Home / Suncorp Group / Determination 856702

Determination 856702

Cash settlement of water damage claims and adequacy of final settlement offer

FirmSuncorp Group
Decided2023-02-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$61,781
Non-financial loss$1,500
Amount claimed$87,493
SourceAFCA PDF

Summary

The complainant made water damage claims under a home insurance policy and the insurer sought to cash settle them after identifying maintenance issues. AFCA found the insurer could cash settle but required it to increase the settlement to include mould remediation and related damage, and to pay $1,500 non-financial loss.

The policy allows the insurer to cash settle where its preferred builder cannot complete repairs, but the settlement must cover all damage accepted under the claims, including mould damage caused by the accepted leaks.

Issues

Subjects and remedies

financial hardshiphome or building damagepay claimpay compensationpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 856702 Financial firm AAI Limited Determination | Case number: 856702 Page 1 of 9 Case number: 856702 8 December 2022 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy (policy) with the financial firm (insurer). In October 2021, the complainant lodged a claim (claim 1) for water damage to the insured property caused by a burst flexi hose in the main bathroom vanity. During restoration works, a second leak was identified to the laundry breach, resulting in a second claim (claim 2). The insurer has accepted the claims. However, it is limiting its liability to damage it accepts to be due to the leaks. The insurer is seeking to cash settle the complainant because it says it cannot complete the repairs due to pre-existing maintenance issues noted to the showers in the main bathroom and ensuite. The insurer says these issues with the showers and repairs to the laundry breach are maintenance works, which are not covered under the policy. The complainant wants the insurer to complete all the works and does not want to be cash settled. 1.2 Issues and key findings Is the insurer entitled to cash settle the complainant? Yes. The insurer, in line with the policy provisions, is entitled to choose to cash settle the complainant under the claims. Is the insurer’s final claims settlement offer fair? No. The insurer is to increase its final settlement offer for the claims to include additional works including mould remediation and associated damage to the insured building. Is the complainant entitled to non-financial loss compensation? Yes. The insurer is to pay the complainant $1,500 in non-financial loss in line with the AFCA Rules. Why is the outcome fair? The outcome is fair as it accepts the insurer is entitled to settle the claims by way of a cash settlement. However, it also finds the insurer is to increase the level of indemnity it is to accept under the claims and pay non-financial loss compensation to the complainant. 1.3 Determination This determination is in favour of the complainant. The insurer is to pay the complainant $61,781.45, inclusive of a 15% contingency payment, less the applicable policy excesses within 14 days of receiving notice of the complainant’s acceptance of this determination. Determination | Case number: 856702 Page 2 of 9 Further, the insurer is to also cover the complainant for a further 10 weeks temporary accommodation to allow him to arrange for repairs and return the home to a habitable condition. The insurer is to pay the complainant $1,500 in non-financial loss within 14 days of receiving notice of the complainant’s acceptance of this determin ation. Determination | Case number: 856702 Page 3 of 9 2 Reasons for determination 2.1 Is the insurer entitled to cash settle the claims? Yes. The available information shows there are maintenance related repairs which prevent the insurer from being able to complete and warrant repairs to be accepted under the claims. Therefore, in line with the policy wording, the insurer is entitled to choose to cash settle the claims. Policy allows the insurer to choose to cash settle its liability under a claim The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘ Escape of liquid and Exploratory costs ’. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). There is no dispute the insured building has suffered damage due to two separate leaks and which triggers cover under the policy. I accept, given there are two separate leaks, that is it reasonable that the damage be assessed and covered under two separate claims, subject to the two excess contributions from the complainant. The policy informs how the insurer will settle building claims. This includes but is not limited to the option to cash settle the claimant in certain circumstances such as if there exists pre- existing damage. The relevant policy wording has been provided in section 3 of this determination. The policy says, where the insurer’s preferred builder is unable to complete repairs under a sum insured building contract of insurance, the insurer will ask the claimant to engage a builder. This builder will be asked to provide a scope of works and quote on the cost of repairs. The insurer will then assess this information to determine if it is appropriate and reasonable including the materials, repair method, labour and overall cost effectiveness. If the insurer finds the quote reasonable, it will pay the claimant the assessed amount. However, if not, it may adjust the quote and pay the adjusted amount of the quote. The available information shows there were pre-existing maintenance issues The available information shows there exist maintenance related issues to the two shower (ensuite and main bathroom) recesses causing them to leak. Further, that the laundry breach also required repairs, which is not covered under the policy . I note the insurer’s appointed builder ‘AM’, list s the recommended maintenance works as: Work required to fix the leaks: • Bathroom Structural drying needed underneath shower base from walk in robe side Caused from burst Flexi connection silicon seal shower screen replace both flex connections on vanity basin Determination | Case number: 856702 Page 4 of 9 • Ensuite silicon seal shower screen recommend replacing flex connections on vanity as they have rust spots. • Powder room recommend replacing flex connection on toilet as it ’ s got rust spots. • Laundry laundry breach piece needs to be replaced • Back garden tap steel socket needs to be replaced with brass It is fair to permit the insurer to cash settle the claims I am satisfied the available information shows the above noted maintenance related works are required. I am also satisfied that these costs are excluded from cover under the policy and remain the responsibility of the complainant. I accept the information from AM shows the resultant water damage to the insured building cannot be repaired until such time as these maintenance works are completed. Further, that AM would not be able to obtain a post remediation verification certificate and therefore warrant repairs whilst these maintenance works remain outstanding. I note the complainant was allowed the opportunity to arrange the required maintenance work. He completed some of the works but refuses to complete other aspects of the works based on his opinion they relate to the burst flexi hose in the main bathroom. Given this, the insurer has elected to cash settle the complainant under the claims. The complainant provided three scopes of works and associated quotes from builders ‘ M ’, ‘G’ and ‘GC’. I note the scope of works and quote from M has been found to be the more de tailed and favoured by the parties. The scope of works and quote from M has been discussed in detail at section 2.2 below. Given the above, I am satisfied it is fair in all the circumstances to permit the insurer to exercise its right to cash settle the claims. On balance, it has been shown it is not in a position to authorise and guarantee the repairs due to the existing maintenance related issues with the showers and laundry breach. 2.2 Is the insurer’s final claims settlement offer fair? No. Although the insurer is not required to accept M’s scope of works and quote in their entirety. The insurer is to increase its final claim settlement offer to include cover for all the damage it is required to accept under the claims. Determination | Case number: 856702 Page 5 of 9 The scope of works and quote from M were excessive The complainant has provided a scope of works and quote for repairs for the damage he is seeking cover for under the claims. A quote has been provided by builder M dated 14 April 2022, in the amount of $87,492.90. The insurer says the quote does not provide adequate details to allow it to be assessed for its reasonableness and cover under the policy. The insurer says there are works included in the quote which are unrelated to the insured events giving rise to the claims, and therefore not covered under the policy. I have carefully considered M’s scope of works and quote. I accept they include damage and/or repairs to areas that have not been shown to have been damaged by the leaks giving rise to the claims, such as:  Complete replacement of the installation of a new kitchen at a cost of $18,890.00. There is no information to support these works are required due to damage from the leaks. The information only shows damage to the laminate kickboards, which can be repaired  Installation of new curtains/drapes at a cost of $9,482.00. There is no information to show the curtains were damaged by the insured events. Rather, the information shows the curtains have been removed and are in storage with other contents items  Supply and install a new front door at the cost of $1,450.00. There is no information to show the front door was damaged by the insured events. I accept the insurer has shown M’s quote includes works which are not covered under the claims. However, I am not satisfied the insurer, in line with its obligations under the policy, has provided an assessment of the remaining works and associated costs. There is an absence of any persuasive information to show M’s costings and remaining leaks related works are excessive or unreasonable. Rather, the insurer’s assessment of M’s quote in its report dated 19 August 2022 confirms M’s costings for flooring repairs, replacement of vanities and security door cost etc are fair and reasonable. I acknowledge the insurer says there are not enough details in the quote relating to repairs such as the plaster work, painting works, replacement of door jambs, architraves and skirting etc. However, I am not convinced by the insurer’s position that it was not able to complete a reasonable assessme nt of M’s quote. This is because, other than the areas claimed which were not related to the leaks, the remaining areas and extent of damage is not in dispute. Therefore, in my opinion the insurer was in a position to assess M’s scope of works and costs and provide compelling information to show why it should be considered unreasonable. Further, there is no information indicating the insurer made any effort to communicate with M to seek clarification and/or discuss the scope of works and quote. This is despite the insurer having been made well aware of the fact the complainant was experiencing difficulty in coping with matters under the claim. The insurer’s SOW and quote s do not include all claimable damage The insurer in seeking to settle the complainant’s claim , relies on scopes of work and associated quotes from AM. This is despite the policy provisions advising that the insurer will cash settle a claim based on a quote from the claimant’s preferred repai rer where its appointed repairer is unable to complete the repairs accepted under a claim. Regardless, having considered all the information, I am not satisfied the scopes of work and therefore cash settlement offer from the insurer fulfils its obligations under the policy. This is Determination | Case number: 856702 Page 6 of 9 because the cash settlement is not based on quotes that include all the damage the insurer should be accepting under the claims. The quotes from AM do not appear to include the works and associated costs required to complete mould remediation works as well as mould damage or damage caused in the course of the mould remediation. It seems the insurer is of the view that it is not required to cover the mould remediation works as it says this is not due to the two leaks giving rise to the claims. The insurer says the mould is because of the pre-existing issues with the showers and the long-term leaking laundry breach. I am not satisfied the available information supports this position. It is not in dispute the laundry breach is an insured event and the insurer has accepted to cover the damage due to this leak (just not the cost to replace laundry breach). Given this, it is hard to understand how the insurer then seeks to distance itself from the mould that has admittedly developed because of this leak. I note in the information provided by AM, relevant to the mould issue, it says there was mould found to the hallway wall, in the laundry, linen cupboard, loungeroom wall, walk in robe and main bathroom wall adjoining the ensuite. AM says in its opinion the mould infestation relates to:  a previous event for which a claim had been lodged and accepted in around 2014; and  water underneath the bathroom shower base from the burst f lexi connection which hasn’t dried out from structural drying. Further, I note AM says based on the evidence collected, it is not of the view that the water damage noted to the insured building is due to the leaking showers. Also, that the laundry breach has leaked into the wall cavity which has caused the mould damage to laundry walls, linen cupboard and lounge room wall. Without compelling information to the contrary, I am satisfied it is reasonable to accept the leaks giving rise to the two claims are the reason for the mould infestation and associated damage to the insured building. Accordingly, it is fair in all the circumstances to require the insurer to accept liability for the cost to remediate the mould as well as any associated damage under the claims. The insurer is to increase its final claim settlement offer For the reasons discussed above, and in the interest of bringing finality to this complaint, I accept it is fair to require the insurer to cash settle the claims based on M’s quote, not including the works which have been shown to be unrelated to the leaks giving rise to the claims. This is because it is clear AM’s quotes do not include the damage relating to the mould. Also, M’s quote is the mo re recent and, in my opinion, a fairer reflection of the current costs of labour and materials. I determine the insurer is to cash settle the claims based on the cost of repairs totalling $53,723.00. This is based on M’s quote but not including the works which have been deemed to be unrelated to the leaks. Also, it includes repairs to the kitchen kickboards based on the cost of repairs noted in AM’s quote and a 15% uplift to allow for contingencies and transfer of risk to the complainant in arranging the works. In the interest of completeness:  the insurer is entitled to apply the separate policy excess payments to both claims, which can be deducted from the final claims settlement payment Determination | Case number: 856702 Page 7 of 9  the insurer is to continue to cover and/or cash settle the complainant for further 10 weeks of temporary accommodation. This is to allow the complainant reasonable time to arrange repairs and return the home to a habitable condition. 2.3 Is the complainant entitled to compensation? Yes. The insurer’s overall management of the claims has resulted in the complainant experiencing undue delays, stress and physical inconvenience. The insurer is to pay the complainant $1,500 in non-financial loss compensation. Insurer to pay $1,500 in non-financial loss compensation The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. In this instance and considering AFCA’s approach to compensation, I accept the insurer’s overall management of the claim has resulted in an unreasonable delay in bringing this matter to conclusion. Further, that this has caused the complainant to experience an undue level of stress, anxiety and physical inconvenience. I accept, as discussed above, the insurer was entitled to limit its liability under the claims as well as offer to cash settle the claims. However, the available information shows, there was a failure to ensure adequate assessments of the damage in the first instance. This resulted in further damage and maintenance related issues being identified later than they should have been. Th information shows this resulted in repairs, which had already commenced, and progress under the claims coming to a stop. I am of the opinion the insurer’s assessment of its liability regarding the mould issue was not fair in all the circumstances and contributed to a breakdown in the relationship between the parties. It is clear from the communications between the parties that the complainant was having trouble managing and/or coping with the claims. I find it is unreasonable that the insurer failed to recognise this and assist the complainant in navigating the claim requirements. This includes a failure to communicate with M in an effort to establish the fair scope of works and repairs costs under the claims. In saying this, I also accept that it would not be fair to place all liability with the insurer and it was not the insurer alone that has contributed to the delays experienced under the claim. The available information shows the complainant did fail to co-operate at times and failed to complete the required maintenance works, when provided the opportunity to do so. I am satisfied this was contrary to his obligations under the policy. Having considered all the available information, I am satisfied it is fair to require the insurer to pay the complainant $1,500 in non-financial loss compensation. 2.4 Why is the outcome fair? The determination is fair as it accepts the insurer is entitled to settle the claims by way of a cash settlement. However, it also finds the insurer is to increase the level of indemnity it is to accept under the claims and pay non-financial loss compensation to the complainant. Determination | Case number: 856702 Page 8 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy wording How we settle building claims We will aim to use a member of our supplier network to repair or rebuild the damage to the building. Sometimes, this is not always possible e.g. if there is pre- existing damage. This will determine how the building claim will be settled. When a me mber of our supplier network is unable to complete the repair or rebuild and you have a building sum insured When your claim for loss or damage to the building is covered and a member of our supplier network is unable to complete the repair or rebuild, we will ask you to Determination | Case number: 856702 Page 9 of 9 engage a builder to provide a scope of works and provide a quote on the cost to repair or reb uild the building on a ‘new for old’ basis. Once the scope of works and quote is provided to us, we will arrange for it to be assessed. This will involve reviewing the quote to determine it is appropriate and reasonable for the scope of works. This includes a consideration of the appropriateness of materials, repair method, labour and material costs and overall cost effectiveness. If the quote is appropriate and reasonable for the scope of works, we will then pay you the assessed amount. If it is not, the quote may be adjusted. This may include, adjusting the scope of works or the quote. We will then pay you the adjusted amount of the quote. If we pay you for the repair or rebuild, the Lifetime guarantee on building repairs does not apply, see page 84. 3.3 AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.