 1 September 2022
1 Determination overview
1.1 Complaint
The complainant says the financial firm (insurer) is liable for corrective work to her property
following a repair under a hail damage claim in October 2020. The complainant says the
insurer’s tradesmen were unprofessional both with the work they performed and the way the y
behaved during the repairs.
The complainant says the roof repair is defective and it is likely the roof needs to be entirely
replaced. Further, she says the insurer has unnecessarily delayed the claim by trying to re-
use the same tradesmen as before and failed to complete reasonable emergency work which
has resulted in additional damage to the property.
The complainant seeks repair by a tradesman suitably qualified to work on a property like
hers at the insurer’s expense. She also seeks repair of any ad ditional damage resulting from
the poor make safe work now and into the future, and compensation for the claim experience.
The insurer denies it handled the claim poorly. The insurer says it has been prepared to
proceed with repairs since December 2021 an d would have done so but for the complainant’s
objections. It says it has accepted the roof requires rectification, but a full roof replacement is
not required. The insurer says the additional damage the complainant has raised concerns
about is not connected with its conduct or the claim.
1.2 Issues and key findings
Has the insurer correctly identified its liability?
No. The insurer’s liability extends beyond its current position. The insurer is to accept
rectification work and additional repairs in line with this determination.
Should the insurer pay non-financial loss?
Yes. The insurer must pay the complainant compensation for avoidable errors and the impact
this has had on the complainant.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is to accept rectification work, additional repairs and reimburse expert fees in line
with section 2.1.
The insurer is to pay $3,500 non-financial loss compensation.
Determination | Case number: 857006 Page 2 of 9
2 Reasons for determination
2.1 Has the insurer correctly identified its liability?
Policy provides the terms of the previous repair work
The policy between the parties is a landlord insurance policy covering accidental damage and
insured events. This means it gives broad cover for several listed events. It also covers
damage to the insured property where the cause of the damage is accidental within the
meaning outlined in the policy, limited by conditions and exclusions.
The policy also sets out its commitments when it chooses to repair a property. Details of the
relevant policy wording can be found in section 3 of this determination.
Insurer should replace the roof
There is no dispute the roof repair is defective. The complainant’s building inspector (DR)
supplied a list of 71 defects in his report. The insurer’s building consultant (PG) accepted all
but a handful of these defects as noted in section 3 of this determination.
Having read both roof reports, it is clear there is still a dispute over the extent of the work
needed to rectify the roof. PG suggests much of the roofing material can be re-used as it
simply needs to be repositioned. However, I am not satisfied doing so will meet the terms of
the policy.
The policy is clear where the policyholder has taken the replacement benefit, which the
complainant has, the repair must be to a standard as close as possible to when new.
Both DR and PG agree there are multiple roof sheets and caps with overtightened screws,
and visual evidence of damage to these as a result. Re-using these sheets does not meet the
policy wording o f “as close as possible to when new . ”
Further, PG suggests there are problems with the veranda beam and other pre-existing
issues which have affected the quality of the roof repair. The report from the insurer’s
previous builder (RI) did not note any maintenance work required of the complainant and has
proceeded with replacing the roof by subcontracting to another repairer (SR).
Accordingly, of the two reports, I prefer DR’s evidence. It is extensive, detailed, supported by
photographs and logical. It is more likely to result in an outcome that will restore the roof to a
condition in line with the policy conditions.
Therefore, I accept DR’s evidence about the extent of works required. It follows the insurer
must replace the roof in line with DR’s evidence.
Insurer must meet the policy terms around make safe work
The complainant has consistently raised concern about the make safe work. In particular,
images supplied show a section of gutter has been used in lieu of a downpipe, angling away
from the complainant’s roof.
The complainant has supplied numerous photos showing the extent of water flooding into the
subfloor area, which she says is due to the poor drainage.
Determination | Case number: 857006 Page 3 of 9
These photos have been provided to the insurer. According to PG, no further make safe
works are necessary. PG does not explain why, particularly given the complainant’s concern
that this is causing water to enter the subfloor.
On balance, I am not persuaded this arrangement is appropriate. I consider further works
should be done to mitigate the water affecting the soil. Therefore, the insurer must correct this
make safe work within seven days of the complainant accepting this determination if roof
repairs are not due to commence within that timeframe.
Concrete cancer, cracked window and septic tank
DR’s report says the concrete footings now have significant moisture in them and one of the
pillars is showing signs of concrete cancer. Others are showing efflorescence consistent with
water saturation.
PG disputes this in his second report. PG says concrete stumps are designed to withstand
external application with constant contact with groundwater, surface water and ongoing
inclement weather. PG says the cancer is likely due to the steel reinforcement being too close
to the surface of the stump.
On balance, I prefer DR’s evidence. The photos provided by the complainant show there has
been excessive water entering the subfloor. This supports DR’s conclusion that one stump
has been affected . In contrast, PG’s opinion is based on an assumption the concrete stump
installed was constructed with the steel reinforcement being too close to the surface.
However, there is no objective evidence substantiating this stump has that flaw. Neither does
PG explain why excessive water into the subfloor could not be the cause of the concrete
cancer.
The insurer is liable to rectify this concrete stump.
There is no evidence that other stumps have been damaged by concrete cancer. If further
damage is identified, the insurer must assess them.
I have also considered the complainant’s evidence a window has cracked and that this may
be due to building movement relating to the water in the subfloor affecting the foundations.
There is insufficient information to support this. Neither DR nor PG have provided any
persuasive evidence to consider whether the surface water has caused foundation
movement. For instance, neither report considers the type of soil the building is founded on,
the normal site drainage conditions, vegetation, trees or floor measurements. All of this would
be relevant to determine if the water in the subfloor is causing foundation movement that has
resulted in the cracked window as opposed to other factors.
Should there be further signs of building movement, the insurer must return with a suitably
qualified expert (e.g. an engineer) and assess the damage.
The complainant has also said the septic tank has been affected by the excessive ground
water. PG did not consider this was the likely cause. PG said the foundation soils in and
around the septic system would have consolidated and naturally compacted over its
serviceable life. This would have occurred many years prior to the claimed event. If there had
been a significant shifting of the foundation soils due to the recent claimed event, there would
be evidence of subsidence on the surface. None was observed.
Whilst the complainant says the septic tank issues are recent, there is no expert evidence in
support. Given PG’s ev idence, I am not persuaded the available information shows the septic
tank issues are caused by the claimed event or the repairs.
Determination | Case number: 857006 Page 4 of 9
Insufficient evidence mould is related to faulty repair work
I am not satisfied the complainant has shown the mould claimed is the result of the errors
noted in this determination. The location of the mould does not have any corresponding
evidence of water infiltration within the building, nor is there signs of water affecting the
external areas nearby.
The mould appears localised to one area of the house, which is not consistent with the signs
of water flooding the subfloor area in various locations. Accordingly, I am not satisfied the
available evidence, on balance, shows the mould is being caused by the defective works.
Insurer to reimburse complainant for expert report fees
The complainant provided three expert reports reviewing the roof, gutters, and subfloor area
of the property.
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded if the
complainant needed an expert to understand or establish their claim. These costs are
normally capped at $5,000 unless exceptional circumstances apply.
I am satisfied all three reports assisted the complainant to understand and establish her
claim. Given this, it is fair the insurer compensates her for these costs.
The complainant is to provide the insurer with paid invoices or receipts showing what was
paid for these reports. The insurer is to settle the value of these reports or pay her $5,000,
whichever is lesser, subject to the complainant accepting this determination.
2.2 Should the insurer pay non-financial loss?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Insurer must compensate the complainant for the claim experience
I am satisfied the complainant has suffered an unusual degree of inconvenience and
interference due to the insurer’s claims handling.
The claim has been ongoing now for almost two years, with substantive rectification work to
the roof required. Other issues have been identified, such as the concrete cancer, which has
been caused by the insurer’s claims handling .
The complainant has been managing a relationship with a tenant living in the property during
this time who will again be disrupted by further repair work. She has also organised multiple
trips for herself or her real estate agent to attend the property while the insurer’s experts have
been reassessing the damage.
The complainant has made clear she felt ignored as her concerns were dismissed by the
original roof contractor. To the extent this relates to the quality of the works, these have been
Determination | Case number: 857006 Page 5 of 9
substantiated. Her concerns about the make safe work does not appear to have been
actioned given the subfloor water entry.
Overall, I consider the complain ant’s experience to be beyond minor and, at least, moderate.
However, I note her tenant could still occupy the property, so she has not suffered loss of
rent. I also note various items she was seeking, such as the mould and septic tank, have not
been substantiated.
Given this, and considering our conservative approach, the insurer should pay the
complainant $3,500 non-financial loss compensation within 14 days of receiving notice she
accepts this determination.
Determination | Case number: 857006 Page 6 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 857006 Page 7 of 9
3.2 Relevant policy wording
Glossary
accidental loss of damage
damage to, loss or destruction of the buildings that make up your rental property, or your
contents when it is caused by an unintentional act, or an unforeseen and uncontrollable
incident.
Accidental damage cover
We will cover your buildings and contents for any accidental loss or damage.
There are also a number of incidents we will cover under specific conditions - there are listed
on the following pages.
How to make a claim
…
3. If you need emergency repairs
If you need to make emergency repairs, we will arrange assistance through our preferred
repairers and suppliers.
How we settle a buildings claim
1. We will decide how we will settle your claim
If your building suffers loss or damage, we will decide whether to:
repair
…
When we settle your claim, the law that will apply is the law of the state or territory where the
loss, damage or liability occurred.
…
4. If we decide to repair or rebuild your buildings and your current schedule shows
‘including replacement benefit’
We will repair or rebuild the part of your buildings that suffered the loss or damage to a
condition as close as possible to when new, but not better.
…
Our guarantee
Our guarantee assures you of quality insurance and service at all times.
Fair dealing guarantee
We will meet any claims covered by this policy fairly and promptly.
…
Service guarantee
We will provide you with the highest standard of service.
Determination | Case number: 857006 Page 8 of 9
3.3 Expert evidence summary
Record Key points
Insurer ’ s b uilder ( RI )
Building assessment report
18 December 2020
hail damage to the property requires full roof replacement of the
main house
no maint enance of defect issues noted.
Complainant’ s building
inspector ( DR )
Roof assessment r eport
28 October 2021
works conducted by previous builder were unsatisfactory
71 items assessed as defective work
rectification work must meet the requirements of the QBCC, NCC,
and manufacturers specifications.
I nsurer’s building consultant
( PG )
Building inspection r eport
23 November 2021
disputes DR’s findings around flexible sealant use
misaligned roof sheets should be repositioned and planed during
the repair rather than replaced . Some of the misalignment is due
to a pre - existing issue
repairer’s attempt to avoid lobster tail hip capping is the best
option while meeting complainant’s preference . Any correction to
be resolved in consultation with the complainant
item 48 relating to gutter installation is disput ed. PG says no error
in its installation
item 49 is also disputed. PG says veranda beam alignment is the
reason for the defect, which is pre - existing and not part of the
builder’s repair work
all other issues are agreed or accepted as items to resolve with
the complainant.
Complainant’ s building
inspector ( DR )
Gutter and downpipe
assessment r eport
11 March 2022
roof catchment exceeds the maximum allowance of a single
90mm downpipe and 100mm downpipe
recommends installation of four additional 100mm downpipes
downpipes to direct water to the site storage tank or to a suitably
sized rubble pit a minimum of 3m from building.
Complainant’ s building
inspector ( DR )
Subfloor assessment r eport
11 March 2022
subfloor excessive damp throughout with scouring and ponding
evident
majority of water ponding is near to the kitchen and back stairs
at the time of inspection, only one downpipe fitted to the dwelling
no downpipe installed at gutter outlet above kitchen and rear steps
area where worst po nding is occurring
all concrete stumps showing high moisture content of 4 to 6% by
weight
efflorescence occurring in the conc rete piers
long exposure will cause concrete canc er, or which there is early
signs
stormwat er needs to be addressed immediately to prevent further
water damage to the property
normal drying is adequate as the subfloor area is open and clear
Determination | Case number: 857006 Page 9 of 9
Record Key points
Insurer’s building consultant
(PG)
Building inspection report
9 May 2022
mould growth to the wall and ceiling of bedroom at north east
corner, bu t no sign of water ingress or staining
external boards local to the mould growth showed signs of dust
and debris, but no water tracks present
moisture test did not indicate elevat ed moisture readings
dust in the ceiling cavity did not show signs of water i ngress
mould growth likely due to irregular cleaning
disputes DR’s view concret e cancer is the res ult of excess surface
water from gutter make safe
concrete cancer is due to long term gradual deterioration which is
a maintenanc e item
unevenness of subfloor soil is allowing water to pond.
septic tank shows signs of recent repairs
septic tank showing signs of rotation and possible escape of liquid
rotation and movement likely predate the claimed event . More
likely the damage is due to gradual deterioration a nd uneven
ground movement over many years .