Retaining wall claim declined under defective construction exclusion
Summary
The complainants' home insurance claim for storm-damaged retaining walls was declined under a defective construction exclusion. AFCA found the insurer failed to prove the exclusion applied and ordered payment of the rebuild, development application fees, expert report costs and non-financial loss compensation.
The insurer bore the onus of proving on the balance of probabilities that the wall was not built to applicable engineering criteria, and it failed to identify any applicable criteria that were breached.
Issues
- Claim denial primary · upheld“The insurer has failed to identify any applicable engineering criteria and any failure to accord with that criteria. The exclusion does not apply.”
- Inadequate claim investigation secondary · upheld“The insurer's expert evidence was flawed resulting in substantial stress and lost time by the complainants”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay non financial loss
Related
Text of the determination
Determination
Case number 856922
Financial firm Youi Pty Ltd
Case number: 856922 12 September 2022
Determination | Case number: 856922 Page 2 of 6
1 Determination overview
1.1 Complaint
On 23 October 2021 a very severe storm with winds exceeding 100kph caused damage
including bringing down fencing and retaining walls at the complainants’ home.
The complainants’ claim on their home policy was accepted by the insurer , except with regard
to the retaining walls which were declined on grounds that that a policy exclusion applied to
defective construction.
1.2 Issues and key findings
Is insurer entitled to deny claim relying on defective construction exclusion?
No, the insurer has failed to identify any applicable engineering criteria and any failure to
accord with that criteria. The exclusion does not apply.
Is the complainant entitled to compensation for non-financial loss?
The insurer’s expert evidence was flawed resulting in substanti al stress and lost time by the
complainants and an amount of $2,000 is appropriate.
Why is the outcome fair?
The outcome is fair because the insurer has fallen short in its attempt to prove defective
design and construction. Reliance on an exclusion for alleged non-compliance with
engineering criteria in circumstances where there was undoubtedly a severe storm, requires a
careful and considered approach to the technical issues involved.
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of acceptance of this Determination, the insurer is to pay the complainants the
following:
$34,650 retaining wall/fence rebuild)
$2,621 development application fees
$2,080 reimbursement of expert report costs
$2,000 compensation for non-financial loss
Determination | Case number: 856922 Page 3 of 6
2 Reasons for determination
2.1 Is insurer entitled to deny claim relying on defective
construction exclusion?
No, the insurer has failed to identify any applicable engineering criteria and any failure to
accord with that criteria. The exclusion does not apply.
Insurer has burden of proving exclusion applies
I t is not in dispute that the complainants’ home suffered damage from a severe storm event
on 23 October 2021 and that accordingly the onus shifts to the insurer to show an applicable
exclusion in relation to the damage suffered to the retaining wall.
The insurer has to prove on the balance of probabilities that the design and construction of
the wall was not according to engineering criteria that applied at the time of construction.
Insurer has not identified non-compliance with applicable engineering criteria
The insurer referred to the following as applicable engineering criteria.
AS4678
The insurer’s engineer (S E) reported the house and retaining wall were built in 2019 and that
the wall was undersized for its retaining height of 600mm and that accordingly, the subject
retaining wall does not comply with AS4678.
Following receipt of a report from the complainants’ expert engineer, FE, it has been
accepted that AS4678 does not apply to walls less than 800mm. SE maintains that the same
principles still apply.
However, the policy exclusion can only be sensibly construed as referring to some specific
engineering criteria such as are contained in a well-known and applicable standards. AS4678
does not apply and therefore does not assist the insurer, nor has the insurer demonstrated
that I am entitled to extrapolate “engineering criteria” from its general principles.
AS3700:2001
SE further reported that the masonry retaining wall would be required to comply with
AS3700:2001 – Masonry Structures Code. SE stated that design calculations indicated the
retaining wall is significantly under-designed with regard to permissible tensile stresses on the
wall.
The complainant has submitted and it is apparently agreed that as at the date of the storm,
AS3700:2001 was superseded by AS3700:2018. The insurer has not addressed whether
there is any relevant difference between the two versions. The insurer has not provided or
explained the calculations that apparently show a discrepancy with engineering criteria in
AS3700.
The standard apparently deals with the earth retaining strength of the wall. It is not explained
how this is relevant in the present case where wind pressure on metal fencing erected on the
retaining wall caused the damage. There is no suggestion of earth subsidence or movement
causing the damage.
Determination | Case number: 856922 Page 4 of 6
Manufacturing Guidelines
SE has provided a document containing manufacturing guidelines for a concrete interlocking
block retaining wall system similar to the proprietary system used by the complainant. SE
says this guide shows steel fenceposts should be embedded through 3 such blocks and then
core filled, whereas the complainant’s posts were embedded in only one block. As a general
proposition this seems eminently sensible, but it is not the same system used by the
complainant. In any event the document describes its content as “recommendations.” This is
considerably less prescriptive than an industry standard.
Imposed Load required engineering analysis
Lastly in a Supplementary Report, SE refers to the manufacturer guidelines for the actual
interlocking concrete block system used in the complainant’s retaining walls. The guidelines
state “ If imposed loads are expected, the retaining wall should be designed by engineering
analysis similar to that in the worked example, in RW0 3 Appendix A.” In other words, if there
is an imposed load some appropriate customised designing is required.
An imposed load was expected. The building plans provide for a solid metal 1.8 metre high
fence to be installed on top of the retaining wall for the whole length of the backyard. Even a
moderate wind would apply substantial lateral pressure to the fence and thereby to the
retaining wall. On 23 October 2021 the pressure generated by the strong winds was sufficient
in some areas to bend a number of the steel fencepoles and in other areas shift and dislodge
the retaining walls.
It is clear that the retaining walls failed. However, the insurer has not identified a failure to
construct in accordance with any specific engineering criteria which applied at that time. It is
simply unknown to me if any engineering analysis was done and if that analysis was or was
not in accordance with the example in RW03 referred to above.
It seems likely that no analysis was done. I say this because FE has observed the fence was
erected by a different contractor to the landscaper who built the retaining wall. FE states “ It
was, in this engineer’s opinion , correctly assumed by all parties involved that no engineering
was necessary for works performed and how they interact with each other”. I do not agree
with this statement. However, the insurer has the burden of proof.
The insurer has failed to identify any applicable engineering criteria and any failure to accord
with that criteria. The exclusion does not apply.
Insurer to pay damage plus interest
The complainants have not yet repaired the damaged retaining wall and have provided the
following quotations and costs in support:
development application fees: $2,621
retaining wall/fence rebuild: $27,720
total: $30,341
The quote was issued on 1 December 2021. It is well known that building prices have risen
steeply in the last several months. I have sought to factor this into my consideration of an
appropriate cash settlement. I have considered contingencies and the absence of an
insurer guarantee. I apply a 25% loading on the $27,720 making an amount of $34,650.
Determination | Case number: 856922 Page 5 of 6
Insurer to reimburse cost of expert ’s report
The cost for F E’s report was reasonably incurred and the report materially assisted the
complainants’ position in advancing their claim. The insurer is required to reimburse the
complainants the cost incurred of $2080.
2.2 Is the complainant entitled to compensation for non-
financial loss?
Insurer’s declinature reveals a lack of scrutiny of its expert’s report.
AFCA has the power to award compensation for non-financial loss up to $5,400 in
circumstances where there has been significant distress and or inconvenience caused by an
insurer in the conduct of a claim. AFCA expects complainants to have a reasonable level of
resilience.
In the present case there was clear evidence that the com plainant’s house had been hit by a
severe storm which caused widespread damage to properties in its path and resulted in
substantial media reporting. For an insurer to rely on an exclusion for failure to comply with
engineering standards in respect of a component of that damage would usually require clear
and compelling evidence. Unfortunately, the first report by SE contained a number of
significant errors. A careful reading of SE’s report by the insurer would have revealed these
errors. However, the insurer persisted in its declinature.
It was entirely reasonable for the complainant to obtain a fresh engineering report. In addition
to incurring these costs the complainants clearly devoted substantial time and effort to their
written submissions to the insurer and to AFCA. In the circumstances and considering the
stress involved I consider an amount of $2,000 is appropriate.
2.3 Why is the outcome fair?
The outcome is fair because the insurer has fallen short in its attempt to prove defective
design and construction. Reliance on an exclusion for alleged non-compliance with
engineering criteria in circumstances where there was a severe storm, requires a careful and
considered approach to the technical issues involved.
Determination | Case number: 856922 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.