Text of the determination
Determination
Case number 856702
Financial firm AAI Limited
Determination | Case number: 856702 Page 1 of 9
Case number: 856702 8 December 2022
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy (policy) with the
financial firm (insurer). In October 2021, the complainant lodged a claim (claim 1) for water
damage to the insured property caused by a burst flexi hose in the main bathroom vanity.
During restoration works, a second leak was identified to the laundry breach, resulting in a
second claim (claim 2).
The insurer has accepted the claims. However, it is limiting its liability to damage it accepts to
be due to the leaks. The insurer is seeking to cash settle the complainant because it says it
cannot complete the repairs due to pre-existing maintenance issues noted to the showers in
the main bathroom and ensuite. The insurer says these issues with the showers and repairs
to the laundry breach are maintenance works, which are not covered under the policy.
The complainant wants the insurer to complete all the works and does not want to be cash
settled.
1.2 Issues and key findings
Is the insurer entitled to cash settle the complainant?
Yes. The insurer, in line with the policy provisions, is entitled to choose to cash settle the
complainant under the claims.
Is the insurer’s final claims settlement offer fair?
No. The insurer is to increase its final settlement offer for the claims to include additional
works including mould remediation and associated damage to the insured building.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer is to pay the complainant $1,500 in non-financial loss in line with the AFCA
Rules.
Why is the outcome fair?
The outcome is fair as it accepts the insurer is entitled to settle the claims by way of a cash
settlement. However, it also finds the insurer is to increase the level of indemnity it is to
accept under the claims and pay non-financial loss compensation to the complainant.
1.3 Determination
This determination is in favour of the complainant.
The insurer is to pay the complainant $61,781.45, inclusive of a 15% contingency payment,
less the applicable policy excesses within 14 days of receiving notice of the complainant’s
acceptance of this determination.
Determination | Case number: 856702 Page 2 of 9
Further, the insurer is to also cover the complainant for a further 10 weeks temporary
accommodation to allow him to arrange for repairs and return the home to a habitable
condition.
The insurer is to pay the complainant $1,500 in non-financial loss within 14 days of receiving
notice of the complainant’s acceptance of this determin ation.
Determination | Case number: 856702 Page 3 of 9
2 Reasons for determination
2.1 Is the insurer entitled to cash settle the claims?
Yes. The available information shows there are maintenance related repairs which prevent
the insurer from being able to complete and warrant repairs to be accepted under the claims.
Therefore, in line with the policy wording, the insurer is entitled to choose to cash settle the
claims.
Policy allows the insurer to choose to cash settle its liability under a claim
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘ Escape of liquid and Exploratory costs ’. Cover under these
benefits is subject to the conditions, limitations and exclusions specified in the product
disclosure statement (PDS).
There is no dispute the insured building has suffered damage due to two separate leaks and
which triggers cover under the policy. I accept, given there are two separate leaks, that is it
reasonable that the damage be assessed and covered under two separate claims, subject to
the two excess contributions from the complainant.
The policy informs how the insurer will settle building claims. This includes but is not limited to
the option to cash settle the claimant in certain circumstances such as if there exists pre-
existing damage. The relevant policy wording has been provided in section 3 of this
determination.
The policy says, where the insurer’s preferred builder is unable to complete repairs under a
sum insured building contract of insurance, the insurer will ask the claimant to engage a
builder. This builder will be asked to provide a scope of works and quote on the cost of
repairs.
The insurer will then assess this information to determine if it is appropriate and reasonable
including the materials, repair method, labour and overall cost effectiveness. If the insurer
finds the quote reasonable, it will pay the claimant the assessed amount. However, if not, it
may adjust the quote and pay the adjusted amount of the quote.
The available information shows there were pre-existing maintenance issues
The available information shows there exist maintenance related issues to the two shower
(ensuite and main bathroom) recesses causing them to leak. Further, that the laundry breach
also required repairs, which is not covered under the policy . I note the insurer’s appointed
builder ‘AM’, list s the recommended maintenance works as:
Work required to fix the leaks:
• Bathroom
Structural drying needed underneath shower base from walk in robe side Caused
from burst Flexi connection
silicon seal shower screen replace both flex connections on vanity basin
Determination | Case number: 856702 Page 4 of 9
• Ensuite
silicon seal shower screen recommend replacing flex connections on vanity as
they have rust spots.
• Powder room
recommend replacing flex connection on toilet as it ’ s got rust spots.
• Laundry
laundry breach piece needs to be replaced
• Back garden tap steel socket needs to be replaced with brass
It is fair to permit the insurer to cash settle the claims
I am satisfied the available information shows the above noted maintenance related works
are required. I am also satisfied that these costs are excluded from cover under the policy
and remain the responsibility of the complainant.
I accept the information from AM shows the resultant water damage to the insured building
cannot be repaired until such time as these maintenance works are completed. Further, that
AM would not be able to obtain a post remediation verification certificate and therefore
warrant repairs whilst these maintenance works remain outstanding.
I note the complainant was allowed the opportunity to arrange the required maintenance
work. He completed some of the works but refuses to complete other aspects of the works
based on his opinion they relate to the burst flexi hose in the main bathroom. Given this, the
insurer has elected to cash settle the complainant under the claims.
The complainant provided three scopes of works and associated quotes from builders ‘ M ’, ‘G’
and ‘GC’. I note the scope of works and quote from M has been found to be the more de tailed
and favoured by the parties. The scope of works and quote from M has been discussed in
detail at section 2.2 below.
Given the above, I am satisfied it is fair in all the circumstances to permit the insurer to
exercise its right to cash settle the claims. On balance, it has been shown it is not in a
position to authorise and guarantee the repairs due to the existing maintenance related
issues with the showers and laundry breach.
2.2 Is the insurer’s final claims settlement offer fair?
No. Although the insurer is not required to accept M’s scope of works and quote in their
entirety. The insurer is to increase its final claim settlement offer to include cover for all the
damage it is required to accept under the claims.
Determination | Case number: 856702 Page 5 of 9
The scope of works and quote from M were excessive
The complainant has provided a scope of works and quote for repairs for the damage he is
seeking cover for under the claims. A quote has been provided by builder M dated 14 April
2022, in the amount of $87,492.90.
The insurer says the quote does not provide adequate details to allow it to be assessed for its
reasonableness and cover under the policy. The insurer says there are works included in the
quote which are unrelated to the insured events giving rise to the claims, and therefore not
covered under the policy.
I have carefully considered M’s scope of works and quote. I accept they include damage
and/or repairs to areas that have not been shown to have been damaged by the leaks giving
rise to the claims, such as:
Complete replacement of the installation of a new kitchen at a cost of $18,890.00. There is
no information to support these works are required due to damage from the leaks. The
information only shows damage to the laminate kickboards, which can be repaired
Installation of new curtains/drapes at a cost of $9,482.00. There is no information to show
the curtains were damaged by the insured events. Rather, the information shows the
curtains have been removed and are in storage with other contents items
Supply and install a new front door at the cost of $1,450.00. There is no information to
show the front door was damaged by the insured events.
I accept the insurer has shown M’s quote includes works which are not covered under the
claims. However, I am not satisfied the insurer, in line with its obligations under the policy,
has provided an assessment of the remaining works and associated costs. There is an
absence of any persuasive information to show M’s costings and remaining leaks related
works are excessive or unreasonable.
Rather, the insurer’s assessment of M’s quote in its report dated 19 August 2022 confirms
M’s costings for flooring repairs, replacement of vanities and security door cost etc are fair
and reasonable. I acknowledge the insurer says there are not enough details in the quote
relating to repairs such as the plaster work, painting works, replacement of door jambs,
architraves and skirting etc.
However, I am not convinced by the insurer’s position that it was not able to complete a
reasonable assessme nt of M’s quote. This is because, other than the areas claimed which
were not related to the leaks, the remaining areas and extent of damage is not in dispute.
Therefore, in my opinion the insurer was in a position to assess M’s scope of works and costs
and provide compelling information to show why it should be considered unreasonable.
Further, there is no information indicating the insurer made any effort to communicate with M
to seek clarification and/or discuss the scope of works and quote. This is despite the insurer
having been made well aware of the fact the complainant was experiencing difficulty in coping
with matters under the claim.
The insurer’s SOW and quote s do not include all claimable damage
The insurer in seeking to settle the complainant’s claim , relies on scopes of work and
associated quotes from AM. This is despite the policy provisions advising that the insurer will
cash settle a claim based on a quote from the claimant’s preferred repai rer where its
appointed repairer is unable to complete the repairs accepted under a claim.
Regardless, having considered all the information, I am not satisfied the scopes of work and
therefore cash settlement offer from the insurer fulfils its obligations under the policy. This is
Determination | Case number: 856702 Page 6 of 9
because the cash settlement is not based on quotes that include all the damage the insurer
should be accepting under the claims. The quotes from AM do not appear to include the
works and associated costs required to complete mould remediation works as well as mould
damage or damage caused in the course of the mould remediation.
It seems the insurer is of the view that it is not required to cover the mould remediation works
as it says this is not due to the two leaks giving rise to the claims. The insurer says the mould
is because of the pre-existing issues with the showers and the long-term leaking laundry
breach.
I am not satisfied the available information supports this position. It is not in dispute the
laundry breach is an insured event and the insurer has accepted to cover the damage due to
this leak (just not the cost to replace laundry breach). Given this, it is hard to understand how
the insurer then seeks to distance itself from the mould that has admittedly developed
because of this leak.
I note in the information provided by AM, relevant to the mould issue, it says there was mould
found to the hallway wall, in the laundry, linen cupboard, loungeroom wall, walk in robe and
main bathroom wall adjoining the ensuite. AM says in its opinion the mould infestation relates
to:
a previous event for which a claim had been lodged and accepted in around 2014; and
water underneath the bathroom shower base from the burst f lexi connection which hasn’t
dried out from structural drying.
Further, I note AM says based on the evidence collected, it is not of the view that the water
damage noted to the insured building is due to the leaking showers. Also, that the laundry
breach has leaked into the wall cavity which has caused the mould damage to laundry walls,
linen cupboard and lounge room wall.
Without compelling information to the contrary, I am satisfied it is reasonable to accept the
leaks giving rise to the two claims are the reason for the mould infestation and associated
damage to the insured building. Accordingly, it is fair in all the circumstances to require the
insurer to accept liability for the cost to remediate the mould as well as any associated
damage under the claims.
The insurer is to increase its final claim settlement offer
For the reasons discussed above, and in the interest of bringing finality to this complaint, I
accept it is fair to require the insurer to cash settle the claims based on M’s quote, not
including the works which have been shown to be unrelated to the leaks giving rise to the
claims. This is because it is clear AM’s quotes do not include the damage relating to the
mould. Also, M’s quote is the mo re recent and, in my opinion, a fairer reflection of the current
costs of labour and materials.
I determine the insurer is to cash settle the claims based on the cost of repairs totalling
$53,723.00. This is based on M’s quote but not including the works which have been deemed
to be unrelated to the leaks. Also, it includes repairs to the kitchen kickboards based on the
cost of repairs noted in AM’s quote and a 15% uplift to allow for contingencies and transfer of
risk to the complainant in arranging the works.
In the interest of completeness:
the insurer is entitled to apply the separate policy excess payments to both claims, which
can be deducted from the final claims settlement payment
Determination | Case number: 856702 Page 7 of 9
the insurer is to continue to cover and/or cash settle the complainant for further 10 weeks
of temporary accommodation. This is to allow the complainant reasonable time to arrange
repairs and return the home to a habitable condition.
2.3 Is the complainant entitled to compensation?
Yes. The insurer’s overall management of the claims has resulted in the complainant
experiencing undue delays, stress and physical inconvenience. The insurer is to pay the
complainant $1,500 in non-financial loss compensation.
Insurer to pay $1,500 in non-financial loss compensation
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
In this instance and considering AFCA’s approach to compensation, I accept the insurer’s
overall management of the claim has resulted in an unreasonable delay in bringing this matter
to conclusion. Further, that this has caused the complainant to experience an undue level of
stress, anxiety and physical inconvenience.
I accept, as discussed above, the insurer was entitled to limit its liability under the claims as
well as offer to cash settle the claims. However, the available information shows, there was a
failure to ensure adequate assessments of the damage in the first instance. This resulted in
further damage and maintenance related issues being identified later than they should have
been.
Th information shows this resulted in repairs, which had already commenced, and progress
under the claims coming to a stop. I am of the opinion the insurer’s assessment of its liability
regarding the mould issue was not fair in all the circumstances and contributed to a
breakdown in the relationship between the parties.
It is clear from the communications between the parties that the complainant was having
trouble managing and/or coping with the claims. I find it is unreasonable that the insurer failed
to recognise this and assist the complainant in navigating the claim requirements. This
includes a failure to communicate with M in an effort to establish the fair scope of works and
repairs costs under the claims.
In saying this, I also accept that it would not be fair to place all liability with the insurer and it
was not the insurer alone that has contributed to the delays experienced under the claim. The
available information shows the complainant did fail to co-operate at times and failed to
complete the required maintenance works, when provided the opportunity to do so. I am
satisfied this was contrary to his obligations under the policy.
Having considered all the available information, I am satisfied it is fair to require the insurer to
pay the complainant $1,500 in non-financial loss compensation.
2.4 Why is the outcome fair?
The determination is fair as it accepts the insurer is entitled to settle the claims by way of a
cash settlement. However, it also finds the insurer is to increase the level of indemnity it is to
accept under the claims and pay non-financial loss compensation to the complainant.
Determination | Case number: 856702 Page 8 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy wording
How we settle building claims
We will aim to use a member of our supplier network to repair or rebuild the
damage to the building. Sometimes, this is not always possible e.g. if there is pre-
existing damage. This will determine how the building claim will be settled.
When a me mber of our supplier network is unable to complete the repair or
rebuild and you have a building sum insured
When your claim for loss or damage to the building is covered and a member of
our supplier network is unable to complete the repair or rebuild, we will ask you to
Determination | Case number: 856702 Page 9 of 9
engage a builder to provide a scope of works and provide a quote on the cost to
repair or reb uild the building on a ‘new for old’ basis.
Once the scope of works and quote is provided to us, we will arrange for it to be
assessed. This will involve reviewing the quote to determine it is appropriate and
reasonable for the scope of works. This includes a consideration of the
appropriateness of materials, repair method, labour and material costs and overall
cost effectiveness.
If the quote is appropriate and reasonable for the scope of works, we will then pay
you the assessed amount. If it is not, the quote may be adjusted. This may
include, adjusting the scope of works or the quote. We will then pay you the
adjusted amount of the quote.
If we pay you for the repair or rebuild, the Lifetime guarantee on building repairs
does not apply, see page 84.
3.3 AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate
the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has occurred to
the Complainant’s feelings or humiliation has been suffered by the Complainant;
or
b) for other complaints – an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with the Complainant’s
expectation of enjoyment or peace of mind has occurred.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.