Determination 856227

Partial decline of liquid damage claim (drainage works excluded) and defective repairs; cash settlement of rectification, non-financial loss and extra rent

FirmHo llard Insurance Partners Limited
Decided2023-03-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$4,000
Non-financial loss$5,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's building claim for liquid damage involved repeated defective repairs and a drainage issue the insurer said was not covered. AFCA found drainage excluded but ordered a cash settlement of rectification costs with 20% uplift, $5,000 non-financial loss and $4,000 further rent.

Drainage problems fall within the faulty workmanship/structural defect exclusion, but the insurer failed to adequately rectify its defective repairs and must pay the cost of doing so.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay non financial loss

Related

Find similar determinations

Text of the determination

Determination Case number 856227 Financial firm Ho llard Insurance Partners Limited Determination | Case number: 856227 Page 2 of 9 Case number: 856227 30 January 2023 1 Determination overview 1.1 Complaint The complainant held a Home Building Insurance policy with the financial firm (insurer). The complainant has held the policy since 11 October 2005. The policy has events-based coverage. The complainant lodged a claim on 4 February 2013 for damage caused by liquid. Rectification work was suggested in two stages. The initial repairs to the bathroom in the property were completed between 30 December 2017 and 19 February 2018. The complainant was not satisfied with the repairs and the insurer appointed an engineer (SB) to assess the further claim. SB found defective items which required rectification. The further repairs were completed on 20 November 2019. A geotechnical investigation was carried out on behalf of the insurer by (PE). This resulted in a recommendation that appropriate subsoil drainage should be installed to the property to divert water infiltration from the ground to the building. The insurer obtained a scope of works on 27 September 2021 in the sum of $52,800. The insurer says that the drainage issues are not covered by the policy. The complainant says that the bank required a building inspection at the time that finance was applied for. He says that the inspection was passed by the bank and that the property was then financed based upon that inspection. The complainant says that the insurer is associated with the bank. The complainant says that there have been four attempted repairs due to the failure of performing the repairs in a workmanship manner. The complainant is still residing in rented accommodation currently paid for by the insurer. 1.2 Issues and key findings Is the insurer required to compensate the complainant for his total claim? On the information provided to me, on balance, I am satisfied as follows:  the insurer has not completed all repairs to the premises that are covered under the policy  the requirement to undertake the provision of further site drainage is not covered under the terms and conditions of the policy  the insurer has failed to adequately rectify the repairs to the defective repairs  the rectification of repairs to the property cannot commence until after a drying out period of approximately 12 months.  The drying out may be affected by the state of the drainage.  The issue raised of the bank inspection of the property is not the responsibility of the insurer. The determination is partially in favour of the complainant. The insurer is to pay for the cost of repairs as per (AA)'s findings. Given the effluxion of time, the insurer is to obtain an up to date quotation based on AA’s report. Determination | Case number: 856227 Page 3 of 9 It is acknowledged that these repairs cannot be carried out until such time as the property has dried out. The complainant has not carried out the site drainage rectification and it is appropriate that this matter be cash settled. The insurer is to pay an uplift of 20 per cent to cover contingencies and loss of guarantee based upon the new quotation. Is the complainant entitled to non-financial compensation? The insurer has offered a payment of $5,000 in recognition of the complainant’s claims handling experience. On the information provide I am satisfied this is an appropriate amount. Is the complainant entitled to further rental accommodation? The insurer has continued to pay rental accommodation for the complainant. The insurer has exceeded the rental provisions under the policy. It is fair that the insurer pays one further amount of $4,000 towards the complainant’s rental . Why is this outcome fair? The complainant has been given sufficient time to obtain information in relation to the drainage. The insurer has a requirement to complete the repairs, but to require compensating the complainant further and, in particular to pay for the drainage works would be unfair as it is not required under the policy. Given the circumstances it is appropriate this matter be cash settled. 1.3 Determination This determination is partially in favour of the complainant. The insurer is to settle the matter as set out in 2.1, 2.2 and 2.3 hereof. Determination | Case number: 856227 Page 4 of 9 2 Reasons for determination The complainant first lodged a claim in 2013 for Liquid Damage. Following the completion of repairs, the complainant did not sign off on the repairs completed in 2019 due to the complainant’s dissatisfaction with the works done by the insurer’s builder (AB ). The complainant is dissatisfied that they have been provided with a $52,000.00 quote for site drainage after ongoing issues with repairs to their bathroom and that they are unable to afford these repairs. The complainant also says repairs completed by C IL’s builders in 2019 is affecting the mold growth within his home. 2.1 Is the insurer required to compensate the complainant for his total claim? Insurer obtained expert reports The insurer assessed the property and repairs were carried out in two stages. Stages 1 (stabilizing foundations) and 2 (resultant damage repairs) of the repairs were completed in 30 December 2017 and 19 February 2018 respectively. The complainant claimed faulty workmanship for bathroom repairs and subsequently the insurer appointed an engineer P to review the quality of repair works. The findings were as follows: Our summary of the above opinions is as follows:  5.1. Based on discussions with the Insured, observations and relevant findings, I find the following items defective and require rectifications:  5.1.1. Bathroom vanity spout.  5.1.2. Bathroom towel rail.  5.1.3. Missing grout and flexible sealant on and around the tiled bath enclosure.  5.1.4. Cracked floor tile below the latch side of the door jamb of the bathroom door.  5.2. In regard to the two damp sections of grout on the floor, I am of the opinion that the cause of these damp areas requires further investigation and monitoring and have made no allowance for this in the scope of works. AJG was appointed to undertake rectification works as the complainant did not want the previous repairer AB to undertake any further works to the home. AJG advised further investigation was required however, it could proceed with minor rectification works. The rectification works were completed 20 November 2019. The insurer appointed assessor AA to assess the home and SF to determine the drainage repairs. The findings were as follows: The SF assessment completed 25 April 2021 provided the following conclusion:  The branch between the kitchen sink and the main drain has been heavily block for a long duration and this is evident in the high scum/stained marks in the drain.  The branch between the kitchen sink and the main drain branch has a form of residue that is stuck to the side of the pipe and did not break free after the jet cleaning was carried out.  The residue sited in the drain branch to the kitchen sink is consistently along the drain under the bathroom. Determination | Case number: 856227 Page 5 of 9  Out location and depth testing found the drain between the wall of the vanity and robe of the rear bedroom (3mt distance) has approximately 10mm of fall. Whist this is approximate we can confirm the camera head where the depths are taken from were firm on the base of the 100mm pvc at the time of them depths being taken.  Minimum gradient over 3mt of sewer drainage is 50mm indicating the drain may have subsided.  A probe test through the point of injection in the bathroom concrete slab found a cavity of approximately 300mm. This is approximately 1 mt from the drain location and may have contributed to the subsidence of the drain. The conclusion for the AA dated 29 April 2021 report states: Evidence available at time of inspection suggests as follows:  3.1 Mould remediation works undertaken following the initial burst pipe event (within bath cavity) were inadequate and well below the duty of care required under IICRC- S520.  3.2 Water damaged and mould contaminated porous linings remained in-situ that should have been removed and replaced. In addition, some porous linings had been encapsulated with paint that is in contradiction to IICRC-S520 and displays a knowledge of mould affected materials that were not removed.  3.3 Mould contaminated structural members had been encapsulated with paint, which is allowed under IICRC-S520 as a last resort. However, some faces of mould contaminated bottom plate surrounding the shower recess was not encapsulated due to nil access with the shower base installed.  3.4 The insert bath had been installed in contradiction to AS3740-2010 with nil water- stop installed under the bath lip.  3.5 Water damage and mould contamination had occurred to the vanity cabinet necessitating replacement of the cabinet. It is unclear as to which event had caused the vanity cabinet damage.  3.6 Considering the above and requirements of AS3740-2010, the entire Bathroom and up to 1200h within the adjoining W.C. will require renovation throughout, including appropriate mould remediation and in all probability replacement of some framing components.  3.7 Rectification of Bathroom and W.C. will invariably impact on adjoining Bedroom and Family Room. Appropriate containment will be required segregating these areas from remaining areas within the home prior to rectification and mould remediation works commencing.  3.8 The concrete floor slab presents as a raft slab construction. Original working drawings and documentation should be obtained to confirm slab construction.  3.9 Upon confirmation that the slab is a raft slab construction, the void identified under the Bathroom area presents as a concern, particularly if the void is sizeable.  3.10 Drain clearing and subsequent CCTV drainage camera inspection identified minimal gradient to a section of main sewer line located under and in proximity to the Bathroom. In addition, CCTV also identified an unusual substance within the line under and in proximity to the Bathroom that could not be removed with 5000psi of pressure from a jet cleaner, even after repeated passes.  3.11 The unusual substance does not present as a plumbing product utilised in typical drainage installations, and the colour and texture is consistent with resin injection based on the writers’ previous experience of resin injection.  3.12 Considering the void, minimal gradient of the sewer line and unusual substance with the line are all under or within proximity to the Bathroom, evidence available suggests these issues have a correlation to the original burst pipe event and / or subsequent rectification works. Determination | Case number: 856227 Page 6 of 9  3.13 Unfortunately, all avenues other than invasive wor ks have been exhausted to provide categoric information in relation to the above issues surrounding and under the Bathroom area. In the event property insurers require further information (and upon confirmation the slab is a raft slab and upon approval fro m a structural engineer), opening the slab within the Bathroom to view the void and physically accessing the sewer drainage will be required. Insurer obtained expert assessment of drainage P Engineering was appointed by the insurer to undertake a geotechnical investigation to determine the soil profile and moisture regime across the site. The summary of P Engineering’s assessment states: Based on our findings in Section 11 above, it is our opinion that the water retention on site is largely due to compromised site-cuts during the construction process. 1. Typically, site cut on the natural impermeable silty clay should be graded away from footings to ensure natural site drainage does not result in water ponding under and around the footings. 2. It is likely that the natural topography of the site (towards the west) was not adjusted and fill was placed on this natural grade to create a level building platform. 3. With such subsoil grading maintained, any dip or localised cuts within the building footprint could result in water ponding. We recommend that appropriate subsoil drainage be installed at the interface of the fill and natural silty clay to divert water infiltration from the ground. The subsoil drainage can comprise of aggy-pipe wrapped in filter sock and backfilled with drainage gravel to encourage water permeability into the system. Due to the waffle slab system founded on existing ground level, the depth of the excavation and invert of the drain must be at least the same distance equivalent away (or 45 degrees zone of influence) from the footings to avoid undermining the footings. Installation of a concrete (or similar) apron grading away from the walls/footings is also recommended. We also recommend that the subsoil drain for the retaining wall parallel to and facing B Drive be checked for the following: 1. Fully functional; and 2. Installed at the correct depth and grading in comparison to the fill and natural interface. If any of the above are found to be defective, additional subsoil drainage at this location should also be considered. We envisage that a drying out period of at least 12 months be commissioned to allow for moisture equilibrium to occur. A 6-monthly monitoring program comprising of floor level survey and moisture content samples could be beneficial for progress data and confirmation of the drying out period. After P provided their report, SF had provided a scope of works to fix the subsoil drainage, on 27 September 2021. This scope of works was worth $52,800.00 Complainant says the insurer as part of the financing bank is responsible for the drainage works Determination | Case number: 856227 Page 7 of 9 The complainant says the insurer’s findings were that drainage works are required under the slab and this is due to poor construction and should have been pick up at building inspections. The complainant says they had undertaken all requirements by the Bank prior to purchasing the home including applying for finance for the property through the Bank and appointing a building inspection. The complainant says the inspection was passed by the Bank Building Inspector and the Bank then financed the loan. The complainant says he relied on this inspection therefore the insurer and the Bank should pay for these repairs. This is an issue with the bank and is not covered under the policy. No information has been provided by the complainant to show that the problem with the drainage is covered under the terms of the policy. Further as the insurance policy is to be viewed as an entire document and the policy is independent of the Bank the complainant needs to direct this complaint to the bank. The complainant has been given the opportunity to provide expert opinion to support his claim that the drainage issues are covered by the policy but has failed to do so. Relevant exclusions under Product Disclosure Statement(PDS) The customers PDS states on page 18 under heading ‘The policy doesn’t cover everything’ subheading ‘General exclusions – apply to the overall policy’: Unless included in additional cover, we will not cover loss, damage or legal liability caused by:  structural defects and faulty workmanship in the construction of the building or lack of maintenance to the building and/or contents; I am satisfied that nothing has been provided which, on balance, shows the state of the drainage is covered by the policy. Whilst I am sympathetic to the complainant this is an issue which he is responsible to rectify. Complainant says more damage has occurred The complainant says the delay has led to more damage. Nothing has been provided to confirm this statement. Insure to cash settle the claim I am satisfied on the information provide, on balance, that the insurer is required to rectify the repairs as per AA report. However, given the effluxion of time since that report the insurer is to arrange a scope of work (SOW) for the rectification and a quotation. A difficulty has arisen because it appears that a period of drying is required, however this cannot take place until the drainage works are not completed. I have already held that these works are not covered under the policy. In the circumstances it is appropriate that this matter be cash settled. The insurer is to uplift a cash settlement by 20 % to cover contingencies and loss of guarantee. Determination | Case number: 856227 Page 8 of 9 The insurer is to obtain a quotation for the repairs within 14 days of acceptance of this determination and to pay the cash settlement within 14 days of receipt of the quotation. 2.2 Is the complainant entitled to non-financial compensation? Insurer to pay non-financial compensation The conduct of the insurer and the poor quality of the repair work warrants the award of non- financial compensation. The insurer has paid accommodation beyond the period required under the policy however I am satisfied that an award of $5,000 is appropriate. The insurer is to pay $5,000. 2.3 Is the complainant entitled to further rental accommodation? Insurer to pay a further $4,000 The insurer was required to pay rental accommodation for a period of 52 weeks, under the policy. This has been exceeded. The complainant advised me, in September 2022, that he was obtaining a report in relation to the drainage. Despite a further request he has failed to provide the report. The insurer has been reasonable in providing extra rental accommodation. On the basis of fairness the insurer should pay a further sum of $4,000. Determination | Case number: 856227 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.