Home / QBE / Determination 856899

Determination 856899

Insurer declined strata building damage claim after marina wall collapse; AFCA found exclusions not established, ordered claim settled and benefits paid

FirmQBE
Decided2023-01-04
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,500
Amount claimed—
SourceAFCA PDF

Summary

A strata owners' corporation's balcony and decking collapsed after a marina wall failed, and QBE declined the building damage claim relying on exclusions. AFCA found the insurer had not established an excluded cause, ordered the claim settled, temporary accommodation and legal costs reimbursed, and $2,500 non-financial loss paid.

The insurer failed to establish on balance that an excluded factor was the proximate cause of accidental damage to insured property, and the marina wall was not insured property within the complainant's control, so exclusions were properly limited.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionnatural disasterthird party authoritypay claimpay compensationpay interestpay non financial lossreassess claim

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 856899 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 856899 Page 1 of 15 Case number: 856899 30 November 2022 1 Determination overview 1.1 Complaint The complainant is a third-party beneficiary whose lot (Unit 71) is insured under a residential strata insurance policy held by the Owners’ Corporation (OC) with the financial firm (insurer). The policy provides accidental damage cover for the building and common area contents. On 9 July 2020 the complainant’s balcony and decking collapsed after the marina wall beneath them failed. The complainant made a claim seeking cover for the building damage under the policy, as well as cover for temporary accommodation and furniture items damaged or lost in the collapse. The insurer declined the claim as it says the damage was caused by defects and other excluded factors. The complainant disputes this decision. The complainant also says the insurer has not provided a timely resolution to the complaint, as it agreed to obtain a further engineer report and review the matter by November 2021 but did not do so. 1.2 Issues and key findings Is the insurer is entitled to decline the claim? No. A valid claim for accidental damage has been established. The insurer has not shown, on balance, that any excluded factor(s) relating to the insured property caused the loss. That means the insurer is not entitled to decline the claim for damage to the insured property (building and common area contents). The insurer is, however, not liable for loss of or damage to the complainant’s personal contents, as distinct from common area contents . In the circumstances, the insurer is liable for temporary accommodation costs under the Special Benefits policy provisions, up to the applicable policy limit; and for legal costs up to $5,000. It is not liable for travel costs. Is compensation for non-financial loss warranted? Yes. Compensation of $2,500 is warranted for the significant upset and inconvenience experienced by the complainant. The insurer unreasonably delayed the progress of the claim by making unduly vague requests for information from third parties, and by delaying the appointment of an additional expert who might reasonably have completed a report without that requested information. The insurer also failed to provide temporary accommodation to which the complainant is entitled under the policy, and that caused additional avoidable upset and inconvenience. Why is the outcome fair? The outcome is fair in all the circumstances because the insurer has not established, on balance, the proximate cause of damage was excluded by the policy. Accordingly, the insurer is liable for repair of the insured property and for all applicable policy benefits, as well as compensation for non-financial loss. Determination | Case number: 856899 Page 2 of 15 1.3 Determination This determination is substantially in favour of the complainant. The insurer is required to:  accept and settle the claim for accidental damage to the insured property in accordance with the policy terms and conditions  reimburse the complainant his temporary accommodation costs (subject to the complainant providing reasonable evidence of costs incurred), together with statutory interest as specified in section 2.1 below  reimburse the comp lainant’s legal fees incurred in connection with the complaint (up to a maximum of $5,000), subject to receipt of reasonable evidence of those costs  pay $2,500 compensation for non-financial loss. Determination | Case number: 856899 Page 3 of 15 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? No. A valid claim for accidental damage has been established and the insurer has not shown, on balance, an excluded factor was the proximate cause of loss. It is not entitled to decline the claim for damage to the insured property. Policy covers accidental damage to the building and to common area contents The damage was first noted on 7 July 2020 when the support post for the neighbouring balcony dropped through the decking below. The post was supported by, but not fixed to the top of the marina wall. The marina wall was found to have shifted 350mm when inspected the following day. On 9 July 2020, the marina wall below the property failed, causing the collapse of the decking and balcony above. The policy covers ‘damage’ to the insured property (building and common area contents) occurring during the period of insurance and not otherwise excluded by the policy. ‘Damage’ is defined in the policy to mean: any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by the policy. ‘Accidental’ is not defined in the policy, but is commonly understood to mean ‘unintended and unexpected’. This is consistent with the policy definition of ‘Event‘ as ‘an incident that is not intended to happen’. The parties agree the damage to the property resulted from the failure of the marina wall beneath it. No information has been provided to show the complainant (or the insured Owners’ Corporation) intended or expected the wall failure or damage to occur. Accordingly, the panel accepts a valid claim for accidental damage has been established. Valid c laim for complainant’s contents items not established The complainant is seeking cover for unspecified furniture items situated on the balcony of his unit at the time of the collapse. He says these items were lost or damaged. No detail regarding what items were lost or damaged has been provided. The policy provides cover for ‘common area contents’. The policy specifies this does not include lot owner’s contents or their personal property. ‘Common area’ is defined to mean the area of the insured property that is not part of any lot/unit. The complainant says the claimed contents items are covered under Special Benefit 17 – Personal property of others. This benefit provides cover for up to $10,000 for personal property of others damaged by an event while in the insured/complainant’s physical or legal control. ‘Others’ is not defined in the policy. However, the complainant is a lot owner and beneficiary under the policy, and lot owner’s contents are excluded from the definition of insured property. Therefore the panel is not satisfied the complainant falls within the meaning of ‘others’ such that this benefit applies. That means the complainant’s contents items are not covered under the policy. Determination | Case number: 856899 Page 4 of 15 To be clear, no information has been provided to show the claimed items were being held by the complainant on behalf of others or that they were common area contents items otherwise covered by the policy (in which case, the owner or insured would be the appropriate beneficiary). Panel satisfied damage not caused by plumbing issues A report from the marina’s engineer OF attributes the damage to excessive lateral loading from behind the wall, likely due to the retained soil becoming saturated from rainfall discharged from a broken downpipe at a neighbouring property. OF based this view on the assumption that the downpipe was broken a considerable time before the failure of the wall. OF considered there was no other mechanism by which the retained soil could overload the marina wall. OF also made assumptions regarding the level of rainfall and roof area serviced by the downpipe. Plumbing investigations of the affected properties did not reveal any leaks or blockages. This included CCTV inspection of the sewer and stormwater system (to the extent possible, noting the rear stormwater drain could not be tested due to the damage), pressure testing and gas testing. While it was not possible to inspect the sewer line at this property, the insurer’s engineer FM attended the site three times (including on the day of loss) and notes there was no evidence the pipe was leaking, and it is also remote from the damage on the other side of the property. FM considered the pipe was not leaking before the initial movement or subsequent failure of the wall. Engineer MC noted the drain pipe hooked over the marina wall, so movement of the wall would pull on the pipe. The broken section was replaced after the initial movement of 7 July 2020, which required an extra length of pipe to allow the pipe to hook back over the marina wall. This indicates it was the movement of the wall on 7 July 2020 that caused the movement of the pipe. FM also noted the vertical end section of the downpipe was missing and the break in the PVC pipe appeared recent. The downpipe to a neighbouring property had also been pulled away from the building by the failure of the marina wall. FM and MC agreed leaking pipes did not cause the damage. Even if there was an issue with the stormwater pipe, FM noted the roof area it serviced was not sufficient to supply enough water to damage the marina wall, and is also too remote from the failure to have contributed to the damage. The insurer’s seco nd engineer RB agreed the failure of the wall had nothing to do with whether any downpipe was cracked, noting the ground behind the marina wall has been exposed to rainwater runoff for decades, including more than 10 years before the houses were built. OF ’s opinion is not persuasive and is inconsistent with the other available information. The panel does not consider the available information establishes the existence or contribution of any plumbing leak to the failure of the wall or property damage. Insurer relies on various exclusions to decline building claim The policy states the insurer will not pay for damage caused by or arising directly or indirectly from:  lack of maintenance, corrosion, wear and tear, developing flaws, gradual deterioration or the passage of time  any action of the sea, high water or high tide  erosion or earth movement (unless due to a plumbing leak)  underground (hydrostatic) water Determination | Case number: 856899 Page 5 of 15  latent defect  damage caused by non-rectification of an insured property defect, error or omission the insured was aware of, or should reasonably have been aware of. The insurer relies on these exclusions to decline the claim, based on the expert evidence obtained. Marina wall construction details unknown The marina wall was constructed around 1985, approximately 35 years before the collapse. FM considers the design life for the wall at the time of construction would have been at least 50 years. MC said it would be hundreds of years if designed and constructed correctly. The design specification of the wall is not known as no engineering or construction records for the wall have been able to be obtained by either party, with the local council and marina developer also being unable to produce these records. FM notes the wall was designed and constructed before the issue of the Australian Standard, however says the design considerations and expected practice for the design and construction of the wall would not vary substantially from the current requirements. Accordingly, the marina wall should have been designed to withstand the lateral loads from the retained ground, along with ground water if no drainage was installed, and a nominal surcharge loading. FM said while it cannot be known if the design considered the surcharge created by houses built in close proximity, if the wall did not have adequate structural capacity to accommodate the houses it would expect the wall to have shown distress in the years shortly after they were constructed. Developer responsible for maintaining and repairing marina wall T he policy definition of ‘Building’ includes marinas ‘that You own or have legal responsibility for’. ‘You’ in that context means the Owner’s Corporation. The marina wall sits on the boundary of the insured property. The licence agreement for the marina confirms the developer has responsibility for the marina walls and required it to maintain and repair them to a professional standard. As such, the complainant considers a narrow interpretation of ‘insured property’ should be given to only include property w holly owned by the insured or for which they are legally responsible. In its report of 10 July 2020, the insurer’s loss adjuster (DL) confirmed the marina wall does not form part of the Owners’ Corporation property. The insurer advised that the developer has commenced repairs to the marina wall. Accordingly, repair of the marina wall itself is not in issue. Experts identify various possible causes, agree design documents are required Noting the design or exact configuration of the marina wall are not known, FM considered the possible causes of failure included (but were not limited to):  inadequate design and/or construction of the marina wall  the design of the marina wall did not allow for the surcharge associated with the construction of the houses  the failure of those responsible to stipulate a required set-back from the marina wall or a footing depth sufficient enough to prevent loads from the houses impacting the wall if the wall was not designed to accommodate the loads from the houses Determination | Case number: 856899 Page 6 of 15  the limited scope of the geotechnical investigation prior to the construction of the houses which did not address the proximity of the houses to the marina wall in the footing recommendations  the footing design of the houses imparts lateral loads onto the marina wall  corrosion and subsequent failure of ground anchors laterally restraining the top of the wall, if the observed anchors were intended to be part of the permanent design of the wall  tidal erosion of the ground beneath the marina wall  scouring of the material behind the marina wall due to tidal water passing in and out of the retained material behind the wall. The insurer obtained a further opinion from engineer RB. RB completed a desktop assessment to the available material in July 2022. RB noted there was still no documentation confirming the design and construction of the wall, and accordingly what the wall was capable of withstanding or what might cause it to collapse. RB also makes certain assumptions in his assessment which are subject to verification in line with the design information and examination of the failed components of the wall. RB noted all opinions on the failure of the wall were hampered by this lack of information. MC noted the failed wall section had a different profile to the other pieces which is likely to have partially contributed to its failure. RB agreed the failed section was an anomalous unit, and this culvert unit may have relied on its own weight to resist lateral forces, using frictional resistance of the earth. RB noted the saturated very silty clay material in this location had negligible frictional resistance to horizonal forces. MC considered the most likely cause of the marina wall collapse was inadequate design and/or construction. RB said the failed segments need to be examined to confirm the construction and cause of failure of the wall. While several potential causes of failure have been identified, the insurer notes they relate to the likely inadequate design and construction of the marina wall. The insurer further says no other accidental and sudden cause of the damage has been identified. The panel acknowledges the experts (other than OF) broadly agree the failure of the wall was at least contributed to by design or construction defects. The experts also agree that their views are subject to confirmation by reference to the marina wall design documents and inspection of the failed elements. Accordingly, the relative contribution of the various potential causes or nature of any defect responsible for the failure is not known. There is also disagreement between the experts on the contribution of various factors, as discussed below. Complainant says exclusions relating to marina wall should not apply As the developer has responsibility for the marina wall, the complainant says the exclusions relating to defects in or maintenance of the marina wall should not apply. The panel accepts the available information indicates the defects likely responsible for the damage were not within the insured’s responsibility, control or ownership. Accordingly, the panel considers the application of the identified exclusions is properly limited to the insured property. This is consistent with the policy terms and obligations, as the insured cannot reasonably rectify defects to the marina wall in the circumstances. Anecdotal evidence also indicates where maintenance issues were identified, they were promptly reported to the developer for action by the insured. The nature of any maintenance concerns and what actions were taken in response by the developer is not known. The panel is not satisfied it has been established that any lack of maintenance contributed to the damage in any event. Determination | Case number: 856899 Page 7 of 15 No insured property defect established The policy states the insurer will not pay for damage caused by the non-rectification of an insured property defect the insured was aware of or should reasonably have been aware of. The complainant denies knowledge of any defects at any time. OF said there was excessive vertical loading on the marina wall from the decks and balconies of the affected properties, which partially contributed to, although did not cause, the failure of the wall. MC disagreed however, and said the balconies and decks would not have induced loads that would be detrimental to the marina wall. FM also considered the additional loading of the decks and balconies would be insignificant in relation to the dead weight of the marina wall and lateral loads of the retained ground. FM said the required factor of safety at the time of construction should have easily accommodated these additional loads. Accordingly, FM considered the loadings from the decks and balconies would not have contributed to the failure of the wall. The panel finds FM and MC’s reports and reasoning more persuasive than OF’s and accepts their findings in this regard. As no defect to the insured property has been established, on balance, as the proximate cause of the damage, the insurer is not entitled to rely on this exclusion. The policy also states the insurer will not pay for rectifying faulty or defective materials or faulty or defective workmanship, design or specification. The insurer references this provision, presumably in relation to its argument that the marina design or construction was faulty or defective. However, the complainant is not asking the insurer to rectify the damage to the marina, which is being attended to by the developer. Accordingly, the panel does not consider this provision assists the insurer, as no defect to the insured property has been established. Impact of high tides and hydrostatic pressure not confirmed FM noted the ground beneath the decks of the affected properties was open ground with no discernible surface water drainage system. FM also noted holes within the tidal zone of the marina, with water passing into and out of the ground behind the wall. FM said potential exists for these tidal flows through the wall to scour and erode away the retained ground behind the wall. FM noted gaps between the concrete marina wall segments, and water seeping through cracks between segments remote from the marina wall failure. OF however said soil fill and natural soil was dislodged from behind the seawall and under the ground slab during and after the marina wall failure, and this soil was slumped in the basin. MC agreed the loss of the marina wall resulted in the erosion of the retained soil, and said the wall would have been designed for hydrostatic pressure. Further, while FM said it was possible for tidal erosion to contribute to the collapse, it also said this should not have been possible and points to inadequate design and construction of the marina wall. RB considered the open joints would have allowed water from the marina to penetrate the retained earth through the period of existence of the wall. RB considered it highly probable the earth immediately behind the wall had been saturated beyond its liquid limit and deteriorated into a slurry. Even so, RB noted the remainder of the wall has held firm. Accordingly, RB considered the impact of tides could safely be dismissed given the wall remains largely intact after over 30 years existence under all tidal and rainfall conditions. Determination | Case number: 856899 Page 8 of 15 There is no detailed consideration of the impact of tidal flows or hydrostatic pressure on the marina wall, or whether the loss of retained soil was the cause or result of the marina wall failure. Considering the available information and the balance of the expert opinion, the panel does not accept exclusions relating to actions of the sea/high tide and hydrostatic pressure have been established. Extent of any natural erosion not established The policy states the insurer will not pay for ‘damage caused by or arising directly or indirectly from the removal or weakening of or interference with the support of land or buildings or any other property, erosion or earth movement’. ‘Erosion’ is defined in the policy as being ‘worn or washed away by water, ice or wind’. ‘Earth movement’ is defined as ‘heavage, landslide, land -slippage, mudslide, settling, shrinkage, subsidence or collapse’. The licence agreement required the developer to keep the marina and all improvements in good condition. It also required the developer to dredge the marina to maintain minimum water levels for the safe use of boats in accordance with the EPA dredging protocol. RB notes the engineering aspects of the dredging practice used or the depth of the dredging are not known. RB also considered no monitoring surveys were undertaken, but does not state the basis of this belief. RB said it was probable the earth under the supporting base for the culvert was eroded by a number of influences, including dredging the marina floor. RB said the available photos show there was quite deep water near the marina wall. RB considered if dredging was undertaken to a level of around 3 metres or more, submerged soil in front of the marina wall would migrate over time to the centre of the harbour, as the soil is silty to very silty clay and easily disturbed, with a tendency to level out. RB believed the silty clay under the failed culvert had gradually been eroded, with the culvert rolled out into the marina when its weight could no longer be supported. RB considered there was no other way the culvert could have become displaced to the extent it did. RB said while the collapse of the culvert may appear to be a single event, it was the culmination of several influencing factors occurring for many years. RB considered the proximate cause of failure of the wall was a combination of inadequate and inappropriate design and a lack of monitoring and maintenance to ensure the earth around the units at the floor of the marina did not deteriorate through erosion. RB did not comment on the extent to which uncontrolled dredging was thought to have contributed to the damage, noting he considers the remaining walls are generally intact and serviceable. RB also emphasised the collapse of the culvert was not from lateral forces from retained earth behind the wall. The available information indicates the weakening of the support of the buildings is a consequence of the wall failure rather than the cause. While the panel acknowledges RB’s theory, it is not satisfied there is sufficient evidence to establish, on balance, natural erosion or earth movement is the proximate cause of failure of the wall. Insurer says complainant has not cooperated with assessment of claim Additionally, the insurer says the complainant has not complied with the policy obligation to give all information and assistance the insurer reasonably requires in relation to the claim. Determination | Case number: 856899 Page 9 of 15 The insurer says the insured OC has not provided maintenance records relevant to the pre- existing condition of the marina, despite repeated requests for this information. In particular, the insurer seeks a copy of a report form 2019 relating to maintenance works to the marina. This report was mentioned by the body corporate manager AC in conversation with FM during the initial inspection of the property. AC reportedly offered to provide this report to FM but later said it was with AC’s lawyers and could not be released. FM understood AC arranged inspections of the marina wall and this report was issued to the developer requesting maintenance works be completed. The nature of these works or whether they were done is not known. The complainant and the insured have advised they do not have access to this report. The complainant provided emails requesting these documents in July and August 2022 but not copies of the response provided. The complainant has provided meeting minutes for the 2019, 2021 and 2022 annual general meetings for owner’s corporation two (the minutes ind icate no meeting was held in 2020) and documents confirming this is the correct owner’s corporation. The minutes make no reference to the affected units, marina damage or maintenance. While the panel acknowledges this is a complex matter and not all relevant material appears to be available, the insurer did not refuse to make a claim decision on this basis. Rather, the insurer promptly declined the claim and now raises concerns it had insufficient material to justify the decision. If the insurer considered it did not have sufficient material to assess the claim it should have declined to make a decision until sufficient records were available. In the circumstances, the panel does not consider it fair or reasonable for the insurer to rely on any failure by the complainant to provide information (to which he does not have access in any case) as a basis for rejecting the complaint. Additionally, the insurer considers additional materials would have become available as works progress to repair the marina, however it is unclear why the complainant or insured would have access to these materials. The insurer seems better placed to obtain this information, as it also insures the marina. The panel is not satisfied it has been demonstrated that the complainant or insured have not reasonably cooperated with the claim or that the insurer is entitled to decline the claim on this basis. To be clear, the complainant himself has no control over the insured OC. Temporary accommodation and other applicable Special Benefits payable As the panel is satisfied complainant has established a valid claim under the policy, the insurer is also required to cover all applicable Special Benefits in accordance with the policy terms. That includes the benefit for temporary accommodation, since the complainant was required by the local council to vacate his unit following the event. The insurer’s liability for that benefit is for the period commencing on the date of the claimed event, up until the complainant reoccupies his unit following repairs, but subject to the policy limit as stated on the certificate of insurance (15% of the building sum insured). The complainant is required to provide reasonable evidence of the costs/losses incurred. The insurer has not covered any such costs to date, and so payment for this component of the claim should include interest at the rate determined under section 57 of the Insurance Contracts Act 1984 (Cth) calculated from the date the relevant costs/losses were incurred by the complainant until the date of settlement. Determination | Case number: 856899 Page 10 of 15 The complainant also seeks cover for their travel costs under Special Benefit 1i. Where the property is leased, the policy provides up to $250 per unit for reasonable travel costs incurred visiting the unit for the purposes of consulting with claim adjusters or building repairers. No detail regarding the travel costs incurred by the complainant, nor any evidence that the property was leased has been provided. This benefit is not payable in the circumstances. AFCA may award professional costs The complainant seeks cover for legal fees under Additional Benefit 4 of the policy. This provides cover for legal fees necessarily incurred making submissions or applications to any public or statutory authority, Builders Licensing Board or Land and Environment Court. AFCA is not a public or statutory authority and accordingly this benefit does not apply in relation to costs incurred in making this complaint. AFCA provides a free service to complainants, and it is not usually expected or necessary that a complainant will use the services of professional representatives to assist. Under our Rules, however, we may decide that an insurer should contribute to the legal or other professional costs incurred in the course of a complaint, up to a maximum of $5,000. In this case, having regard to the relative complexity of the claim and the policy being held by the OC rather than the complainant himself, the panel is satisfied that it was not unreasonable for the complainant to have engaged legal representation to assist him. Subject to the complainant providing evidence of his legal costs incurred in pursuing this complaint, the panel considers it fair for the insurer to pay $5,000 towards those costs. 2.2 Is compensation for non-financial loss warranted? AFCA can award compensation for unreasonable delay and upset Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where there has been an unusual amount of physical inconvenience, time taken to resolve the situation or interference with the complainant’s expect ation of enjoyment or peace of mind, due to the insurer’s conduct of the claim. AFCA takes a conservative approach to compensation and expects a complainant to bear a normal degree of inconvenience during the course of a complaint. Unnecessary steps, delays and inconvenience caused in dealing with the claim The panel acknowledges the claim was actioned promptly and decided within a month of lodgement. However, subsequent delays occurred during the review of the matter after the claim decision was disputed – and when it became apparent the insurer had not established a sound basis for its initial prompt denial of the claim. The claim records show these delays were mostly due to the insurer seeking information from third parties, as well as from the insured. However, the panel considers certain of the insurer’s information requests of third parties were unduly broad and vague and unlikely to be helpful (which proved to be the case). The delays experienced while seeking and awaiting those reports could have been avoided. That included the consequential delay in appointing a final expert, who might reasonably have completed a report without that information. Determination | Case number: 856899 Page 11 of 15 The panel also considers it was unfair and unreasonable in the circumstances for the insurer not to have provided temporary accommodation. This understandably caused the complainant significant and avoidable upset and inconvenience. It is fair and appropriate that the insurer pays the complainant $2,500 compensation for non- financial loss. 2.3 Why is the outcome fair? The outcome is fair in all the circumstances because the insurer has not established, on balance, the proximate cause of damage was excluded by the policy. Nor has it established any other basis for denying what the complainant has shown was a valid claim. It is therefore fair that the insurer accepts and settles the claim for accidental damage to the insured property in accordance with the remaining policy terms and conditions, and provides the applicable policy benefits. Determination | Case number: 856899 Page 12 of 15 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 856899 Page 13 of 15 3.2 Relevant policy provisions Product Disclosure Statement: P OLICY 1 – I NSURED P ROPERTY We insure You up to the Sum Insured shown on the Schedule for Policy 1- Insured Property for Damage to Your Insured Property (Building and Common Area Contents) that occurs during the Period of Insurance not otherwise excluded by the policy. If your Sum Insured is not exhausted, We will also pay for the costs or fees incurred as a result of damage to Your Insured Property under Policy 1. Details of the costs and fees We pay are set out under the heading ‘Additional Benefits’ in Policy 1 – Insured Property of the Policy. We also provide cover for Special Benefits in addition to Your Sum Insured for Policy 1 – Insured Property. Details of the Special Benefits are set out under the heading ‘Special Benefits’ in Policy 1 – Insured Property of the Policy. The combined total amount we will pay under Special Benefits arising out of one Event that is admitted as a claim under Policy 1 – Insured Property is limited to the percentage of the Building Sum Insured for Policy 1 – Insured Property as shown in the Schedule or such other percentage as we may agree in writing. G ENER AL D EFIN ITIONS : Common area means the area at Your Situation that is not part of any Lot/Unit. … Damage, Damaged means any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by the policy. Event, Events means a happening or an incident not intended to happen which occurs during a particular interval of time and causes or results in Damage or series of Damage happening from that one Event, that is claimable under the policy. Insured Property a. Building means building or buildings as defined in the Strata Legislation applying where Your Building is situated, including: … ii. fixtures and structural improvements, gates and fences … iv. m arinas… … that You own or have legal responsibility for at, in or adjacent to Your Situation. b. Common Area Contents means: i. furniture… that You own or have legal responsibility for at, in or adjacent to Your Situation… Building and Common Area Contents do not include:  …  Lot Owner’s Contents and any other personal property of theirs  … Lot Owner’s Contents means (but no so as to limit the generality thereof): … Determination | Case number: 856899 Page 14 of 15 c. Lot Owner’s business and personal effects, furniture… You, Your, Yours means a. in respect of Policies 1, 8 and 10: the Body Corporate, Corporation, Owner’s Corporation. Plan or Company named in the Schedule including: i. the interests therein of Members; ii. Lot Owner’s in respect of Special Benefits 1,2 11, 13, 18, 2 2 and 23 of Policy 1 – Insured Property Members means and is limited to the interest of Proprietors, Members, Lot Owners or Shareholders in respect of the ownership of Your Insured Property as defined in the Strata Legislation applying where Your Insured Property is situated. Unless otherwise specifically provided by this Policy, the Proprietors’, Lot Owners’ or Shareholders’ interest or liability as and owner and/or occupier of a Lot/Unit is not included. S PECIAL B ENEFITS 17. Personal property of others We will pay up to $10,000 for the Indemnity Value of personal property of others (including employees) which is Damaged by an Event claimable under Policy 1 – Insured property while in Your physical or legal control. E XCLUSIONS 1. We will not pay for Damage caused by or arising directly or indirectly from: … b. lack of maintenance, rust, oxidisation, corrosion, mould, wear and tear, fading, concrete or brick cancer, developing flaw, wet or dry rot, gradual corrosion or gradual deterioration or failure to maintain Your Insured Property in a reasonably god state of repair. This includes when the damage to the Insured Property is caused by light, air sand, the climate (which includes wind or rain) or the passage of time; … d. any action of the sea, high water or high t ide or tidal wave… … f. vibration or from the removal or weakening of or interference with the support of land or buildings or any other property, Erosion or Earth Movement. However We will pay if the Damage is due to: i. … ii. bursting, leaking or overflowing of water tanks, pipes, drains, gutters or other water or liquid carrying apparatus; g. underground (hydrostatic) water; However We will pay if the Damage is due to bursting, leaking or overflowing of water tanks, pipes or drains; … i. inherent vice, latent defect, vermin, mice, rats, termites, insects, mildew or by pecking, biting, chewing or scratching by birds or animals… 3. We will not pay for … Determination | Case number: 856899 Page 15 of 15 b. Damage caused by non-rectification of an Insured Property defect, error or omission that You were aware of, or should reasonably have been aware of; c. The cost of rectifying faulty or defective materials or faulty or defective workmanship, design or specification;

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.